TRANSPORTATION PLANNING
FOR THE
FUTURE OF CENTRAL OHIO
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
• Transportation & Infrastructure Development
• Planning & Sustainability
• Data & Mapping
• Residential Services
• Government Affairs
• Communications & Engagement
WHO IS MORPC?
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
The Metropolitan Transportation
Plan includes only communities
within the official MPO boundary.
METROPOLITAN PLANNING AREA
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
WHAT IS THE METROPOLITAN TRANSPORTATION PLAN (MTP)?
• Identifies regional transportation strategies and projects
• Long-range (20+ years)
• Fiscally constrained
• Formal document submitted to ODOT and USDOT every 4 years
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
WHY IS IT IMPORTANT?
• Central Ohio is growing
• Demographics are changing
• Preferences are changing
• Demands on the transportation system are changing
• Transportation projects must be on MTP to be eligible for federal funding
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
POPULATION & EMPLOYMENT FORECASTS
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
PREFERENCES ARE CHANGING
We want options.
Smaller Homes Walkability More Mobility Green SpaceAmenities
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
REGIONAL GOALS
REDUCE PER CAPITA ENERGY
CONSUMPTION AND PROMOTE
ALTERNATIVE FUEL RESOURCES
TO INCREASE AFFORDABILITY
AND RESILIENCE OF REGIONAL
ENERGY SUPPLIES
PROTECT NATURAL
RESOURCES AND MITIGATE
INFRASTRUCTURE
VULNERABILITIES TO MAINTAIN
A HEALTHY ECOSYSTEM AND
COMMUNITY
POSITION CENTRAL OHIO TO
ATTRACT AND RETAIN
ECONOMIC OPPORTUNITY TO
PROSPER AS A REGION AND
COMPETE GLOBALLY
CREATE SUSTAINABLE
NEIGHBORHOODS TO
IMPROVE RESIDENTS'
QUALITY OF LIFE
INCREASE REGIONAL
COLLABORATION AND EMPLOY
INNOVATIVE TRANSPORTATION
SOLUTIONS TO MAXIMIZE THE
RETURN ON PUBLIC
EXPENDITURES
USE PUBLIC INVESTMENTS TO
BENEFIT THE HEALTH,
SAFETY, AND WELFARE OF
PEOPLE
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
Regional Strategies
Priority Projects
Documentation
Evaluation Criteria
Fiscal Analysis
Impact Analysis
Local Plans
Data
Public Engagement
Goals, Objectives &
Targets
INPUT PROCESS OUTPUT
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
• Most suggested project type: Stand-alone Bike & Pedestrian
STRATEGY & PROJECT IDENTIFICATION
82
28
17 17
1311
97 7 7
2
0
10
20
30
40
50
60
70
80
90
Bike/Pedestrian Transit IntersectionModification
New Roadway Major Widening InterchangeModification
Operations Minor Widening NewInterchange
New Freeway Convert toFreeway
Suggested Projects by Type
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
REGIONAL STRATEGIES
• System Management• Physical Preservation
• Operations
• Safety & Security
• Demand Management
• System Development• Bike & Pedestrian Infrastructure
• Transit Infrastructure
• Freight Rail Infrastructure
• Multimodal Infrastructure Connections
• Roadway Infrastructure
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
MTP WEBMAP
• Draft projects viewable on interactive webmap• Zoom
• Pan
• Click for project info
• www.morpc.org/mtp2050
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
*cost includes activities in addition to specific projects
Total: $29.6 billion
DRAFT FISCAL ANALYSIS
Management & Operations*$7,80026%
Intersection$3001%
Stand-alone Bike & Pedestrian
$8303%
Transit*$12,960
44%
Freeway System$3,60012%
Major Widening of Surface Street
$1,3805%
Minor Widening of Surface Street
$1,4305%
New Roadway or Bridge$1,200
4% Studies/Other$1200%
• 5 high capacity transit projects
• Expand COTA & DCT service
• Replacement vehicles and other
capital expenses
• 6 Access Management &
One-way Conversion projects
• Maintenance & Preservation
• ITS and other operations51 Projects
63 Projects
79 Projects
152 Projects
218 Projects
111 Projects
DRAFT HIGH CAPACITY TRANSIT PROJECTS
619
643
988
1709
1711
East Main St. from High St.to Waggoner Ave.
Dublin - Columbus fromDublin to Downtown Columbus
West Broad St. from Norton Rd. to High St.
Northeast Corridor fromHigh St. (Downtown Columbus)to Polaris Pkwy
Southeast Corridor fromHigh St. (Downtown Columbus)to Groveport Rd.
For Further Study of High Capacity Transit
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
NEXT STEPS
• March 2020
• Community presentations
• Draft document available online
• Public Comment Period
• April 3, 2020 – Public comment period closes
• May 2020 – Plan Adoption
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
PARTICIPATE
• Review & Comment• Draft plan
• Comment period ends April 3, 2020
• Contact• [email protected]
• For hard copies or translated materials:
• 614-233-4130
• Information• www.morpc.org/mtp
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
2020-2050 COLUMBUS AREA METROPOLITAN TRANSPORTATION PLAN
Hyperloop
• A new mode of transportation
• Freight or passengers are loaded into a pod
• Pods are accelerated via electric propulsion in a low-pressure tube
• Pods float above the track using magnetic levitation and glide at high
speeds
• Capable of moving freight or passengers quickly and safely
• Travel speeds of 600+ miles per hour
L O W - P R E S S U R E T U B E
N E X T G E N M A G N E T I CL E V I TAT I O N
E L E C T R O - M A G N E T I CP R O P U L S I O N
P A S S E N G E R | C A R G O V E H I C L E
A U T O N O M O U S C O N T R O L P L A T F O R M
Virgin Hyperloop One Global Challenge Winner
ROUTE
ALTERNATIVES
RAPID SPEED TRANSPORTATION
RAPID SPEED TRANSPORTATION
STATION/PORTAL
ALTERNATIVES
POTENTIAL STATIONS/PORTALS – COLUMBUS
POTENTIAL STATIONS/PORTALS – COLUMBUS
FRANKLINTON CONVENTION CENTERJOHN GLENN INT’L AIRPORT
POTENTIAL STATION – DUBLIN
POTENTIAL STATION – MARYSVILLE WEST
LOOKING SOUTH ALONG N. MAPLE ST Source: Google Maps
POTENTIAL STATION – MARYSVILLE SOUTH
LOOKING NORTH ALONG COLUMBUS AVE Source: Google Maps
KEY HYPERLOOP
STUDY FINDINGS
RIDERSHIP MARKET
RIDERSHIP MARKET
Label map with Population 2040
RIDERSHIP MARKET
Label map with Population 2040
RIDERSHIP MARKET
RIDERSHIP MARKET
RIDERSHIP MARKET
TRAVEL TIME AND COST SAVINGS
Auto Air Conventional Rail Hyperloop
Metro Pair
(bi-directional)
Total
Travel
Time
(min.)
Business /
Non-Business
Total Travel
Cost*
Total
Travel
Time
(min.)
Total Fare
(Existing)
Total
Travel
Time
(min.)
Total Fare
(Existing)
Total
Travel
Time
(min.)
Total Fare
(estimated)
Chicago-Fort Wayne 191 $98 / $27 - - - - 22 $33
Chicago-Columbus 336 $198 / $54 249 $171 - - 38 $60
Chicago-Pittsburgh 412 $256 / $69 245 $177 587 $127 55 $93
Columbus-Fort Wayne 205 $96 / $26 - - - - 20 $28
Fort Wayne-Pittsburgh 317 $177 / $48 - - - - 36 $60
Columbus-Pittsburgh 199 $113 / $31 - - - - 20 $33
• Feasible given:• Certification of the technology
• Assumed optimal main line speed of 500 mph avg.
• Branch lines with slower speeds (portal connectors)
• Potential for initial phases with less tunneling
• Existing and new right of way, some tunneling (for main line primarily)
HYPERLOOP STUDY KEY FINDINGS
• Once fully operational, over 30 years:• 1.9 billion autos shifted to hyperloop passengers
• 2.4 million tons of reduced CO2 emissions
• $19 billion direct transportation benefit
• Reduction of 450 million commercial truck vehicles hours traveled
HYPERLOOP STUDY KEY FINDINGS
WIDER ECONOMIC BENEFITS
1,400.0
1,900.0
2,400.0
2,900.0
3,400.0
3,900.0
2030 2035 2040 2045 2050 2055 2059
Cu
mu
lative
GR
P (
$B
illio
ns)
Midwest Connect Hyperloop Assessment Corridor GRP - With/Without Hyperloop Enabled Productivity Increases
~$300BMidwest Connect Hyperloop
Assessment Corridor
Build Scenario
Midwest Connect Hyperloop
Assessment Corridor
Baseline Scenario
FINDINGS: TRAVEL TIME SAVINGS
ESTIMATED HYPERLOOP FARES*
Metro PairLine Haul Travel
Time (min)Line Haul Distance
(miles)Fare Cost (dollars)
Chicago-Fort Wayne 22 163 $33
Chicago-Columbus 38 302 $60
Chicago-Pittsburgh 58 465 $93
Fort Wayne-Columbus 19 139 $28
Fort Wayne-Pittsburgh 39 302 $60
Columbus-Pittsburgh 22 163 $33
Average Hyperloop Service Characteristics by Metro Pair
* 2019 dollars. Based on an assumed $0.20/mile, as calculated by AECOM with input from Virgin Hyperloop One
EMISSIONS SAVINGS
Environmental Sustainability
Mode Shift Emissions Savings (Auto to Hyperloop) $113.9M
Mode Shift Emissions Savings (Air to Hyperloop) $0.3M
Mode Shift Emissions Savings (Train to Hyperloop) $7.8M
Mode Shift Emissions Savings (Commercial Truck to Hyperloop) $4.6M
• Public meetings
• VHO certification segment – R&D collaboration opportunity
• Create a travel demand advisory panel (public agencies, academic institutions, VHO)
• Monitor NETT Council activities and opportunities to engage in federal regulatory framework
• Advance regulatory framework with appropriate agencies
• Continue to facilitate collaboration
HYPERLOOP NEXT STEPS
• Public meetings
• Secure funding to complete the environmental studies necessary for the federal construction approval process
• Engage and secure the support of communities east of Columbus
• Develop a strategy with other surrounding states to secure regulatory guidance
PASSENGER RAIL NEXT STEPS
QUESTIONS?
THEA WALSHTransportation & Infrastructure Development Director
Mid-Ohio Regional Planning Commission
111 Liberty Street, Suite 100
Columbus, OH 43215