000|Architecture PortfolioRebecca Choong
REBECCA CHOONG0430 [email protected]
This portfolio is a collection of works that have have been undertaken during the Bachelor of Environments as well as a summer course at the Architecture Association.The process of developing each of these projects from initial concept to documenting have had significant impact on my personal process of designing and thoughts behind what is involved in architecture.
EDUCATIONUniversity of Melbourne 2010-2012
Architecture Association July 2012
Brentwood Secondary College 2004-2009
VOLUNTEER EXPERIENCERobin Boyd Foundation Australian Institute of Architects Charity events - Mothers Day Classic Run, Herald Sun Run for the Kids
PROGRAM SKILLSAutodesk Revit Autodesk CAD Rhinoceros\Grasshopper\Vray Adobe Illustrator Adobe Photoshop Adobe InDesign
Bachelor of Environments Majoring in Architecture AA Summermake
Victorian Certificate of Education
2012 2012 2011\2012
Intermediate Basic Basic Intermediate Intermediate Basic
Current EmploymentBakers Delight 2010-presentRefereeSally Harris0428 882346
Additional SkillsFluent EnglishBasic JapaneseBasic FrenchVictorian Drivers licence
Sales Assistant
Shift Supervisor
RESUME
001|Barlow MotorsThe capstone project of the Bachelor of Environments degree required for a car showroom to be designed around the central character of A.G. Barlow. The reputation that Barlow has built for himself as a result of his past personal and business life served as inspiration for the possibilities of the new Barlow Motors car showroom. University of Melbourne 2012Studio Leader: Derham GrovesTutor: Larry Cirillo
001| Barlow Motors
Barlow motor's business in selling mini coopers have inspired the architecture behind the Barlow's latest car dealership. Influenced by the popular proportions of the mini cooper - a small but spacious car - the building attempts to encapsulate similar ideas which are translated into its form. The spaciousness of the car is afforded by the front wheel engine arrangement,a feature that has been maintained ever since its beginning. A similar arrangement is adopted within the building where services of the building such as stairs, lifts and toilets are classified as the engines of the building and thus are placed towards the edges and centre of the building - symbolizing the two front wheels and engine. In addition, the footprint of the building also aims to follow the proportions of the cooper whereby it appears small to the passerby but the interior consists of large open spaces. The overall design of the building is a combination of ideas that are meant to symbolize the progression of car dealership architecture - beginning from the early 1900's to current car dealership typology.
1 2
3
4
51 Car Service2 Car Service3 Car Showroom4 Outdoor car showroom5 Meeting rooms\offices
Ground Floor First Floor Second Floor Third Floor Fourth Floor
Short Section Longitudinal Section Front Elevation
Render of the exterior car showroomIntended to resem-ble showroom of the 60\70's
Render of the interior car showroomIntended to resemble present showrooms
Images of the modelLeft: Perspective viewRight: View from the street
002|Gateway for Wyndham City The focus on for this project was to introduce the possibilities of parametric design through the process of replicating, fabricating and finally using those skills de-veloped to create a parametrically designed structure. University of Melbourne 2012Studio Leader: Stanislav RoudavskiTutor: Dave Lister & Jerome Frumar
002| Gateway for Wyndham CityExploration and Fabrication of Parametric Design
The fabricated voronoi patterns were subjected to various experimentations to explore the different effects that are made possible by this form. Experimentations involved bending, freezing and different lighting conditions.
First Column: Experimentations with iceSecond Column: Effects of bending and twisting
002| Gateway for Wyndham CityExploration and Fabrication of Parametric Design
Initial explorations into parametric design were achieved by replicating a previous case study, specifically, the Airspace Tokyo by Faulder Studio. The pattern was recreated through Rhino&Grasshopper using the voronoi component that were driven by a set of points previously mapped on rhino. Variations of voronoi curves were created in layers and overlapped to form a three dimensional form.
Layers of voronoi geometry created using Grasshopper and overlayed
002| Gateway for Wyndham City
Wyndham's motto of City.Coast.Country forms the inspiration behind the gateway to emphasize on what the city prides itself on - an amalgamation of cultures that stem from various parts of Victoria
The merging of road from different directions creates a form for the gateway and is symbolic of Wynd-ham as being the merging point of people coming from Melbourne and Geelong
The initial elongated triangle is re-peated, twisted and loftedto signify the shift in focus towards Wynd-ham-particularly its reputation as the fastest growing city in Victoria.
The solid form is sectioned to create a sense of horizontalitywith the landscape and maintain the visibility of the adjacent service station.
Parametrically controlled contours are added to each layer to give additional dynamic characteristics at different times of the day
PRINCES HIGHWAY(WEST BOUND)
PRINCES HIGHWAY (EAST BOUND)
WEST ROAD
GEELONG ROAD EXIT
SERVICE STATION
NORTH MELBOURNE
GEELONG
WYNDHAM
Driver's Perspective View towards Melbourne View towards Geelong Construction detailing
PRINCES HIGHWAY(WEST BOUND)
PRINCES HIGHWAY (EAST BOUND)
WEST ROAD
GEELONG ROAD EXIT
SERVICE STATION
NORTH MELBOURNE
GEELONG
WYNDHAM
Construction detailing
003|Studley Park Boathouse
This studio presented the unique opportunity to "learn from the masters" by analyzing and observing the previous works of a popular architect. From the research collected, the brief was to design a boathouse with specific needs in the manner and style of a chosen archi-tect. The boathouse was designed according to the principles of Frank Lloyd Wright University of Melbourne 2011Studio Leader: Jianfei ZhuTutor: Chen-yu Chiu
Analysing the works of Frank Lloyd Wright, particularly his house for George Sturges, several of his main principles were categorized and incorparated into the design of the boathouse.Features such as Wright's cantilevers, floating roofs and linearity were emphasized in the design by including similar characteristics into the building. In addition to the external features, the arrangement of spaces and services were also done in the manner of Frank Lloyd Wright.
003|Studley Park Boathouse
Public
UP
UP
DN
DN
UP
1
Diagramatic arrangement of Wright's internal spacesLeft: Public and Private SpacesCentre: Outdoor and Indoor spacesRight: Volumetric spaces
ServicesPublicPrivate
Outdoor spaces
Volume of spaces
Ground Floor First Floor Second Floor
1
2
3
4
5
1 Boat Hire2 Kiosk3 Cafe4 Restaurant5 Offices
1
4
Hand drawn perspective using watercolour
Longitudinal Section East Elevation
004|SummerMake Visiting School The SummerMake program was a hands on course that emphasized on the engagement of live architecture.The theme for the course was "Symphony" and aimed at exploring the acoustic possibilities of timber and creating an instrument that would play a continuous symphony in the forest Architecture Association2012Team Leaders: Luke Olsen
Jesse Randzio
The theme of symphony was represented by a set of water powered logs with accompanying man made instruments from recycled tree stumps.Three logs were partially hollowed out and suspended onto a perpendicular log that sat between two trees. Water was brought in from a nearby river and funelled into the hollowed out logs to allow for it to counter balance the weight of the log and consequently "hit" the instruments that were positioned at the end of the logs. The notion of a continued symphony was particularly significant in this instrument as the water from the river creates a continuous sound that resonates throughout the forest at different volumes - depending on the flow of the water.
004|SummerMake
Above: Panoramic image of the instrument in its entirety placed onto the siteLeft to Right:1) determining the correct position for the logs to be suspended to allow the logs to work2) Detailing of how the water is transfered into each log3) Re-routing the water to our log4) Accompanying instruments made of re-cycled tree stumps.Stumps were hollowed out and fitted with a drum skin. The hollowness of the log and the skin stretched in tension amplified the sound of the water as it emptied out from the log above.
005|Construction Design A core within the Bachelor of Environments degree that focuses on the process of going from architectural design to buildable works. University of Melbourne2012Subject Coordinator: Blair GardinerTutor: Clare Kwok
The central aim of this subject was to translate a provided sketch design into a legible set of construction drawings.Part of creating these drawings were to address specific design intentions, such as a shadow line and a glass void, and select the appropriate structure and material to comply with industry standards. Each of these drawings were done in Autodesk Revit 2012.
005|Construction Design
UP
UP
D1.08
D1.06
D1.04 D1.05 D1.06
4321
D
C
B
A
FFL 44.75
RECEPTION
GALLERY
FFL 44.751.05
1.02VISITOR ENTRY
FFL 44.751.01
TOILETSFFL 44.79
1.03
MEETING ROOMS
FFL 44.75
1.04
WT1
WT2
COURTYARDFFL 44.25
1.03W1.01
GD
TP
CT
PC
PC
GT
DPDP
DP
DP
D1.03
BSP
D1.02
10110
4210
100
BSP
1
A113
1540
4260
110 1103930 5050 310 2060
310
180
3930
180
980
4520
2° FALL
4250
310
150
WT1
WT2
D1.01
D1.08
5640
5770 4150 5370
1970
2490
100
800
330
5210 31039305490
A
A11
4447
A
A12
A10
A
4010
2090
2650
5490 4020 5180
Project:
Proposed two storey office for Holmwood Place
Description: Ground Floor Plans
Drawn By: Rebecca Choong
389988
Date: May 2012
Scale : 1: 50
Tutor: Clare Kwok
A3
COL
CO
LCO
L
COL
Legend
Property boundary
COLCOL
TP Pivoting tilt panels
Wall panels are portable and can be stacked to suit
space needs
GD Renlita Series 3000 fold up garage doors
DP 100mm x 100mm PVC downpipes
COL Steel column
89 x 89 x 3.5 Square Hollow Section
Wall Types
Floor Finishes
PC Polished concrete floors
GT Grass Turfing
CT 300mm x 300mm ceramic tiling
BSP Bluestone paving
WT3
WT2
D1.01 Ground floor door numbers
North
WT4
WT4
W1.02W1.03
W1.01 Ground floor window number
W1.0
3
W1.04
W1.0
5
WT1Insulated tilt up pre-cast sandwich panels
Pre-cast panels joined using face-sealed joints
WT2 92mm steel stud wall
Plasterboard lining on interior walls
WT3 92mm steel stud wall
with exterior cement rendering
WT4 92mm steel stud wall
with vertical shiplap timber cladding
WT1.01 Insulated tilt up precast sandwich panels
Manufactured with customized pockets to
embed PFC
SP
EB
EBR
WM
Y20 dowels
150PFC
MC
Insulation as provided with
thermomass
GFN
CT
PC
150mm concrete slab
SL82 Mesh reinforcement
50mm sandbed
Fill Soil
Backer rod and caulk
SL82 Mesh reinforcement
Project:
Proposed two storey office for Holmwood Place
Description: Vertical Detail Section
Drawn By: Rebecca Choong
389988
Date: May 2012
Scale : 1: 5
Tutor: Clare Kwok
A12
Legend
Y20 Panels tied to edge rebate using Y20 dowels @2m
centres
WT1 Insulated tilt up pre-cast sandwich panels
Pre-cast panels joined using face-sealed joints
PFC 150mm Parallel flange channel
Notes
CT Connector Ties
Precast panel to be manufactured with cut out to fit PFC
to create shadowline
Exposed PFC to be galvanized to protect from
external environment
GFN
Edge Beam with embedded cast in platesEB
EBR Edge Beam reinforcement
WM Polyethene waterproof membrane
MC Mass Concrete
SL82 Square reinforcement mesh
7.62mm deformed reinforcement bars @ 200mm
centres both ways
PC
Floor finish
Polished concrete with epoxy finish
Double glazed
aluminium window
WT1
WF
WF Welded wire fabric
Galvanized furring nails
Angle welded to cast in plates
Expansion joint with grout fill
SP Shim packers and sealant
Precast panel to have a grade A finish
D C B A
FFL 4475
FFL 4775
FFL 4855
FFL51.75Capping
TC
TB
CP1
MR
Insulation
PL
BG
GB
WP
200UB25
Insulation
PCL
CP2
PC
Bondek
CS1
250UB
200UB
WT3
LS
EB
EBR
MC
SL82 Mesh Reinforcement
WT4
Flashing
PB
TB
TD
TJ
TC
TS
PLC
SD
BAL
COL
BSP
SP
BN
D1.02
VISITOR ENTRY
COURTYARD
COL
GALLERY
W1.02
WORKSPACE
DP
OUTDOOR SPACECOURTYARD
CS2
Project:
Proposed two storey office for Holmwood Place
Description: Section B
Drawn By: Rebecca Choong
389988
Date: May 2012
Scale : 1: 50
Tutor: Clare Kwok
A10
Legend
MR 762 mm x 29mm Trimdeck metal roofing
BG 300mm x 170mm box gutter
GB Gutter board
WP Welded cleat plates
GH Gutter hangers
UB Universal beam
CP1 C10015 purlins
PCL Purlin cleats
BN Bon-nut heavy duty square nut to suspend ceilings
C20015 purlins @ 1200mm centresCP2
TC Vertical shiplap spotted gum timber cladding
TS Tophat sleeves
PFC Parallel flange channel
CS2 150mm concrete slab
SP Shim packers and sealant
Edge Beam with embedded cast in platesEB
EBR Edge Beam reinforcement
WM Polyethene waterproof membrane
SL82 Square reinforcement mesh
7.62mm deformed reinforcement bars @ 200mm
centres both ways
MC Mass Concrete
W1.01 Window Number
TB Timber blocking
PL Plasterboard wall lining
LS Landscape stairs
Floor Finishes
BSP Bluestone paving
PC Polished concrete with epoxy finish
PB Planter box
BAL Balustrade
COL Steel column
89 x 89 x 3.5 Square Hollow Section
GT Grass Turfing
Pipes for courtyard
drainage
GT
TD Timber decking
SD Eliosolar thermal shading device with
integrated solar thermal collector
DP 100mm x 100mm PVC downpipes
WD
WD Drainage pipe for timber deck
Notes
Both planter box and external cladding to be clad with
spottted gum timber cladding
External cladding to have 135mm x 20mm vertical shiplaps
Planter box to have horizontal boards of the same grade of
timber with a square edge
Timber decking to use same type of timber with no finishes
to allow for natural weathering
Decking to have a 3° fall to allow for water drainage
Fill soil in courtyard area to have geotextile fabric instead
of pollyethene waterproof membrane
CS1 120mm concrete slab
WT3
WT4
92mm steel stud wall with exterior cement rendering
92mm steel stud wall with vertical shiplap
timber cladding