URENCO Capenhurst Site Integrated Waste Strategy
Transcript
Page 1: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 1

URENCO Capenhurst Site Integrated Waste Strategy

Page 2: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 2

Executive SummaryThis document describes the URENCO Integrated Waste Strategy (IWS) for managing radioactive and non-radioactive wastes at the URENCO site at Capenhurst. It covers wastes currently on the Capenhurst site and wastes that will be produced by future operations. The URENCO site at Capenhurst comprises URENCO UK Limited (UUK), the holder of a nuclear site licence and environmental permits, and a number of tenants, some of whom are also in possession of an environmental permits. The tenants holding environmental permits are Capenhurst Nuclear Services Limited (CNS) and URENCO Chemplants Limited (UCP). A third tenant (Enrichment Technology UK – ETUK) also resides as a tenant on the site but operates under UUK’s environmental permits.

It is a regulatory expectation of the Office for Nuclear Regulation (ONR) that licensees develop an IWS. It is also a regulatory expectation of the Environment Agency (EA) that Permit holders develop an IWS. In view of this, the Capenhurst Site has developed a joint IWS and UUK as licensee, has taken the lead in coordinating its production.

The IWS is aligned with the seven topic areas outlined in the Nuclear Decommissioning Authority’s (NDA) guidance ENG01. The Capenhurst site does not store or generate higher activity waste and therefore the joint guidance issued by ONR and the Environment Agency is not applicable (and hence a Radioactive Waste Management Case is not required). The IWS summarises the key waste management strategies for both radioactive and non-radioactive wastes, waste management opportunities and risks. In addition to wastes, the IWS includes an overview of the types of residues generated by URENCO at the Capenhurst site. The IWS outlines the current waste management practices and looks ahead to define where the site wants to get to, how we will get there and the key milestones for the short, medium and longer term periods. A key to a successful IWS is early regulator and stakeholder communication and engagement.

An Action Plan has been compiled that develops a forward programme of work. This assigns responsibilities and completion dates for a set of objectives and actions.

The key elements of the integrated waste strategy are that:

• itappliestothewholeCapenhurstSite.

• itisalignedwiththeWasteManagementHierarchyandBestAvailableTechniques(BAT).

• itisconsistentwiththeNationalLowLevelWasteManagementprogramme.

• Itprioritiseshazardsandidentifieshowriskswillbereduced.

• wastemanagementawarenessandwastemanagementtrainingisprovided.

• presentandfuturearisingsofwastearemanaged.

• legacyWastesaremanaged.

URENCO UK Limited 2

Page 3: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 3

ContentsExecutive Summary 2

1 INTRODUCTION 41.1 Background 41.2 Purpose 61.3 Scope 6

2 COMMUNICATION AND CONSULTATION 72.1 Regulatory input and consultation 72.2 Stakeholder input and consultation 72.3 BestAvailableTechniques(BAT) 72.4 Accessibility 8

3 OBJECTIVES AND AIMS 93.1 Where are we? Where are we going? 93.2 Setting Objectives 153.3 TheWasteHierachy 163.4 Interaction with other strategies and plans 18

4 DATA GATHERING 194.1 What Wastes Do We Generate At Present? 194.2 What Wastes Will We Generate In The Strategy Period? 19

5 CRITICAL EVALUATION OF WASTE MANAGEMENT OPTIONS 205.1 What Do We Do At Present? 205.2 WhatWillBeNeededInTheFuture? 215.3 Are Existing routes And Plans Satisfactory? 21

6 HORIZON 226.1 KeyDeliverables,DecisionsandRequiredTimescalesForDelivery 226.2 Threats (risks) and Opportunity Management in Strategy Delivery 226.3 Action Planning 23

7 MONITORING AND EVALUATION 247.1 IWS review cycle 247.2 Indicators and metrics 247.3 Reporting and auditing 25

8 ACRONYMS 26

9 REFERENCES 27

Page 4: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 4

1 Introduction

This Integrated Waste Strategy (IWS) has been prepared by URENCO and it describes waste management strategies for operations at the Capenhurst Site, near Chester. This IWS is part of the company’s commitment to demonstrate and communicate an integrated and sustainable waste management strategy for all URENCO operations on the Capenhurst site.

URENCO generates radioactive and non-radioactive wastes and in the future new sources of waste will arise as new plant is commissioned or old plant is decommissioned. These wastes are managed in compliance with Environmentalpermits,theNuclearSiteLicenceandotherregulatoryrequirements.Forradioactivewastes,aCorporate Radioactive Waste Advisor (CRWA) scheme (ref 1) has been established to ensure knowledgeable, experienced and competent personnel are available to provide advice on radioactive waste management and environmental radiation protection. As part of the CRWA arrangements, similar procedures are used by the four companies to encourage consistency across the site.

1.1BackgroundURENCOLimitedisaninternationalenergyandtechnologygroupoperatinguraniumenrichmentplantsinthe United Kingdom, Netherlands, Germany and United States. The company’s primary focus is on providing safe, cost effective and reliable uranium enrichment services for civil power generation within a framework of environmental, social and corporate responsibility. In the UK, the operator of the URENCO enrichment plants at CapenhurstisURENCOUKLimited.

TherelationshipswithintheURENCOgroupareillustratedinFigure1.

Figure 1: URENCO Organisational Structure

Page 5: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 5

CapenhurstNuclearServicesLimited(CNS)isasubsidiarybusinessofURENCOLtdandatenantontheUUKlicensed site. CNS is a company specialising in uranic material management, decommissioning and recycling activities. CNS has recently taken over the contract to manage uranic materials and decommissioning activities from previous site operators, and delivers this work on behalf of the Nuclear Decommissioning Authority (NDA). CNSisdevelopinganewLegacyCylinderFacility(LCF)tomanageitslegacystocksofNDAownedUraniumHexafluoride(UF6).

Other URENCO group tenants on the site include URENCO ChemPlantsLimited(UCP)whichiscurrentlydesigningandbuildingtheTailsManagementFacility(TMF),afacilityonsiteforthemanagementofUF6 ‘tails’ (i.e. a uranium co-product of enrichment with some viable U235 resource remaining). It is anticipated that this facility will become operational in 2016.ThisfacilitywilldeconvertUF6 to Uranium Oxide (U3O8) to allow the uranium to be stored in a more chemically stable oxide form for potential future reuse in the nuclear fuel cycle. Aby-productofthedeconversionprocesswillbeHydrofluoricAcid(HF)andthiswillberecoveredforreuseinthechemicalsindustry.

EnrichmentTechnologyUKLimited(ETUK),asubsidiaryoftheEnrichmentTechnologyCompanyLimited(ETC), runs a small development and qualification facility on the site and a project office. It operates within the requirements of the UUK environmental permits.

The Capenhurst site is a single nuclear licensed site, licensed under the Nuclear Installations Act 1965 (as amended) (NIA65) to UUK and operating under the regulatory requirements and permits/licence issued by the Office for Nuclear Regulation (ONR) and the Environment Agency. Although operating on the same nuclear licensed site, the UUK, CNS and UCP businesses all have separate Environmental Permits granted by the Environment Agency under the Environmental Permitting Regulations 2010 (as amended) (EPR 10).

For the purpose of this document, UUK, CNS, UCP and ETUK will be referred to collectively as URENCO or the URENCO group.

Page 6: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 6

1.2 Purpose

This document has been produced as part of URENCO’s commitment to demonstrate and communicate an integrated and sustainable waste management programme at the Capenhurst site. This IWS presents the current strategy for managing radioactive and non-radioactive solid, gaseous and liquid wastes generated by URENCOatCapenhurst.TheinformationinthisdocumentalignswiththeURENCOLimitedstrategiesandpolicies and is used to support onsite environmental and waste activities, waste disposals and future applications for Environmental Permits.

There is an expectation from both the Environment Agency (e.g. as set out in the Nuclear Sector Plan) and ONR that nuclear licensed sites will maintain an IWS. This IWS follows the format and guidance published by the NDA (ref 2) which URENCO has adopted as good practice in the UK nuclear sector.

This document supports compliance with environmental permits where an IWS is required in addition to Nuclear SiteLicenceConditions32and34.ThroughtheIWS,systemsareputinplaceforplanningtheeffectivemanagement of wastes and to demonstrate compliance with regulatory expectations.

1.3 ScopeThis document defines the waste management strategies for all URENCO operations at the Capenhurst site. The strategy recognises the requirements of current legislation, regulatory requirements, government policies and national strategy as well as URENCO permits, licences and environment, health and safety policies and industry good practice.

This document serves as a high level waste strategy and does not provide detailed information regarding individual waste streams, specific management arrangements and methodologies associated with the individual wastes; nor does it identify specific disposal routes. In addition to wastes, the IWS includes an overview of the types of residues generated by URENCO at the Capenhurst site. URENCO classifies residues as radioactive materials where the Uranium may be recovered back into the nuclear fuel cycle.

This strategy describes where waste and residue management arrangements at Capenhurst are today, where the site wants to get to and what actions are required to get there. It applies to legacy wastes, operational wastes and residues, and future arisings.

Waste and residue management arrangements within URENCO provide more specific and detailed inventories and procedures.

This document focuses on communicating the site waste management strategy to both internal and external stakeholders. An Action Plan has been developed in conjunction with this IWS to describe near term activities that need to be addressed. Action owners and target completion dates have been assigned. The Action Plan is a separate ‘live’ document and will be routinely monitored during quarterly meetings by representatives from each of the URENCO companies to ensure progress is being made and target dates are being met. The plan will be updated on an annual basis unless new activities require a shorter timescale.

Page 7: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 7

2 Communication and Consultation

URENCO’s aim is to ensure that operations at the Capenhurst site are understood and supported by the regulators, local community and other stakeholders. Our communication strategy identifies the regulators, stakeholders and special interest groups and their areas of site interest. The objective of our communications programme is to ensure that all interested parties are engaged early and provided with current, factual and relevant information in a timely manner. Where appropriate, progress against the delivery of the plan will be communicated both internally and externally on a routine basis. A Regulatory and Stakeholder Communication Plan will be developed that defines the engagement process and communication strategy for URENCO.

2.1 Regulatory Input and ConsultationURENCO meets with both the Environment Agency and ONR frequently to discuss aspects of site operations, including waste management. When appropriate, meetings, including attendance by tenant representatives, are organised by URENCO to ensure a coordinated approach to regulatory engagement and provide information on site waste management activities.

2.2 Stakeholder Input and ConsultationURENCO engages with internal and external stakeholders as interested parties on a routine basis. An increased use of social media to engage in two-way dialogue with our local communities has proven successful and our internet site offers a virtual tour of our enrichment facilities which has proven to be an effective means of communication. Routine examples of stakeholder engagement include:

• LocalLiaisonCommitteemeetingsthatareheldonasixmonthlybasisandincludeupdatesonperformanceof operations including progress on waste disposals and residues etc.

• URENCO attends the quarterly Parish Council Meetings. General updates are provided and this may focus uponhazardreductionactivitiessuchaswastedisposals,operations,residuesshipmentsetc.

Engagement with our internal stakeholders (e.g. employees and contractors) is also critical to our business as a means of maintaining awareness and involvement in site waste management activities. Several communications toolsareutilisedincludingthequarterly“AboutU”magazine,messagespostedoninformationscreenslocatedthroughout the site, a weekly podcast (which includes interviews with a spectrum of employees, including membersoftheLeadTeam)andalsobyusingtheCompanyintranetportal.

URENCO also engages with government and international organisations such as the World Nuclear Association, Nuclear Industry Association, and European Nuclear Society through site visits, meetings and structured communicationsthroughURENCO’sJointCommittee.URENCOisalsoamemberoftheNuclearIndustryLiaisonGroupandtheNuclearWasteResearchForumwhichisacross-industrygroupthataimstoenhancecoordinationof research and development across UK site restoration and integrated waste management activities.

2.3BestAvailableTechniques(BAT)In compliance with the Environmental Permitting Regulations 2010 (EPR 10) and nuclear industry guidance for BAT,URENCOusesaBATassessmentprocesstoidentifythebestavailablemethodsandtechniquestominimisewaste, discharges and emissions. Available techniques and methods are aligned with the waste hierarchy and assessed via transparent, logical, systematic and auditable processes that balance the benefits of the process/activity on the environment, workforce and public health against the cost and practicability of implementing the option.

Page 8: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 8

URENCOproceduresthatdescribehowtocarryoutaBATassessmentreflecttheguidanceandbestpracticesincludedintheNuclearIndustryCodeofPracticeonBAT(NICoP)(ref3).

Regulators are informed of strategic option studies being undertaken and may be invited to observe and/or participateintheprocess.Forexample,in2011UUKproducedaBestAvailableTechniques(BAT)documentforUUK generated process materials and radioactive solid, liquid and gaseous wastes (ref 4) which was presented to both the ONR and the Environment Agency. Similar documents exist for CNS.

TheimplementationofBAThasbeenakeyconsiderationthroughoutthedesignprocessoftheTMF.ThisisdemonstratedwithinasuiteofBestPracticableEnvironmentalOptions(BPEO)studiesfortheproposedactivities.Optimisation of the preferred options is taking place during the design phase to ensure the finished plant operatesusingBAT.

The primary goal is to maximise the opportunity to recycle uranium back into the nuclear fuel chain and to minimise the disposal of radioactive waste through decontamination of contaminated materials for reuse.

Foranynewwastestreams,gapanalysiswillbecarriedouttoensurethestrategyalignsappropriatelywiththeproposal. It is recognised that in some instances it may be prudent to complete a new study.

2.4 AccessibilityThis IWS is not protectively marked and publically accessible. Copies are available via the URENCO website (www.urenco.com).

Page 9: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 9

3 Objectives and AimsThe aim of our IWS is to provide a common strategy basis and integrated approach for waste management on the Capenhurst site to ensure:

• Continued protection of the workforce, public and the environment through responsible construction, operation, decommissioning and waste management activities.

• All wastes are managed in a safe and responsible manner and waste management activities are implementedusinggoodindustrystandardswithafocusonhazardreduction.

• Common waste management objectives are set.

• Common approaches to waste management are adopted.

• Waste management and disposal routes are identified and available for all waste streams.

• BATisappliedforallwastemanagementactivitiestoensurecompliancewiththewastehierarchy.

• Effective and timely regulatory and stakeholder engagement.

• Lessonslearnedareusedtoidentifyweakornon-compliantareasofworkandprocesses,andactionistakento ensure repeat occurrences are prevented.

3.1 Where are we? Where are we going?The strategy contained in this IWS considers the lifetime of the site but focuses in detail on the period of 2014 to 2016. At the end of this three year period, the IWS will be reviewed in its entirety and revised to reflect the current status at the time. In addition to the IWS, a site decommissioning plan will be developed during 2014, which will identify waste management activities as the result of on-site decommissioning projects.

The following summarises the waste types generated:

• IntermediateLevelWaste(ILW)-WastesexceedingtheupperboundariesforLLW(seebelow),butdonotgenerate enough heat to require special storage or disposal facilities.

• LowLevelWaste(LLW)–Wasteshavingaradioactivecontentnotexceeding4GBq(Gigabecquerels)ofalphaactivitypertonne,or12GBqofbeta/gammaactivitypertonne.

• LowActivity–LowLevelWaste(LA-LLW)-AsubsetofLLWwithanactivity<200MBqpertonne.

• VLLW–AsubsetofLLWwithmaximumconcentrationsof4MBq(Megabecquerels)ofalphaactivitypertonne that can be disposed to specified landfill sites. There is an additional limit for tritium in such wastes.

Page 10: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 10

• OutofScope–AnarticleorsubstancethatisnotradioactiveasdefinedinEPR10.Thesewastesarenotsubject to any radioactive regulation requirements but do remain subject to other relevant waste legislation.

• HazardousWaste–ControlledwastethatcontainsanysubstancespecifiedintheHazardousWaste(Englandand Wales) Regulations 2005. These include oils, acids, specific metals and other materials including asbestos.

• Non-radioactive(general)waste–Controlledwastewhichisnotcoveredbythedefinitionofhazardousor radiological waste, but which remains biologically, chemically or physically active if disposed to landfill. Theseincludemetal,timber,andotherorganicwastes.Nohazardouswastesusuallyresultfromthegeneralsite activities (e.g. office, kitchen, canteen and general operational waste).

URENCO generates radioactive and non-radioactive wastes and uranic residues as the result of site operations. Tables 1 and 2 summarise the current status of where URENCO is now regarding residues and radioactive/ non-radioactive wastes and the projection of future arisings.

Page 11: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 11

Table 1 Radioactive Waste and Residues Inventory Summary

Current Waste Inventory

Current Residues Inventory

Future Projected Arisings

UUK (inc ET UK)

• ILWfiltermaterial• Combustible low activity

LLWsolids• Super-compactableLLW

Absorber material (active carbon)

• Contaminated soils and other inert materials

• VLLWandLA-LLW• Metallic waste•EmptyType30B

UF6Cylinders• Combustible–non-aqueous

liquid• Liquidscintillant• Sources• Waste awaiting

characterisation

• Absorber material • SyntheticPFPEOil• Residues (uranic wipes,

uranic breakdown, citric acid)

As current plus: Metals• Non-leachable/non-combustible

VLLW/LA-LLW• EmptyType48YUF6 Cylinders

CNS Metals• Redundant cylinders• Pipe sections from building

decommissioningLiquids• Water from floor cleaning &

slab remediation• Oils and chemicalsSolid VLLW• Buildingslabrubble• Used PPE & cleaning materials• Silt from slab remediation &

drains clean out• Wood from scaffolding,

cabins etc

• Uranic decommissioning residues

• HFLiquorsfromcylinderwash-out

As current plus:Metals• Metal from demolition of

building structuresLiquids• Liquorsfromcylinderwash-outSolid VLLW/LLW/Residues• Silt from drains clean out• Asbestos from redundant

facilities• Solid material from

decommissioning buildings• Chemical traps and other

material from cylinder washing process

UCP None None Liquids• ContaminatedHFacid• SludgesSolid VLLW/LLW/Residues• Radioactive and non-radioactive

combustible/compactable wastes• Non-leachable/non-combustible

VLLW/LA-LLW• Leachablenon-combustible

VLLW/LA-LLW• Encapsulated wastes generated

from processing• NaDU Residue• Filtermaterial(e.g.MgF2 and

metal filter cartridges)

Page 12: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 12

Table 2 Non-Radioactive(HazardousandNon-hazardous) Waste Arisings Summary

Current Hazardous Waste Arisings

Current Non-Hazardous Waste Arisings

Future Projected Arisings

Generatedby all 4 Companies

• Waste electrical and electronic equipment

• Oils and chemicals (including solvents)

• Fluorescenttubesandbatteries (heavy metals)

• Aerosol cans• Clinical wastes

• Cardboard• Glass• Metals including cans/tins• Paper • Plastic Textiles• Wood • DECW*• FoodWaste• Cooking oils

As columns 1 and 2 plus:• Asbestos and asbestos

contaminated material (from CNS and UUK decommissioning activities)

*DECW–Demolition,ExcavationandConstructionWastes

URENCOUKLimited(IncludingETUK)Residues

Residue streams are not considered wastes.

As shown in Table 1 above, UUK generates multiple residues streams as the result of its uranium enrichment processes.SomeSodiumFluoride/Aluminaresidues,laboratoryeffluentsandcitricacidarecurrentlysentforUraniumrecovery.OtherresiduescurrentlyremainonsitependingONRapprovalofthetype3516Bpackagetotransport these materials to a third party for recovery.

UUKcurrentlyisplanningtorecommenceoperatingthePerfluorinatedpolyether(PFPE)oilrecoveryrigoperationsinearly2014torecoverresidue(PFPE)lubricantoils.

Solid Radioactive Waste

UUKcurrentlyhaslegacyandoperationalwastesstoredonsite.Legacywastesarosewhencertainwastedisposalroutesbecameunavailable.ThroughtheLegacyWasteProject,UUKiscommittedtotakingavigorousandproactive approach to onsite management of waste whilst opening new disposal routes for offsite disposal. The potential disposal routes for these wastes include recycling, incineration, land disposal and release as ‘out ofscope’waste,prioritybeinggiventowasteminimisationanddiversionfromlandfill.ABATassessmenthasbeenpreparedtosupporttheLegacyWasteProjectforsolidlegacywasteanditidentifiesthepreferreddisposaloptions for the different waste streams that will be generated.

Gaseous Radioactive Waste

Gaseous radioactive effluents arise from enrichment and laboratory activities and are discharged in compliance withsitedischargepermitrequirements.StacksarefittedwitheitheraHighEfficiencyParticulateAir(HEPA)filter system or a wet venturi scrubber to minimise discharges.

Page 13: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 13

Aqueous Radioactive Waste

Aqueous effluents are generated from UUK enrichment plant steam chest condensate, wet scrubbers, floor washingsandfromtheChemistryServicesDepartment(CSD).Forbulkradioactiveliquideffluent,thevolumeof liquid transferred is minimised by collecting all radioactive aqueous liquid waste (or potentially contaminated water) in covered or indoor tanks, before being sampled and transferred for discharge. This prevents the ingressofrainwaterorotherliquors.ThesiteDecontaminationFacilityoperatesprocessesthathaveremovedthe requirement for an additional liquid discharge. These include the use of a counter-current flow on the decontamination train (which enables the use of mildly contaminated rinse waters to be used to top up evaporative losses in the preceding tank within the decontamination train) and the use of dry ice (Carbon Dioxide pellets) to decontaminate components. Additionally, effluents and residues containing recoverable levels of uranium are collected for uranium recovery (see residues above), thereby avoiding unnecessary discharges.

Non-aqueous Radioactive Liquid Waste

Non-aqueous radioactive waste includes:

• Pump lubricants.

o PFPEpumplubricantoil(previouslyprocessedon-siteforoilrecovery);spenthydrocarbonoil(arising fromvacuumpumpusepriorto10yearsagoandnowreplacedbyPFPEoil).

o Terminal Valve Test (TVT) rig hydrocarbon lubricant oil with uranium contamination that cannot be reused or treated on site.

• Contaminated scintillant that cannot be treated on-site.

Non-Radioactive Solid Wastes

Allofficewastes,canteenwastes,maintenanceandgeneraloperationalwastes,includinghazardousmaterials,are managed by a facilities management contractor. They are transferred to a registered waste broker for recycling, recovery or disposal to landfill where recycling or recovery cannot be achieved. Again, preferred disposal options are identified during optioneering. There are no legacy wastes stored on site.

Non-radioactive Gaseous Effluents

UUK has an Environmental Permit (ref 5) for the discharge of gaseous effluent from 21 discharge points across the site. Point source chemical emissions to air produced during enrichment operations at the UUK site are relativelylowhazardandareprimarilylimitedtoHydrogenFluoridereleasesfromtheenrichmentplantGaseousEffluent Vent Systems (GEVS).

Non-Radioactive Liquid Effluents

UUKhasanEnvironmentalPermitforthedischargeofliquideffluentfromninedischargepointson-site.Fourpoints discharge directly to the site surface water network and five discharge points flow to the on-site sewage effluenttreatmentplantoperatedbyUUK.AllthesedischargesflowintoaculvertwhichleadstoRivacreBrookand ultimately to the River Mersey.

Water used across the Capenhurst site originates from the River Dee in Chester or from the domestic water supply. Discharges include cooling water from the operational enrichment plants, effluents arising from neutralising and effluents tanks, and chemistry services effluents.

Future Arisings

NewarisingsareexpectedtobeclassifiedasLLW.Inviewofthis,itisanticipatedthatthesearisingswillbemanaged using existing waste service providers, as the character of the waste is not going to be significantly different to existing wastes on site. The management options for the future arisings identified above include on site treatment, disposal of ‘out of scope’ materials and metals recycling.

Page 14: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 14

Capenhurst Nuclear ServicesResidues

The residues held by CNS are from the decommissioning of the former diffusion and centrifuge plants and contain uranyl fluoride (UO2F2)anduraniumtetrafluoride(UF4). The non-oily residues are sent to the National NuclearLaboratory(NNL)forprocessing:NNLisalsocurrentlytriallingarouteforoilyresidues.SimilartoUUK,CNSislargelydependentupontheapprovalofthe3516Bpackagewhilstlookingatalternativetransportstrategies should approval be delayed.

Solid Radioactive Wastes

The potential disposal routes for the radioactive wastes include recycling, disposal in accordance with environmental permit requirements, incineration and ‘out of scope’. Preferred disposal routes for individual wastestreamsareidentifiedintheCNSBAToptioneeringreport.

Gaseous Radioactive Waste

RadioactivegaseouseffluentisdischargedtotheenvironmentfromtheBottleWashFacilityandfromventilationsystems within the miscellaneous waste preparation and storage area in compliance with the CNS Radioactive Substances Activities (RSA) Environmental Permit. Situated within the miscellaneous waste preparation and storageareaaretheHighEnrichedUranium(HEU)andLowEnrichedUranium(LEU)units,whichdischargegaseouseffluentintothegeneralbuildingventilationsystemviaHEPAfiltration.Thistreatedgaseouseffluentcombines with general building ventilation and is discharged to the environment unfiltered via wall louvres. A wetventuriscrubberandpackedcolumnprovidesabatementofgaseouseffluentfromtheBottleWashFacility.

Aqueous Radioactive Waste

Aqueous radioactive waste from the miscellaneous waste preparation and storage area is discharged to the environmentinaccordancewiththeCNSRSAEnvironmentalPermit.TheBottleWashFacilityisaclosedloopsystem and produces no aqueous radioactive waste discharges to the environment.

Non-Radioactive Liquid Effluent

Non-radioactive liquid effluent in the form of trade effluent (treated decommissioning liquors) is discharged to the site surface water drain in accordance with the CNS Environmental Permit.

Non-Radioactive Wastes

All office wastes, maintenance and general operational wastes are managed by the site facilities management contractor and transferred to a registered waste broker for recycling and recovery.

Future Arising

The management strategies for the future arisings identified above include disposal of ‘out of scope’ materials recycling, incineration and land disposal. Significant future waste arisings, from decommissioning activities and theoperationoftheLegacyCylinderFacility(LCF)havebeenestimatedforinclusionintheUKRadioactiveWasteInventory (RWI). Management of all future arisings will be in accordance with established procedures, as outlined above.

Page 15: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 15

URENCOChemplantsLimitedNo radioactive wastes will be generated until active commissioning of the plant has commenced.

Non-Radioactive Solid Wastes

Duringtheconstructionphase,theTMFprojectisworkingtoaSiteWasteManagementPlan(SWMP)inaccordance with the SWMP Regulations 2008. The SWMP identifies the waste types that are expected to be generated, estimated quantities and measures that will be used to minimise those wastes. It also provides for a mass balance to identify any anomalies between what is expected to be generated and what is actually generated.

Non-radioactive wastes generated from this project are segregated at source and transferred to a registered waste broker for recycling and recovery in alignment with the waste hierarchy.

TheTMFConstructionSitedoesnotcurrentlygenerateanyradioactiveliquidorgaseouseffluents.SurfaceWateris managed through a Surface Water Management Plan.

Future Arisings

Once operational, UCP expects to generate both radioactive and non-radioactive wastes and will require an Environmental Permit for Radioactive Substances Activity and an Installations Environmental Permit. The management of these wastes is described in the Installations (ref 6) and Radioactive Substances (ref 7) Permit applications and these management arrangements will be further enhanced in the period leading up to active commissioning of the facility, currently scheduled to commence in the second half of 2015. It should be noted that the waste hierarchy has been applied at all stages of the design process. As part of the improvement conditionsofUCP’sRadioactiveSubstanceActivity(RSA)EnvironmentalPermit,BATassessmentswillbereviewed by 1st June 2018 or three years from commencement of active commissioning to ensure the original assumptions were correct.

3.2 Setting objectivesThe Key strategic objectives for integrated waste management at the Capenhurst site are:

• Wastes are managed in a safe and cost-effective manner and measures to minimise the total quantity of waste generated and its activity are applied during the design, construction, commissioning, operation and decommissioning of a facility through the effective application of the waste hierarchy and through the demonstrationofBAT.

• Measures are implemented to prevent leakage and escape of waste.

• Avoid generation of orphan wastes i.e. materials having no identified disposal route.

• Maximise the potential for recycling or reuse of materials.

• Wastes will be characterised, segregated and, where required, stored in accordance with good practice.

• Accumulation of wastes on site should be minimised so far as is reasonably practicable.

• Wherewastesaredischargedfromthesiteordisposedofoff-site,BATisappliedtominimisepotentialimpacts to the public and the environment.

• Arrangements will be made for monitoring, documenting and reporting on waste programme performance.

URENCO recognises the need to manage its historic, current and future waste arisings. To manage these wastes inanexpeditedandcompliantmanner,aLegacyWasteProjecthasbeensetupbyUUK,aprimaryobjectiveofwhich is to recharacterise and open up disposal routes to manage this waste and future waste arisings. Coupled with this is a requirement to devise a long-term plan to ensure the quantity of waste produced and stored on site is minimised. Project actions and milestones are included in the IWS Action Plan discussed in Section 6.

Page 16: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 16

TheLegacyWasteProjectwillensuresuitablewasteroutesareavailable,wasteischaracterisedtothecorrectspecifications and disposed of as soon as practicable. Once established, a target will be to operate with a minimal interim storage period on site before disposal.

As part of addressing our IWS objectives and actions, there are activities that need to be undertaken by UUK to support this plan.

• Verification of the existing waste inventory for each of the companies operating at URENCO Capenhurst, resulting in a revised on-site waste inventory.

• Development of a robust process to ensure accurate predictions of future arisings based on operational changes.

• Establishment and maintenance of valid disposal routes for all waste streams.

• Identification of waste management projects where further investigation or investment is required.

• Minimisation of all waste through implementation of the waste hierarchy.

• Creation of consolidated waste management and storage areas.

• Updating and monitoring of the waste programme across the site to ensure that it remains within strategic tolerance, that the objectives are met and that the associated benefits can be quantified.

It is recognised that CNS has taken the lead in developing a waste management programme due to its focus on decommissioning and good practice from this will be adopted.

UCP is still in the construction phase, and waste management facilities and arrangements are in the process of being developed in preparation for inactive and active commissioning.

3.3TheWasteHierarchyThe waste hierarchy is a key underpinning element of the IWS and provides an order of preference for waste managementoptionstominimisethevolumeofwastedesignatedfordisposal,asshowninFigure2.Theprinciples of the waste hierarchy are to focus on actions that involve the generation of primary or secondary wastes. URENCO has made a commitment to ‘avoid waste generation’ whenever possible.

The principles of the waste hierarchy are:

• Waste generation should be avoided or minimised at source where possible.

• Waste materials or products should be reused or recycled.

• The final disposal method, where waste generation cannot be avoided and wastes recycled or reused, is incineration or land disposal.

Figure 2: The Waste Hierarchy

Page 17: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 17

ForLLWrequiringdisposal,GovernmentpolicyandnationalstrategyistominimisewastedisposaltothenationalLowLevelWasteRepository(LLWR)whereverpossible,firstlybyaimingtominimisewastesrequiringdisposal, and secondly where disposal is the only option to seek alternative disposal routes or treatment options to minimise volume. The waste hierarchy has been fundamental in the development of current operations and itsuse,demonstratedthroughapplicationofBAT,willbecontinuedintheconstruction,operationandultimatedecommissioning of installations on the Capenhurst site. The approach that URENCO uses to comply with this is discussed further in Section 4.

URENCO operates a number of initiatives to minimise the quantity of waste consigned as radioactive waste. Examples of such initiatives include:

• Unpacking materials and supplies outside radiologically designated areas.

• The Site operates an on-site facility to refurbish Respiratory Protective Equipment, thus avoiding generating additional waste.

• Selection of materials based on their ability to be decontaminated or reused.

• Miscellaneous metallic components from the plant are cleaned at the decontamination facility for subsequent reuse, recycling or disposal as appropriate.

• Promotion of a ‘clean to clean’ policy whereby surfaces are cleared of spillages and cleaned to a state where no radioactive contamination can be detected.

• Uranic residues are commercially valuable and are therefore sent off-site for recovery, thus minimising the volume of radioactive waste.

• Where appropriate, cold traps and chemical absorbers are used toreducethequantityofUF6andHFenteringtheGaseousAbatement Systems.

• Connection and disconnection procedures have been developed thatminimisethepotentialforaUF6 leak.

• Segregation at Source, to minimise impacts during operations, sorting and segregating of wastes takes place at designated waste stations located in each plant. Wastes are hand monitored at designated waste sorting stations and sorted based on the monitoring results - either as radioactive or non-radioactive waste.

ThefollowinggeneralprinciplesareappliedacrosstheURENCObusinesstominimisehazardouswastearisings:

• When buying chemicals, Material Safety Data Sheets (MSDS) are reviewed and where possible, alternative productsareidentifiedtoreplacethosehavinghazardousortoxicproperties.

• Over-purchasing of chemical substances (including oils) is discouraged.

• Chemical substances (including oils) are stored in a safe and environmentally responsible manner so as to prevent spillages which would contaminate other materials.

• Information Technology equipment is recovered through a supplier refurbish and re-use scheme, along with smaller office consumables.

• When contracts are negotiated with suppliers of material which would ultimately be disposed of as hazardouswaste,recyclingtake-backschemesareexploredandimplementede.g.recyclingoffluorescenttubes.

Page 18: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 18

3.4 Interaction with other strategies and plansThis IWS has been developed to be consistent with the following directives and strategies:

• European Union Directives and international standards and guidance (e.g. from the International Atomic Energy Agency, IAEA).

• UKpolicy(e.g.UKpolicyforthemanagementofLLW(ref8),nationalpolicyforthemanagement of non-radioactive waste (ref 9) and Managing Radioactive Waste Safely (ref 10)).

• Nationalstrategies(e.g.thenuclearindustryLLWstrategy(ref11),LLWNationalProgramme(ref12),UKstrategy for Radioactive Discharges (ref 13) etc) and regional waste plans (e.g. Cheshire West and Chester Waste Plan) (ref 14).

• Regulatory requirements set in the respective permits/licences and expectations to demonstrate appropriate radioactive waste management arrangements (e.g. consistency with the Environment Agency Nuclear Sector Plan (NSP)).

In addition to the points outlined above, this IWS is also consistent with the URENCO business strategies as discussed below.

• Decommissioning Strategy TheUUKDecommissioningStrategywasdevelopedin2004andreviewedbytheHealthandSafety

Executive at the end of that year. The strategy identifies the expected methodology, timescales and costs associated with decommissioning the centrifuge enrichment plant and associated facilities. This document is due to be superseded by a Combined Site Decommissioning Strategy. This document will be developed during 2014 and will cover all operators on the Capenhurst licensed site. It will include the activities of CNS which are currently described in the CNS Annual Plan (ref 15 ).

• Tails Strategy Tails are a co-product of the enrichment process. The UUK Tails Policy (ref 16) considers Tails to be an asset

thatcanbemanagedsafelyonsite.ThecurrentTailsStrategydescribeshowTails,intheformofUF6 will betransferredtoUCPLimitedfordeconversiontoUraniumOxidewhichwillthenbestoredonsiteinadedicated store for future use. A ‘letter of comfort’ is being drafted to reassure the regulators that any uranicmaterialsthatTMFwillgeneratewillnotcompromisefuturewastemanagementarrangements.Thetails are considered an asset rather than a waste and hence are not directly addressed in this IWS. In the event that legislation, policy and / or economics dictate that tails should be considered as a waste, the IWS will be updated to take account of the management of what would ultimately be a very large volume ofILW.

Page 19: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 19

4. Data GatheringThe following information provides a summary of the types of waste arising (as discussed in Section 3) and currentwastemanagementarrangementsthathavebeenidentifiedasBAT.Thegenerationofwasteisfromthe UUK enrichment operations and the management and on-going decommissioning of the former gaseous diffusion plant by CNS. Each company maintains residue and waste inventories that are routinely reviewed and updated.

4.1 What wastes do we generate at present?Wastes currently being generated, those that have been generated in the past and those currently stored on-site are listed in Table 1 columns 2 and 3. This table includes process residues where there is the potential for uraniumrecoveryandwhich,assuch,donotallfallundertheformalcategoryofwaste.However,astheyareanuclear material being managed on-site, they are included here for completeness.

4.2 What wastes will we generate in the strategy period?Section 3.1 provided a summary of the waste arisings that are expected to be generated in the future. Most of the wastes identified in the table above will continue to be generated, with the exception of Magnesium Fluoride(MgF2) filter material where there are no firm plans to use reprocessed uranium as a feed material. Refer to Table 1 column 4 for details of future arisings.

Solid radioactive waste arisings expected to be generated from URENCO at Capenhurst in the future are also detailed in the 2010 UK Radioactive Waste Inventory (ref 17). A revised UK Radioactive Waste Inventory has been drafted during 2013 but is not yet published.

Page 20: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 20

5 Critical Evaluation of Waste Management Options The following provides a summary of how wastes are currently managed and what will be needed in the future to manage wastes arising from activities at the Capenhurst Site. It also provides a means for evaluating what waste management, recycling and disposal routes may be required in the future.

5.1 What do we do at present? AsdescribedearlierinSection2.3,URENCOdemonstratestheapplicationofBATbyconsiderationofarangeofoptimisation factors and waste minimisation techniques. This IWS takes account of the conclusions drawn from the2011BATassessmentasreferencedearlier.

Solid and non- aqueous waste

• Wastes are segregated at source.

• Metallic wastes are decontaminated.

• Waste is monitored to determine if it is radioactive.

o Wastes are sampled and in addition low density wastes are scanned using a drum scanner.

• FinallywastesarethenbatchedforconsignmenttoLLWRsegregatedwasteservices.

Gaseous waste

• ProcessventsandactivearearoomventilationsystemsarefilteredusingHEPAfiltration.

o In addition, process vents are filtered using chemical ad/absorbers.

o WhereprocessventshavehighmoisturecontentwetventuriscrubberssubstituteforHEPAfiltration.

• Dischargesarecontinuouslysampledbytakingaproportionofthedischargeandpassingitthroughafilterpaper (for low moisture content discharges) or a bubbler rig.

• Dischargesaremonitoredforeffluentflow.

Aqueous liquids waste

• Liquideffluentsarecollectedineffluenttanks.

• A representative sample is taken for analysis before discharge is approved.

• Discharges are monitored for effluent flow and total volume.

Waste Management Resources

In compliance with the requirements of its RSA Environmental Permits, URENCO has both a Corporate Radioactive Waste Advisor (CRWA) and a resource of Suitably Qualified and Experienced Persons (SQEP) to advise on the following areas:

• CompliancewithEnvironmentalPermitsanddemonstrationofBAT.

• Accounting and recording of waste disposals.

• Supervision of waste disposal activities.

• Radiological dose assessment.

• Calibration of radioactive discharge sampling and monitoring instrumentation.

• Chemical analysis of waste and environmental samples.

• Design and engineering of radioactive liquid and gaseous discharge systems.

• Site drainage infrastructure.

• Maintenance and testing.

Page 21: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 21

5.2 What will be needed in the future?

As operations on the Capenhurst site are being expanded and diversified, waste arisings and their management needs will change over time (see future waste arisings in Table 1). These changes will be a result of the requirement to decommission existing plants, changes to existing processes and potential new processes being adopted by URENCO. A key requirement is the need to ensure that existing waste stocks on site are minimised through the continual availability of waste disposal routes. This is discussed further below.

Key strategic investment decisions relate to the provision of:

• Site capability for waste processing and packaging. Currently wastes are stored in multiple areas across the site. Going forward, a centralised waste management area may be advantageous to process and consolidate wastes prior to offsite disposal.

• Third party final disposal, recycling or processing facilities. As waste arisings are expected to change inthefuture,variousexternalgroupse.g.LLWRarebeingconsultedattheplanningstagetoidentifypotential new disposal routes.

• Uranic residue processing capability. It is recognised that there is reliance upon the facilities at SpringfieldsFuelsLimitedforresidueprocessingwhichareunderstoodtohavealimitedlifetime.URENCO is in the early stages of considering mitigation for this risk.

• Radioactive material transport capability. URENCO is actively managing the work of the transport package supply chain to ensure timely approval and availability of transport packages for wastes and residues. It is also anticipated that future changes to the transport regulations may have an impact on movement of waste and residues. URENCO is actively engaged in industry discussions in anticipation of the regulatory change and is currently assessing the potential effects on operations.

5.3 Are existing routes and plans satisfactory? Recently, UUK performed a gap analysis of the current waste management programme and arrangements to determine if the existing programme was satisfactory and met both regulatory and permit/licence conditions. The gap analysis identified several areas for improvement to support both onsite waste management activities and offsite disposals. An action plan to address these findings has been developed and will be submitted to the Site’s senior management for approval. Once the Gap Analysis Action Plan has been approved, modifications or additions may be incorporated into the IWS Action Plan. Since the commencement of CNS operations in 2012, CNS has been through a transition period during which operations were limited. There is a robust programme for reopening disposal routes, against which significant progress has been made.

ArrangementsmadeforcompliancewithEnvironmentalPermitsandNuclearSiteLicencerequirementsareimplemented through Company Instructions. These place responsibilities on specified individuals within the organisation and require that radioactive and non-radioactive wastes, whether in gaseous, liquid or solid form, are minimised, collected, segregated, stored if appropriate, and disposed of effectively in accordance with the disposal permits, legislation and industry good practice.

Page 22: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 22

6 HorizonThe following provides an overview of the key deliverables, threats and opportunities of the waste management programme.

6.1 Key deliverables, decisions and required timescales for delivery Key deliverables and required timescales have been included in the IWS action plan. This sets out the objectives that need to be met, associated actions, who has accountability for the process and the target date for completion.

6.2 Threats (risks) and opportunity management in strategy deliveryThreats, or risks, are identified as those things that could have a negative impact to the waste management strategy and associated plan. It acknowledges that there are uncertainties associated with the implementation of the IWS and that contingency needs to be built into the programme and schedule. Table 3 is a summary of potential threats or risk that could exist and the mitigation activities that should be implemented to manage these risks.

Table 3 Threats and Mitigation Activities Threat Mitigation Activities

Unavailable disposal routes

There is a threat that a disposal route for some of the wastes generated onsite may not be available. URENCO is working with waste service providers to open disposal routes for radioactive wastes. At this time, there are no identified issues that will preclude legacy and newly generated wastes being sent offsite for disposal. There are several disposal routes available for the non-radioactive waste such that if one should become unavailable, finding a replacement site should not be an issue.

LLWR disposal route for VLLW is not available

Undercurrentinsuranceindemnificationrequirements,VLLWmustbedisposedviatheLLWRcontractual framework. If this route becomes unavailable there is a threat that the site would be unabletodisposeofVLLWviaanyothermeans.

Inability to process residues –hence adding to the waste inventory

There is a risk that recycling capabilities for some of the residues will not always be available (e.g. SpringfieldsFuelsLtd).Inthoseinstances,alterativeopportunitieswillneedtobeidentified,andifno alternative can be identified, the residues will be managed as waste.

Inability to transfer residues

There is a risk that a licence (or supplier) for a package for the transport of fissile residues cannot be obtained. As mitigation URENCO will consider options for onsite recovery and an alternative transport strategy.

Changes in Legislation There is a risk that changes in legislation could lead to the suspension or unavailability of disposal routesthatarecurrentlyinuseorplanned.Asmitigation,URENCOisusingLLWRsegregatedwasteservices to provide multiple waste routes.

Page 23: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 23

Table 4 Opportunities and Mitigation Activities

Opportunity Prospective Benefit Activities required to Realise

Open up a metals recycling route for both radioactive and non radioactive wastes

Minimises the disposal of metals and potentially offers financial benefits by managing metallic waste via one route

Cost benefit and sustainability analysis to determine whether the lifecycle waste management impacts are sufficiently reduced

Campaign implementation of super-compaction of compactable waste

Significant reduction in the volume of compactable waste sent for disposal

Cost benefit and sustainability analysis to determine whether the lifecycle waste management impacts are sufficiently reduced

The operators on the Capenhurst site could optimise waste management and disposals to ensure efficient and cost effective methods by having common disposal routes and single contracts.

The URENCO Companies at Capenhurst can work together to optimise waste management on site.

Establish a single and consolidated waste management system.

Cost benefit and sustainability analysis to determine whether waste disposal management impacts are sufficiently reduced

Engagement with supply chains in a more proactive manner

To identify most appropriate waste treatment and disposals to landfill, ensure good service and application of the waste hierarchy.

Early and regular communication with waste service providers e.g. attending seminars, to establish good relationships and determine industry good practise.

Opportunities are areas where activities, processes or projects are not currently planned, but where the potential to improve delivery may exist. These typically require ongoing work to assess the benefits, and if deemed feasible, to implement them. Opportunities may include an alternative disposal route which has a positive financial impact, whilst also protecting human health and the environment. Table 4 is a summary of identified opportunities that could impact waste management strategies and activities on the URENCO Site.

6.3 Action planning

An IWS Action Plan has been developed based on:

• Information included in this document.

• The identified threats and opportunities.

• Information obtained from a recent internal gap analysis of the UUK waste management programme.

• Input from tenants (ETUK, CNS and UCP).

• Findingsfrominternalassessmentsandaudits.

The action plan identifies the objective, actions that need to be taken and a responsible person and target date. Eachactionhasalsobeenrankedaccordingtoitspriority–high,mediumorlow.

Many of the high priority actions, such as the implementation of a new waste management inventory and tracking system, will be complete by the end of quarter 1, 2014, with the remainder complete by the end of quarter 2, 2014. Medium priority actions will follow by the end of 2014 and lower priority actions will continue into 2015.

Page 24: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 24

7 Monitoring and EvaluationThe following section outlines the timescales for reviewing the IWS and Action Plan, and highlights some of the waste management metrics and indicators that will be used to monitor progress made and the effects of the IWS to assess whether the aims and objectives (benefits) have been realised.

7.1 IWS Review CycleA full review will be carried out at least once every three years unless triggered by a change in circumstances. Triggers may include:

• Changes in legislation, regulation or national policies.

• Changes in URENCO strategic planning for operations on the Capenhurst site.

• Changes in the availability of waste management routes (whether positive or negative).

• Changes either in the quantity or types of wastes produced on-site.

• Change to a management system that would impact the IWS.

• New scientific or technical waste treatment technologies that become available.

• LossorchangeinadisposalrouteorchangeinWasteAcceptanceCriteria.And,

• Lessonslearnedandmonitoringofperformancethatshowsthatanticipatedbenefitsarenotbeingachieved.

The Action Plan, which is a supporting document of this IWS, will be reviewed and updated at least on an annual basis. The review of the Action Plan could be another trigger for a full review of the IWS.

7.2 Indicators and metricsAppropriate monitoring of indicators and metrics is critical in ensuring that the strategic objectives (the benefits) of the IWS are being realised, or if not, that appropriate changes to waste management arrangements (or strategy) are put in place. This process has three aspects, firstly metrics that are monitored; secondly the assurance process in place to review these, and thirdly, how assurance and associated learning is fed back into the strategy and any required improvements made.

Metrics may be both leading (predictive) and lagging (retrospective). Metrics need to be aligned to the strategy for waste management and drive positive waste management behaviours. Metrics to be monitored to evaluate IWS performance are given in Table 5. These metrics will be monitored on a quarterly basis via meetings attended by representatives from all areas of the Capenhurst site.

Page 25: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 25

Metric Associated Strategy Benefit Review/Reporting Frequency

Quantities of anticipated total future waste arisings

Minimisation of waste arisings and strategic planning for waste processing disposal options

Annual reviews.

Quantity of radioactive waste held on site Minimisation of waste awaiting disposal Quarterly reviews

Quantities of radioactive waste diverted from landfill

Compliance with the waste hierarchy and minimisation of disposal to landfill

Quarterly reviews

Quantities of non-radioactive waste diverted from landfill

Compliance with the waste hierarchy, amount of waste recycled or and minimisation prior to disposal

Quarterly reviews

Arisings and management of non-radioactive waste

Compliance with the waste hierarchy Quarterly reviews

Radioactive discharges to the environment and public dose exposure

Demonstration that the dose from discharges to the environment and exposure of the public is ALARA

Quarterly reviews

Table 5 Metrics to be Monitored

7.3 Reporting and AuditThis IWS provides a clear ‘roadmap’ of how URENCO has set waste management priorities and how we aim to achieve targets. UUK as licensee will be responsible for assurance activities and overall monitoring, collation and reporting of the metrics identified above. A quarterly site meeting will be held to review the above metrics and share lessons learned to ensure continuous improvement of the waste management programme.

Quarterly review meetings will be initially scheduled for representatives of all tenants and UUK as licensee to discuss progress, share learning and provide support. This will also be an opportunity to discuss relationships with waste service providers.

Each permit holder is required to carry out inspection and auditing, in addition, UUK, as licensee, will carry out internal and independent assurance assessments of waste management activities of the tenants. This will include reviews of management systems and tools, and waste management practices. A summary of any issues or concerns identified will be provided and actions agreed.

Page 26: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 26

BAT BestAvailableTechnique

BPEO BestPracticableEnvironmentalOption

CNS CapenhurstNuclearServicesLimited

CRWA Corporate Radioactive Waste Adviser

DECW Demolition, Excavation & Construction Waste

EA Environment Agency

EPR10 Environmental Permitting Regulations 2010

EP-RSA Environmental Permit for Radioactive Substances Activity

ETC Enrichment Technology Company

ET UK Enrichment Technology United Kingdom

GBq Gigabecquerel

GEVS Gaseous Effluent Vent System

HEU HighEnrichmentUranium

HEPA HighEfficiencyParticulateAir

HF HydrogenFluoride

HSE Health&SafetyExecutive

IAEA International Atomic Energy Agency

ILW IntermediateLevelWaste

IWS Integrated Waste Strategy

LA-LLWLowActivityLowLevelWaste

LCF LegacyCylinderFacility

LLW LowLevelWaste

LLWR LowLevelWasteRepository

MBq MegaBecquerel

MSDS Material Safety Data Sheet

NaDU Sodium Diuranate

NDA Nuclear Decommissioning Authority

NICoP Nuclear Industry Code of Practice

NNL NationalNuclearLaboratory

NSP Nuclear Sector Plan

ONR Office for Nuclear Regulation

PFPE Perfluoropolyether

SQEP Suitably Qualified and Experienced Person

SWMP Site Waste Management Plan

TMF TailsManagementFacility

TVT Terminal Valve Test

U3O8 Triuranium Octoxide

UCP URENCOChemPlantsLimited

UEC URENCO Enrichment Company

UF6 UraniumHexafluoride

UUK URENCOUKLimited

VLLW VeryLowLevelWaste

VPDF VacuumPumpDisassemblyFacility

WEEE Waste Electrical and Electronic Equipment

8 Acronynms

Page 27: URENCO Capenhurst Site Integrated Waste Strategy · 7 MONITORING AND EVALUATION 24 7.1IWS review cycle 24 7 ... This Integrated Waste Strategy (IWS) has been prepared by URENCO and

URENCO UK Limited 27

9 References

1. EnvironmentAgencies’GuidanceOnRolesandResponsibilitiesofPermitHoldersandRadioactiveWasteAdvisers Document Ref: RWA-G-1 Version 1.0 Publication date: 24 May 2011

2. SpecificationandGuidanceontheContentandFormatofanIntegratedWasteStrategy(DocNoENG 01, October 2012)

3. BestAvailableTechniques(BAT)fortheManagementoftheGenerationandDisposalofRadioactiveWastes–ANuclearIndustryCodeofPractice.December2010.

4. BestAvailableTechniques(BAT)Case:UUKRadioactiveProcessMaterialsandWaste,ENE/0034/AP/FR1,December 2011.

5. Permit with introductory note. Pollution Prevention and Control (England & Wales) Regulations 2000. Permit number WP 3939 SC (Variation notice CP3831UP).

6. Application for an Environmental Permit Under Regulation 13 of the Environmental Permitting (England and Wales)Regulations2010toEnableURENCOChemPlantsLimitedtoOperateaTailsManagementFacility,TOEA/2010/03 March 2010 and TOEA/2012/04 August 2012.

7. UUK6025088InformationinSupportofApplicationtoPartiallyTransferLimitsandConditionsfromtheURENCOUKLimitedRadioactiveSubstancesAct1993Authorisation(CA8205/CD9224)toURENCOChemPlantsLimitedUnderSection16AoftheRadioactiveSubstancesAct1993.Revision1,22ndDecember2009.

8. UKStrategyfortheManagementofSolidLowLevelRadioactiveWastefromtheNuclearIndustry.PublishedAugust 2010

9. Waste Strategy for England 2007.

10. Managing radioactive waste safely: a framework for implementing geological disposal. Published June 2008

11. Nuclear industrial strategy: the UK’s nuclear future. Published March 2013

12. NationalWasteProgramme.ProgrammeManual–ImplementationoftheNationalLowLevelWasteProgramme. Issued March 2012

13. UK Strategy for Radioactive Discharges. Published July 2009

14. CheshireReplacementWasteLocalPlan.PublishedJuly2007

15. NDA Annual Plan 2013-2014 4th January 2013 (12.37-CNS-0008)

16. UraniumHexafluorideTailsPolicy.IssuedJune2012

17. The2010UKRadioactiveWasteInventory.February2011.