N2
N2
KE
UR
BO
OM
S R
IVE
RD
IRE
CT
ION
OF
FL
OW
SILVERSTREAMS
SAN MARIN0
BLUE WATER RIVER ESTATE
LOCALITY PLANN.T.S
LOCALITY PLAN,TYPICAL WALL LAYOUT,SECTION & ELEVATION
NOT TO SCALE - SCHEMATICNOT TO SCALE - SCHEMATIC
PROJEK/PROJECT
TITEL/TITLE
SKAAL / SCALE DATUM / DATE VEL / SHEET
ONTWERP / DESIGN GETEKEN / DRAWN TEK. NR. / DRAW. NR.
949-SILVERSTREAMS - 1
AS SHOWN MAY 2017
D.INGRAMA.B. CILLIERS
SILVERSTREAMSKEURBOOMS RIVERPLETTENBERG BAY
M O S O M O
015 307 4435 P.O.BOX 1093
1 CIRCLE DRIVE
TZANEEN
0850
Fax. 015 307 1886
e-mail:[email protected]
REP. OF SOUTH AFRICA
CONSULTING CIVIL ENGINEERS (PTY) LTD
NO. DATE AMENDMENT
TYPICAL DETAIL OF TRANSITION TO EXISTING SLIPWAY OR STEPSSECTION C - C
SILVERSTREAMS - RIVER REHABILITATION CONSTRUCTIONSECTION A - A
VA
RIE
S
VARIES
VA
RIE
S
4 m
Va
rie
s1
m
2000 VARIES ± 5m
VARIES ± 7m
VARIES ± 2m
± 330m n.t.s.
15
00
SANDERLINGS ESTATE
2250 1000
RENO MATTRESS WITH BIDIM AT BOTTOM
HIGH TIDE LEVEL
LOW TIDE LEVEL
ROCKGRIP WITH COATED DIAMOND MESH WIRE ON LAST 2m(THE COATED DIAMOND MESH WIRE WILL BE USED TO BIND
THE ROCKGRIP TO THE RENO MATTRESSES)
SAND BAGS SLOPED TO SHAPEEMBANKMENT NATURALLY
RENO MATTRESS WITH BIDIM AT BOTTOM
HIGH TIDE LEVEL
LOW TIDE LEVEL
GABION BOXES SLOPED TO SHAPEEMBANKMENT NATURALLY
A2 BIDIM FILLED WITH SANDA2 BIDIM
FILLED WITH SAND
RENO MATTRESS COVERED WITH TOPSOIL AND PLANTED WITH BUFFULO GRASS(STENOTPHRUM SECUNDOTUM) UP TO HIGH WATER LEVEL
EXIST. CONCRETESLIPWAY
GABION BOXES(1 x 1 x 2m)
SAND BAGS (1 x 1 x 1m)
GABION BOXES (1 x 1 x 2m)
GABION BOXES (1 x 1 x 2m)UNDERNEATH RENO MATTRESS
RENO MATTRESS TOFINISH OFF END
RENO MATTRESS TOFINISH OFF END
ROCKGRIP WITH COATED DIAMOND MESH WIRE ON LAST 2m(THE COATED DIAMOND MESH WIRE WILL BE USED TO BIND
THE ROCKGRIP TO THE RENO MATTRESSES)
RENO MATTRESS COVERED WITH TOPSOIL AND PLANTED WITH BUFFULO GRASS(STENOTPHRUM SECUNDOTUM) UP TO HIGH WATER LEVEL
JETTY WALKWAY
RIP RAP INTOEMBANKMENT
SCALE 1:150
BLUE WATER RIVER ESTATE SANDERLINGS ESTATE
EXIST GROUNDLEVEL
SILVERSTREAMS
HIGH WATERLEVEL
RA
MP
TO
JE
TT
Y
TYPICAL LAYOUT PLAN OF EMBANKMENT WALLSCALE 1:150
NEW CCA TREATED POLES@ 4,5m crs
KEURBOOMS RIVERDIRECTION OF FLOW
EXISTING OLD BITUMEN TREATED POLEEMBANKMENT WALL EXISTING OLD BITUMEN TREATED POLE
EMBANKMENT WALL
EXISTING POLEEMBANKMENT WALL
D C
KEURBOOMS RIVERDIRECTION OF FLOW
EXIST. MOORING POLES@ 9,0m crs
EXISTING LAWN
B A
VARIABLE SLOPE WITH RENO MATRESS
GABION BOXES (1 x 1 x 2m)UNDERNEATH RENO MATTRESS
DC
JETTY WALKWAY
RA
MP
TO
JE
TT
Y
NEW CCA TREATED POLES@ 4,5m crs
EXISTING STEPS
EXIST. MOORING POLES@ 9,0m crs
EXISTING LAWN
B A
EXISTING POLEEMBANKMENT WALL
VARIABLE SLOPE WITH RENO MATRESS
EXISTING POLEEMBANKMENT WALL
RENO MATTRESS TOFINISH OFF END
EXTEND GABION BOXES
RA
MP
TO
JE
TT
Y
1
EXIST. MOORING POLES@ 9,0m crs
NEW CCA TREATED POLES@ 4,5m crs
EX
IST
. S
TE
PS
JETTY WALKWAY
RA
MP
TO
JE
TT
Y
5
EXIST. MOORING POLES@ 9,0m crs
NEW CCA TREATED POLES@ 4,5m crs
EX
IST
. S
TE
PS
EXIST. CONCRETESLIPWAY
RIP RAP INTOEMBANKMENT
GABION BOXES (1 x 1 x 2m)UNDERNEATH RENO MATTRESS
RENO MATTRESS TOFINISH OFF END
EXIST. GABION BOXES
EXISTING LAWN
D C B A DCB A
FUTURE JETTY EXTENSIONFUTURE JETTY EXTENSION
FUTURE JETTY EXTENSIONFUTURE JETTY EXTENSION
EXIST. GABION BOXES
NEW GABION BOXESNEW GABION BOXES
EXISTING LAWN
METHOD STATEMENT FOR REHABILITATION OF RIVER BANK ATSILVERSTREAMS; PLETTENBERG BAY
Herewith a summary of planned construction activities torehabilitate the Keurbooms river bank at Silverstreams development.Temporary measures:
1. Excavate a level working platform at the low tide water level mark;
2. Place a "Rockgrip" layer on the invert of the excavation, this will ensure that the proceeding layer will be fixed together to provide adequate stability. The "Rockgrip" layer will have a coated diamond mesh fixed to the last 2 m, to allow the "Rockgrip" to be fixed to the Reno mattresses;
3. Place Reno mattress to form the toe of the structure, to prevent undermining of the embankment;
4. Place 2 No. rows of 1 x 1 x 1 m sand bags along the low tide water level contour, to form the leading edge of protection against erosion;
5. Place 1 No. row at the back of the excavation, this will form an anchor for the sand fill which will follow;
6. Place a geotextile layer to form a container between the front row and back row of sand bags. This will form a boundary into which sand can be placed;
7. Pump the sandy material that has been eroded from the river into the geotextile container. The sand must be compacted to ensure stability of the embankment;
8. Place a "Rockgrip" layer on the crest of the first layer, this will ensure that the proceeding layer will be fixed together to provide adequate stability. The "Rockgrip" layer will have a coated diamond mesh fixed to the last 2 m, to allow the "Rockgrip" to be fixed to the Reno mattresses;
9. Repeat steps 4 - 8 until the top of the embankments are reached, take note that each layer should be offset by the distance necessary to shape the embankment to a natural slope;
10. Once all the layers have been completed, then sandbags should be placed on the steps, they should be filled with sand and the sand bags should be shaped to form a smooth transition between the layers; and
11. Geotextile should be placed on the face of the newly shaped embankment, from the bottom Reno mattress to the top of the embankment.
Permanent measures:
12. A layer of Reno mattresses should be placed on top of the geotextile and anchored vertically into the back of the embankment;
13. Organic material, Salt marsh, should be placed on the Reno mattresses in the inter-tidal zone; and
14. Topsoil salvaged from excavations should be placed on top of the remaining Reno mattresses and plant material should be established to create a natural aesthetic.
SAND BAGS (1 x 1 x 1m)
EXIST. BARGE
RA
MP
TO
BA
RG
ER
AM
P T
O B
AR
GE
EXIST. BARGE
EXTEND GABION BOXES
RENO MATTRESS COVERED WITHTOPSOIL AND PLANTED WITH BUFFULO GRASS(STENOTPHRUM SECUNDOTUM)UP TO HIGH WATER LEVEL
RENO MATTRESS WITHBIDIM (SEE DETAIL)
LOW TIDE LEVEL
RENO MATTRESS WITHBIDIM (SEE DETAIL)
LOW TIDE LEVEL
GABION BOXES(1 x 1 x 2m)
EXISTING OLD BITUMENTREATED POLEEMBANKMENT WALL
EXIST GROUNDLEVEL
JETTY
ACCESS TO JETTY
NEW 200/150 CCA TREATED POLEMIN 6m LONG DRIVEN INTO SAND BEDMIN OF 4,0m DEEP AT 5,4m CRS
EXISTING LAWN
NOTE BALL FIXING BOLTS TO BESTAINLESS STEEL GRADE 304
SECTION THROUGH EMBANKMENT WALLSECTION B -B
SCALE 1:50
HIGH WATERLEVEL
STIROFOAMBOUYANCY BOXES
12 Ø SS U-BOLT
EXIST. MOORING POLES
EXISTING OLD BITUMENTREATED POLEEMBANKMENT WALL
EXIST GROUNDLEVEL
EXISTING LAWN
SECTION AT END OF EMBANKMENT WALLSECTION D -D
SCALE 1:50
HIGH WATERLEVEL
GABION BOXES(1 x 1 x 1m)
JETTY WALKWAY
TYPICAL ELEVATION OF EMBANKMENT WALL
2500 1000
97009700
15
00
± 330m n.t.s.
EXISTING STEPS