+ All Categories
Home > Documents > True Drilling Efficiency€¦ · 15-16 June, Estoril Congress Center, Estoril, Portugal True...

True Drilling Efficiency€¦ · 15-16 June, Estoril Congress Center, Estoril, Portugal True...

Date post: 19-Oct-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
15
IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal True Drilling Efficiency: Lead, Follow or Get Out of the Way John de Wardt, DE WARDT AND COMPANY Ford Brett, Petroskills
Transcript
  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    True Drilling Efficiency: Lead, Follow or Get Out of the Way

    John de Wardt, DE WARDT AND COMPANY Ford Brett, Petroskills

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    Heading into low rig count high oil production Shale drillers took

    over marginal

    production from

    Saudi Arabia

    Drilling efficiency is

    a key to staying in

    business

    Red line – the gas story Created lots of gas with low rig count

    Green line – new oil story

    Expecting lots of oil with low rig count

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    US land drillers reacted to low gas price

    A story of a tight

    gas driller 15,000 ft

    ‘S’ shaped wells

    Nat Gas price fall

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    > 2000 ft (600 m) per day opposite sides of the world – land and tender platform

    4

    DJ Basin Colorado

    Offshore Thailand

    Gas price crash

    Bankruptcy

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    Europe struggles to perform Now in declining

    trend

    Averages from data:

    • Land Europe 300 ft / day

    • Land USA 800 ft / day

    280 ft / dy

    5

    40%

    OG 21 Sources: NPD, Statoil, Petoro

    1994 - 2013

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    Doubling performance in Europe proven by Lean DrillingTM

    560 ft. / day overall vs. 262 ft. / day historic best (plateau)

    Halved completion time

    Cut well cost 35%

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    Lean DrillingTM repeated step change improvement Lessons from application • Organization Architecture = alignment to objectives thro aligned

    delivery systems across breadth & depth of organization

    • Culture change / team building = vision, values, equal players, common objective

    • Performance gap recognition = team owned stretch goal (MTP beyond TL, BIC, BOB)

    • Project services systems = professional detailed scheduling, cost est / control, risk management

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    Breakthrough drilling performance ingredients Ford Brett: Study identified step change above benchmarks &

    analyzed causes: GRI 1997 through today

    latest step change made $35 bbl economic

    • Commitment = “We are going to do this no matter what” • Detailed process focus = “The devil is in the details” • Involvement = “Everyone (all competencies) participates • Financial return = “Need to see return to make investment”

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    How NOT to have a Breakthrough • Keep doing things the same old way

    • a breakthrough requires change, and change requires commitment.

    • Don’t sweat the details • Rarely (never?) is a breakthrough one “magic bullet.”

    • Only involve the experts • A breakthrough touches everyone’s job

    • Don’t invest time & effort to change • A breakthrough requires 5 - 10 X the normal planning, engineering, and

    coordination

    Mr. Can’t

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    Target a true drilling efficiency ratio: Face the facts and stop the hype

    Slide 10

    Act

    ual

    Nor

    mal

    BO

    B

    BIC

    TL

    MTP

    Focus on NPT alone has

    negative performance impact

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    Case studies: MTP application

    Mid East Land

    Drilling – Dayrate,

    High Complexity,

    high risk area

    (terrorist activity)

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    0 5 10 15 20 25 30 35 40

    MD

    [m]

    Time [d]

    Maximum Theoretical Performance Depth vs. Time - 3,500m Development Well

    Maximum Theoretical

    Performance Routine

    Development

    Difficult Development

    Best well drilled

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    0

    1000

    2000

    3000

    4000

    5000

    0 5 10 15 20 25 30 35 40 45 50 55 60 65 70

    MD

    [m]

    Time [d]

    Maximum Theoretical Performance 5,100 m well - seabed zero

    MTP

    Deepwater Appraisal

    Difficult Deepwater Exploration

    Best well drilled

    Case studies: MTP application

    Deep Offshore Far

    East Drilling -

    Appraisal

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    0 5 10 15 20 25 30

    MD

    [Ft]

    Time [d]

    Maximum Theoretical Performance 9,700 ft single lateral well

    Routine Development

    Difficult Development

    Best well drilled

    Case studies: MTP application

    Mid East Land

    Drilling – Lump Sum

    Project Managed

    Step change wells

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    0 5 10 15 20 25 30

    MD

    [Ft]

    Time [d]

    Maximum Theoretical Performance 15,000 ft ‘S’ shaped well

    Routine Development

    Difficult Development

    Wells drilled

    Case studies: MTP application

    USA Land – “Super”

    Performance Drillers

  • IADC World Drilling 2016 Conference & Exhibition 15-16 June, Estoril Congress Center, Estoril, Portugal

    Drilling performance is now competitive advantage

    Rig activity will be performance driven as never before

    • Region to region: Europe is far behind / Mid East often wins on well production rates

    • Operator to operator: drives well cost and production timing = profitability • Project to project: drives NPV so drives well opportunities • Contractor to contractor: winners and losers

    Slide Number 1Heading into low rig count high oil productionUS land drillers reacted to low gas price> 2000 ft (600 m) per day opposite sides of the world – land and tender platformEurope struggles to performDoubling performance in Europe proven by Lean DrillingTMLean DrillingTM repeated step change improvementBreakthrough drilling performance ingredientsHow NOT to have a BreakthroughSlide Number 10Case studies: MTP applicationSlide Number 12Slide Number 13Slide Number 14Drilling performance is now competitive advantage


Recommended