• Update on major transport investments– NET Phase 2– Station Hub– A453– Ring Road
• Coordination of works ‘Keeping Nottingham Open for Business’
• Future investment (2015 to 2019 and beyond)
NET Phase Two
Economic Benefits
• Inward investment - NET Phase Two is a £570m PFI scheme.
• Job creation - both directly and indirectly, resulting in the creation of jobs and contracts for local suppliers.
• Regeneration – Southside, ng2, Science Park, Medipark and Beeston Town Centre.
• Employment & transport links – passengers directly linked to large employers; QMC; universities; and to the M1.
• Congestion relief - remove an additional three million car journeys and overall generate over 20 million tram journeys each year.
NET Phase Two Works – Early worksDemolition & site clearance (Up to end Summer 2012) Nottingham, Wilford, Clifton, Lenton, Beeston, Chilwell
Moving utility services – (Till August 2013)With 60% of all areas due for completion by Sept 2012
New and modified bridges – Starting between April 2012 and September 2012Nottingham, Wilford, Lenton, QMC, Silverdale
Highways works - summer 2012Lenton, University of Nottingham, Beeston
Wilford Embankment removal – June 2012 for six months
Park and Ride sites Toton From February 2012 Clifton From March/ April 2012
Line One worksWilkinson Street Depot modifications – From April 2012
Communications
Strong commitment to keeping the public informed
Joint resources - Nottingham City Council, Tramlink and TWAJV.
• Website www.thetram.net/phasetwo
• Tram Hotline (0115) 924 24 54
• Publications, leaflets and flyers
• Drop-in Sessions
• Information Points
• Liaison Groups
• Local Liaison Officers on the ground
• Restore Grade 2* listed buildings with Porte Cochere ‘brought inside’
• Enhance passenger and operator facilities, including upgraded travel information, ticket office, shops, cafes and waiting areas – 2000m2 new retail space
Station Hub
Station Hub• A new concourse to connect trains, trams and car park and provide new
passengers facilities
2011-1st 2011-2nd 2012-1st 2012-2nd 2013-1st 2013-2nd 2014-1st 2014-2nd 2015-1st 2015-2nd 2016-1st 2016-2nd
NET Phase 2
A453 Widening
Ring Road
Station Hub (main contract)
Station Area Blockade
Major Transport Works Coordination
Longer Term Investments
• Local Major Transport Scheme Funding Devolution
• Electrification and upgrading of the Midland Mainline
• High Speed Rail• National Airports Policy developments