K
1 9 6 4
Nomor
Kepada
Perihal
Lampiran
INFORMASI TEKNIK
~ September 2018
15'.l - u,,i
Seluruh Pengguna Jasa BKI dan Surveyor BKI
Korigenda Rules for Floating Docks, (Pt. 3, Vol. II)
1 (satu) berkas korigenda.
1. Sehubungan dengan adanya perubahan editorial pada Rules for Floating Docks, (Pt. 3, Vol. II) edisi 2002, maka diinformasikan perubahan editorial terhadap Rules tersebut melalui korigenda terlampir.
2. Korigenda tersebut dapat diunduh di website BKI (www.bki.co.id) pada menu "Rules, Regulations and Guidelines" dan di versi terbaru dari program "BKI Rules Compilation". lnformasi ini juga dapat diakses melalui One Gate System (OGS) khusus untuk pengguna internal di http://ogs.bki.co.id .
Untuk informasi lebih lanjut, dapat menghubungi : Divisi Riset & Pengembangan Bagian Pengembangan Peraturan dan Aplikasi Klasifikasi
Jalan Yos Sudarso 38-39-40 Tanjung Priok Jakarta, 14320 Indonesia !elp. : +6221 4301017, 4301703 Fax : +6221 43901974
K
$ 1 9 6 4
CORRIGENDA No.1
Part 3 Special Ships
Volume II
RULES FOR FLOATING DOCKS
2002
Biro Klasifikasi Indonesia
Copyright © 2018 Biro Klasifikasi Indonesia JI. Vos Sudarso No. 38-40, Tanjung Priok Jakarta 14320 - Indonesia [email protected] www.bki.co.id
August 2018
Pt Vol
3 II
Page i
Specia l Ship Rules for Floati ng Docks
Corrigenda No. 1
This page intentionally left blank
Biro Klasifikasi Indonesia - 2018 Edition
Pt Vol
3 II
Special Ships Rules for Floating Docks
Corrigenda No. 1-August 2018
Section 6 Testing and Surveys
A. Testing
1 Testing ofTanks
Corrigenda No. 1
1.1 Fresh water and portab le water tanks, oi l fuel and lubricating oil tanks as we ll as waste oil ta nks are to be tested by a head of water of 2,5 m above the tank top.
1.2 All ba llast compartments in the pontoon and in the wing wa ll s are to be tested by a powerfu l jet of water, or else by air pressure. When air testing is adopted, all welded seams essential for watertightness are to be wetted with suds or a sim ilar liqu id.
2. Testing of the Dock
Upon the comp letion of the dock, the freeboard to the top deck, the light weight and the nomina l li ft ing capacity of t he dock are to be ascertained.
B. Surveys
Survey during construct ion and surveys for mai ntena nee of class of the fl oating docks a re to be carried out
in accordance with Ru les for Classification and Surveys (Pt.1, Vol.I} Sec.4.G.
Correct i on: Rewrite the whole of Section 6 from Rules for Floating Dock {Pt.3, Vo l . II} .
Biro Klasifikasi Indonesia - 2018 Page 1