ACCESS TO WESTERN POWERS TRANSMISSION
NETWORKS
A USERS GUIDE
Transmission Division
363 Wellington Street
PERTH WA 6000
GPO Box L921PERTH WA 6842
Telephone: (08) 9326 6687
Facsimile: (08) 9326 6550
Version 1 - April 1998
8/13/2019 Transmission Userguide
2/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
\Z\19098PC.DOC
TABLE OF CONTENTS
1. SUMMARY................................................................................................................................. 1
2. INTRODUCTION....................................................................................................................... 1
3. MARKET ARRANGEMENTS IN WESTERN AUSTRALIA.................................................. 1
4. ACCESS RULES......................................................................................................................... 2
5. TECHNICAL CODE .................................................................................................................. 2
6. APPLICATION PROCEDURE.................................................................................................. 3
7. ACCESS ENQUIRIES ................................................................................................................ 3
8. TREATMENT OF LOSSES & BALANCING........................................................................... 4
8.1 LOSSES ........................................................................................................................................ 4
8.2 BALANCING ................................................................................................................................. 4
9. DESCRIPTION OF NETWORK ASSETS ................................................................................ 4
10. TRANSMISSION NETWORK PRICING ............................................................................... 5
11. NETWORK CHARGES ........................................................................................................... 5
11.1 CHARGES TO A LOAD USER......................................................................................................... 5
11.2 CHARGES TO A GENERATOR........................................................................................................ 5
11.3 CHARGES TO A GENERATOR WITH ON-SITE LOADS ...................................................................... 6
11.4 CHARGES TO A USER WITH STANDBY USAGE............................................................................... 6
11.5 CATEGORIES OF CHARGES........................................................................................................... 6
12. ANCILLARY SERVICES......................................................................................................... 7
13. CAPITAL CONTRIBUTIONS................................................................................................. 7
14. FURTHER INFORMATION..................................................................................................... 8
BIBLIOGRAPHY............................................................................................................................ 8
FIGURE 1 - WESTERN POWERS TRANSMISSION NETWORKS.......................................... 9
FIGURE 2 - ACCESS APPLICATION PROCEDURE FLOW CHART..................................... 10
FIGURE 3 - TRANSMISSION NETWORK - ASSET DESCRIPTION ...................................... 11
APPENDIX 1 - ENERGY BALANCING EXAMPLE.................................................................. 12
8/13/2019 Transmission Userguide
3/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
1
1. Summary
The Western Power transmission networks becameavailable for open access on 1 January 1997. This has
provided an opportunity for independent power
producers to compete with Western Power and other
generators in the supply of electrical energy using the
Western Power transmission networks. Access to the
Western Power transmission networks is managed by
the Transmission Division in the South West and
Pilbara Power Division in the North West, both of
which operate as ring-fenced business units. The
market arrangement currently supported is for
bilateral contract trading between generators and
loads. This is in contrast to the proposal for theNational Electricity Market (NEM) in Eastern
Australia where all electricity will be traded through a
pool. In the WA arrangement, independent
generators seeking access must do so in conjunction
with contracted associated loads.
The access regime has been developed through
extensive consultation with the Office of Energy and
industry representatives. The terms and conditions of
network access are defined by the Electricity
Transmission Regulations 1996 (Regulations), the
Electricity Transmission Access Technical Code
(Technical Code) and the Electricity TransmissionAccess Pricing and Charges paper (Pricing and
Charges Paper).
Both the technical requirements for access and the
transmission network pricing follow where practical
the proposals for the National Electricity Market. In
particular, the transmission Use of System prices vary
according to location to promote economic efficiency.
Ancillary services necessary for secure network
operation are provided by generators and the
transmission network operator and are charged for
according to usage by generators and loads.
The purpose of this brochure is to outline the open
access regime that has been set in place and provide
details on how to make an access application.
2. Introduction
Western Power has two separate transmission
networks: the South West Transmission Network and
the North West Transmission Network (refer to figure
1). A brief outline of each is given below. Reference
should be made to the Western Power publication
Transmission Networks for geographics and a more
detailed description of the transmission networks.
The South West Transmission Network extendsfrom Geraldton to Albany and across to the
Eastern Goldfields. It contains 140 substations,
some of which are privately owned, and over6000km of transmission/subtransmission lines
owned by Western Power. Other lines are
privately owned. The North West Transmission Network extends
from Dampier/Karratha to Roebourne/Cape
Lambert and across to Port Hedland. It contains
over 27 substations, some of which are privately
owned, and over 400km of
transmission/subtransmission lines owned by
Western Power. There is over 500km of privately
owned transmission lines.
The programme of implementation of access to
Western Powers transmission and distribution
networks, as determined by the Western Australian
State Government, is as follows:
Access to the transmission networks has beenavailable to all users regardless of load size since 1
January 1997. Access to the distribution networks has been
available to users with an average load of 10MWor above since 1 July 1997. Load levels for distribution network access will be
progressively reduced. The State Governments
current timetable for further deregulation is:
1 July 1998 - Average load of 5MW orabove;
1 January 2000 - Average load of 1MW orabove.
3. Market Arrangements in Western
Australia
The Western Australian transmission access regime is
currently based on physical bilateral contracts
between generators and loads. This is in contrast to
the proposed National Electricity Market which,
being much larger, will operate as a pool of
generators bidding into the market.
As a consequence of the (physical) bilateral contract
arrangements, users are required to ensure that the
energy imported at their load points is balanced with
the energy exported at their generation points
8/13/2019 Transmission Userguide
4/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
2
(network losses are also taken into consideration).
Refer to section 8.2 of this brochure for more details.
Users must comply with the technical requirements
set out in the Technical Code to ensure that thereliability and integrity of the networks are
maintained.
Prices for access to the networks and related services
are set out in the Pricing and Charges Paper which is
published annually by Western Power.
A user is required to enter into an access agreement
with Western Power for the provision of access
services.
4. Access Rules
The requirements and regulations which form the
open access regime for the transmission networks in
Western Australia are set out in the following
documents:
Electricity Corporation Act 1994; Electricity Transmission Regulations 1996 (as
amended); Electricity Transmission Access - Pricing andCharges (published each financial year); Electricity Transmission Access - Technical Code
(Technical Code); and Electricity Referee and Dispute Resolution
Regulations 1997.
The Electricity Corporation Act 1994 requires
Western Power to provide access to its transmission
and distribution networks; the manner and timing
being prescribed by ministerial order. Section 100 ofthe Act provides for the Governor to make any
regulations necessary to give effect to the open access
regime, in accordance with the principles and
requirements set out in the Act.
The Electricity Transmission Regulations 1996 (as
amended) provide the framework for access to
Western Powers transmission networks. They set
out, among other things:
the application and access procedure; confidentiality requirements;
demand and energy balancing requirements; technical regulation provisions (contained in
the Technical Code); terms and conditions of an access agreement;
and transitional provisions.
Persons requiring access to Western Powers South
West network must submit an access application to
the Transmission Division of Western Power.
Persons requiring access to Western Powers North
West network must submit an access application to
the Pilbara Power Division of Western Power. Refer
to Section 6 of this brochure for more details.
The Pricing and Charges Paper sets out the prices tobe charged for access services (including ancillary
services). These charges are covered in more detail in
sections 11 and 12 of this brochure.
The Technical Code sets out the technical
requirements applying to the transmission networks
and users facilities, and the network planning criteria
to be used when planning reinforcements or
enhancements to the transmission networks. Further
detail is provided in Section 5 of this brochure.
The Electricity Referee and Dispute ResolutionRegulations 1997 establish the office of the Electricity
Referee for resolving disputes regarding transmission
and distribution access.
5. Technical Code
Regulations 26 and 27 of the Electricity Transmission
Regulations 1996 require Western Power to publish a
Technical Code and network planning criteria,
respectively. The Technical Code was first published
on 31 March 1997. It sets out, among other things:
transmission network performance criteria,including network planning criteria;
technical requirements of users facilities; inspection, testing, commissioning, disconnection
and reconnection requirements; power system security requirements; metering requirements; and schedules of technical details required to support
an application for connection.
8/13/2019 Transmission Userguide
5/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
3
The Electricity Transmission Regulations 1996
require Western Power and all users to use all
reasonable endeavours to comply with the Technical
Code.
The requirements of the Technical Code are similar tothose set out in the National Electricity Code,
particularly those in Chapter 4 (Power System
Security) and Chapter 5 (Network Connection).
6. Application Procedure
Part 2, Access, of the Electricity Transmission
Regulations 1996 sets out the application procedure
for a person requiring access to Western Powers
transmission networks. Figure 2 shows the
application procedure (simplified) in flow chart form.
Application forms are available from, and should be
submitted to, the following contacts within Western
Power:
For access to the South West Network:
Manager Planning & Contracts
Transmission Division
Western Power Corporation
363 Wellington Street
PERTH WA 6000
GPO Box L921PERTH WA 6842
Telephone: (08) 9326 6687
For access to the North West Network:
Manager Pilbara Power
Pilbara Power Division
Western Power Corporation
18 Anderson Street
PORT HEDLAND WA 6721
PO Box 314
PORT HEDLAND WA 6721
Telephone: (08) 9173 8222
Following the receipt of an application, Western
Power must provide the applicant with an initial
response within 20 business days of receiving the
application. The initial response will set out
information such as:
whether it is likely that there is sufficient sparecapacity to provide access to the network or
whether the network will have to be augmented; whether it is likely that any connection will have
to be installed or upgraded;
whether a capital contribution will be required of
the user;
the period within which Western Power is able tomake a preliminary assessment; and
whether Western Power is able to make an accessoffer within 65 business days of receiving the
application, and, if not, an alternative period.
Following the initial response, Western Power
proceeds to performing a preliminary assessment of
the application and/or making an access offer.
A preliminary assessment is only performed ifrequested by the applicant. A preliminary assessment
is intended to provide an applicant with a good
assessment of their proposal in situations where the
making of an access offer may not be appropriate.
For instance, a number of generators may be
tendering to provide generation for a project. Not all
the generators will want Western Power to go as far
as making an access offer but will want to know the
feasibility of their proposal in terms of connecting to
the network.
Following an access offer being made by Western
Power, an applicant has 20 business days within
which to accept the offer. A longer period may be
given with Western Powers agreement.
Western Power charges for the assessment of an
access application. Details of the estimated charges
are provided to applicants in the initial response
provided by Western Power.
7. Access Enquiries
In the feasibility stage of a project, a person may notwish to make an application but would still like to
ascertain the likely feasibility of their project in terms
of being able to connect to the transmission network.
In this case, an access enquiry may be made.
Information regarding the proposal to be assessed
should be forwarded to the contacts mentioned in
Section 6. To assist people in providing relevant
information, it is often helpful if the information
requested in an application form is completed as far
as possible, however, it should be made clear that an
access enquiry is being made.
8/13/2019 Transmission Userguide
6/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
4
Western Power charges for the assessment of an
access enquiry. Details of the estimated charges are
provided following the receipt of an access enquiry.
8. Treatment of Losses & Balancing
8.1 Losses
The calculation of system losses incurred in bilateral
access arrangements is based on network connection
point loss factors. Loss factors are used to determine
the half hourly energy to be sent out from generators
to meet the half hourly energy usages at the associated
load points plus system losses. Loss factors are
calculated in a similar way to that proposed for theNational Electricity Market (NEM). In the NEM, loss
factors are applied to pool prices. In WA, loss factors
are applied to quantities of power and energy.
Loss factors are based on marginal losses on the
system. They depend on the system operating
conditions and will vary with the load and generation
patterns. They are to be re-calculated annually and
based on past system operating conditions.
Loss factors are defined by the following equations:
For a lossless network with n nodes,i = n
Pi = o
i = 1
i.e. energy injected equals energy taken.
For actual networks where a proportion ofenergy is consumed (lost) in lines and
transformers, the energy balance is given by:
i = n
Li*Pi = o
i = 1
where Li is the loss factor for node i at which
incremental energy Pi is injected or taken.
8.2 Balancing
The principles of energy and demand balancing are
given in Part 4 of the Electricity Transmission
Regulations 1996. The prices and charges, including
practical examples, are provided in the Pricing andCharges Paper.
As stated earlier, the energy market arrangement
currently operating in the Western Australian
transmission open access regime is not based on a
generator pool system, but relies on bilateral contracts
between generators and loads.
Therefore, network users must use reasonable
endeavours to ensure that the energy imported at their
load (exit) points is balanced, after considering losses,
with the energy exported at their generation (entry)
points. It is likely that some form of load following
governor control would need to be installed to achieve
this.
Energy imbalances which occur within a permitted
tolerance of 3% of half the Contract Maximum
Demand, ie small load following errors, may be
settled on an energy basis. Where imbalances exceedthis tolerance, settlement will be on a financial basis
at published half hourly seasonal energy rates. An
energy balancing example is provided in Appendix 1
of this brochure.
However, to assure reliability of supply during periods
of generator maintenance or unplanned outages, users
are encouraged to contract for the provision of
standby power. This standby power, or standby
generation reservation, may be contracted from
Western Power or from any independent generator
user.
Where a users import power demand exceeds its
export power supply by more than its standby
generation reservation it will incur an excess standby
generation capacity charge for each kW in excess.
This charge can only be applied once in every seven
day excess demand period to the maximum demand
imbalance occurring during that period.
Unlike energy imbalances, there is no permitted
tolerance for demand imbalances. This provides users
with a significant incentive to contract for the
provision of standby power.
To assist Western Power in the management of
transmission capacity, users are also given an
incentive to match their export supply and import
demand power to the generator declared sent out
capacity (DSOC) and load contract maximum
demand (CMD), respectively. Users which exceed
their DSOC or CMD will incur an excess network
usage charge.
9. Description of Network Assets
8/13/2019 Transmission Userguide
7/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
5
The principal elements of the transmission networks
include transmission substations and zone substations,
interconnected by transmission and subtransmission
lines. The transmission networks enable the
transportation of electricity from power stations to
zone substations and high voltage customer loads.
The zone substations provide the interface betweenthe transmission networks and distribution networks.
For the purpose of transmission open access, the
transmission networks assets comprise Connection
assets, Shared Network assets and Ancillary Services
assets. These are described as follows:
Connection Assets: those assets at the point ofphysical interconnection with the transmission
networks which are dedicated to a user - that is, at
substations including transformers and
switchgear, but excluding the incoming lineswitchgear. Connection assets for generators are
referred to as entry assets and for loads they are
called exit assets.
Shared Network Assets: all other transmissionassets in the networks not dedicated to any
particular customer, but shared to some extent by
network users.
Ancillary Services Assets: network assetsperforming an Ancillary Services function
comprise:
Those providing a Control System Serviceeg system control centres, supervisory
control and communications facilities.
Those providing a Voltage Control servicein the networks eg a proportion of the costs
of capacitor and reactor banks in
substations.
Figure 3 shows in simplified form the principal
elements of the transmission networks and the
categorisation of the assets as described above.
10. Transmission Network Pricing
Transmission pricing for the Western Power
transmission network has been developed along
similar lines to other Australian states and as
proposed for the National Electricity Market. There
are two main aspects to determining prices: (i)
determination of the aggregate annual revenue
requirement (AARR), and (ii) the cost reflective
allocation of the revenue requirement to network
connection points. The methodology for the latter is
known as the cost reflective network pricing (CRNP)
method.
The AARR consists primarily of asset related charges
and operating costs, the largest component of which
is the asset charges reflecting the capital intensive
nature of transmission. Transmission assets areindependently valued using the Optimised Deprival
Value (ODV) methodology. The operating costs
component of revenue reflects good operating practice
and is scaled from year to year using an efficiency
factor to reflect expected improvements in operating
efficiency.
The CRNP method basically performs the function of
allocating network revenue requirements according to
usage of network assets. In principle the further the
load from generation sources, the higher will be the
usage of network assets and the higher the charges.The proportion of network AARR allocated using this
method (50%) is chosen to provide a pricing signal to
loads approximating the long run incremental cost of
network augmentation at each connection point. The
decision to base pricing on long run rather than short
run signals reflects the belief that most network users
invest for the long run and that short run signals for
the most part would not be effective.
11. Network Charges
11.1 Charges to a Load User
A load user will be required to pay the following
charges:
connection; exit use of system; common services; capital contribution in relation to any system
augmentation, connection assets or ancillary
service; and
excess standby generation capacity and excessnetwork usage charges.
11.2 Charges to a Generator
A generator will be required to pay the following
charges:
connection; entry use of system; ancillary service; capital contribution in relation to any system
augmentation, connection assets or ancillary
service; and
8/13/2019 Transmission Userguide
8/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
6
excess standby generation capacity and excessnetwork usage charges.
11.3 Charges to a Generator With On-site Loads
A generator with on-site loads which exports and
imports energy from the transmission network will be
required to pay the following charges:
connection; the higher of the entry use of system charge based
on the declared sent out capacity or the total of the
exit use of system and common services charges
based on the contract maximum demand (CMD);
ancillary service; capital contribution in relation to any system
augmentation, connection assets or ancillary
service; and
excess standby generation capacity and excessnetwork usage charges.
11.4 Charges to a User With Standby Usage
A load user or a generator with on-site loads can
apply for network standby usage and receive a
discount on the common services charge if it satisfies
the following:
there is a feeder at the connection dedicated tostandby access or the total generation capacity of
on-site generators is more than 10MW; and the load factor of actual standby energy usage
during the standby terms is not more than 0.15.
Reference should be made to the Pricing and Charges
Paper for further details.
11.5 Categories of Charges
Connection charge: this charge is based on theconnection assets provided and includes the
control system service (CSS) charge which is one
of the ancillary services charges.
Transmission Use of System (TUOS) charge: this
charge provides locational signals to all network
users to encourage efficient network expansion.
There are exit TUOS charges and entry TUOS
charges. The exit TUOS charge applies to a user
who imports electricity from the transmission
network (load user). 50% of the cost of the
transmission shared network is allocated to the
exit TUOS cost pool. This cost pool is allocated to
individual load users using the Cost Reflective
Network Pricing (CRNP) method. The exit TUOS
prices are based on the CMDs.
The entry TUOS cost pool represents 20% of the
cost of the transmission shared network assets and
is allocated to generators. This cost pool is
allocated to individual generators using the CRNP
method. The entry TUOS prices are based on the
declared sent out capacities.
Common service charge: the remaining 30% ofthe cost of the transmission share network plus
two-thirds of the voltage control cost is postage
stamped to all load users. Ancillary services charges: these are to recover the
cost of providing the following services:
voltage control control system services (CSS) spinning reservepost trip management energy balancingVoltage control charge: one third of the voltage
control cost is allocated to the connection charge
and the remaining is included in the common
services charge.
CSS charge: this is allocated to all connection
points based on the equivalent number of remote
terminal units (RTU) installed on site. This
charge is included in the connection charge for
simplicity.
Spinning reserve charge: at present,
approximately 20% of the spinning reserve cost is
allocated to load users and the remaining to
generators with a generation capacity of 10MW
and higher. Refer to the Pricing and Charges
Paper for details of the allocation.
Post trip management charge: this is allocated to
generators based on the number of times the unit
is tripped and its MW losses. Refer to the Pricing
and Charges Paper for details of the charge
calculation.
Energy balancing charge: this consists of the
balancing service charge and the out of balancing
and half hourly out of balancing charges. The
balancing service charge depends on the number
of connections involved in the access
arrangement. The out of balancing and half
hourly out of balancing charges depend on usage.
Loss factors are used to determine the system
losses. Refer to regulation 22 in the Electricity
Transmission Regulations 1996 for details.
8/13/2019 Transmission Userguide
9/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
7
Refer to section 12 of this brochure for further
details on ancillary services, including definitions
of the services listed above.
Capital contribution charge: refer to Section 13,Capital Contributions, below.
Excess standby generation charge: refer to section8.2 of this brochure for details.
Excess network usage charge: refer to section 8.2of this brochure for details.
12. Ancillary Services
Western Power in its role of system operator is
responsible for maintaining the quality of supply, and
ensuring the safe, secure and reliable operation of the
power system. To satisfy these responsibilities, a
system operator must be able to monitor and correct
where necessary the system frequency and voltage,
transmission network loading, generation dispatch,
communication and SCADA facilities.
To this end, Western Power has defined a number of
categories of ancillary services which are provided bygeneration, transmission, and system operations
communication and control equipment.
These categories are:
Voltage Control; Spinning Reserve; Post Trip Management;
Control System Services; and Energy Balancing.
Voltage Control is required to maintain the system
voltage within operational limits during steady state
operation and in the aftermath of trips. It is achieved
by regulating generator MVAr output and
transmission voltage control equipment, such as
capacitors, reactors and transformer on-line tap
changers.
Spinning Reserve is the additional generation
capacity and interruptible load schemes necessary to
maintain the system frequency during load
fluctuations and generator tripping.
Post Trip Management is the maintenance of system
stability in the aftermath of generator trips. It is
provided by spinning and standing reserves.
Control System Services is the 24 hour monitoring
and control of the power system, including data
acquisition, switching and generator dispatch. It is
provided by control centres and SCADA and
communication assets.
Energy Balancing refers to the marginal energy
trades that will occur between Western Power and
independent generation. The energy balancing
ancillary service is required to monitor and record
energy supply and usage in order to facilitate energy
balancing and settlement.
13. Capital Contributions
A new user who requires Western Power to make a
capital investment to provide the access services, the
connection services or the ancillary service to it will
be required to make a capital contribution to make the
investment commercially viable to Western Power.
The investment is commercially viable to Western
Power if:
Western Power can recover within a reasonabletime the costs, the capital investment and a
reasonable rate of return without increasing the
charges payable by the existing users to contribute
to the new investment; and Western Power has sufficient allocated capital
funds to undertake the augmentation.
The reasonable time, which is limited to 15 years, is
determined based on:
the expected commercial life of the augmentation; the potential future use of the augmentation by
existing and potential users; the financial viability of the applicant and the
applicants business; and Western Powers performance targets.Reference should be made to the Electricity
Transmission Regulations 1996 (as amended) for
details.
8/13/2019 Transmission Userguide
10/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
8
14. Further Information
Further information on all aspects of access to
Western Powers transmission networks (including
obtaining various documents and application forms -
see Bibliography below) may be obtained from thecontacts given in Section 6 of this brochure.
Bibliography
1. Electricity Corporation Act 1994.2. Electricity Transmission Regulations 1996 (as
amended).3. Electricity Referee and Dispute Resolution
Regulations 1997.4. Western Power Corporation, Electricity
Transmission Access - Pricing and Charges - 1
July 1997 to 30 June 1998.5. Western Power Corporation, Electricity
Transmission Access - Technical Code.6. Western Power Corporation, Transmission
Networks.
Documents 1, 2 and 3 are available from:
State Law Publisher10 William Street
PERTH WA 6000
Telephone: (08) 9321 7688
Facsimile: (08) 9321 7536
Documents 4, 5 and 6 are available from the Western
Power contacts listed in Section 6 of this brochure.
8/13/2019 Transmission Userguide
11/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
9
FIGURE 1 - WESTERN POWERS TRANSMISSION NETWORKS
8/13/2019 Transmission Userguide
12/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
10
APPLICANT
1. Formulate proposal.
2. Submit access application with
optional request for preliminary
assessment.
6. Accept access offer within 20
business days or such longer
period as is agreed.
WESTERN POWER
3. Prepare written response to access
application within 20 business days
(unless further information
requested by Western Power).
Response to include:
. time for preliminary assessment;
. time to make access offer.
4. If a preliminary assessment isrequired, prepare report within
time specified in response,
otherwise prepare access offer
within period specified in response
(unless further information
requested by Western Power).
5. Prepare access offer within time
specified in response (unlessfurther information requested by
Western Power).
7. Finalise access agreement.
NOTE: The application procedure shown in this chart is in simplified form. The
procedure and times for performing activities are subject to conditions
and variations set out in Part 2 of the Electricity Transmission
Regulations 1996.
FIGURE 2 - ACCESS APPLICATION PROCEDURE FLOW CHART
8/13/2019 Transmission Userguide
13/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
11
FIGURE 3 - TRANSMISSION NETWORK - ASSET DESCRIPTION
Generator
Transformer
330,220 & 132 kV
Lines
132 & 66 kV
Lines
POWER
STATION
TRANSMISSION
SUBSTATION
TRANSMISSION
NETWORK
TRANSMISSION
SUBSTATION
SUBTRANSMISSION
NETWORK
ZONE/CUSTOMER
SUBSTATION
SHARED
NETWORK
ASSETS
CONNECTION
(ENTRY)
ASSETS
CONNECTION
(EXIT)
ASSETS
TRANSMISSION
NETWORK
8/13/2019 Transmission Userguide
14/14
Access To Western Powers Transmission Networks - A Users Guide
Version 1 - April 1998
12
Appendix 1 - Energy Balancing Example
The following energy balancing example assumes a transmission access agreement consisting of two
generators in the users group of entry connections and three loads in the users group of exit
connections.
The entry and exit point energy amounts are based on a single half hour energy reading.
Gen 1 Gen 2 Load 1 Load 2 Load 3
Entry Loss Factor (LFEntry) 1.025 1.020
Entry Energy Reading, kWh ( ETEntry) 4763.5 3239.0
Contract Max Demand, kW ( CMD) 11000 16000 8000
Exit Loss Factor (LFExit) 1.040 1.030 1.035
Exit Energy Reading, kWh (ETExit) 2705.5 3964.0 1989.5
Energy Imbalance (EIMB) = Energy Entry Amount (EEA) - Energy Exit Amount (EEXA)
EEA = (ETEntry * LFEntry)
= (4763.5 * 1.025) + (3239.0 * 1.020)
= 8186.37 kWh
EEXA = (ETExit * LFExit)
= (2705.5 * 1.04) + (3964.0 * 1.03) + (1989.5 * 1.035)
= 8955.77 kWh
EIMB = 8186.37 - 8955.77
= -769.40 kWh
Permitted Tolerance (TOL) = 3% * CMD/2
= 0.03 * (11000 + 16000 + 8000)/2
= +/-525 kWh
Energy Settlement
The energy imbalance amount to be settled on an energy basis by the end of the month, called the
Adjusted Net Amount (ANA), is equal to the negative of the Permitted Tolerance = -525 kWh.
The aggregate of this amount and all other ANAs for the month would be multiplied by the
appropriate out of balance price to calculate the energy out of balance charge for the month.
Financial Settlement
The energy imbalance amount to be settled on a financial basis at half hourly seasonal energy rates,
called the Revised Net Amount (RNA), is equal to the amount in excess of the Permitted Tolerance =
-769.40 - (-525) = -244.40 kWh
This amount would be multiplied by the applicable half hour seasonal energy price to calculate the
energy imbalance charge.
In both cases the energy imbalance is negative. The user would, therefore, be in debt to Western
Power for the energy deficit.