I HEMANOTE CONSULTANTS 15-17 SMITH STREET, RYDE PROPOSED CHILDCARE CENTRE TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B) APRIL 2017 HEMANOTE CONSULTANTS TRAFFIC ENGINEERING & DESIGN CONSULTANTS SUITE 20, LEVEL 2, 215-219 GEORGE STREET, LIVERPOOL NSW 2170 CONTACTS: 0414 251 845 & 0414 445 497 EMAIL: [email protected]
Transcript
Page 1: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

I

HEMANOTE CONSULTANTS

15-17 SMITH STREET, RYDE

PROPOSED CHILDCARE CENTRE

TRAFFIC & PARKING

IMPACT ASSESSMENT

(REVISION B)

APRIL 2017

HEMANOTE CONSULTANTS

TRAFFIC ENGINEERING & DESIGN CONSULTANTS

SUITE 20, LEVEL 2, 215-219 GEORGE STREET, LIVERPOOL NSW 2170

CONTACTS: 0414 251 845 & 0414 445 497

EMAIL: [email protected]

Page 2: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

II

TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

15-17 SMITH STREET, RYDE

PROPOSED CHILDCARE CENTRE

DATE: 03 APRIL 2017

DISCLAIMER

All information and material contained in this report is the property of Hemanote Consultants. It is solely based on the instructions of our client and the findings of Hemanote Consultants and is not intended for use or should not be relied upon by any third party. No responsibility is undertaken by Hemanote Consultants to any third party.

Any use, copying, reproduction or retransmission of the information and material in this report, in whole or in part, is not permitted without the written consent of Hemanote Consultants.

Page 3: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

III

Table of Contents

1 INTRODUCTION .......................................................................................................... 4

2 EXISTING SITE DESCRIPTION ................................................................................... 5

3 EXISTING TRAFFIC CONDITIONS .............................................................................. 7

3.1 Road Network and Classification .......................................................................... 7

3.2 Road Description and Traffic Control .................................................................... 7

3.3 Current Traffic Flows .......................................................................................... 10

3.4 Existing Transportation Services ......................................................................... 12

4 PROPOSED DEVELOPMENT .................................................................................... 13

4.1 Description of the proposal ................................................................................. 13

4.2 Vehicular & Pedestrian Access ........................................................................... 13

4.3 On-site Parking Provision ................................................................................... 14

4.4 On-site Parking Layout and Circulation ............................................................... 14

5 ON-STREET PARKING PROVISION .......................................................................... 16

5.1 Existing Parking Controls .................................................................................... 16

5.2 Parking Utilisation Survey ................................................................................... 16

5.3 Impacts of Proposed Development on Parking .................................................... 16

6 EXTERNAL TRAFFIC IMPACT .................................................................................. 17

7 CONCLUSION ............................................................................................................ 19

Appendix A – Proposed Development Plans.................................................................... 20

Appendix B – Vehicle Swept Path Diagrams.................................................................... 22

Appendix C – SIDRA Intersection Analysis ...................................................................... 32

Appendix D – Traffic Volume Intersection Counts ............................................................ 39

Page 4: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 4

1 INTRODUCTION

This revised report has been prepared by Hemanote Consultants to assess the traffic

and parking implications of the proposed childcare centre to be located at 15-17

Smith Street, Ryde for 40 children between the ages of 0 to 6 years old.

This report is to be read in conjunction with the revised architectural plans prepared

by Sydney Access Consultants (reduced copy of the plan attached in Appendix A)

and submitted to the City of Ryde as part of a Development Application.

This report is set as follows:

Section 2: Description of the existing site location and it use;

Section 3: Description of existing traffic conditions near the subject site;

Section 4: Description of the proposal, vehicular access and on-site parking

provision, layout and circulation;

Section 5: Assessment of the on-street parking conditions and utilisation near the

subject site; and impacts on parking;

Section 6: Assessment of Impacts on traffic near the subject site; and

Section 7: Outlines Conclusions.

Page 5: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 5

2 EXISTING SITE DESCRIPTION

Site Location

The subject site is located on the eastern side of Smith Street, at property No. 15-17

and north of intersection with Watt Avenue, within the suburb of Ryde. The site has a

frontage of approximately 18.3 metres to Smith Street from the west and 45.7m

metres to Watt Avenue from the south. Refer to Figure 1 for a site locality map.

Figure 1: Site Locality Map

Existing Site Land Use

The subject site has an area of approximately 836m2 and currently has a single-

storey dual occupancy residential dwelling.

The site is located in a mainly residential area characterised by a single dwelling

houses and residential flat buildings and in close proximity to Top Ryde City

Shopping Centre and Ryde Park.

SITE

Page 6: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 6

Photo 1: The subject site frontage to Smith Street

Photo 2: The subject site frontage to Watt Avenue

Page 7: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 7

3 EXISTING TRAFFIC CONDITIONS

3.1 Road Network and Classification

Smith Street is a local street running northeast-southwest between Pope Street (local

road) and Buffalo Road (local road). Watt Avenue is a local road running east-west

between Smith Street (local road) and a cul-de-sac end.

3.2 Road Description and Traffic Control

Watt Avenue is a two-way undivided carriageway, with a width between kerbs of

approximately 10 metres. It generally provides one travel lane per direction, with

kerbside parking lanes on both sides of the street, where unrestricted parking is

permitted along the north side and 2-hour parking is along the south side. At present,

there are seven on-street car parking spaces along the frontage of the subject site to

Watt Avenue.

Watt Avenue forms a T-intersection with Smith Street which is controlled by ‘Give

Way’ controls, with priority given to traffic along Smith Street. The legal speed limit on

Watt Avenue and Smith Street is 50 km/h.

Figure 2: Aerial photograph of the subject site and surrounding road network

SITE

Page 8: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 8

Photo 3: Watt Avenue – facing northwest

Photo 4: Watt Avenue at its junction with Smith Street – facing southeast

Page 9: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 9

Photo 5: Smith Street – facing southwest

Photo 6: Smith Street – facing northeast

Page 10: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 10

3.3 Current Traffic Flows

A traffic volume count was undertaken by Engdata Services at the intersection of

Smith Street / Watt Avenue at the subject site on Thursday 28 July 2016 during

morning peak periods (7.00am to 10.00am) and afternoon peak periods (3.00pm to

6.00pm) considering the childcare centre proposed hours of operation and traffic

peak periods.

The traffic flows on Watt Avenue and Smith Street in the morning & afternoon peak

hours are attached in Appendix ‘D’ and shown in Table 1 below.

Traffic

Movement

Morning Peak Hour

(Vehicles Per Hour)

Afternoon Peak Hour

(Vehicles Per Hour)

8.30am – 9.30am 5.00pm – 6.00pm

Watt Avenue

Eastbound 28 41

Westbound 27 32

Smith Street

Northbound 255 307

Southbound 364 535

Table 1: Current traffic flows on Watt Avenue and Smith Street at the subject site (on a

typical weekday)

The results of the traffic volume counts undertaken determined that the traffic

morning peak period on Watt Avenue and Smith Street was between 8.30am to

9.30am and the afternoon peak period was between 5.00pm to 6.00pm on a typical

weekday.

The traffic flows on Watt Avenue and Smith Streets are considered to be appropriate

for a local road in a residential street that is in close proximity to a commercial area,

where traffic is free flowing without any major queuing or delays in peak hours.

Page 11: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 11

It is determined that the current Level of Service on Watt Avenue is ‘A’ and on Smith

Street is ‘B’, in accordance with Table 4.4 of the Roads & Maritime Services’ “Guide

to Traffic Generating Developments - 2002” (attached below).

Table 4.4: Urban road peak hour flows per direction (RMS Guide)

A SIDRA intersection performance analysis for the intersection of Smith Street / Watt

Avenue was undertaken by Bitzios Consulting for the pre-development and post-

development situations. Refer to the summary report form the analysis attached in

Appendix ‘C’.

It has also been determined that the current operational performance of the

intersection of Smith Street / Watt Avenue is in ‘Good operation’ at a Level of Service

‘A’, in accordance with Table 4.2 of the Roads & Maritime Services’ “Guide to Traffic

Generating Developments - 2002” (attached below) with an average delay of less

than 14 seconds per vehicle.

Table 4.2 : Level of Service Criteria for intersections (RMS Guide)

Page 12: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 12

3.4 Existing Transportation Services

The subject site has good access to public transport services in the form of trains and

buses.

The site is located approximately 2.1km from Meadowbank Railway Station and

2.3km from West Ryde Railway Station.

Regular bus services operate along Lane Cove Road and Buffalo Road in the vicinity

of the subject site (i.e. bus routes 50 and 5187).

Figure 3: Bus services near the subject site

SITE

Page 13: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 13

4 PROPOSED DEVELOPMENT

4.1 Description of the proposal

The proposal is for the construction of a new double-storey building at 15-17 Smith

Street, Ryde to be used as a childcare centre for 40 children between the ages of 0-6

years old.

The proposed development would consist of the following elements:

1. Childcare centre building accommodating a total of 40 children:

10 children between the ages of 0 to 2 years old (3 staff members);

10 children between the ages of 2 to 3 years old (2 staff member); and

20 children between the ages of 3 years and older (2 staff members).

2. Nine (9) off-street car parking spaces for staff and visitor/parent parking, including

one (1) accessible parking space for people with a disability.

There will be a maximum of seven (7) staff members at any given time. The

proposed hours of operation of the centre will be from 7.00am to 6.00pm on

weekdays only. Refer to Appendix 'A' for the proposed development plan.

4.2 Vehicular & Pedestrian Access

The vehicular access to and from the proposed on-site car parking area will be via a

new driveway crossing in Watt Avenue (replacing the two existing driveway crossings

in Smith Street and Watt Avenue).

The new driveway crossing is to be 5.5 metres in width and provides for two-way

vehicular movements, where two vehicles can pass each other in a forward direction

without causing any delays or congestion.

All vehicular access to be located in accordance with the requirements of

AS2890.1:2004, where adequate sight distance is provided.

A separate pedestrian gate and clearly defined path is provided from the front

boundary in Watt Avenue to the entrance to the proposed centre.

Page 14: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 14

4.3 On-site Parking Provision

Ryde Development Control Plan 2014, Part 9.3, requires off-street parking for

childcare centres to be provided at a rate of 1 car space per 2 employees and 1

space for every 8 children for parents/visitors for the drop-off and pick-up of children.

The proposed childcare centre is to have a maximum of 38 children and 6 employees

at any given time and on-site car parking is to be provided as shown in Table 2

below:

Age Group 0-2 years 2-3 years 3-6 years Total

Number of children 10 10 20 40

Number of Staff 3 2 2 7

Off-street parking required (4 spaces for staff & 5 spaces for visitors) 9

Off-street parking provided (4 spaces for staff & 5 spaces for visitors) 9

Compliance with on-site car parking Yes

Table 2: on-site parking provision

The proposed development provides a total of nine (9) off-street parking spaces on

ground level for staff & visitor parking, including one (1) accessible parking space for

use by people with a disability. Therefore, the on-site parking provided is

adequate in accordance with Council’s requirements.

It should be noted that there are some convenient on-street parking opportunities are

also available in Smith Street and Watt Avenue. It should also be noted that the

majority of the adjacent residential dwellings have their own off-street parking

facilities.

4.4 On-site Parking Layout and Circulation

The proposed layout of the on-site car parking area and manoeuvring arrangements

has been designed to enhance access and pedestrian safety. A dedicated and

clearly defined pedestrian gate/path is to be provided from Watt Avenue at the front

of the site, between the front fence and the entrance of the childcare centre building,

in order to segregate pedestrian and vehicle movements and improve safety within

the site.

Page 15: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 15

It is noted that the majority of staff members normally arrive at the childcare centre

before the children and leave the centre at the closing time after the children have

been picked-up by their parents/care takers.

AS2890.1:2004 Parking facilities Part 1: Off-street car parking requires a minimum

parking space width of 2.4 meters for class 1A (staff parking), 2.6 metres wide for

class 3 (visitor parking) and a minimum length of 5.4 meters for staff parking. The

proposed off-street car parking spaces have a minimum width of 2.5 metres for staff

parking and 2.6 metres for visitor parking and a length of 5.4 meters each, which is

adequate.

The accessible car parking space for people with a disability has a clear width of 3.48

metres. It should be noted that this space shall comprise a firm plane surface with a

fall not exceeding 1:40 in any direction (i.e. 2.5%) or 1:33 if the surface is a

bituminous seal and the parking space is out of doors.

Car parking spaces adjacent to walls/obstructions have been made wider than the

minimum width, to accommodate full door opening in accordance with Clause 2.4.2

(d) of AS2890.1:2004.

Clause 2.4.2 of AS2890.1:2004 requires a minimum aisle width of 5.8 metres for two-

way aisles, adjacent to 90o angle parking. The proposed aisle within the on-site

parking area has a minimum width of 6.1 metres, which is adequate for manoeuvring

into and out of parking spaces.

Pedestrian paths line markings can be provided within the car parking area and along

the fence and building line, to highlight to vehicles the presence of pedestrians and

direct pedestrians to a defined path away from vehicles. The accessible car space

will incorporate a 1m wide walkway adjacent to it, within the boundary of the subject

site.

All vehicles' manoeuvring within the site has been designed and checked using the

B85 design car turning path from AS2890.1:2004 and Austroads. Refer to the

attached vehicle swept path diagrams in Appendix ‘B’.

Therefore, the car parking layout and circulation are considered to be adequate

in accordance with AS2890.1:2004, where vehicles can enter and exit the site in

a forward direction.

Page 16: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 16

5 ON-STREET PARKING PROVISION

5.1 Existing Parking Controls

The subject site is located in a mainly residential area and in close proximity to Top

Ryde City Shopping Centre and Ryde Park. Unrestricted parking is permitted on

both sides of Smith Street including the frontage of the subject site. Unrestricted

parking is permitted along the north side of Watt Avenue, including the frontage of

the subject site, while 2-hour parking is along the south side of the street.

5.2 Parking Utilisation Survey

A parking survey was carried out by Hemanote Consultants in Smith Street and Watt

Avenue near the subject site, on a typical weekday in order to determine the

availability of on-street parking spaces and the current utilisation levels nearby the

subject site.

The parking survey was undertaken at 30 minute intervals on Thursday 28 July 2016,

during morning (7.00am to 9.00am) and afternoon (3.00pm to 6.00pm) peak periods,

considering the proposed hours of operation of the childcare centre and traffic peak

periods.

On-street parking spaces surveyed in the vicinity of the subject site were generally

moderate to highly utilised during the survey periods, with a moderate turnover rate

and some parking spaces being available. It should be noted that the process of

dropping-off and picking-up a child takes an average of between 7 to 10 minutes.

5.3 Impacts of Proposed Development on Parking

The parking demand resulting from the proposed childcare centre can be easily

accommodated within the proposed on-site parking area for staff and visitors, which

is provided in accordance with Council’s car parking requirements.

Therefore, the proposal will have no major impact on parking in the surrounding area.

Page 17: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 17

6 EXTERNAL TRAFFIC IMPACT

An indication of the potential traffic generation of the proposed development is

provided by the RMS Guide to Traffic Generating Development - 2002.

The Guide specifies the following traffic generation rates for long-day care centres:

0.8 peak period vehicle trips per child for two hours between 7.00am and 9.00am; and

0.7 peak period vehicle trips per child for two hours between 4.00pm and 6.00pm.

Therefore, the proposed childcare centre for 40 children has an estimated hourly

traffic generation as shown on the following table:

Type of developments on site Peak hour vehicle trips

AM Peak hour PM Peak hour

Childcare centre accommodating 40 children

32 28

It should be noted that the rate used by the RMS Guide is based on surveys of

childcare centres, where it was determined that the mean proportion of children

transported to the centre by car was 93% for long-day care centres.

It should also be noted that the process of dropping-off and picking-up a child takes

an average of between 7 to 10 minutes.

A SIDRA intersection performance analysis for the intersection of Smith Street / Watt

Avenue was undertaken by Bitzios Consulting for the pre-development and post-

development situations. The analysis concluded that the proposed childcare

development at the subject site would have little/marginal impact on the performance

of the intersection. Refer to the summary report form the analysis attached in

Appendix ‘C’.

The estimated peak period traffic generation is considered to be of low impact on

existing flows on Smith Street, Watt Avenue and surrounding road network. The

traffic generated by the operation of the proposed childcare centre will not alter the

current levels of service and additional traffic generated can be readily

accommodated within the road network.

Page 18: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 18

The potential increase in the number of vehicle movements in and about Smith Street

and Watt Avenue will remain well within the Environmental capacity of the street, with

no adverse impacts on the amenity of the area.

Page 19: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 19

7 CONCLUSION

It can be concluded from the traffic and parking impact assessment that the proposed

childcare centre to be located at 15-17 Smith Street, Ryde is adequate and will have

no major impacts on current traffic or parking conditions:

The traffic flows on Watt Avenue and Smith Street are considered to be

appropriate for local roads in an urban residential area that is in close proximity

to commercial properties, with free flowing traffic without any major queuing or

delay in peak traffic periods.

The external impact of the traffic generated by the proposal is considered to be

satisfactory and will not result in an unacceptable peak hour traffic generation.

A SIDRA intersection performance analysis for the intersection of Smith Street /

Watt Avenue was undertaken by Bitzios Consulting for the pre-development and

post-development situations. The analysis concluded that the proposed childcare

development at the subject site would have little/marginal impact on the

performance of the intersection.

The potential increase in the number of vehicle movements in and about Smith

Street and Watt Avenue will remain well within the Environmental capacity of the

streets, with no adverse impacts on the amenity of the area.

The subject site has good access to public transport services in the form of

regular bus and train services.

The level of on-site car parking provision is considered to be adequate and in

accordance with Council’s requirements.

The on-site car parking layout and circulation is adequate in accordance with

AS2890.1:2004, where vehicles can enter and exit the site in a forward direction.

The proposed development will have no major impact on parking.

Page 20: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 20

Appendix A – Proposed Development

Plans

Page 21: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 21

Page 22: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 22

Appendix B – Vehicle Swept Path Diagrams

Page 23: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 23

Page 24: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 24

Page 25: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 25

Page 26: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 26

Page 27: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 27

Page 28: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 28

Page 29: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 29

Page 30: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 30

Page 31: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 31

Page 32: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 32

Appendix C – SIDRA Intersection Analysis

Page 33: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 33

Page 34: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 34

Page 35: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 35

Page 36: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 36

Page 37: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 37

Page 38: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 38

Page 39: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 39

Appendix D – Traffic Volume Intersection

Counts

Page 40: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 40

Page 41: TRAFFIC & PARKING IMPACT ASSESSMENT (REVISION B)

Hemanote Consultants updated Traffic & Parking Impact Assessment – 15-17 Smith St, Ryde

03 April 2017 Page 41


Recommended