TRIPURA STATE ELECTRICITY CORPORATION LIMITED (A Govt. of Tripura Enterprise) Transmission Division, TSECL, Agartala –Tripura (w) Phones: 0381-235-3279 FAX: 0381-235-3279 1 Name of Work: - Dismantling and transportation of 132/33/11 KV, 7.5 MVA (2.5 MVA+5 MVA) Power Transformer from 132 KV Sub-Station, Missiontilla to 132 KV Sub-Station, Dhalabil including dismantling of damaged 132/33 KV, 7.5 MVA Power Transformer at 132 KV Dhalabil Sub-Station. Ref: SNIQ .NO. DGM/TD/AGT/2019-20/01 Date, 27/05/2019 Terms & Conditions 1. Sr. Manager, 132 KV Sub-Station, Dhalabil shall be the consignee for the work. 2. The Contractor/ agency should be a registered organization capable of executing above mentioned work having capacity of 7.5 MVA Power Transformer or above; of 132 KV voltage level in a single award of work in Indian supported by performance certificate issued by reputed Indian utilities(Government /Public Sector) not below the rank of Executive Engineer/Dy. General Manager/Divisional Engineer or equivalent. Authentic documents in support of the above facts should be accompanied with the Bid. TSECL shall verify the same accordingly. 3. The agency shall be liable for any loss/damage of materials during execution of work up to ready for commissioning at site. 4. The quotetioners shall bear all cost and expenses pertaining to submission of quotations etc. TSECL will in no case, be responsible or liable for these cost. 5. The quotetioners are to satisfy themselves by actual site visit to the site of work, as regards the prevailing condition of approaches, transportation facilities, availability of labours and availability of materials etc. before submission of bid. No claim or excuse on this account will be entertained at any stage later on. 6. The quotetioners shall be expected to employ skilled employees with experience of this particular work. No female labour shall be employed. No person below the age of eighteen years shall be employed. 7. The Terms & Conditions and Schedule of work can be seen and downloaded from the website www.tenders.gov.in/department.asp?id=802 and TSECL’s official website (URL: http://www.tsecl.nic.in/) . 8. The down loaded terms & conditions in undamaged condition shal be signed by the quotationer/bidder on all pages . 9. a) The quotetioners shall be required to deposit earnest money of Rs.15,610.00 (Rupee Fifteen thousand Six Hundred and Ten) only in the shape of Demand Draft or Banker Cheque from any nationalized / scheduled Bank guaranteed by Reserve Bank of India favouring TRIPURA STATE ELECTRICITY CORPORATION LIMITED payable at Agartala along with the bid in a separate sealed envelope. The earnest money deposited is adjustable with Contract performance guarantee. The envelope containing the quotation with document shall be super scribed with PNIQ No & date and name of work distinctly. Earnest Money Deposit in any other form or amount will not be accepted. Bid not accompanied with requisite Earnest Money in a separate sealed envelope shall not be entertained and shall be returned to the quotationer / bidder without being opened. b). Tender Fee shall be submitted in the form of Demand Draft on any Scheduled Bank guaranteed by Reserve Bank of India favouring TRIPURA STATE ELECTRICITY CORPORATION LIMITED payable at Agartala in a separate sealed envelope along with bid document.
Transcript

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

1

Name of Work: - Dismantling and transportation of 132/33/11 KV, 7.5 MVA (2.5 MVA+5 MVA) Power Transformer from 132 KV Sub-Station, Missiontilla to 132 KV Sub-Station, Dhalabil including dismantling of damaged 132/33 KV, 7.5 MVA Power Transformer at 132 KV Dhalabil Sub-Station.

Ref: SNIQ .NO. DGM/TD/AGT/2019-20/01 Date, 27/05/2019

Terms & Conditions

1. Sr. Manager, 132 KV Sub-Station, Dhalabil shall be the consignee for the work.2. The Contractor/ agency should be a registered organization capable of executing above mentioned work

having capacity of 7.5 MVA Power Transformer or above; of 132 KV voltage level in a single award of work in Indian supported by performance certificate issued by reputed Indian utilities(Government /Public Sector) not below the rank of Executive Engineer/Dy. General Manager/Divisional Engineer or equivalent.Authentic documents in support of the above facts should be accompanied with the Bid. TSECL shall verify the same accordingly.

3. The agency shall be liable for any loss/damage of materials during execution of work up to ready for commissioning at site.

4. The quotetioners shall bear all cost and expenses pertaining to submission of quotations etc. TSECL will in no case, be responsible or liable for these cost.

5. The quotetioners are to satisfy themselves by actual site visit to the site of work, as regards the prevailing condition of approaches, transportation facilities, availability of labours and availability of materials etc. before submission of bid. No claim or excuse on this account will be entertained at any stage later on.

6. The quotetioners shall be expected to employ skilled employees with experience of this particular work. No female labour shall be employed. No person below the age of eighteen years shall be employed.

7. The Terms & Conditions and Schedule of work can be seen and downloaded from the website www.tenders.gov.in/department.asp?id=802 and TSECL’s official website (URL: http://www.tsecl.nic.in/) .

8. The down loaded terms & conditions in undamaged condition shal be signed by the quotationer/bidder on all pages .

9. a) The quotetioners shall be required to deposit earnest money of Rs.15,610.00 (Rupee Fifteen thousand Six Hundred and Ten) only in the shape of Demand Draft or Banker Cheque from any nationalized / scheduled Bank guaranteed by Reserve Bank of India favouring TRIPURA STATE ELECTRICITY CORPORATION LIMITED payable at Agartala along with the bid in a separate sealed envelope. The earnest money deposited is adjustable with Contract performance guarantee.The envelope containing the quotation with document shall be super scribed with PNIQ No & date and name of work distinctly. Earnest Money Deposit in any other form or amount will not be accepted.

Bid not accompanied with requisite Earnest Money in a separate sealed envelope shall not be entertained and shall be returned to the quotationer / bidder without being opened.

b). Tender Fee shall be submitted in the form of Demand Draft on any Scheduled Bank guaranteed by Reserve Bank of India favouring TRIPURA STATE ELECTRICITY CORPORATION LIMITED payable at Agartala in a separate sealed envelope along with bid document.

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

2

N.B.: Non submission /short submission of cost of tender form in case of down loading will be treated as non responsive and shall be rejected outright.

10. The amount of earnest money of the unsuccessful Quotationer will be refunded but in case of successful Quotationer, the earnest money will be converted in to security deposit and shall be retained till completion of the contract. The security shall not earn any interest.

11. The successful quotationer shall be required to furnish a Contract Performance Guaranty (CPG) @ 10% of the total contract price. 5% of CPG in the shape of Demand Draft / Banker cheque favouring Dy. General Manager, Transmission Division,79 Tilla, Agartala on any schedule Bank guaranteed by Reserve Bank of India , payable at SBI, TLA House Branch, Agartala, West Tripura in the form attached as Annexure-I. Rest 5% amount will be deducted from running bills on pro –rata basis or 10% of the balance amount whichever is higher from each bill till full realization of Contract Performance Guarantee.

12. Rate should be inclusive of all applicable GST and quoted both in words and figures for per person per month.

13. The quotetioners must quote their rate(s) both in figure as well as words as per prescribed format. Quotation(s) should be initialed by the quotationers including correction, if any.

14. The work shall be completed within 15(fifteen) days from the date of issue of LOA. 15. There shall be no increase in the rate / charge during the contract period.16. The following document must be submitted along with the quotation :-

a. Copies of Trade License.b. Registration Certificate from the appropriate authority.c. Experience Certificate.d. Copy of Labour Registration Certificate.e. Copy of PTC of current validity Certificate.f. Copy of GST Registration certificate.g. Copy of PAN Card.

17. Insurance against loss, theft, damage, transportation etc.:The agency shall have to require to take the transformer from132 KV Sub-Station, Missiontilla, Dharmanagar to 132 KV Sub-Station, Dhalabil has to make insurance coverage policy for a sum assured not less than Rs.1 (One) crore for 7.5 MVA 132/33/11 KV Power Transformer infavour of TSECL. The premium whatsoever shall be borne by the agency.

18. Tax: Rate should be inclusive of GST and other applicable taxes. 19. The payment shall be made after successful completion of the work subject to availability of fund.20. Other conditions not covered in this order/LOA shall be as per TSECL’s Bidding documents.

21. Liquidated Damage:

a) The date of completion of the work shall be deemed to the essence of the contract and shall be completed not later than the date of specified in the work order/contract. In case of delay in completion of work beyond the stipulated time for the entire scope of work, TSECL shall be entitled to cover a penalty @ 1%(one percent) of the total ordered value

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

3

of the work per week or part thereof delay subject to maximum 10%(ten percent) of the total ordered value as liquidated damage. This is however, subject to force majeure.

b) The payment of liquidated damage shall not in any way relieve the contractor from any of its obligations and liabilities of the contractor under the contract.

22. FORCE MAJEURE

a) Force majeure shall cover only act of GOD, Fire, War, Strikes, Riots and Civil commotion, acts of any Government etc. Any constraint other than those specified above will not constitute force majeure condition. In view of other constrain beyond the control of the contractor primarily due to statutory compulsion, extension of execution may also be considered on individual meritof the case . In case of force Majeure condition the contractor shall notify TSECL for such causes within 10(ten) days from the beginning of such delay in writing for consideration and acceptance. Acceptance of which will be given by TSECL after verification.

b) The date of completion will, subject to herein after provided, to be extended by a reasonable time. In such case the contractor shall submit to owner’s Engineer-in-charge of the work the time extension application as per proforma attached at Annexure-II.

23. The Bid shall be submitted in 2(Two) parts in separate sealed envelopes properly super scribing PNIQ No., name of work, and bid opening date containing in 1(One) sealed cover as follows:

Part-I: Pre Qualification Bida) Containing Bid earnest money as per the stipulations of the Bid Documents in a separate sealed

envelope.

b) Containing Bid Quotation free as per the stipulations of the Bid Documents in a separate sealedenvelope.

c) Containing Documentary Evidence of the Bidder fulfilling the Qualifying Requirements in a separate sealed envelope.

d) The quotations shall submit copies of relevant work order / Award letters / Agreements etc. and corresponding completion certificates issued by the concerned clients. The Quotationer shall also submit professional tax clearance certificate & sales tax clearance certificate and all such other documents deemed necessary in support of their meeting the stipulated qualifying requirements and its credentials as per Clause No. 2&16 of terms and conditions of this SNIQ without which the quotation will be rejected.

Part-II: Price Bid

Price schedule as per the format indicated in the Bid Price Schedule ( Annexure-III). The price Bid should be quoted both in figures and words ( sub-total and total value). If there is no meaning of words the figures will be considered otherwise words are final. No other price schedule format, other than this (Annexure-I) shall be acceptable and in such event of submission in their own price format, the bids shall be cancelled.

Notwithstanding anything contained herein above, TSECL reserves the right to assess the capacity and capability of the bidder to supply the transformer.

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

4

24. In case of any dispute, the decision of the Tripura State Electricity Corporation Limited Authority shall be final and binding.

25. The earnest money shall be forfeited:a. If a Bidder withdraws its bid during the period of bid validity specified by the

Bidder on the bid form; orb. In case of a successful Bidder fails:

i) to sign the contract; orii) to furnish the ‘Contract Performance Guarantee’.

26. Completion period: 15(Fifteen) days from date of issue of LOA.

27. The contract performance Guarantee shall be forfeited: -a) If the contractor left / suspends the work without prior written intimation to the Consignee of

the work stating the reasons for such suspension of work.

b) If the contractor left / suspends the work for reasons which are not acceptable to TSECL.

28. The successful Quotationer/bidder shall have to enter in an agreement with the Deputy General Manager, Transmission Division, 79 Tilla, Agartala.

29. PERIOD OF VALIDITY OF BIDS

a. Bids shall remain valid for 180(One hundred eighty) days after the date of bid opening prescribed by TSECL, unless otherwise specified in the accompanying Special Conditions of Contract. A Bid valid for a shorter period shall be rejected by TSECL as non-responsive.

b. In exceptional circumstances, TSECL may solicit the Bidder’s consent to an extension of the period of Bid validity. The request and the response thereto shall be made in writing (including cable or fax). The Earnest money provided under Clause 8(a) shall also be retained up to the extended period. No interest shall be payable by TSECL for retaining the earnest money up to the extended period. A Bidder may refuse the request without forfeiting the earnest money deposited by him. A Bidder granting the request shall not be required or permitted to modify his Bid.

30. Notwithstanding anything contained herein above, TSECL reserve the right to access the capacity & capability of the bidder to execute the work.

31. Quotation will be received at the following address: Dy. General Manager, Transmission Division, TSECL, 79 Tilla,Agartala, Tripura (W), PIN: 799006.

Dy. General Manager,

Transmission Division,TSECL 79 Tilla, Agartala, Tripura (W)

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

5

ANNEXURE – I

PROFORMA OF BANK GUARANTEE FORCONTRACT PERFORMANCE(To be stamped in accordance with stamp Act)

Ref. …………………… Bank Guarantee No. ……………

Date ………………………………

ToThe Dy. General Manager Transmission DivisionTripura State Electricity Corporation LimitedAgartala.

Dear Sir,

In consideration of Tripura State Electricity Corporation Limited (hereinafter referred to as the ‘Owner’, which expression shall unless repugnant to the contest or meaning there of include its successors, administrators and assigns) having awarded to M/s ……………………….. with its registered/Head office at …………………………….(hereinafter referred to as ‘Contractor’ which expression shall unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns), a Contract by issued of Owner’s Letter of Award No……………………..dated………………….and the same having been acknowledged by the Contractor, .valued at ……………for …………………(scope of contract) and the Contactor having agreed to provide a Contract Performance Guarantee for the faithful performance of the entire Contract equivalent to …………………………being 10% (Ten per cent) of the said value of the Contract to the Owner.

We, ……………………………………………………………………… (Name & Address) having its Head Office at…………………………….(hereinafter referred to as the ‘Bank’, which expression shall, unless repugnant to the context or meaning thereof, include its successors, administrators , executors and assigns) do hereby guarantee and undertake to pay the Owner, on demand any all monies payable by the Contractor to the extent of …………………………………………………………………..as aforesaid at any time up to…………………………**………………………………(days / month / year) without any demur, reservation, contest, recourse or protest and/or without any reference to the Contractor.

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

6

Any such demand made by the Owner on the bank shall be conclusive and binding notwithstanding any difference between the Owner and the Contractor or any dispute pending before any Court, Tribunal, Arbitrator or any other authority. The Bank undertakes not to revoke this guarantee during its currency without previous consent of the Owner and further agrees that the guarantee herein contained shall continue to be enforceable till the Owner discharges this guarantee.The Owner shall have the fullest liberty without affecting in any way the liability of the Bank under the guarantee, from time to time to extend the time for performance or the Contract by the Contractor. The Owner shall have the fullest liberty, without affecting this guarantee, to postpone from time to time the exercise of any powers vested in them or of any right which they might have against the Contractor, and to exercise the same at any time in any manner, and either to enforce or to for bear to enforce any covenants, contained or implied, in the Contact between the Owner and the Contractor or any other course or remedy or security available to the Owner. The Bank shall not be released to its obligations under these presents by any exercise by the Owner of its liberty with reference to the matters aforesaid or any of them or by reason of any other act of omission or commission on the part of the Owner or any other indulgences shown by the Owner or by any other matter or thing what so ever which under law would, but for this provision have the effect of relieving the Bank.The bank also agrees that the Owner at its option shall be entitled to enforce this guarantee against the Bank as a principal debtor, in the first instance without proceeding against the Contractor and not withstanding any security or other guarantee the Owner may have in relation to the Contactor’s liabilities.Notwithstanding anything contained herein above our liability under this guarantee is restricted to ………..and it shall remain in force up to and including ……………..and shall be extended from time to time for such period (not exceeding one year), as may be desired M/s …………….on whose behalf this guarantee has been given.

Dated this …………… day of ……………200…………… At ……………

WITNESS

…………………… …………………..Signature) (Signature)

……………………………… ………………………………...(Name) (Name) ……………………………… …………………………………(Official Address) (Official Address) Attorney as per PowerOf Attorney No. …………………………… Date………………

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

7

ANNEXURE – II

APPLICATION FOR EXTENSION OF TIME

(Part – I)

1. Name of Contractor ______________________________________________________________2. Name of work (as given in the contract) ________________________________________________________________________________________________________________________

___________________________________________________________________________

3. Agreement of ________________________________________________________________4. Estimate amount put to tender ___________________________________________________5. Date of Commencement of work _________________________________________________6. Period allowed for completion of work (as per agreement) _____________________________7. Date of completion stipulated in the agreement

8. Period for which extension of time has been given previously if any

a) 1st extension vide No. __________________________b) 2nd extension vide No.________________________________________c) 3rd extension vide No. _______________________________d) 4th extension vide No. ____________________________________

9. Period for which extension have been previously given (Copies of the previous application should be attached).

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

8

10. Hindrances on account of which extension is applied for with date on which hindrances occurred.

Sl. No.

Nature ofhindrances

Date of occurrence

Period of which

hindrances is likely to

last

Extension of time

applied for by the

contractor

Overlapping period, if any, giving reference to items which

overlap

Period for

which extensio

n is applied

for.

Remarks as to why the

hindrances occurred and

justification for extension of

time

11. Total period for which extension is now applied for on account of hindrances mentioned above.

12. Extension of time required for extra work: - ___________ Months. _______________ days.

13. Detailed for extra work and the amount involved: -

a) Total value of extra work: -

b) Proportionate period of extension of time based on estimated amount put to tender on

account of extra work: -

14. Total extension of time required for 11 & 12: -15. The price shall remain Firm even during extended period whatsoever.

Signature of Contractor

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

9

APPLICATION FOR EXTENSION OF TIME

(Part – II)

(To be filled in by TSECL)

1. Date of receipt of application from ______________________________________________ contractor for the work of _____________________________________________________

_________________________________________________in the Sub-Divisional

_________________________________________________________.

2. Acknowledgement issued by the Sr. Manager, vide his No. ____________________ __________________ Dated _____________________________.

3. Recommendation of Sr. Manager, in – charge of the Sub-Division is to whether the reasons given by the Contractor are correct and what extension, if any, recommended by him, if he does not recommended the extension, reasons for rejection should be given

Dated ………………….. Signature of the Sr. Manager in-charge of Sub-Division.

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

10

APPLICATION FOR EXTENSION OF TIME

(Part – III)

(To be filled in by TSECL)

1. Date of receipt in the Divisional office: _____________________________________2. Report of DGM, in-charge of the Division regarding hindrances mentioned by the contractor

____________________________________________________________

Sl. no.

Nature of hindrances

Date of occurrence

Period for which

hindrances is likely to

last

Extension of time applied

for by the contractor

Overlapping period, if

any, giving reference to items which

overlap

Net extension applied

for

Remarks as to why the hindrances occurred and justification for

extension recommended

3. Recommendation / Approval of the DGM, in-charge of the Division: -(The present progress of work should be stated and whether the work is likely to be completed by the date upto which extension is applied for, if extension of time is not recommended, what compensation is proposed to be levied under clause 13 of section – III.

Signature of DGM

4. Recommendation / Approval of the AGM, in-charge of the Circle: -

Signature of AGM5. Recommendation / Approval of the GM (Technical): -

Signature of GM (Technical)

6. Recommendation / Approval of the CMD: -

Signature of CMD

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

11

ANNEXURE-III

SCHEDULE OF WORK

Name of Work : Dismantling and Transportation of 132/33/11 KV, 7.5 MVA (2.5 MVA + 5 MVA ) Power Transformer from 132 KV Sub-station, Missiontilla to 132 KV Sub-Station, Dhalabil including dismantling of damaged 132/33 KV ,7.5 MVA Power Transformer at 132 KV Dhalabil Sub- station.

SL. No. Details of Particulars Quanti

ty Unit Rate Amount

1

Dismantling, dragging, loading, unloading, transportation from 132 KV Mission Tilla Sub-Station, Dharmanagar to 132 KV Dhalabil Sub-Station and commissioning of 7.5/2.5/5 MVA, 132/33/11 KV power transformer at 132 KV Sub-Station, Dhalabill.i) Dragging of transformer from unloading point to

plinth (distance = 75 mtr ) 2962.5per MT per mt.

ii) Loading of Transfomer and accessories like bushings with packing & oil etc. on tailor at Mission Tilla, Dharmanagar. 39.5 MT

iii) Transportation of above Transformer with necessary accessories & oil by low bed tailor from Mission Tilla to Dhalabill (Distance = 143 Km)Weight: 39.5 MT

a) 1st 50Km 1975 MT/Km

b) Next 51 Km to 150 Km 3673.5 MT/Kmiv) Unloading of transformer & accessories like

bushing with packing & oil etc. on tailor at Dhalabill

39.5 MT

2

Dismantling, dragging, loading, unloading, transportation from 132 KV Mission Tilla Sub-Station, Dharmanagar to 132 KV Dhalabil Sub-Station and commissioning of 3 MVA, 33 KV grounding transformer.i) Dragging of transformer from unloading point to

plinth (distance =75 mtr ) 212.25per MT per mt.

ii) Loading of Transfomer and accessories like bushings with packing & oil etc. on tailor at Mission Tilla, Dharmanagar.

2.83 MT

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

12

SL. No. Details of Particulars Quantity Unit Rate Amount

iii) Transportation of above Transformer's necessary accessories & oil by low bed tailor from Mission Tilla to Dhalabill (Distance=143 Km)Weight: 2.83 MT

a) 1st 50Km b) Next 51 Km to 150 Km

iv ) Unloading of transformer & accessories like bushing with packing & oil etc. on tailor at Dhalabill

2.83 MT

3 Dismantling of the followings:

i) 132 KV single phase CT of CTR 100/1-1-0.577 A 3 No.

4 Carrying of the followings:

i) Mechanical carrying of 3 Nos. 132 KV single phase CT of CTR 100/1-1-0.577A and 3 Nos.33 KV single phase CT of CTR 50/1-1-1 A from Mission Tilla 132 KV Sub-Station to 132 KV Dhalabil Sub-Station in/c loading, unloading & manual carrying of the same.

1 Trip

ii) Mechanical carrying of 11 KV, 3-core 95 sq.mm aluminium conductor XLPE insulated armoured cable from 132 KV Sub-Station, Ambassa to 132 KV Dhalabil Sub-Station in/c loading, unloading & manual carrying of the same.

1 Trip

5 Supply of heat shrinkable cable jointing kit suitable of following size and voltagei) Out-door type 300 sq.mm 11/6.35 KV(E) 3 -core

XLPE insulated armoured cable. (make DENSON)

2 Set

ii) Out-door type 120 sq.mm 11/6.35 KV(E) 3-core XLPE insulated armoured cable (make DENSON).

1 Set

iii) In-door type 120 sq.mm 11/6.35 KV(E) 3-core XLPE insulated armoured cable (make DENSON).

1 Set

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

13

SL. No. Details of Particulars Quantity Unit Rate Amount

6 Erection of the following :

i) 132 KV single phase CT of CTR 100/1-1-0.577 A 3 No.ii) 33 KV single phase CT of CTR 50/1-1-1 A 3 No.iii) 11 KV single phase CT of CTR 300/1-1-0.577 A 1 No.iv) Bi-metalic clamps & connectors suitable for

ACSR 'Panther'conductor, CT, Isolator etc. 11 No.

v) Laying of 11 KV, 3-core 95 sq.mm aluminium conductor XLPE insulated armoured cable 80 mtr

7 Termination of cable end with heat shrinkable jointing kit suitable for a) 120 sq.mm 11/6.35 KV(E) 3-core XLPE Cable

i) In door type 1 Setii) Out door type 1 Setb) 300 sq.mm 11/6.35 KV(E) 3-core XLPE Cable out door type 2 Set

8 Supply & erection of earthing set by 2.5 mtr. long G.I.pipe (ISI marked) of 40 mm diameter with holes including a pair of clamps of 50 X6mm M.S. flat & 12 mm dia galvanised nuts & bolts along with alternate layer of salt & charcoal with supply of G.I. pipe as per REC specification & design (60 KG salt & 55 Kg charcoal).

4 No

Total 0.00(+) Add GST

@18% 0.00

Grand Total 0.00

Dy. General Manager, Transmission Division,TSECL 79 Tilla, Agartala, Tripura (W)

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

14

DECLARATION

I / We hereby declare that I / we have personally gone through the Bid-Documents of Contract, Technical Specifications, other instructions / Special instructions etc. incorporated in the Bidding Document for the works / Supply and I / We do agree to abide by all the rules and regulations of TSECL.

SIGNATURE OF THE TENDERER / BIDDER

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

15

TRIPURA STATE ELECTRICITY CORPORATION LIMITED(A Govt. of Tripura Enterprise)

Transmission Division, TSECL,Agartala –Tripura (w)

Phones: 0381-235-3279 FAX: 0381-235-3279

16

SCHEDULE OF WORK

Name of work: Deployment of uniformed private security guard for watch & ward duties round the clock at 132KV Jirania Sub-Station for a period of 1(one)year.

Ref: PNIQ .NO. DGM/TD/2015-16/20 Date, 19/01/2016

Sl. No.

Particulars Total no of Guard

Unit Rate/month(In Rs.)

Amount (In Rs.)

1.

Private security guard for watch & ward duties at Jirania 132 KV Sub-Station for 24 hrs duty (8hrs. per Person) for a period of 01(One) year.

3 Person per month for 12 months 12x3=36

Each

Total =


Recommended