+ All Categories
Home > Documents > UH-60P Blackhawk Helicopter AAR/ALE Installation Blackhawk Helicopter AAR/ALE Installation ......

UH-60P Blackhawk Helicopter AAR/ALE Installation Blackhawk Helicopter AAR/ALE Installation ......

Date post: 06-May-2018
Category:
Upload: phunghanh
View: 229 times
Download: 5 times
Share this document with a friend
1
UH-60P Blackhawk Helicopter AAR/ALE Installation FAA/EASA APPROVED REPAIR STATION # S66R266N 1399 General Aviation Drive | Melbourne Intl. Airport | Melbourne, FL 32935 USA Tel 321-255-9877 Fax 321-255-9608 | Email [email protected] | www.seaerospace.com Southeast Aerospace designed installation kits and installed the AAR-47 and ALE-47 missile warning and flare dispense systems in four UH-60P helicopters. All four aircraft were modified on site in Southeast Asia by an SEA modification team. SEA design included: - Systems electrical interface - Forward sensor fairings & a customized vertical stabilizer fairing - 2-Axis flare dispenser bracket fabrication - Tailboom structural fortification The aircraft mission was for foreign military to provide airlift support in Afghanistan. The installation project was completed in time to meet the customer's airlift schedule for deployment. PORTFOLIO
Transcript
Page 1: UH-60P Blackhawk Helicopter AAR/ALE Installation Blackhawk Helicopter AAR/ALE Installation ... Southeast Aerospace designed installation kits and installed the AAR-47 and ALE-47

UH-60P Blackhawk Helicopter AAR/ALE Installation

FAA/EASA APPROVED REPAIR STATION # S66R266N1399 General Aviation Drive | Melbourne Intl. Airport | Melbourne, FL 32935 USA

Tel 321-255-9877 Fax 321-255-9608 | Email [email protected] | www.seaerospace.com

Southeast Aerospace designed installation kits and installed the AAR-47 and ALE-47 missile warning and �are dispense systems in four UH-60P helicopters. All four aircraft were modi�ed on site in Southeast Asia by an SEA modi�cation team.

SEA design included:- Systems electrical interface- Forward sensor fairings & a customized vertical stabilizer fairing- 2-Axis �are dispenser bracket fabrication- Tailboom structural forti�cation

The aircraft mission was for foreign military to provide airlift support in Afghanistan.The installation project was completed in time to meet the customer's airlift schedule for deployment.

PORTFOLIO

Recommended