Trigger/DAQ/DCS. TDMT on behalf of the Trigger/DAQ System. LVL1: Introduction. O (1M) RPC/TGC channels. ~7000 calorimeter trigger towers. Muon trigger. Calorimeter trigger. Muon Barrel Trigger. Muon End-cap Trigger. Pre-Processor (analogue  E T ). Muon-CTP Interface (MUCTPI). - PowerPoint PPT Presentation
Popular Tags:
26
1 Trigger/DAQ/DCS TDMT on behalf of the Trigger/DAQ System
Transcript
Page 1: Trigger/DAQ/DCS

1

Trigger/DAQ/DCS

TDMT on behalf of the Trigger/DAQ System

Page 2: Trigger/DAQ/DCS

2

LVL1: Introduction

Calorimeter trigger Muon trigger

Cluster Processor (e/, /h)

Pre-Processor (analogue ET)

Jet / energy-sum Processor

Muon Barrel Trigger

Muon End-cap Trigger

Muon-CTP Interface

(MUCTPI)

~7000 calorimeter trigger towers O(1M) RPC/TGC channels

Timing, Trigger, Control (TTC)

ROD_BUSY LTP

Central Trigger Processor (CTP)

Timing, Trigger, Control (TTC)

ROD_BUSY LTP

Page 3: Trigger/DAQ/DCS

3

LVL1: Calorimeter Trigger

• Preprocessor – Preprocessor Module is being assembled and will be debugged in March

• essential for slice tests

• enough existing ASICs and MCMs work well enough to do slice tests

– ASIC resubmitted with minor design faults corrected• final version expected back imminently

– MCM yield is currently lower than expected, due to surface finish and faulty ASICs

• must understand surface finish problem

• must test ASIC dies more thoroughly before mounting them

Page 4: Trigger/DAQ/DCS

4

LVL1: Calorimeter Trigger

• Cluster Processor– Cluster Processor Module design updated to improve timing margins;

now being made• problems with badly made boards now hopefully solved by finding "one-stop

shop" firms with better instrumentation and QA

• Jet/Energy-sum Processor– Jet/Energy Module re-designed to use Virtex-II FPGA; now being made

• Common Modules:– Common Merger Module design is essentially final; no big changes

needed

– Readout Driver full-specification design is being laid out• Handles readout to DAQ from all types of trigger modules

• Also handles RoIs to level-2

• Each ROD reads out a full crate of trigger modules

Page 5: Trigger/DAQ/DCS

5

LVL1: Calorimeter Trigger

• Have tested analogue receiver/monitor modules from Pittsburgh and been in close contact with them– Simulated LAr and TileCal signals sent via receiver to Preprocessor

analogue input circuit

• TileCal signals sent to receiver in test-beam– Further tests have been done by TileCal group

– Receiver circuit has been modified to handle saturated pulses better

• Discussions continue on use of LAr and TileCal calibration signals for energy and timing calibration of calorimeter trigger

Page 6: Trigger/DAQ/DCS

6

LVL1: Muon Trigger

RPCRPC

On-detector electronicsOn-detector electronics

Off-detectorOff-detector

Barrel and endcap systems successfullyoperated in 25 ns test-beam last September — endcap chain includedMUCTPI and CTPD

Page 7: Trigger/DAQ/DCS

7

LVL1: Muon Trigger

MDTMDT

TGCTGC

SSWSSW

HPTHPTOn-detector electronicsOn-detector electronics

Near-detectorNear-detector

Off-detectorOff-detector

Page 8: Trigger/DAQ/DCS

8

LVL1: Muon Trigger

• Work going on to produce final version of all parts of on-detector system in time for test-beam this summer– “Slave Board” ASIC for endcap trigger

• Revised version recently submitted

– “Coincidence Matrix” ASIC for barrel trigger• Design revisions ongoing — hope to submit in April

– Final version of “PAD” boards for barrel trigger• Prototypes of revised design being assembled

• Much design work still to be completed, including:– Many variants of “PS” boards for endcap trigger

(connectivity depends on detector region)

– Off-detector electronics• Has been given lower priority than on-detector electronics since it is not

critical for the detector integration/installation schedule

Page 9: Trigger/DAQ/DCS

9

LVL1: Muon Trigger

• Production quantities of on-detector barrel electronics needed as soon as possible for integration with detectors– Pre-production of barrel “Splitter” boards already available

• Main production in preparation (orders for components, etc ongoing)

– Production of barrel “Pad” boards will start as soon as possible • After completion of tendering process

• After checking of prototypes

• Schedule for production (and QA testing) of on-detector electronics for both barrel and endcap triggers is tight

Page 10: Trigger/DAQ/DCS

10

LVL1: Central Trigger Processor

• COM_backplane: produced• PIT/CAL_backplane: produced• CTP_MON: tested successfully• CTP_MI: produced recently (see photo)• CTP_CORE: under design• CTP_IN: under design • CTP_OUT: under design• CTP_CAL: to be designed later

CTP_MI

• Prototype with one module each• no CTP_CAL• CTP_CORE w/ reduced functionality• Lab-tests: Jul-Aug 2004• Testbeam: 25 ns period Sep 2004

• Final CTP: beginning of 2005

Plan:

CTP crate:

Page 11: Trigger/DAQ/DCS

11

LVL1: Central Trigger Processor

Trigger Items

LUT CAMMask

PrescalingPriority

256256160

TriggerConditions

TriggerInputs

160 inputs at any timeselected from > 160 on input boards

Trigger Menu : the collection of the (256) Trigger Items, formed from combinations of (256) Trigger Conditions on the (160) Trigger Inputs.

Decode incoming multiplicities, map onto 256 Trigger Conditions

Each trigger item can be a combination of ALL 256 trigger conditions

programmable programmable programmable

• more trigger items (TDR limit was only 96)• programmable LUTs/CAM (no FPGA re-configuration)• larger flexibility to construct Trigger items from all inputs

Compared to TDR:

Page 12: Trigger/DAQ/DCS

12

HLT/DAQ/Controls

Some highlights and examples of ongoing work

Page 13: Trigger/DAQ/DCS

13

HLT, DAQ and Controls TDR

CERN/LHCC 2003-069/G-067:

‘The LHCC finds both the technology adopted and the procedures proposed for the ATLASHLT/DAQ/DCS to be adequate to achieve thephysics goals stated in the Technical Proposal,and congratulates the ATLAS Collaboration onthe quality of the work presented in the TDR.’

‘The LHCC therefore recommends general approval of the ATLAS HLT/DAQ/DCS TDR.’

Several meetings took place with the LHCCreferees since the last Plenary, presentationsand summaries are on the Web

A very major milestone for ATLAS is the positive conclusion of the HLT/DAQ/ControlsTDR review process at the end of 2003

Page 14: Trigger/DAQ/DCS

14

Network overview

Page 15: Trigger/DAQ/DCS

15

Plans for large-scale test (control)

Servers

1 Global Segment 1 Global Segment for L2 Sub-farmsfor L2 Sub-farms

1 node: Start upServers

Monitoring factory

1 Online Infrastructure 1 Online Infrastructure SegmentSegment

Numbers for similar configurations will vary depending on each other for a total of ~ 250 nodes

5 individual L2 sub-farm segments5 individual L2 sub-farm segments

1 Global ROS Segment1 Global ROS Segment

1 EB Segment1 EB Segment

5 EF sub-farm segments5 EF sub-farm segments8 Sub detector segments8 Sub detector segments

16 nodes per detector:Controller (1), ROS (15)

32 nodes per sub farm:Controller (1), EF(31) running 1 EFD + 4PTs each

32 nodes per sub farm1 application per node:Sub-farm controller(1)L2SV(1), L2PU(30)

Legend:Node running a controller:

Node running one or more applications

1 Global Segment for EF 1 Global Segment for EF Sub-farmsSub-farms

1 pROS1 DFM5 SFIs4 SFOs

Page 16: Trigger/DAQ/DCS

16

Example of work in PESA group

• Fast latency reduced by 60 s thanks to the new data-access schema:

– fewer MDT hits to handle and process

• RPC and MDT data preparation improved:

– total data prep time ~ 800 s– data preparation takes the same

amount of CPU time of Fast TotalTotal

Fast Fast

The muon selection latency The muon selection latency at Level-2 is now ok!at Level-2 is now ok!

The muon selection latency The muon selection latency at Level-2 is now ok!at Level-2 is now ok!

Page 17: Trigger/DAQ/DCS

17

Readout System

ROB,ROS,SFI,SFO,

LVL2/EF

Tier 0

Calibration FARM

GathererSubd.

Mon Mon Mon

Mon Mon Mon

Mon Mon Mon

Mon Mon Mon

GathererSubd.

GathererRec

GathererCalib.

Intelligent Monitoring

Intelligent Monitoring

Display Shift Crew

DisplayExperts

DisplayExperts

Archiver Archiver

Data Quelity Assessment

ALARMS & Status Displ.

Slow Ctrl.DBS

Slow Control

Var. Ref.DBS

MonitoringDBS

Data Qual.DBS

Var. Conf.DBS

DynamicAllocationOf Links

online

Mon Mon MonLVL1

Unified Monitoring Scheme (for test-beam)

Page 18: Trigger/DAQ/DCS

18

HLT Development & Integration Testbeds

• LVL2 alone– no algs Jan04 DF-06-00->DF 06-02 , Online 20

• EF alone– no algs Jan-Feb04 nightly*->DF 06-02 , Online 20

• HLT (LVL2+EF) Integrated– no algs Jan-Feb04 nightly*->DF 06-02 , Online 20

• Large Scale tests – Starts ~1st March 04– No algorithms

• Testbeam preparations– In progress

• Testbeds with algorithms – Begin in March with Offline R8

Page 19: Trigger/DAQ/DCS

19

I/O path for Read-Out System

• In TDR (30 June 2003):– “The optimisation of the ROS architecture will be

the subject of post-TDR studies” using a Read-Out Buffer (ROBIN) prototype implementing bus-based (PCI) and switched-based (GEth) I/O paths

• Schedule and milestones to match ATLAS commissioning– ROBIN Final Design Review completed LHCC 31.05.04

– Final decision on ROS Input/Output path EB 31.12.03

RO

BIN

S-Links

GbE

PCI bus

Page 20: Trigger/DAQ/DCS

20

I/O path for Read-Out System

• On 11 Dec 2003, TDAQ decision was made:Bus-Based (BB) with Switch-Based (SB) as option for increased scalability

– ROBIN : 3 Slink input - PCI and GEth output• Max input retaining max output functionality• High potential for scalability and upgrades

– The baseline implementation of the ROS would be BB with an upgrade path to combined BB and SB I/O or only SBI/O for future upgrades.

Full assessment of the potential of theSB Read-Out will be done as soon aspossible (planning in preparation), so as to be ready with a viable upgradeif and when needed.

PCI bus RO

BIN

RO

BIN

RO

BIN

GbEthernet

L2 & Event Builder NetworksL2 & Event Builder Networks

NIC

Increased

scalability

if/when needed

RO

BIN

S-Links

GbE

PCI bus

Page 21: Trigger/DAQ/DCS

21

ROBin schedule• Measurements on existing

prototype continuing:– Meeting required performance

for final system

• Schedule for final module– FDR schedule detailed : on time for LHCC milestone May 2004– Final Protoypes Sep 2004– Tendering starts Sep 2004– PRR Oct 2004– Production starts Feb 2005– Production completed May 2005

Level1 Rate vs. L2 rejection,12 ROLs, hotspot

0.020.040.060.080.0

100.0120.0140.0160.0180.0

0 2 4 6 8 10 12

EB fraction (%)

L1 ra

te (k

Hz)

0123456789

requ

est r

ate

(kH

z)

Level1 rate (kHz)

Level2 request rateper ROL (kHz)

EB request rate perROL (kHz)

emulated Trigger & dataOut, SLINK input, L2 = 2.2% / ROL,

3 GHz PC with 33 MHz/64bit PCI

PRELIMINARY

Page 22: Trigger/DAQ/DCS

22

Software releases and testbeam• DAQ release (targeted to TB-2004)

– LHCC milestone (see TDR)30.04.04

• Online Software release 29.02.04• Dataflow release 31.03.04

– Status• Online Software release 00-21-00 done on 09.02.04• Dataflow release (including now ROD-Crate DAQ

and EF Dataflow) 00-07-00 01.03.04

• New HLT Release 13.02.04

• Release and software integration testing– Continuously done in our HLT/DAQ test-beds – Major testing step: large scale scalability test on 250 PCs starting next

Monday for 4 weeks

• Detector integration for TB-2004– Global planning being finalized– Pre-testbeam lab setup in Bdg 40, 5th floor - Integration at RCD started

Page 23: Trigger/DAQ/DCS

23

DCS Subdetectors

• Individual meetings with each subdetector have been held to:– Agree on deliverables provided by the central DCS team to subdetector

groups with the timescale

– Define and document a DCS Baseline

• The point of connection between the subdetector DCS and the central DCS is the Subdetector Control Station (SCS)

• Subdetectors are responsible for everything towards the detector

• Central DCS is responsible for the items towards the control room

Page 24: Trigger/DAQ/DCS

24

Central DCS Deliverables

• SCADA software PVSS and JCOP Framework

• Connection software to DAQ (DDC)

• Tools and libraries for front-end read-out of standard devices

• All functions needed for operations from the control room

• Supervision of common experimental infrastructure

• Connection to Detector Safety System (DSS)

• Information exchange with the CERN services

• Information exchange with the LHC machine

Page 25: Trigger/DAQ/DCS

25

Subdetector responsibilities

• The subdetector groups are responsible for all applications in the SCS and for all HW and SW in the SCS and the Local Control Stations (LCS) below

• The CAN/ELMB hardware will be procured centrally (on subdetector budget)– CAN/PCI interface (commercial, selected)

– ELMB (in production)

– CAN Power Supervisor (being prototyped)

– CAN cables (to be defined by subdetector)

Page 26: Trigger/DAQ/DCS

26

Issues• Conditions DB: ATLAS plans?

– For testbeam 2004: Lisbon API

• Configuration DB: ATLAS plans?

• Changes in interaction with DAQ Run Control?

• Workspace for subdetector groups– Commissioning and debugging in US(A)15 and (where) on surface?

– Where are the SCS located?

• DCS Network– Security (remote) Accessibility

Summary:

• No major problems discovered– Some issues to tackle

• DCS Baseline is defined and documented– See http://agenda.cern.ch/displayLevel.php?fid=3l89