Strategic
SustainabilityPerformancePlanReportto:TheCouncilonEnvironmentalQualityTheOfficeofManagementandBudgetJune2,2010
U.S.DepartmentofENERGY
UnitedStatesDepartmentofEnergyWashington,DC20585
StrategicSustainabilityPerformancePlanDiscoveringSustainableSolutionstoPowerandSecureAmericasFuture
ReporttoTheWhiteHouseCouncilonEnvironmentalQualityandOfficeofManagementandBudgetSeptember
2010
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
2/92
DepartmentofEnergy
ii
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
3/92
DepartmentofEnergy
iii
DepartmentofEnergy
StrategicSustainabilityPerformancePlan
DiscoveringSustainableSolutions
toPowerandSecureAmericasFuture
TableofContents
Section1:DepartmentPolicyandStrategy.................................................. 1
I.DepartmentPolicyStatement ................................................................. 1
II.SustainabilityandtheDepartmentsMission......................................... 2
III.GreenhouseGasReductionGoals ......................................................... 4
IV.PlanImplementation............................................................................. 6
V.EvaluatingReturnonInvestment......................................................... 10
VI.Transparency....................................................................................... 12
Section2: PerformanceReview&AnnualUpdate .................................... 13
I. SummaryofAccomplishments ............................................................. 13
II.GoalPerformanceReview .................................................................... 17
1. GOAL: Scope1&2GreenhouseGasReduction ............................. 19
2. GOAL: Scope3GreenhouseGasReduction.................................... 33
3. GOAL: ComprehensiveGreenhouseGasInventory........................ 37
4. GOAL: HighPerformanceSustainableDesign(HPSB)..................... 38
5. GOAL: RegionalandLocalPlanning ................................................ 43
6. GOAL: WaterUseEfficiencyandManagement .............................. 46
7. GOAL: PollutionPreventionandWasteElimination....................... 50
8. GOAL: SustainableAcquisition ....................................................... 57
9. GOAL: ElectronicStewardshipandDataCenters ........................... 61
10.GOAL: DepartmentInnovation....................................................... 65
Section3:DepartmentSelfEvaluation....................................................... 69
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
4/92
DepartmentofEnergy
iv
Appendices
Appendix1:Abbreviations........................................................................... 75
Appendix2:SustainabilityGovernance ....................................................... 77
Appendix
3:
Federal
Energy
Management
Program.................................... 78
Appendix4:CurrentDOEProjects............................................................... 81
Appendix5:SummaryofDOEOrders.......................................................... 84
Appendix6:SourceDocumentReferences.................................................. 87
ListofTables
Table1:CriticalPlanningCoordination.......................................................... 9
Table2:EnergyIntensityProgress............................................................... 13
Table3:RenewableEnergyProgress ........................................................... 13Table4:WaterIntensityProgress................................................................ 14
Table5: DOEsFY2009PerformanceinMeetingEPACT2005andEO13423
Requirements ............................................................................... 15
Table6:Goal1PlanningTable..................................................................... 33
Table7:Goal2PlanningTable..................................................................... 36
Table8:Goal4PlanningTable..................................................................... 43
Table9:Goal6PlanningTable..................................................................... 49
Table10:Goal7PlanningTable................................................................... 57
Table11:Goal8PlanningTable................................................................... 61Table12: Goal9PlanningTable.................................................................. 65
Table13:EnergySavingsPerformanceContractscurrentlyinplace(1999
2010)............................................................................................. 83
ListofFigures
Figure1: EstimatedDOE2008Scope1and2Greenhouse
GasInventorybySource................................................................ 4
Figure2: TotalEnergyUseforDOERealProperty ...................................... 20
Figure3:EnergyIntensityFY03FY09........................................................... 21
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
5/92
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
6/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page2
II.SustainabilityandtheDepartmentsMissionSustainabilityisfundamentaltotheDepartmentofEnergysresearchmissionand
operationsasreflectedintheDepartmentsStrategicPlan. Ouroverarchingmissionis
todiscoverthesolutionstopowerandsecureAmericasfuture. Weareimplementing
ourmissionthroughthreestrategicgoals:
Innovation,tomaintainU.S.globalleadershipinscienceandengineering
Energy,tobuildacompetitiveandsustainablecleanenergyeconomytosecure
Americasenergyfuture
Security,toreducenucleardangersandenvironmentalrisks
Toaccomplishitsmission,theDepartmentfocusesonachievinganumberofambitious
strategicpriorities. DOEinvestsinsciencetoachievetransformationaldiscoveries. Itis
pursuingclean,secureenergy,byreducingourdependenceonoilandchangingthe
landscapeofenergydemandandsupply. TheDepartmentispositioningtheU.S.tolead
onclimatechangetechnologyandscience. DOEadvanceseconomicprosperityby
creatinggreenjobsandincreasingtheNationscompetitiveness. Itcleansupthe
environmentallegacyleftbynuclearweaponsandnuclearenergyresearchprograms,
andworkstoprotectnationalsecuritybymaintainingthenationsnucleardeterrentand
preventingnuclearproliferation.
TheDOEStrategicSustainabilityPerformancePlan(SSPP)isfundamentallybasedonthe
Departmentsmission,vision,andstrategicplan. ItisthroughthesesynergiesthatDOE
willmeetthegoalsofalltheapplicablegreeningthegovernmentexecutiveordersand
statutes.
1
Innovation. Thisstrategicgoalcoversbasicandappliedresearchinscientificprograms
thatincludebioscience,environmentalandclimatescience,advancedmaterials,and
eventhefundamentalnatureofmatterandenergyattheatomicandmolecularscales.
Energyrelatedresearchsupportsthegoalsofalowcarbon,energyefficienteconomy
throughtransformationalbreakthroughs. Inaddition,DOEconstructsandoperatesthe
worldspremierscientificfacilitiesandinstrumentsthatresearchersdependonto
extendthefrontiersofscienceandtechnology.
Energy. CleanenergyandsustainabilitylieatthecoreoftheDepartmentsmission.
DOEcontributestoacompetitive,lowcarboneconomythroughscientific
breakthroughsleadingtonewtechnologiesthatenhanceenergyefficiencyand
1KeyExecutiveOrdersandstatutesinclude:EO13514FederalLeadershipinEnvironmental,Energy,and
EconomicPerformance(2009);EO13423StrengtheningFederalEnvironmental,Energy,and
TransportationManagement(2007);NationalEnergyConservationPolicyActof1978;EnergyPolicyActof
1992;EnergyPolicyActof2005;EnergyIndependenceandSecurityActof2007.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
7/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page3
productivitywhilebringingclean,reliable,andaffordableenergytechnologiestothe
marketplace.
TheDepartmentchampionssustainabilityinitiativesinsuchdiverseareasasvehicleand
fueltechnologies,buildingtechnologies,renewableenergytechnologies,andenergy
efficiencyandstorage. Inaddition,DOEpromotesnuclearpowerasaresourcecapable
ofmeetingtheNationsenergy,environmentalandnationalsecurityneedsbyresolving
technicalandregulatorybarriersthroughresearch,developmentanddemonstration.
DOEalsoleadsnationaleffortstomodernizetheelectricgrid,enhancesecurityand
reliabilityoftheenergyinfrastructure,andfacilitaterecoveryfromdisruptionsofenergy
supply.DOEisinvolvedinadvancingcarboncaptureandstorage(CCS)technologies,
whichcanplayanimportantroleinreducingdomesticGHGemissionswhilepreserving
theoptionofusinganabundantdomesticfossilenergyresource. DOEiscommittedto
integratingtheresultsoftheseinitiativesintoouroperationstoachievethegoalsofthe
relevantEOsandstatutes.
Security. IssuesofnuclearsafetyandsecurityareatoppriorityasDOEtransformsthe
Nationsnuclearweaponsstockpileandsupportinginfrastructuretobemoreresponsive
tothethreatsofthe21stCentury. TheDepartmenthasprovenitsabilitytointegrate
sustainabilityintoitsnationalsecuritymissionthroughsucheffortsasdesigningand
operatingsustainablebuildings,despiteoperationalconstraintsthatmaylimit
opportunitiesforconventionalresourceconservationinthisarea.
TheDepartmentisalsoresponsibleforthelargestnuclearenvironmentalcleanup
projectintheworldandiscommittedtocompletingthismissioninasustainable
manner. TheDepartmentmanagesitspostclosureenvironmentalresponsibilitiesto
reducewastesitefootprints,ensuresthefutureprotectionofhumanhealthandthe
environment,andincreasesthenumberoflegacymanagementcustodyandcontrol
sitesinbeneficialreuse.
AlthoughthenatureoftheDepartmentsstockpilesecurityandenvironmentalcleanup
responsibilitiesposechallenges,DOEiscommittedtofindingopportunitieswithinits
portfoliotoachieveandexceedthesustainabilitygoals.
DOEwilladdressthesechallengesbypursuingthefollowingkeyobjectives:
Fosteringacultureofenergyefficiencyandsustainability
Improvingdataqualitytoinformoperationsanddecisionmaking
OptimizingallocationofresourcestoachieveEOgoalswhilesafeguardingthe
mission
Applyingthebestsustainabilitypractices
Adoptingemerging,promisingtechnologies
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
8/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page4
III.GreenhouseGasReductionGoalsTheDepartmentsestimatedScope1and2FY2008baselineis4.6millionmetrictons
(mT)CO2e(Figure1). AsofMay2010,therewere87buildingsandstructuresscheduled
forcompletionbyFY2020(indevelopmentatCD2orabove). Althoughsomeofthese
facilitieswillreplaceolder,lessefficientoperations,thisnewconstructioncould
increasetheDepartmentsGHGleveltoatleast5.5millionmTCO2e/year. Despitethis
potentialincreaseinemissions,DOEwillidentifyopportunitiestooffsetthese
operationswhilestrivingtomeetitsGHGreductiongoals. TheDepartmentalso
identifiedanestimatedbaselineof748,000mTCO2eforitsScope3FY2008baseline.
DOE GHG Emissions by Source
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
Electricity Fossil Fuel Fugitive Gas Transportation
Emissions(MillionmTCO2
e)
Figure1: EstimatedDOE2008Scope1and2GreenhouseGasInventorybySource
TheDepartmentestablishedthefollowingGHGemissionreductiongoalsforfiscalyear
(FY)2020:
ReducingScope1and2GHGby28%(1.3M mTCO2efromtheFY2008baseline)
ReducingScope3GHGby13%(97,000mTCO2efromtheFY2008baseline)
DOEsstrategytoachievethesetargetstakesfulladvantageoftheextenttowhich
emissionsarelinkedtochangesinotherrelatedperformanceparameters,particularly
energy. ForScope1and2emissions,theDepartmentwill:
Prioritizeinvestmentinefficiencymeasuresandinfrastructureimprovements
basedoncarbonintensity
Reducetheuseofpetroleumbasedfuels
Deployoperationsandmaintenancebestpractices
Installassetlevelmetering
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
9/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page5
Assessandupgradeitsrealpropertyportfoliotomeetthehighperformance
sustainablebuildingprinciples
Reducenoncarbondioxide(CO2)fugitiveemissions,specificallysulfur
hexafluoride(SF6)
AssessthefeasibilityofusingDOEfacilitiesastechnologyinnovationsitesfor
carboncaptureandsequestrationorbeneficialreuse.
Explorelowcarbon,nextgenerationenergytechnologiessuchasfuelcells,
cogeneration,biomass,otherrenewabletechnologiesandadditional
technologiesasdeveloped.
TheDepartmentofEnergymaintainsoneofakindmissionessentialfacilities
(accelerators,lightsources,nuclearprocesses,petroleumreservesandsupercomputing
facilities)thatareinherentlyenergyand/orwaterintensive.Toaddresstheseunique
sustainabilityissues,theDepartmentwillestablishinternalexperttransformation
teams,accountabletoeachUnderSecretary,todetermineopportunitiestoimprovethe
energy
and
water
use
efficiency
of
these
facilities.
The
Department
will
establish
a
processtoaccountfor,andreporttheirenergy,waterandGHGcontribution/reduction
concurrentwithitsnormalfacilitiesportfolio. DOEwillconductinternaldepartmental
discussionstodeterminehowgoalswillbemetwithoutaffectingmission
accomplishment.
ToreduceitsScope3emissions,theDepartmentwill:
Expandtheuseofteleconferencing,videoconferencing,andwebbased
meetingstoreduceemployeeairtravel
Reduce
transmission
and
distribution
(T&D)
losses
through
on
site
power
generation
Reducewastegenerationbyincreasingsustainablepurchasingandrecycling
ThefullbenefitofalleffortstoreduceGHGemissionswillberealizedwhenthe
Departmentscorporatecultureembracesthefullrangeofsustainablepractices. Tothis
end,theDepartmentisstrengtheningitscommitmenttoresourceconservationasa
corevalue. AllDOEorganizations,includingtheirFederalandcontractorpersonnel,are
expectedtoexhibitsustainablebehavior,whichcontributestothisSSPP.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
10/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page6
IV.PlanImplementationa.InternalCoordinationandCommunication
TheDepartmentestablishedagovernancemodel(seeAppendix2)topreparetheSSPP
andbeginimplementationoftheEO. Themodelreflectsthedecentralizednatureof
DOEsoperationalactivities,anddrawsinthemaximumamountofinternalexpertise
andoperationalperformancedata. Itprovidesbroadrepresentationfrom
Headquarters,DOEsites,andDOEcontractors,andfosterseffectivecommunicationand
coordination. Themodel,graphicallyillustratedinAppendix2,includesthefollowing
elements:
SeniorSustainabilitySteeringCommittee(SSSC). TheDeputySecretaryistheSeniorSustainabilityOfficer(SSO)andchairsthiscommitteecomprisedofthe
UnderSecretaries,ChiefFinancialOfficer(CFO),GeneralCounsel(GC),Director
oftheOfficeofManagement,ChiefHealth,SafetyandSecurityOfficer,andthe
AssistantSecretaryforEnergyEfficiencyandRenewableEnergy. TheSSSCaligns
DOEbusinesspracticeswiththegoalsoftheEOsandrelatedstatutes.
SustainabilityIntegrationTeam(SIT). ThecommitteeiscochairedbyaseniormanagerfromHeadquartersandfromFieldOperations,andincludes
representativesfromvariousDOEorganizations. WorkingGroupcochairs
participateinSITdiscussions. TheSITsupervisedthedevelopmentoftheinitial
SSPP. ThisteamdiscussedandresolvedissuesrelatingtotheSSPPhoweverhad
nolineauthoritytodirectorimplementpolicy. Thefunctionandorganizational
placementoftheSITissubjecttochange.
WorkingGroups(WG). WorkingGroupsarecomprisedofmembersfromHeadquarters
and
from
Field
Operations.
They
provide
subject
matter
expertise
totheSIT.
ImplementationandcoordinationoftheSSPPwilloccurthroughexistingDOElinesof
authority. Inaddition,theFieldManagementCouncil,NationalLaboratoryDirectors
Council,EnergyFacilitiesContractorsOperationsGroup,communitiesofpractice,
assistancenetworksandworkinggroupswillenhancethecommunicationofPlan
implementation. TheDepartmentsdirectivessystemwillincorporateand
institutionalizeimplementationproceduresbywhichDOEwillmeetSSPPgoals.
Forlongtermimplementationandoversight,theDepartmentwillestablisha
SustainabilityPerformanceOffice(SPO)tocoordinatecorporateoversight,foster
behaviorchange,evaluateperformance,facilitateinformationmanagement,andreport
progresstowardsustainabilitygoals. TheSPOwillsupporttheDeputySecretaryintheir
roleastheSSO,aswellastheUnderSecretaries,DOEsites,andotherofficesas
appropriate. TheSPOwillbestaffedwithfulltimeequivalentseniorlevelprofessionals.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
11/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page7
b.CoordinationandDisseminationofthePlantotheField
TheSSPPwasdevelopedwithsignificantparticipationfromHeadquarterselements,
fieldrepresentatives,andDOEcontractors. Assuch,alargenumberofkeypersonnel,
representingacrosssectionoftheDepartment,wereinvolvedinthediscussions,
analysesanddecisionmakingassociatedwiththisPlan.
Atthesitelevel,theDepartmentwillbuildontheEnvironmentalManagementSystem
(EMS)process,requiredbyEO13423andalreadyinplaceatitssites,toimplementthe
goalsarticulatedinthisPlan.
c.Leadership&Accountability
TheSecretaryispersonallycommittedtoachievingtheEOandstatutorytargetsandis
leadingtheefforttochangetheDepartmentsculturetointegratesustainabilityintoall
DOEoperationaldecisions. TheSecretarysdesignationoftheDeputySecretaryasSSO
demonstratestheDepartmentshighlevelcommitmenttosustainability. Inaddition,
the
establishment
of
the
SSSC
and
the
designation
of
the
SSO
as
its
chair,
ensures
continuedseniorlevelattentiontoachievingsustainabilitygoals. Further,senior
leaders,managers,staff,andDOEcontractorswillbeheldaccountablecommensurate
withtheirresponsibilitiesforperformanceundertheEOsandrelatedstatutes.
ThethreeUnderSecretarieswillbeaccountableforallplanning,resourcing,
implementation,andreportingtoachievesustainabilitygoalswithintheirorganizations.
Internalsustainabilityscorecardswillassessthelevelofsuccessateachlevelofthe
Department(individualsites,programs,andUnderSecretary). Thesescorecardswillbe
reviewedbytheSSOtoevaluateperformanceanddeterminebestpathstoward
meetingsustainabilitygoalsonaregularbasis.
d.DepartmentPolicyandPlanningIntegration
TheDepartmenthasseveralmechanismsinplacewithinwhichtheSSPPwillbe
integratedwithexistingpolicyandplanningefforts. Forexample,theSSPPisakey
initiativewithintheEnergygoaloftheDepartmentsStrategicPlan. Executionofthe
SSPPwillalsobeintegratedintotheDepartmentsperformanceplanning,budget
formulationandexecutionprocesses. Inaddition,theSSPPwillbelinkedtopolicy
initiativesprimarilyemanatingfromtheDOEOfficeofEnergyEfficiencyandRenewable
Energy. Table1providesdetailedinformationonthelinkagetootherpolicyand
planningmechanisms.
e.DepartmentBudgetIntegration
ConsistentwiththeobjectivesofEO13514,theDepartmentiscommittedtofurther
integratingtheprinciplesofsustainabilityintoitsdecisionmakingandbudget
developmentprocesses. Theannualbudgetprocesswillbeinformedbythegoalsofthe
SSPP,startingattheUnderSecretarylevelandprogressingthroughtheProgram
SecretarialOffices(PSO)tothesites. FutureinternalDOEbudgetguidancewillinclude
informationontheimportanceofsustainability,GHGemissionsreduction,andresource
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
12/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page8
conservation. TheDepartmentwillalignitssitelevelenvironmental,energy,andreal
propertyplanningsystemstoelevatesustainabilityinsitemanagementandbudgeting
processes.
Workingwiththeirprogramoffices,siteswillcontinuetoutilizeenergysavings
performancecontracts(ESPC)andutilityenergyservicecontracts(UESC)aspractical.
ESPCprojectsthatrequireappropriatedfundingpaymentsmaybesubmittedthrough
theDOEbudgetprocess.
f.MethodsforEvaluationofProgress
DOEwillutilize,integrate,andstreamlineexistingDepartmentdatacollection
mechanismstoevaluateprogresstowardmeetinggoalsfromEOsandrelatedstatutes,
including:
PollutionPreventionTrackingandReportingSystem(PPTRS),collectsenvironmental,
purchasing,
and
best
practices
data.
EnergyManagementSystemversion4(EMS4),collectssiteenergyandwaterconsumptionandcosts.
FederalAutomotiveStatisticalTool(FAST),collectsfleetinventoryandfueluse. ConsolidatedEnergyDataReport(CEDR),collectsadditionaldataonmetering
requirements,wateruse,renewableenergygenerationandpurchases,and
sustainablebuildings.
SiteSustainabilityPlanPerformanceReporting,collectsdataonsiteidentifiedsustainabilityprojectsandsupportsEnergyIndependenceandSecurityAct(EISA)
Section432compliance.
IntegratedFacilities
Infrastructure
(IFI)
Crosscut,
identifies
the
resource
requirementsassociatedwithTenYearSitePlanimplementation.
TenYearSitePlans(TYSP),collectsplannedadditionsorchangestotherealpropertyportfolio.
FacilitiesInformationManagementSystem(FIMS),collectsdataconcerningrealpropertyattributesanduse.
DOEwilldevelopandpromulgateinternalDOESustainabilityScorecardstotrackprogram
andsiteperformancetowardsmeetingtheSSPPgoals. Thisscorecardwillbedeveloped
anddisseminatedforinternalreviewandcommentduringthefirstpartofFY2011. DOE
willalsoprepareDOEssemiannualreporttoOMBandCEQinresponsetothe
sustainabilityscorecardprocess.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
13/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page9
Table1:CriticalPlanningCoordination
ThefollowingtableshowsthelongtermintegratingrelationshipbetweentheSSPPand
otherplanningandreportingeffortsusedbyDOE. AYesmeanstheSSPPhasbeen
integratedintothesubjectreport,Pmeansitwillbeintegratedwithinthenextfiscal
year,Nomeansithasnotyetbeenplannedforintegration,andN/Ameans
integrationisnotapplicableornotappropriate.
OriginatingReport/Plan
Scope1&2GHG
Reduction
Scope3GHGReduction
DevelopandMaintain
AgencyComprehensive
GHGInventory
High
Performance
SustainableDesign/
GreenBuildings
RegionalandLocal
Planning
WaterUseEfficiencyand
Management
PollutionPreventionand
WasteElimination
SustainableAcquisition
ElectronicStewardship
andDataCenters
DepartmentInnovation
GPRAStrategicPlan Yes Yes N/A Yes P P P P Yes Yes
CircularA11300s N/A N/A N/A No N/A N/A N/A Yes No N/A
AnnualEnergyData
ReportYes Yes Yes N/A N/A Yes N/A N/A N/A N/A
EISASection432Facility
Evaluations/Project
Reporting
Yes N/A N/A No N/A Yes N/A N/A Yes Yes
Budget P P P P P P P P P P
AssetManagementPlan
/3YearTimelineP N/A N/A No N/A N/A N/A N/A N/A N/A
CircularA11Exhibit53s N/A N/A N/A N/A N/A N/A N/A No No N/A
OMB
Scorecards
N/A
N/A
N/A
Yes
N/A
Yes
N/A
Yes
Yes
N/A
DOE'sAnnualFederal
FleetReporttoCongress
andthePresident
Yes N/A Yes N/A Yes N/A N/A Yes N/A Yes
DataCenter
ConsolidationPlanN/A N/A N/A P N/A N/A N/A P P P
Environmental
ManagementSystemYes P P Yes No Yes Yes Yes Yes P
SiteSustainabilityPlans P P P Yes P Yes P Yes P No
HighPerformanceand
SustainableBuildings
ImplementationPlan
P N/A N/A Yes P Yes N/A P N/A N/A
Affirmative
ProcurementPlanfor
GreenPurchasing
No P N/A Yes No Yes Yes Yes Yes No
USClimateChange
TechnologyProgram
StrategicPlan(2006)
Yes Yes Yes Yes Yes N/A N/A Yes Yes Yes
FederalGHGAccounting
&ReportingGuidanceYes Yes Yes N/A N/A Yes Yes Yes N/A Yes
FederalProcurement
DataSystemN/A N/A N/A P N/A N/A N/A Yes P N/A
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
14/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page10
V.EvaluatingReturnonInvestmentTheDepartmentwillestablishaprocesstoprioritizeprojectsthatmostcosteffectively
meettheSSPPsenergyandenvironmentalgoals,whilegeneratingthegreatestcost
savingsforDOEasitexecutesitsmission. Eachprojectconsideredforfundingwillbe
evaluatedfirstoneconomicReturnonInvestment(ROI)andthenonanROIthat
includesenvironmentalandsocialbenefits. DOEwillcalculatetheROIofresource
conservationandGHGreductionprojectsasdescribedbelow.
FinancialROIisoneofseveralkeyfactorsinprioritizingprojectsanddeterminingthe
abilitytoimplementtheseprojects(especiallyfordirectappropriationproposals). In
additiontothecomponentsofROI,DOEmayconsider(althoughisnotlimitedto)the
followingcriteriawhenassessingprojects:
CostperunitcontributiontotheSSPPenergyandenvironmentalgoals
Program/siteprioritiesandfutureplansinsupportofitsmissions
Localandregionalplanningfactors
Currentsiteinfrastructureandplannednewconstruction
Siteenergyorwaterconsumptionandcosttrends
Publicvisibility(DOEplacesvalueonshowcasingtechnologiesdeveloped
throughitsresearchefforts)
Riskmanagementconsideration(e.g.,environmentalremediationfrom
unplannedspillsandreleases)
Safetyandhealth
Continuityofoperations
Socialcostofcarbon(SCC)
a.EconomicLifecycleCost/ReturnonInvestment
Whenevaluatingproposedprojects,DOEwillusearigorouscostbenefitanalysisfor
selectingprojectsandinitiatives. ReturnonInvestmentandNetPresentValue
(NPV)willbecalculatedperOMBCircularA94GuidelinesandDiscountRatesfor
BenefitsCostAnalysisofFederalPrograms. Otherfinancialcalculationsmaybe
performedtodeterminepaybackperiod,internalrateofreturn(IRR),andproject
costeffectivenesswithregardtoGHG,energyandwatersavingsovertime.
b.SocialCosts&Benefits
BeyondafinancialROI,theDepartmentwillconsiderthesocialcostsofGHG
emissionsandthebenefitsofabatement. ThesesocialcostswillfactorintotheROI
analysisthroughtheuseofanominalSCCasprovidedinSocialCostofCarbonfor
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
15/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page11
RegulatoryImpactAnalysisunderEO12866.2 The2010SCCvalueof$21.40per
mTCO2ewillbeusedasanadditionalprojectreviewfactorafteranNPVandother
financialanalysesarecompleted,anditsvaluewillbeadjustedovertimetoreflect
inflationandotherrelevantescalationrates.
c.EnvironmentalCosts&Benefits
DOEwillcontinuetofactorenvironmentalcostsandbenefitsintoitsROIanalysis.
PreviousstatutesandEOsmandatingresourceconservationprovideastrong
frameworktoguidetheDepartmentscontinuingeffortstoreduceitscollective
environmentalimpact. DOEwillapplylifecycleanalysistoactionswith
environmentalimpactstorevealtheproportionalityoftheirimplementationcosts
totheircontributiontotheSSPPenergyandenvironmentalgoals.
d.MissionSpecificCosts&Benefits
ManycoreDOEactivitiesarehighlyenergyintensive. Scientifictools(suchas
accelerators,
synchrotron
light
sources,
reactors
and
supercomputers),
materials
developmentprocesses,andenvironmentalremediation(suchastankwaste
treatment),requirereadyaccesstoreliableenergyandbackuppoweratreasonable
costs. DOEwilltakeproactivestepstoaddresstheenergysupplysourcesatthese
facilitiestomaximizeGHGreductionopportunities.
Incompletingitsenvironmentalresponsibilities,DOEwillconsideropportunitiesto
acceleratedeactivationanddecommissioning(D&D)ofexcessfacilitiesaswellas
opportunitiestodeploymoresustainableD&Dtechnologiessuchasinsitu
decommissioning. DOEwillalsocontinuetoincorporategreenremediation
practicesintoitsenvironmentalcleanupprogram.
Inaddition,DOEwillevaluatetheuseofmissionspecificresearch,suchasenergy
efficiencyandrenewableenergy,forprojectsthatcanbedemonstratedatDOE
sites. SuchdemonstrationscanputDOEresearchintopractice,increaseDOEenergy
savingsandrenewableenergy,andpotentiallyreduceassociatedcostsforDOEand
commercialtechnologytransfer.
e.Operations&MaintenanceandDeferredInvestments
DOEsitemanagersareresponsibleforimplementingeffectiverealproperty
managementprocessesandproperapplicationofoperationsandmaintenance(O&M)
funds.
Maintenance
and
repair
activities
are
prioritized
based
on
many
factors
including
safety,qualityoflife,protectionofassets,andprotectionoftheenvironment. The
Departmentmaintainsabacklogofdeferredmaintenance(i.e.,maintenanceactivities
thatweredeferredbeyondtheiroptimaltimeforexecution). Certaindeferred
2See
http://www1.eere.energy.gov/buildings/appliance_standards/commercial/pdfs/smallmotors_tsd/sem_fin
alrule_appendix15a.pdf
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
16/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page12
maintenanceresultsinincreasedenergyusageandgeneratesadditionalrepaircosts
(e.g.,aleakingroofwilldamageinternalbuildingcomponentsifnotfixed). Site
Managerswillconsiderenergy,waterandGHGreductionopportunitieswhen
prioritizingmaintenance,repairanddeferredmaintenanceactivities.
f.ClimateChangeRiskandVulnerability
ClimatechangeisexpectedtoaffecttheUnitedStatesinanumberofways.
Warmingoceanswillraisesealevels,whichcouldleadtonegativeconsequencesfor
DOEcoastalsites. Climatechangemayalsochangepatternsofrainfall,resultingin
greaterwaterscarcityinpartsofthecountry. Increasedwaterscarcityposesthe
greatestrisktoDOEsitesthatrelyonlargeamountsofwaterforwasteprocessing
andpowergeneration,particularlythoseindrierregionsofthecountry. Climate
changemayalsoincreasethefrequencyandintensityofstorms,whichmayleadto
greaterpotentialdamagetoDOEsitesandanincreasedlikelihoodofpowerloss,
localizedflooding,andotherthreatstobusinesscontinuityandinfrastructure. DOE
will
study
and
consider
these
concerns
as
environmental
factors
when
evaluating
projectprioritization.
g.AlternativeFundingApproaches
TheDepartmentutilizesthirdpartyfinancingmechanismssuchasESPCsandUESCs
tofinanceenergyefficiencyandconservationmeasures. Byusingtheseapproaches,
theDepartmentleveragesprivatesectorfinancingandexpertise. Whenentering
intoalternativefinancingarrangements,DOEwillworktoensurereasonablecost
savingsestimates,properprojectimplementation,soundcontractoversight,and
accuratemeasurementandverificationofsavings.
VI.TransparencyTheDepartmentcommitstotransparentcommunicationonsustainabilitywithboth
internalandexternalaudiences. KeepingstakeholdersapprisedofDOEprogressand
resultsisconsistentwithDOEsOpenGovernmentPlan3andisessentialtoachievingthe
requisiteculturalchangeneededtointegratesustainabilityasaDepartmentcorevalue.
TheDepartmentwillengageintwowayinternalcommunicationtoinformcontinuous
improvementintheimplementationoftheEOsandrelatedstatutes. Thiswillinclude
gatheringdataandoperationalexperiencefromDOEprogramsandsitesthrough
reportingprocesses,anddisseminationofinternalscorecards.
InformationwillbeaccessiblethroughDOEswebsitewheretheSSPP,andassociated
milestones/performanceinformation,willbeposted. DOEwillprovideperiodicupdates
onthestatusofprograms,initiativesandaccomplishmentsassociatedwiththeSSPP.
3http://www.energy.gov/open/documents/DOE_OGI_Plan_07Apr2010.pdf
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
17/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page13
Section2: PerformanceReview&AnnualUpdate
I. SummaryofAccomplishmentsThe
Department
has
made
considerable
progress
in
its
sustainability
efforts
under
the
requirementsofEO13423andrelatedstatutes. Theseaccomplishmentsare
summarizedbelowandincludediscussionofsuccessfulprograms,lessonslearnedand
anticipatedchallenges.
ProgresstowardFacilityEnergyandWaterGoals
InFY2009,DOEreporteda17.4%decreaseinenergyintensitycomparedtoFY2003for
facilitiessubjecttothestatutorygoalof12%,asnotedinTable2. Thisreductionincludes
purchasesof778billionBritishThermalUnits(Btu)ofrenewableenergy. Withoutthese
purchases,DOEsreductionis14%,stillsurpassingthe12%goalfortheyear.
Table2:EnergyIntensityProgress
EnergyManagementRequirement FY2003Btu/GSF FY2009Btu/GSF %Change2003 2009 FY2009GoalTarget
Reductionoffacilityenergy
intensity
225,483 186,355 17.4% 12.0%
Thereductioninenergyintensityistheresultofenergyconservationmeasures,reduced
missionrelatedactivitiesandthedownsizingofsomeoperationsandfacilities. As
manpowerisreducedandfacilitiesareclosed,effortstoconsolidateoperationsand
minimizeenergyuseinvacatedbuildingswillcontinue.
DuringFY2009,DOEsitesuseofrenewableelectricenergywas4.7%oftotalelectricity
use,surpassingthegoalof3%forFY2009(seeTable3). OfDOEstotal236Gigawatt
hours(GWH)ofrenewableelectricityuse,225GWHcamefromnewrenewableenergy
(RE)sources(developedafterJanuary1,1999).
Table3:RenewableEnergyProgress
RenewableEnergyRequirement RenewableElectricityUse
(MWH)
TotalElectric
Use
(MWH)
REas%of
TotalElectric
Use
FY2009Goal
Target
Eligible
renewable
electricity
use
asapercentageoftotal
electricityuse
235,945.0
4,971,650.0
4.7%
3.0%
InFY2009,DOEfacilitiesgeneratedabout1,900MWHofrenewableelectricityfrom141
onsiteprojects,orapproximately0.8%ofDOEstotalofeligiblerenewableenergy
(purchasesarethemainsource). Inadditiontorenewableelectricenergy,DOEused
46.2billionBtuofrenewablebiomassgasandthermalenergyinFY2009. Eight
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
18/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page14
renewablethermalenergyprojects,notcountedunderthestatutoryrenewableenergy
goal,produced182billionBtuofenergy.
ThereareseveralsignificantprojectsbeingpursuedorunderwaythatwillincreaseRE
generatedatDOEsites. Constructionstartedonabiomasscogenerationplantatthe
SavannahRiverSite,whichwillreplaceanexistingoldandinefficientcoalplant,and
saveanestimated100,000metrictonsofCO2annually4and1.4billiongallonsofwater.
TwoadditionalbiomasssteamplantsareunderconstructionatSavannahRiver,
replacingexistingfossilfuelfiredplantsandreducingthemilesofsteampipingneeded
tomovetheheat. Abiomasssteamgenerationplantisscheduledtobeoperationalin
2011atOakRidgeNationalLaboratory(ORNL). Itwillreplacefouragingnaturalgas
firedboilersandreduceannualCO2emissionsbyover55,000metrictons,alongwith
significantreductionsinairpollutants. TheNationalEnergyTechnology
Laboratoryinstalledsatellitebiomasslowpressuresteamandhotwaterboilersin
variousDOEbuildingsatitsPittsburgh,Pennsylvaniasite,replacingtheexistinglandlord
operated
coal
fired
high
pressure
central
steam
plant.
DOE
will
continue
to
identify
renewableenergyprojectsand/ortechnologydemonstrationsatsitesthatcan
contributetosustainabilitygoals.
AsshowninTable4,DOEsitesreporteda2.6%decreaseinwaterintensityforFY2009
comparedtoFY2007,howeverthisdoesnotmeetthe4%reductionrequiredbyEO
13423. Theintensityreductionoverthepastyearispartiallyduetoreducedmission
relatedactivities,implementationofbestmanagementpracticesandwater
conservationmeasures(e.g.,leakdetectionandrepair).
Table4:WaterIntensityProgress
WaterIntensityReductionGoal FY2007Gallon/GSF
FY2009
Gallon/GSF
%Change
2007 2009
FY2009Goal
Target
Reductioninpotablewater
consumptionintensity
64.8 63.1 2.60% 4.00%
DOErecognizesthepotentialtosavemoneyandnaturalresourcesthroughwater
conservation. DOEencouragesitsfieldofficesandsitestoincludewatermanagement
planswithintheirfacilitymanagementplans. DOEwillworktoincreaseefforts
associatedwithwaterconservationasdescribedinGoal6.
TheDepartmentrecentlyfundedmanyfacilityefficiencyimprovementsthroughits
aggressiveuseofESPCs. Theseinvestmentstotaled$139millioninFY2008and$176
4ThoughtheplantunderconstructionisestimatedtoresultintheGHGsavingsmentioned,thecontractor
hasretainedrightstothecarboncredits,sotheGHGsavingsmaynotcounttowardDOEsGHG
reductiongoals. TherenewableenergyattributesofthegenerationareretainedbyDOEunderthe
contract,sotheprojectwillcounttowardtheDepartmentsrenewableenergygoal.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
19/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page15
millioninFY2009(33%and43%ofannualfacilityenergycosts,respectively). DOEwill
continuetopursuealternativefinanceprojectsasappropriate.
ProgresstowardFleetTransportationGoals
DOEdemonstratescompliancewithrequirementstodecreasepetroleumuse,increase
useofalternativevehiclefuels,andtheotherrequirementsforcoveredfleetvehiclesas
showninTable5.
Table5: DOEsFY2009PerformanceinMeetingEPACT2005andEO13423Requirements
Authority/
Mandate PerformanceMeasure Goal/Requirement
DOEPerformance
inFY2009
EnergyPolicy
Act(EPACT)
1992
Alternativefuelvehicle
(AFV)acquisitions
75%ofthe733covered
lightdutyvehicles(LDV)
acquiredinFY2009mustbe
AFVs
Acquired1,237AFVsand
earned169additional
credits1
foratotalof
1,406creditsor192%of
covered
acquisitions.
Compliant
EO13423 Reduceconsumptionof
subject2petroleumby2%
annuallythroughtheendof
FY2015fromFY2005
baseline3
Reduceconsumptionof
subjectpetroleumtobelow
FY2009targetof6,798,690
gasolinegallonequivalents
(GGE)
Reducedconsumptionof
subjectpetroleumto
6,185,765GGE(8.3%
belowtheFY2009
target).Compliant
Increaseannualalternative
fuelconsumptionby10%
(compoundedannually)
throughtheendofFY2015
fromFY2005baseline2
Increasealternativefuel
consumptionequaltoor
aboveFY2009targetof
913,276GGE
Increasedalternativefuel
consumptionto
1,307,721GGE(43.2%
overtheFY2009target).
Compliant
EPACT2005,
Section701
AlternativefueluseinAFVs OperatealldualfuelAFVs
onalternativefuelunless
theAFVisgrantedawaiver
forfuelavailabilityorcost
Used340GGEof
alternativefuelpernon
waivereddualfuelAFV.
Compliant
1Creditsearnedforbiodieseluse.
2Subjectpetroleumincludesthepetroleumusedinalllightduty,mediumduty,andheavyduty
vehicles,unlesssuchvehiclesareexemptedfromEO13423(e.g.,lawenforcement,emergency,and
militarytacticalvehicles,andvehiclesoperatedoutsideoftheU.S.).3DOEsFY2005subjectpetroleumbaselineis7,389,881GGEandFY2005alternativefuelbaselineis
623,779GGE.
TheDepartmentcontinuestotransformitsvehiclefleettoutilizealternativefuels. In
ordertofurtherreduceGHGemissionsfrompetroleumuse,DOEisexploringoptionsto
transformitsfleet. InApril2010,DOEannouncedthatitwillleverageEO13514to
doubleitshybridvehiclefleet. Replacing850DOEvehicleswithhybridvehicleswill
bringthetotalnumberofhybridsattheDepartmentto985,whileDOEcontinuesto
reducetheoverallsizeofitsvehiclefleet.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
20/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page16
ProgresstowardOtherSustainabilityGoals
InFY2009,DOEattainedastatusofGreenonthreeoutoffourenvironmental
stewardshipperformancemetricsontheOMBscorecard: EnvironmentalManagement
Systems(EMS),AffirmativeProcurementProgram,andElectronicStewardship.
ThroughitsongoingimplementationofrobustsitelevelEMS,DOEinstitutionalizedan
effectiveframeworkforimplementingsustainabilitythroughoutthecomplex. Allsites
havefullyimplementedEMS,mostofwhichalreadyaddressmanyEO13514goals.
EnvironmentalManagementSystemsprovideastructureforthesitelevelcrosscutting
andmultifunctionalcoordinationnecessarytoplanfor,andachieve,theDepartments
sustainabilitygoals.
DOEcontinueditsleadershipinFederalelectronicsstewardshipinFY2009. Over97%of
computersleasedorpurchasedbyDOEwereElectronicProductEnvironmental
AssessmentTool(EPEAT)registered;over95%ofDOEsitesextendedlifespansof
computers
and
monitors
to
at
least
48
months;
and
over
99%
of
DOE
end
of
life
or
surpluselectronicswerereusedorrecycled. Inaddition,over90%ofDOEsites,
representingover95%ofDOEFederalandcontractorpersonnel,employedpower
managementoncomputersandmonitors.
DuringFY2009DOEwasunabletodemonstrateimplementationofFederalGuiding
PrinciplesforSustainableDesign(GP)in3%ofitsnew,existingandleasedenduring
buildingslargerthan5,000squarefeet. DOEsstatuschangedfromGreentoRed
withonly1.2%ofeligiblebuildingsmeetingtheGP. DOEhascommittedtocompletinga
largenumberofbuildinglevelevaluations(FY20112012),andwillcontinuenumerous
projectstobringadditionalbuildingsintoGPconformance. TheDepartmentisclosely
monitoringthiseffort,andwillcontinuetoprovidetechnicalsupportandtrainingtoits
ProgramOfficesandsitestoincreasetherateatwhichbuildingscanmeettheGPs.
DOEsiteshavealreadyimplementedseveralgreenwastemanagementsystems. All
siteshaverecyclingprogramsinplace,reportinginFY2009a49%diversionofwaste
Departmentwide. Twentyonesiteshaverecyclingprogramsthatcovercompostable
andorganicmaterials,divertingover10,000metrictonsfromlandfillsinFY2009.
DOEpurchasesofrecycledcontentproductsexceeded$38MinFY2009. Sitesreported
anincreaseinthevarietyandnumberofsitespurchasingbiobasedproducts,andover
98%
of
DOE
Federal
and
contractor
personnel
reported
preferences
for,
and
purchases
of,ENERGYSTARproducts. Sitesalsoreportedapreferenceforandpurchaseof
FederalEnergyManagementProgram(FEMP)designatedandWaterSenselabeled
products.
FederalEnergyManagementProgramActivities
UniqueamongotherFederalagenciesisthecoordinatingandsupportroleofDOEs
FederalEnergyManagementProgram(FEMP). FEMPsmissionistofacilitatethe
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
21/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page17
FederalGovernment'simplementationofsound,costeffectiveenergymanagementand
investmentpracticestoenhancethenation'senergysecurityandenvironmental
stewardship. Giventhestrongassociationbetweengreenhousegas(GHG)emissions
andenergymanagement,FEMPhasbeenspecificallytaskedunderEO13514toprovide
criticalsupporttotheWhiteHouseCouncilonEnvironmentalQuality(CEQ)in
implementingtheOrderincludingprovidingdetailedrecommendationsforGHG
accountingandreporting,guidanceonFederalfleetmanagement,technicalassistance
toagencies,andchairingseveralinteragencyworkinggroups. Currently,FEMPalsohas
akeyroleinsupportingDOEsinternalsustainabilityefforts. FurtherdetailsonFEMPs
Governmentwideandinternalsupportroles,recentactivities,andaccomplishments
relatedtoEO13514areprovidedinAppendix3.
II.GoalPerformanceReviewTheStrategy. To
achieve
the
goals
outlined
in
this
plan,
and
achieve
the
Secretary
of
EnergysintenttodemonstrateSustainableScience,theDepartmentwillorganizeits
managementandimplementationeffortsinfourmajorareas. First,DOEwillstrengthen
itsinternalmanagementstructuretoenhancedecisionmaking,analysisand
accountability,withsignificantresponsibilitiesdelegatedtotheUnderSecretariesbut
performancetrackedcentrally. Second,theDepartmentwillundertakeawholesale
assessmentofitssustainabilityposture,collectingcriticalenergyandefficiencydata
acrosstheentirecomplexinordertoinformfutureinvestmentsdecisions. Third,the
Departmentwillputinplacearobustgoalattainmentandperformancemanagement
systembasedonmetering,benchmarkinganddocumentedefficiencygains. Finally,in
recognitionthatgoalattainmentis,attheendoftheday,aquestionnotonlyof
technologyanddata,butofleadership,theDepartmentwillestablishdedicatedefforts
tochangeindividualandcollectivebehaviorthroughincentiveprogramsandperiodic
reportingtotheDepartmentsuppermostmanagement. Allofthiswillbe
accomplishedasrapidlyaspossiblewhilemaintainingacommitmenttopublic
transparencyandmissionaccomplishment.
DOEOrganization.UndertheDeputySecretary(whoisalsotheSSO)aretheUnder
SecretaryforNuclearSecurity,theUnderSecretaryforScience,andtheUnderSecretary
forEnergy. ProgramSecretarialOfficesreporttotheUnderSecretaries. TheNational
NuclearSecurityAdministration(NNSA)isalignedundertheUnderSecretaryforNuclear
Security. TheOfficeofScienceisalignedundertheUnderSecretaryforScience. All
othermajorPSOsarealignedundertheUnderSecretaryforEnergy. TheManagement
PSO,whichisresponsiblefortheHeadquartersoffices,andthefourPowerMarketing
AdministrationsworkdirectlyfortheOfficeoftheSecretary. AllDOEsitesarealigned
underaPSO.
NewPositions. DOEwillestablishaSustainabilityPerformanceOffice(SPO)toassistthe
SSOintheperformanceofthisplan. Theofficewillfocusondatacollection,analysis,
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
22/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page18
reporting,providingexpertiseasnecessary,andotherdutiesasassigned. TheSPOmay
requirenewFTEs. TheFY2011SSPPwillprovideamoredetaileddiscussionofmission,
andorganizationalplacementofthisoffice.
EnvironmentalManagementSystems. DOEwillcontinuetouseitsexistingEMSasthe
overarchingplanningandmanagementprocesstoachievethesustainabilitygoalsofthe
EOsandrelatedstatutes. TheDeputySecretaryorderedtheDepartmenttointegrateits
environmentalandenergymanagementdirectives,includingconformanceto
InternationalStandardsOrganization(ISO)14001astheDepartmentsstandardfor
environmentalmanagementsystemsandtherequirementsofEO13514. The
DepartmentwillpromulgateanOrderinFY2011torequiresitestorevisetheirEMS,as
necessary,toincorporateactivitiesandprogramstomeetthegoalsandtargets
identifiedinthisSSPP,toensureconformancewiththeISO14001standard,andto
provideannualreportstoHeadquartersontheirprogressinachievingtheEOandSSPP
goals. TheDepartmentwillalsousethisnewOrdertoalignitscorporatepoliciesand
requirements
to
support
the
integration
of
energy
use
reduction
and
environmental
sustainabilityintositeoperationsandactivities.
SustainabilityTransformationTeams. DOEwillleverageitsscientificexpertisebydirectingtheDOENationalLaboratoriesandsitestocollectivelycollaborateusingthe
fullsuiteofresourcesattheirdisposal(includingtheexpertiseoflaboratoryscientists
andengineers)todevelopinnovative,crosscuttingstrategiesformeetingtheExecutive
Ordergoals. TheSustainabilityTransformationTeamswillaggressivelyaddressDOE
operations,includinghighenergymissionspecificequipmentandfacilities,toidentify
opportunitiestoimprovesustainabilityandachievemissionrequirements.The
strategiesrecommendedbytheTransformationTeamswillbereportedtothecognizant
UnderSecretariesforusebyallDOEsites. Thesestrategieswillbeintegratedwithand
alignwiththeSitesongoingsustainabilityplanningefforts.
SSPPRollOut. TheSSPPwillbeintroducedtoDOEpersonnelthroughawell
coordinatedrollout. Activitieswillinclude:
DistributionofamemofromtheSSOtoDOEpersonnelintroducingtheSSPP
PublicationandpublicdistributionoftheSSPPonaDOEwebsite
ConveningaGHGsummitofseniorDOEleadership(toincludelaboratoryChief
OperatingOfficersandChiefFinancialOfficers)
Verificationthatenergyconservationandrecyclingareincludedinallnewemployeeorientationprograms
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
23/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page19
1. GOAL: Scope1&2GreenhouseGasReduction
TheDepartmentsoverarchingmissionistodiscoverthesolutionstopoweringand
securingAmericasfuture. Assuch,theDepartmenthasdevelopedprogramsand
fundingapproachesandhasinvestedinarangeoftechnologiesthatincrease
efficiency,produceclean,renewableenergy,andimprovetransportationefficiency.
Overtheyears,manysuchtechnologiesweredemonstratedandusedatDOEsites.
TheseweredeployedunderDOEOrder430.2BandpriorOrders. DOEwillexpand
theseactivitiesforEO13514withreductionofGHGemissionsastheintegrating
performancemetrictoincreaseitssustainability.
EO13514directedeachagencytoselectacombinedScope1and2GHGemissions
reductiongoal. TheDepartmentselectedacombinedScope1and2GHGemissions
reductiongoalof28%(fromDOEsFY2008baseline). ToreachthisgoalDOEwill:
a.
Improve
the
energy
efficiency
of
processes,
buildings,
and
facilities
b.Increasetheamountofrenewableenergyused,withemphasison
developmentofrenewableenergygenerationonDOEsites
c.Reducethefossilfueluseofthevehiclefleet
d.ReducenonCO2fugitivegasemissionsthatproduceGHG
Eachofthesestrategiesisdiscussedbelow.
a. EnergyEfficiencyinProcessesandFacilities:ReduceFacilityEnergy
Intensity
DOEsrealpropertyportfolioincludesover10,000buildingsandtrailers
representingmorethan126Mgrosssquarefeet(GSF)ofofficebuildings,
laboratories,stagingfacilities,andwarehousesat47majorsitesacrossthe
country5.
i.GoalDescriptionEISA2007,asamendedbytheNationalEnergyConservationPolicyAct
(NECPA),requiresa30%energyintensityreductionforfederalfacilitiesby
2015(relativetoa2003baseline). Thisgoalisconsistentwiththegoalsetin
Section2aofEO13423andisincludedinSection1.b.1ofDOEOrder430.2B.
5DOEcurrentlyownsapproximately22MGSFofspacethatisoutgranted,orleasedtothirdpartiesover
whichtheDepartmenthasnooperationalormanagementcontrol.Becausetheoutgrantedfacilitiesarenot
underDOEsoperationalcontrol,theyarenotincludedinDOEsScope1and2GHGinventoryortheSSPP.
ExamplesincludetheU.S.EnrichmentCorporationsPortsmouth,OhioandPaducah,Kentucky.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
24/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page20
ii.CurrentStatusFigures2and3illustrateDOEstotalenergyuseandenergyintensity,
respectively,forDOEsrealpropertyportfoliofrom2003to2009. Thecharts
showenergysubjecttothe30%energyintensitygoalandtotalenergyuse
(whichincludesenergyexcludedfromthegoal).
BytheendofFY2009,DOEhadachievedanenergyintensityreductionof
14%(17.4%ifRenewableEnergyCertificates[RECs]areincluded). The
majorityofenergyconservationprojectshavebeenperformedthroughthe
leveragingofESPCcontracts,aswellastheimplementationofbestpractices
anddemandsidemanagement.
DOE Energy Use 2003-2009
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
2003 2004 2005 2006 2007 2008 2009
EnergyUse(10^9BTU)
Goal Subject Buildings Energy Total Energy (Goal Subject + Exc luded)
Figure2: TotalEnergyUseforDOERealProperty
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
25/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page21
DOEEnergyIntensityFY0309
180,000
185,000
190,000
195,000
200,000
205,000
210,000
215,000
220,000
225,000
230,000
235,000
240,000
245,000
250,000
255,000
260,000
265,000
270,000
275,000
2003 2004 2005 2006 2007 2008 2009
EnergyIntensity,
BTU/SF
RequiredEnergyIntensity (EI)EIforGoalSubjectEnergyw/oRECsandSourceEnergyCreditEIforGoalSubjectEnergyw/RECsandSouceEnergyCreditEIforAllEnergywithoutRECsorSourceEnergyCredit
Figure3:EnergyIntensityFY03FY09
iii.SpecialConsiderationsAchievingScope1and2GHGreductiontargetsforFY2020willbemore
challengingthansimplymeetingtheenergyintensityreductiontarget.
NECPAallowsfortheexclusionofcertainprocessesandfacilitiesfromthe
energyintensitycalculation. However,theGHGemissionsoftheseloadsare
notexcludedunderEO13514,andarecurrentlysubjecttothe28%GHG
reductiongoal.
DOEcontinuestolookforwaystoreduceprocessloadsatexcludedfacilities
withoutadverselyaffectingthemissionoftheDepartmentanditsfacilities.
TheSustainabilityTransformationTeamswillexamineinnovativeapproaches
toachievingmissiongoalsinalignmentwithSSPPgoals.
iv.ImplementationMethodsWhilesufficientprojectstomeettheenergyintensitygoalarestillbeing
identified,
the
Department
will
focus
on
the
following
actions:
Conductingprocessassessments,andenergyandrecommissioning
audits
Meteringprocessesandindividualbuildingsforperformance
diagnostics
Benchmarkingbuildingperformance,withinternalandexternal
disclosure
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
26/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page22
Implementingprojects(energyconservationmeasures[ECM])to
includerecommissioningofbuildings
Asapriority,DOEwillconductsiteassessmentsandenergyauditson
facilitiesandprocessenergyuse. Theseauditsandassessmentswillbeused
toidentifyprojectstosupportallthegoalsofthisplan,toincludeenergy
efficiency,coolroofs,andpotentialimplementationofcombinedheatand
power(CHP)units(withorwithoutbiomassfuels). Theseauditswillcoincide
withauditsrequiredbySection432ofEISA2007andaDOEsurveyofenergy
andwaterefficiencytechnologiesinstalledateachsite.
Overtime,buildingsdepartfromtheirdesignbehaviors. Thesedeviations
mayoccurfromoperatorintervention,sensordegradationorequipment
malfunction. Thereturnofabuildingsoperatingsystemstotheirdesign
conditionwilloftenresultinimprovedenergyefficiency.DOEwillperform
recommissioning
assessments
on
75%
of
its
buildings
(in
terms
of
energy
use)
asapriority,andwillidentifybuildingsmostinneedofrecommissioning
measures.
DOEwillestablishtwospecialpurposeteamstoapply,andassistsite
personnellearnaboutstateoftheartwaterandenergyauditingtechniques.
OneteamwillbeformedfromDOEsIndustrialProgramsOfficeandwill
focusonprocessandindustrialassessments. Amongothertopics,thisteam
willlookforappropriateopportunitiestoapplyCHPtechnology,andwill
assistintheperformanceofboilerassessmentstoimproveboilerefficiency
tofullcompliancewithEPAproposedrulesforboilertuneups/audits. The
secondteamwillbeformedfromDOEsBuildingTechnologiesProgram
Officeandwillfocusonbuildingenergy,waterandrecommissioning
assessments. Lowornocostcorrectivemeasureswillbeimplementedin
thenearterm,whereascorrectivemeasureswithlargerimpactwillbe
addressedinfuturebudgetsubmissions. Theseteamswillprovide
assessmentsandtechnicalassistancetosites,programs,SPOandtheUnder
Secretariestoenablesharingoftechnicalexpertise,publicandprivatebest
practices,andaccesstostateoftheartindustrialprocessandbuilding
assessments.
Metering
is
critical
to
resource
control,
as
well
as
measurement
and
verification(M&V)ofimplementedECMs. Itiscurrentlyestimatedthatonly
40%ofDOEsbuildingsareindividuallymeteredforelectricity.6 NECPA,as
amendedbyEPAct2005,requirestheinstallationofelectricalmetersby
2012,withadvancedelectricalmeterstothemaximumextentpracticable.
6Meteringguidancecanbefoundat:http://www1.eere.energy.gov/femp/pdfs/adv_metering.pdf
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
27/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page23
EISA2007mandatesappropriatebuildinglevelmeteringofnaturalgasand
steamby2016.Electricalmeterinstallationwillremainaneartermpriority.
DOEwillreevaluate,updateandpromulgateinternalmeteringguidance.
Siteswilladjusttheirmeteringplansaccordingly.
ThemajorityofDOEbuildingsfallintooneoftwogroups: amultibuilding
facility(oftencalledacampus),orstandalonebuildings. DOEsmetering
philosophydiffersbetweenthesetwogroupsandisdiscussedbelow.
1) Multibuildingsites
Forunmeteredbuildingsandprocesses,DOEwillinstallelectricity
meterssothatatleast90%ofthemultibuildingfacility(interms
ofenergyuse)ismetered.
Forunmeteredbuildingsandprocesses,DOEwillinstallnatural
gasandsteammeters,asappropriate,sothatatleast90%ofthe
multi
building
facility
(in
terms
of
energy
use)
is
metered.
2)Standalonebuildings,suchasheadquartersbuildingsinWashington
DCand GermantownMD,thatarenotpartofmultibuildingfacilitieswill
bemeteredforelectricity,naturalgas,andsteam,andbenchmarked
throughmonthlyreportingofenergyuse.
Toincreasetransparencyofenergyandbuildingperformanceinformation,
theDepartmentwillusemeteringdataforbenchmarkingpurposes.
Benchmarkingisakeyenergyefficiencymanagementtool. Itallowsfacility
managerstocompareindividualbuildingperformancetosimilarbuildings,
andallowscomparisontothebuildingsperformanceinpreviousyears. DOE
willbenchmarkallindividuallymeteredbuildingsinEnergyStarPortfolio
ManagertoallowDOEdecisionmakerstoanalyzebuildingenergyuseona
building,site,orportfolioleveltobetterinformcorporatebudgetdecisions.
UnderDOEOrder430.2B,DOEsitesannuallysubmitdataonthestatusof
theiractualandpotentialenergyefficiencyandrenewableenergyprojects.
Currently,DOEhasover100projectsundercontractforacombined
investmentofabout$500M(withabout$340MofthatunderESPCcontract).
Anadditional35projectsareindevelopment(meaningtheyarepreparingto
solicitbids). DOEwillcontinuetoidentifyanddevelopenergyefficiencyand
renewableenergyprojects(toincludebuildingcommissioningand
recommissioning)toreducetheenergycostandfootprintofthevarious
sites. AsummaryofenergyprojectsunderwayisprovidedinAppendix4.
Overthelongterm,theDepartmentwillreducefacilityenergyintensityby:
Installingenergyimprovementsinexistingbuildings(equipment
upgrades;improvingmaintenance,commissioningprocedures,and
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
28/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page24
operatingprocedures,retrofittingwithcoolroofs7andENERGY
STARmaterialsandapplianceswhereappropriate,andbuilding
envelopeimprovements)
Constructionofnewbuildingsthatarehighlyefficientandfollowthe
GPofsustainability(seeGoal4)
Disposingexcessrealpropertyinventory
Reductionofprocessenergyloadswherepractical
Utilizationofadvancedbuildingmeteringforrealtimecontroland
display,andtoencourageenergyefficientpracticesamong
employeesthroughawardsandincentives
UtilizationofDOEfacilitiesforenergydemonstrationprojectsand
emergingtechnologiesforcommercialuse
Systematicconsiderationofenergyreductionasafactorinthe
decisionprocessformaintenanceandrepair
Rebenchmarkingindividuallymeteredbuildings(annually)tocompare
buildingperformancetopeersandtopastyears. Buildingenergy
performancebenchmarkswillbepublicallydisclosed
Reverifying(periodically)thatgreenbuildingscontinuetomeet
greenbuildingcertifications
RecognizinghighestperformingbuildingswithSecretarialAwards.
Reducingtheenergyintensityofexistingfacilitieswillcontinuetobeamajor
componentofthesustainabilitystrategy. Purchasedelectricityaccountsfor
approximately60%ofDOEsScope1and2GHGinventory.
ExistingFacilities. Numerous
opportunities
exist
to
improve
the
energy
efficiencyofexistingbuildings. Theseinclude:
Installingmoreefficientequipmentorbetterequipmentcontrols
Improvingmaintenance,commissioning,andoperatingprocedures)
Retrofittingbuildingswithcoolroofs
UsingENERGYSTARmaterialsandappliances
Improvingthebuildingenvelope(insulation,windows,and
weatherization)
FacilityDeactivationandDecommissioning. DOEwillcontinuetodisposeof
assetsnolongerneededforcurrentorfuturemission. Facilitiesidentifiedfor
disposition,butnotremovedwilloperateatminimalenergylevelssoasto
preventfurtherenvironmentaldegradation.
7SeeSecretaryofEnergymemoofJune1,2010: InstallationofCoolRoofsonDepartmentofEnergy
Buildings
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
29/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page25
From2003through2009,DOEconductedD&Dproceduresonabout2.1M
GSFperyear(averagingabout400buildings/year). Forplanningpurposes,it
isassumedthatabout2MGSFperyearofbuildinginventorywillbe
decommissionedanddisposedofeachyearfromFY2010throughFY2020.
TheDepartmentusesaoneforonepolicy,whichstatesthatforevery
squarefootofnewconstruction,onesquarefootofsimilarbuildingtype
mustberemoved.8
NewConstruction. DOEOrder430.2Brequiresallnewconstructionand
majorrenovationsunder$5MtocomplywiththeGP,andbuildingsabove
thatthresholdtoachieveLeadershipinEnergyandEnvironmentalDesign
(LEED)Goldcertification,ifithadnotreachedcriticaldecision2(CD2)
beforeOctober1,2008. BothLEEDGoldcriteriaandtheGPanalyzeand
scoreenergyefficiency,waterefficiency,andenergysavingstrategies. Asof
May2010,thereare87buildingsandstructuresscheduledforcompletionby
FY
2020
(in
development
at
CD
2
or
above).
These
buildings
will
add
in
excessof6MGSFandconsumeover800,000MWHofelectricityandover
400Mcubicfeetofnaturalgaseachyear.
Asanticipatedconstructionofnewfacilitiesmayincreasefutureenergy
consumption,theDepartmentisensuringfacilitiesaredesignedandbuiltto
operateasefficientlyaspossiblewhileachievingmissiongoals. Increased
energyconsumptionwillbeoffsetbyincreasedrenewableenergy
generation,energyefficiency,andRECprocurement,asnecessary.
v.DepartmentLeadforGoalThethreeUnderSecretariesareresponsibleformeetingthetargettoinclude
theplanning,budgeting,development,implementationandoversight.9
vi.PositionsAspreviouslydescribed,DOEplanstoestablishanSPO.
DOEwillconductatrainingneedsassessmentofallDOEdesignatedenergy
managersanddevelopastrategyforaddressingnotedshortfalls. DOEwill
requiretheFacilityEnergyManagerofeveryDOEsitetoattainaCertified
EnergyManagerqualification. TheEnergyManagerpositiononallsiteswith
8HouseReport109086EnergyandWaterDevelopmentAppropriationsBill,2006.
http://thomas.loc.gov/cgibin/cpquery/R?cp109:FLD010:@1(hr086)
9ThethreeUnderSecretariesareresponsibleforeachoftheiroperations,theDOEOfficeofManagement
(MA)isresponsibleforthetwoHeadquartersbuildings,theDOEOfficeofHealth,SafetyandSecurity
(HSS)isresponsiblefortheNationalTrainingCenter,andeachAdministratorofaPowerMarketing
Administrationisindividuallyresponsiblefortheirorganization.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
30/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page26
greaterthan5millionsquarefeetofbuildingsshallbeafulltimeposition
focusedonwater,energyandGHGmanagement.
b.RenewableElectricityInstallation&Use
AnumberofDOEsitesarelocatedinareaswithabundantrenewableenergy
resources(toincludesolarinNewMexico,windinTexasandIdaho,and
biomassinSouthCarolina). Evenbeforethecurrentgroupofstatutesand
ExecutiveOrders,DOEledtheNationinthedevelopmentofrenewable
energy.
i.GoalDescriptionEPAct2005requiresfederalagenciestoensurethatnolessthan5%ofits
electricenergycomesfromrenewablesourcesfrom20102012,andthatno
lessthan7.5%befromrenewableelectricsourcesinFY2013andbeyond.
EO
13423
requires
that
at
least
half
of
the
required
renewable
energy
come
fromnew(post1999)renewableenergysources,andencourages
departmentstoinstallrenewableenergygenerationonsiteforusebythe
site.
ii.CurrentStatusMostDOEsiteshaveinstalledandusesomeformofrenewablepower. The
largerscalerenewableelectricityinstallationsarelocatedinColorado,
includingalmost2MWfromphotovoltaic(PV)arraysandupto4MWfrom
windturbines. DOEhassmallerprojectsinotherlocations,includingrooftop
PVarraysinWashingtonDC,geothermalpowerinWyoming,anddish
SterlingsolarpowersystemsinNewMexico. Additionallargescaleprojects
beingdevelopedonDOEpropertyincludeamajorbiomasspoweredco
generationplantinSouthCarolinaanda37MWPVsysteminNewYork.
AtthebeginningofFY2010,DOEreceived0.16%ofitselectricalenergyfrom
onsiterenewablesources. ByFY2011,DOEexpectstoaddanother0.5%of
renewableelectricity,primarilyfromwindenergyattheNationalRenewable
EnergyLaboratory(NREL). Anadditional4.4%ofonsiterenewableelectric
power(primarilyfromthebiomasspoweredCHPplantattheSavannahRiver
Site)isexpectedtobeonlinebytheendofFY2012,foratotalof5.1%of
DOEs
electricity
consumption
coming
from
renewable
sources.
iii.SpecialConsiderationsManypotentialalternativelyfinancedorPPAprojectsdonotmeetNPVor
ROIcriteriabecauseofthelimitedcontractingperiodscurrentlyauthorized
fortheseprojects. ExpandingthecontractedperiodforPPAscouldexpand
commercialinterestindevelopingandfinancingrenewableenergyprojects.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
31/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page27
DOEwillworktodeterminehowthisperiodcouldbeexpandedforfuture
negotiation.
LargebulkenergycontractshaveallowedDOEsitestoobtainhighly
favorableenergyratesinmanyregionsofthecountry. Onapurelyeconomic
basis,manyrenewableenergytechnologiesmaynotbeabletocompetewith
thislowcostofenergy,howeverrenewableenergyhasmanybenefits.
Movingforward,theDepartmentwilltakesocialandenvironmentalcosts
intoconsiderationwhendeterminingthebestmixofenergysourcesand
negotiatingfutureutilitycontracts.
DOEownsandcontrolslargetractsoflandthathavebeenreclaimedafter
industrialcleanup. Muchofthislandrequireslongtermmonitoringandis
notcurrentlysuitableforunconstraineddevelopment. DOEwillexaminethe
feasibilityofusingthislandforfutureREproduction. TheDepartmentis
pursuing
Enhanced
Use
Leasing
(EUL)
authority
to
improve
opportunities
to
makethislandusefulwithoutinterferingwiththelongtermmonitoring
effort.
iv.ImplementationMethodsRenewableenergyassessmentreportsforalargenumberofDOEsiteswere
completedinthe20072009timeframe. Asufficientnumberofprojects
wereidentifiedtomeettheREgoalfromonsiteprojects,however,few
projectswerefoundtohaveapositiveNPVorROIatthattime. DOEwill
continuetoevaluatethemorepromisingprojectsfordevelopmentwhile
researchingfavorablenewprojects.
IntheneartermDOEwill:
Conductsitesurveysandidentifynewprojects
CollaboratewithotherFederalagenciestoleverageopportunitiesand
bestpractices
Developandconstructrenewableenergyprojectsasappropriate
PurchasegreenpowertomeetstatutoryandEOgoalsasnecessary
Workwithotheragenciestodeterminebestpracticesforalternative
financingmechanisms.
SiteassessmentsandenergyauditswillenableDOEtoidentifynew,more
promisingprojects. Inthepast,manyrenewableenergyprojectscouldnot
competeagainstthelowcostofgridsuppliedenergy. Factorsthatincrease
thelocalcostofelectricity(suchasacarbontax,gridcongestion,ornew
billingstructure)maysignificantlychangethefinancialviabilityofrenewable
energyprojects. Assuch,additionalassessmentswillbeconductedeach
yeartoinvestigatethetechnicalandeconomicfeasibilityofnewprojectsor
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
32/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page28
toreevaluatethefinancialviabilityofanexistingproposalwherelocal
factorsmayhavechanged.
DOEfundsthedevelopmentofmanynewREtechnologies. TheDepartment
willevaluateitssitestodeterminetheirpotentialtoperformlargescale
demonstrationand/orinstallationofnewREandEEtechnologies
Whilemostpreviouslargeprojectswerefundedusingalternativefinancing
methods,otherpromisingprojectsmayneedacombinationofappropriated
andalternativefundingtobeconsideredfordevelopment. Inaddition,DOE
willevaluatetheuseofrenewableenergyPPAsinthewesternUnitedStates
forperiodslongerthan10years(throughtheWesternAreaPower
Administration).
DuringtheperiodFY20122020,DOEwilldemonstrateleadershipby
achieving
the
following
goals:
Produceatleast7.5%ofitselectricityfromonsitesources(eliminate
theneedtobuygreenpower)
Cofireallcoalfedboilerswithbiomasstothemaximumextent
possible(whereaneconomicsourceofbiomassisavailable)
ConductlargescaledemonstrationofpromisingREtechnologiesat
DOEsites
v.DepartmentLeadforGoalThethreeUnderSecretariesareresponsibleformeetingthetargettoinclude
theplanning,budgeting,development,implementationandoversight.
vi.PositionsAspreviouslydescribed,DOEplanstoestablishanSPO.
c. Fleet
DOEmaintainsadiversefleetofvehicles. Whilesomearepassenger
vehicles,othersaremedium andheavydutytrucksorarespecialpurpose
vehicles. Attheendof2009,theDOEfleetconsistedof14,279vehicles
managedby96reportingorganizationsdistributedthroughouttheUnited
States. Thisfleetincluded5,067E85capablevehicles,213compressed
naturalgasvehicles,135hybrids,13liquidnaturalgas,andthreeliquid
petroleumgasvehicles.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
33/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page29
i.GoalDescriptionEISA2007andEO13423requirea2%peryearreductioninfleetpetroleum
usethroughFY2015(fromaFY2005baseline). EO13514incorporatesthis
requirementandextendsitto2020,foranoverallreductionof30%. EISA
2007alsorequiresfederalagenciestoincreasetheuseofnonpetroleum
fuelsby10%annually. EISA2007,EO13423andEO13514allprovide
directionforfederalagenciestopurchaselowGHGemittingvehicles,
includingalternativefuelvehicles.
ii.CurrentStatusDOEcurrentlymeetsallannualrequirementsofthelawandthevariousEOs.
DOEhasalreadymetthe2013milestoneforalternativefueluse.
iii.SpecialConsiderationsThecommencementorcompletionofalargeenvironmentalmanagement
activity
(which
frequently
uses
a
significant
number
of
heavy
duty
vehicles)
maydriveDOEsfuelstatisticsupordownbyasignificantpercentage. Asa
result,petroleumfuelusagenumberswillfluctuatealongatrendline.
WhileDOEmetthepetroleumreductiongoalin2009,manyprojectswill
startandstopbeforeFY2020. TodateDOEhasnotreducedfuelusage
enoughtoensurethefluctuationremainsbelowtherequiredlimit,andthus
willdetermineandundertakeadditionalmeasurestoensurecontinued
compliance.
DOEhasalargeproportionofmediumandheavydutyvehicles,almost
threetimestheproportionofotherFederalagencies. Whilefewcost
effectivefuelsavingsoptionscurrentlyexist,DOEwillconsidershiftingto
biofuelswherepossible,andwillcloselyexaminepotentialsolutionsinthe
researchanddevelopmentpipelineandmovetoadoptthemwhere
appropriate.
iv.ImplementationMethodsDOEistakinglarge,boldstepstoreachthevariousgoals:
ReplacetheIdahoNationalLaboratory(INL)dieselbusfleet
UseaGeographicInformationSystemoptimizationtooltoguide
relocationoflightweightvehicles
Purchasehybridelectricvehicles(HEV)
RelocateE85capablevehicles
Developinfrastructuretosupportelectricvehicles(EV)andplugin
hybridelectricvehicles(PHEV)
Increaseuseofbiodieselfordieselfueledvehicles
Downsizetosmallervehicleswherefeasible
Conductdrivertraining
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
34/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page30
Eliminateunnecessaryvehiclesinthefleet
TheDOEbusfleetatINLisamajorconsumerofpetroleumdieselfuel. DOE
intendstoreplacethesebuseswithnewbusespoweredbycompressed
naturalgas. Doingso,DOEwillgreatlyreduceitspetroleumuse,increaseits
useofalternativefuels,andenticeemployeeswhocurrentlydrivetothesite
totakethebus(reducingScope3GHGemissions). Thetimingandmethod
toconductthisreplacementiscurrentlyunderevaluation.
TheDepartmentofEnergyisfundingdevelopmentofafleetoptimization
toolbyNREL. Thistoolwilloptimizethedeploymentofalternativefuel
vehiclestomaximizetheiruseofalternativefuels;andtooptimizethefleet
vehicleinventorytoensuremissionneedsaremetwiththeappropriatesize
andnumberofvehicles. DOEintendstousethisprograminthe
managementofitslightvehiclefleet.
DOEhascommittedtoacquiringalargenumberofHEVs. Thesevehicles,
withbetterfueleconomythanthevehiclestheyreplace,willreducethe
Departmentspurchaseofgasoline. DOEwillreplace850gasolinevehicles
withHEVsinthenearfuture.
InparallelwiththepurchaseoftheseHEVs,DOEwillrelocateitsE85
capablevehiclesintoregionsofthecountrywhereE85ismore
commerciallyavailable. Whereneeded,DOEwillinstallfillingstationson
siteorataconvenientlocationtosupporttherelocationofE85vehicles.
TheseactionswillincreaseaccessofE85capablevehiclestoE85fuels,
increasingtheDepartmentsuseofalternativefuels.
DOErecognizesthatEVandPHEVwillbeavailableinthenearfuture. In
preparationforthesevehicles,DOEwillestablishaprogramtoencourage
theinstallationofelectricchargingstationsforsiteuse,andforuseby
commuters. Wherepossible,thisprogramwouldbetiedtotheinstallation
ofonsiterenewableenergygeneration. TheseactionswouldreduceDOEs
purchaseofpetroleumfuelsandwouldprovideanincentiveforcommuting
employeestopurchaseelectriccapablevehicles(EVorPHEV),reducing
Scope3emissions.
DOEalsowillconducttrainingofpotentialdriverstohelpthemdevelop
skillsandbehaviorstomaximizethefueleconomyofthesevehicles. This
trainingwillbeprovidedtobothfederalandsitecontractoremployees.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
35/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page31
v.DepartmentLeadforGoalThethreeUnderSecretariesareresponsibleformeetingthetargetto
includetheplanning,budgeting,development,implementationand
oversight.
vi.PositionsAspreviouslydescribed,DOEplanstoestablishanSPO.
d. FugitiveEmissions
i.GoalDescriptionDOEwillreduceGHGemissionsfromnonCO2sources,andwillsetspecific
yearlyreductionmilestonesinthenearfuture.
ii.CurrentStatusDOEs
non
CO2
GHG
emissions
comprise
an
estimated
14%
of
the
DOE
Scope
1and2GHGinventory. Theseestimatesarebeingvalidatedwhileanew
processisdevelopedtotrackfugitiveemissions. ThemajorityoftheseGHG
emissionsarefromofSF6gasreleases,whereSF6iscommonlyusedasan
electricinsulator(dielectricmedium)inhighvoltageelectricalequipment.
Itsreleaseisattributedtothreecauses: maintenance,equipmentfailure,
andgasseepage. Releaseestimatesarebasedonhistoricalpurchasing
documentsandnotbydirectmonitoringforleakage. Assuch,these
estimatesdonotdifferentiatebetweenthevariouscausesofleakageorthe
fluctuatinginventoryofgasinthesubjectequipment.
iii.SpecialConsiderationsOver95%oftheSF6emissionscomefromninesites,withover80%coming
fromjustfoursites. DOEwillworktodeterminehowbesttoreduceSF6
emissions. Reductioneffortswillbetargetedtothesespecificsites.
iv.ImplementationPlanDOEwilladdressSF6emissionsthroughatwofoldapproach:
ReduceSF6releasedduringmaintenanceactions
Findanalternativedielectricmediumthatisecofriendlyandprovides
comparableorsuperiorelectricalinsulationperformance
Reducingmaintenanceemissionswillbeaccomplishedwithcaptureand
storageequipment,developingprocedurestorecaptureandthenreuseSF6
recoveredduringmaintenanceactions,developingtraining,anddeploying
theSF6captureprogramatkeyDOEsites. Thenecessarycaptureequipment
iscommerciallyavailable.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
36/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page32
AFugitiveGasWorkingGroupwillbeestablishedtoshareinformationand
monitoring/controltechnologyamongstthosesiteswithsuchgases. This
groupwillalsobetaskedtolookforanenvironmentallyfriendlyreplacement
material. Ifnosuchmaterialcanbefound,DOEwillconsiderproviding
supportforthedevelopmentofanecofriendlyreplacementmaterial.
v.DepartmentLeadforGoalThethreeUnderSecretaries,withassistancefromtheOfficeofProcurement
AssistanceManagementandtheOfficeofHealth,SafetyandSecurity,are
responsiblefortargetplanning,budgeting,development,implementationand
oversight.
vi.PositionsAspreviouslydescribed,DOEplanstoestablishanSPO.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
37/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page33
Table6:Goal1PlanningTable10
2. GOAL: Scope3GreenhouseGasReduction
TherearemanycategoriesofScope3GHGemissions. ForthePlansubmittedin
June2010onlythreecategoriesareconsidered: employeetravel,contracted
wastedisposal,andtransmissionanddistributionlossesfrompurchased
electricity. Whilereductionactionsforeachcategoryareseparate,they
primarilyfocusonchanginghumandecisions: findwaystoperformlesstravel,
10Fundingamountsprovidedarestrictlyestimatesandaresubjecttochange.
SCOPE1&2GHGTARGETUnit
FY10
FY11
FY12
FY13
FY14
FY15
FY16
.
FY20
EnergyIntensityReduction
Goals.
BTU/SF
reduced
from
FY03baseyear)%
15%
18%
21%
24%
27%
30%
hold
hold
PlannedEnergyIntensity
Reduction. (BTU/SFreduced
fromFY03baseyear)
% 18% 19% 21% 24% 27% 30% hold hold
Meterbuildingandprocesses
onmultibuildingsitesfor
electricity(%ofenergyuseon
eachsite)
% 20% 75% 90% hold hold hold hold holdBuildings
Meterbuildingsandprocesses
onmultibuildingsitesfor
naturalgas,steamandchill
water(%ofresourceuseon
eachsite)
% 5% 10% 25% 50% 75% 90% hold hold
RenewableElectricityGoals
(Percentofelectricityfrom
renewablesources)
% 5% 5% 5% 7.5% hold hold hold hold
Renewables
PlannedRenewableElectricity
Use (Percentofelectricityfrom
renewablesources)
% 5% 5% 5% 7.5% hold hold hold hold
PetroleumUseReduction
Targets (Percentreduction
fromFY05baseyear)
% 10% 12% 14% 16% 18% 20% 22% 30%
PlannedPetroleumUse
Reduction(Percentreduction
fromFY05baseyear)
% 15% 18% 21% 24% 27% 30% hold hold
AlternativeFuelUseinFleet
AFVTarget(Percentincrease
fromFY05baseyear)
% 61% 77% 95% 114% 136% 159% hold holdFleet
PlannedAlternativeFuelUsein
FleetAFV(Percentincreasefrom
FY05baseyear)
% 125% 142% 159% hold hold hold hold hold
Scope1&2 ReductionTarget
(reducedfromFY08baseyear)% 2% 2% 0% 4% 8% 12% 17% 28
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
38/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page34
producelesswaste,anduselesselectricity. FutureScope3GHGreportingis
expectedtorequireexpandingthereportedcategoriesofemissions,thus
adjustingDOEsoverallreductiongoalaccordingly.
i.GoalDescriptionAfterreviewingthepreliminaryDOEScope3GHGinventoryforFY2008and
anticipatingtheimpactoftravelandrecyclinglikelytobeputinplace,DOEset
Scope3GHGreductiongoalsasfollows:
Federalemployeetravel: 12%
Contractedwastedisposal(wastenotcurrentlyrecycledorreused):12%
TransmissionandDistributionlossesfrompurchasedenergy: 16%
Pendingtheinclusionofnewcategories,theoverallDOEScope3GHGreduction
goalis13%. Asnewcategoriesareaddedinsubsequentyears,theoverallgoal
will
change.
ii.DepartmentStatusDOEsScope3GHGemissionsforFY2008wereestimatedtobejustunder
750,000mTCO2e. ThisestimateincludesthecategoriescomprisingScope3
emissionsasprescribedandrequiredbytheWhiteHousesCouncilon
EnvironmentalQuality(CEQ)andtheOfficeofManagementandBudget(OMB)
for2010:
Federalemployeebusinessairandgroundtravel
Employeecommute
Contractedsolidwastedisposal
Contractedwastewaterdischarge
Transmission&Distribution(T&D)lossesrelatedtopurchasedelectricity
iii.SpecialConsiderationsDOEconsistsofabout15,000Federalemployees. However,contractorsmanage
andoperateDOEsitesunderagovernmentowned,contractoroperated(GOCO)
model. Theyconsistofabout70,000personnelwhoperformfunctionsatDOE
sitesindirectsupportoftheDOEmission. DOEelectedtoincludetheseprime
contractoractivitiesinitsScope3calculations. Primecontractorsnotassociated
withsiteoperations,aswellasallsubcontractors,internsandvisitorsarenot
includedinDOEsScope3calculations.
iv.ImplementationMethodsAchievementofthereductiongoalsrequiresacombinationofpolicyand
behaviorchange. Implementationmethodsforeachcategoryaredescribed
below.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
39/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page35
BusinessAirTravel
Increasinguseofwebbasedmeetings
Reducingairtravel,exceptwherenecessaryformissionaccomplishment
DOEwillconductaninternalsurveytodeterminewhereadditional
bandwidthandequipmentareneededtosupportanincreaseinwebbased
meetings. Oncetherequiredequipmenthasbeenorderedandinstalled,
DOEwillreassesstheneedforandcriteriausedtoapproveairtravel.
Effortswillbemadetoreduceoreliminateshortrange(
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
40/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page36
Introducingenvironmentallyfocusedproductpackagingrequirements
Increasingreusabilityorrecyclabilityrequirementsinprocurementpractices
ActionsinsupportofcontractedwastedisposalareaddressedunderGoal7
and8ofthisPlan. Siteswillcontinuetoencourageemployeestorecycleand
reusematerials.
ContractedWasteWaterTreatment
EncouragingTelecommuting
DOEwillsurveyallsitestodeterminetheapplicabilityandimplementationof
existingtelecommutingpolicy. UponcompletionofthissurveyDOEwill
reviewand,ifneeded,reviseitsexistingtelecommutingpolicy.
TransmissionandDistributionLosses
Increasingonsitegenerationofelectricity
Increasingpurchasesofgreenenergy
Actionstoreducetheneedtopurchaseelectricityfromthegridinclude
reductionofneed(energyefficiency)andincreaseoflocalsupply(local
generation). TheseissuesareaddressedinGoal1.
v.DepartmentLeadforGoalThethreeUnderSecretariesareresponsibleformeetingthetargettoinclude
theplanning,budgeting,development,implementationandoversight.
vi.PositionsAspreviouslydescribed,DOEplanstoestablishanSPO.Table7:Goal2PlanningTable
11
SCOPE3GHGTARGET Units FY10 FY11 FY12 FY13 FY14 . FY20
OverallAgencyScope3
ReductionTarget(reduced
fromFY08baseyear)
% 0% 1% 2% 3% 4% 13%
SubTargetforFederal
EmployeeTravel% 0% 1% 2% 3% 4% . 12%
SubTargetforContracted
WasteDisposal %
0%
1%
2%
4%
6%
.
12%
SubTargetforTransmission
andDistributionLossesfrom
PurchasedEnergy
% 0% 0% 1% 3% 5% . 16%
11Fundingamountsprovidedarestrictlyestimatesandaresubjecttochange.
8/4/2019 US Department of Energy DOE: Sustainability Plan 2010
41/92
DepartmentofEnergy|2010
StrategicSustainabilityPerformancePlan|Page37
3. GOAL: ComprehensiveGreenhouseGasInventory
ThedevelopmentofacomprehensiveGHGinventoryiscriticallydependentonthe
accuracyandcompletenessoftheinputdata. DOEwillrefinecurrentdatacollection
methodstoacquirethedataneededtoproduceacomplete,accurateand
sustainableinventory.
i.GoalDescriptionDOEisrequiredtoprovideacomprehensiveinventoryofScope1,2,and
specifiedScope3emissionstotheCEQChairandOMBDirectorbyJanuary2011
andannuallythereafter.
ii.CurrentStatusDOEsitesreportfuelandutilitypurchasingdataintoaDOEdatabase(EMS4).
This
data
is
used
to
develop
an
inventory
of
GHG
emissions
from
electric
and
carbonbasedfuels. NonCO2basedGHGemissionsaretrackedthroughadhoc
datacallstodeterminethepurchasehistoryandquantityofknownGHG
emittingsubstances. Thehistoricalcontextofmanypastpurchasesremains
unknown;henceGHGemissionreportsfromthesesubstancesareonly
estimates.
Scope3GHGemissionsfromFederalemployeeairtravelwerebasedondata
accessiblethroughGSA. Contractorairtraveldatawascollectedviaadatacall.
DatarequestedbytheCEQprovidedScope3GHGTargetingTool(gallonsoffuel
forrentalcars,milestravelledforpersonallyownedvehicles,bus,rail,subway)
wasnotavailable. Instead,DOEderivedthisinformationfromtravelclaim
informationretainedforFY2008. DatarequestedbytheScope3GHGTargeting