+ All Categories
Home > Documents > VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

Date post: 12-Nov-2021
Category:
Upload: others
View: 3 times
Download: 1 times
Share this document with a friend
10
G-001 18217.0 VALVE REPLACEMENT AND DDC CONTROL SYSTEM WESTERN GUILFORD HIGH SCHOOL GUILFORD COUNTY SCHOOLS 409 FRIENDWAY RD, GREENSBORO, NC 27410 DRAWING DATE DRAWN BY DESIGNED BY PROJECT NUMBER REVIEWED BY SHEET NUMBER 6/18/2018 A B C 4 3 2 1 OWNER'S REPRESENTATIVE: DESIGNER: PROJECT: CONSULTING ENGINEERS LICENSE NO. C-0315 SITE PLAN REVISIONS ID DATE COMMENTS MJS MS MS/MJS LIST OF DRAWINGS Sheet Sheet Title G-001 COVER SHEET M-100 MECHANICAL COVER M-101 PARTIAL FIRST FLOOR - AREA A - DDC CONSTRUCTION M-102 PARTIAL FIRST FLOOR - AREA B - DDC CONSTRUCTION M-103 PARTIAL FIRST FLOOR - AREA C - DDC CONSTRUCTION M-104 PARTIAL SECOND FLOOR - AREA C - DDC CONSTRUCTION M-105 MECHANICAL ROOM 249 - ENLARGED FLOOR PLAN - DDC CONSTRUCTION M-106 MECHANICAL ROOM 143 - ENLARGED FLOOR PLAN - DDC CONSTRUCTION M-500 MECHANICAL DETAILS M-501 MECHANICAL SCHEDULES WESTERN GUILFORD HIGH SCHOOL 409 FRIENDWAY ROAD GREENSBORO, NC 27410 Mr. Gerald Greeson Executive Director of Maintenance
Transcript
Page 1: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

G-001

18217.0

VALVE REPLACEMENT AND DDC CONTROL SYSTEM

WESTERN GUILFORD HIGH SCHOOL

GUILFORD COUNTY SCHOOLS

409 FRIENDWAY RD, GREENSBORO, NC 27410

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

6/18/2018

A

BC

4 3 2 1

OWNER'S REPRESENTATIVE:

DESIGNER:

PROJECT:

CONSULTING ENGINEERS

LICENSE NO. C-0315

SITE PLAN

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

LIST OF DRAWINGS

Sheet Sheet Title

G-001 COVER SHEET

M-100 MECHANICAL COVER

M-101 PARTIAL FIRST FLOOR - AREA A - DDC CONSTRUCTION

M-102 PARTIAL FIRST FLOOR - AREA B - DDC CONSTRUCTION

M-103 PARTIAL FIRST FLOOR - AREA C - DDC CONSTRUCTION

M-104 PARTIAL SECOND FLOOR - AREA C - DDC CONSTRUCTION

M-105 MECHANICAL ROOM 249 - ENLARGED FLOOR PLAN - DDC CONSTRUCTION

M-106 MECHANICAL ROOM 143 - ENLARGED FLOOR PLAN - DDC CONSTRUCTION

M-500 MECHANICAL DETAILS

M-501 MECHANICAL SCHEDULES

WESTERN GUILFORD HIGH SCHOOL

409 FRIENDWAY ROAD

GREENSBORO, NC 27410

Mr. Gerald Greeson

Executive Director of Maintenance

AutoCAD SHX Text
G-001 COVER.DWG
AutoCAD SHX Text
6/19/2018 11:15 AM
Page 2: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

M-100

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.

CONSULTANT

ME

CH

AN

IC

AL T

IT

LE

S

HE

ET

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

A/C AIR CONDITIONING

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

BFF BELOW FINISH FLOOR

CD CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CONC CONCRETE

COND CONDUIT

CW COLD WATER SUPPLY

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DDC DIRECT DIGITAL CONTROL

DMC DOMESTIC COLD

DN DOWN

DWGS DRAWING

E.C. ELECTRICAL CONTRACTOR

EH ELECTRIC HEATER

ELEC ELECTRICAL

EMCS ENERGY MANAGEMENT CONTROL SYSTEM

EQUIP EQUIPMENT

EXIST EXISTING

FCU FAN COIL UNIT

FD FIRE DAMPER

G GAS

G.C. GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

HP HORSEPOWER

HTWR

HOT WATER RETURN (HEATING)

HTWRR

HOT WATER REVERSE RETURN (HEATING)

HTWS

HOT WATER SUPPLY (HEATING)

HVAC

HEATING, VENTILATING & AIR CONDITIONING

DHW DOMESTIC HOT WATER

M.C. MECHANICAL CONTRACTOR

MANUF. MANUFACTURER

MAX. MAXIMUM

MECH MECHANICAL

MIN MINIMUM

MUW MAKEUP WATER

O.A. OUTDOOR AIR

P.C. PLUMBING CONTRACTOR

PSI POUNDS PER SQUARE INCH

R.A. RELIEF AIR

R.V. RELIEF VENT

RET. A. RETURN AIR

RM ROOM

S.F. SQUARE FOOR

TYP TYPICAL

U.O.N. UNLESS OTHERWISE NOTED

UL UNDERWRITERS LABORATORIES

W/ WITH

VA

LV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

AutoCAD SHX Text
FD
AutoCAD SHX Text
T
AutoCAD SHX Text
H
AutoCAD SHX Text
M
AutoCAD SHX Text
FD
AutoCAD SHX Text
ES
AutoCAD SHX Text
T
AutoCAD SHX Text
*
AutoCAD SHX Text
AI
AutoCAD SHX Text
A0
AutoCAD SHX Text
DI
AutoCAD SHX Text
DO
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
TW
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SCHEMATIC
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
GLOBE VALVE
AutoCAD SHX Text
PRESSURE GAGE
AutoCAD SHX Text
THERMOMETER
AutoCAD SHX Text
CIRCUIT SETTER
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
TRIPLE DUTY VALVE
AutoCAD SHX Text
RELIEF VALVE
AutoCAD SHX Text
THREE WAY CONTROL VALVE
AutoCAD SHX Text
TWO WAY CONTROL VALVE
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text
IN-LINE PUMP
AutoCAD SHX Text
AD - AREA DRAIN FD - FLOOR DRAIN FS - FLOOR SINK RD - ROOF DRAIN
AutoCAD SHX Text
COCK OR PLUG
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
NEW PIPING OR EQUIPMENT
AutoCAD SHX Text
EXISTING PIPING OR EQUIPMENT
AutoCAD SHX Text
DEMO PIPING OR EQUIPMENT
AutoCAD SHX Text
TEMPERATURE WELL
AutoCAD SHX Text
ANALOG INPUT TO DDC
AutoCAD SHX Text
ANALOG OUTPUT TO DDC
AutoCAD SHX Text
DIGITAL INPUT TO DDC
AutoCAD SHX Text
DIGITAL OUTPUT TO DDC
AutoCAD SHX Text
SCHEMATIC
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
*
AutoCAD SHX Text
THERMOSTATIC RADIATOR VALVE
AutoCAD SHX Text
TEMPERATURE SENSOR (EMCS)
AutoCAD SHX Text
MANUAL OVERRIDE (EMCS)
AutoCAD SHX Text
HUMIDISTAT (EMCS)
AutoCAD SHX Text
TEMPERATURE SENSOR (EMCS) * INDICATES ASSOCIATED UNIT
AutoCAD SHX Text
THERMOSTAT * INDICATES UNIT
AutoCAD SHX Text
DUCT STATIC PRESSURE SENSOR
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
FD
AutoCAD SHX Text
ONE HOUR FIRE RATED BARRIER
AutoCAD SHX Text
TWO HOUR FIRE RATED BARRIER
AutoCAD SHX Text
VD
AutoCAD SHX Text
BALANCING DAMPER
AutoCAD SHX Text
DUCT SMOKE DETECTOR
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
FM
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
HANGER
AutoCAD SHX Text
OR
AutoCAD SHX Text
PSIG
AutoCAD SHX Text
TT
AutoCAD SHX Text
TEMPERATURE TRANSMITTER
AutoCAD SHX Text
MECHANICAL PIPES SEE ABBREVIATION TABLE FOR *
AutoCAD SHX Text
GENERAL MECHANICAL LEGEND
AutoCAD SHX Text
*
AutoCAD SHX Text
POINT OF CONNECTION OF DISCONNECTION
AutoCAD SHX Text
EMERGENCY SHUT-DOWN
AutoCAD SHX Text
M-100 MECHANICAL COVER SHEET.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM
AutoCAD SHX Text
ABBREVIATIONS
Page 3: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

136 B

197

142

116 A

1123

198

195

116

115D

115E

138

139

115A

137

115C

115

115B

114B

114A

114

196

196A

196B

113

136

199

136A

136C

135A

135C

135

135B

135D

135E

1100176

153

152

151

149

150

148

147

144

145

146

141

140

143

AHU-8

AHU-9

AHU-9

AHU-11 LOCATED IN

MECHANICAL LOFT

ABOVE

AHU-11

AHU-14

AHU-8

T

AHU-4

T

T

T

SUPPLY

OUTDOOR AIR

OPEN RETURN IN

BOTTOM OF UNIT

SUPPLY

SUPPLY

SU

PP

LY

OUTDOOR AIR

OPEN RETURN IN

BOTTOM OF UNIT

OU

TD

OO

R

AIR

OPEN RETURN IN

BOTTOM OF UNIT

OPEN RETURN

BELOW

MECHANICAL

ROOM

CT-1

CT-2

CAFETERIA

MAIN LOBBY

AUDITORIUM

STAGE

CHORAL

INSTRUMENTAL

MECHANICAL

ROOM

MUSIC

KITCHEN

NOT IN

SCOPE

MAIN

ENTRANCE

2

3

1

1

REFER TO M-106

FOR WORK IN

MECHANICAL ROOM

FCU

FC

U

FC

U

1-1/2" CHWS&R

1-1/4" HWS&R

1-1/2" CHWS&R

1-1/4" HWS&R

3-1/2" CHWS&R

2" HWS&R

2-1/2" CHWS&R

1-1/4" HWS&R

MAIN

ENTRANCE

CORRIDOR

5

5

5

3

3

CAMPUS KEY PLAN

NTS

A

B

C

M-101

ME

CH

AN

IC

AL F

LO

OR

P

LA

NS

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.V

ALV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

LS

CONSULTANT

M-101

13/32" = 1'-0"

PARTIAL FIRST FLOOR - AREA A - DDC CONSTRUCTION

GENERAL NOTES: CONSTRUCTION (APPLY TO ALL CONSTRUCTION SHEETS)

1. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND INDICATE APPROXIMATE LOCATION OF EQUIPMENT, PIPING, AND

DUCTWORK. MINOR ADJUSTMENTS AND OFFSETS SHALL BE PROVIDED WHERE REQUIRED AT NO ADDITIONAL COST TO THE

OWNER. COORDINATE CHANGES IN PIPE/DUCT ROUTING OR OTHER WORK WITH ENGINEER PRIOR TO PROCEEDING.

2. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND THE NORTH CAROLINA

STATE MECHANICAL CODE.

3. THE BUILDING PLANS ARE BASED ON INFORMATION PROVIDED BY THE OWNER. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, QUANTITIES, PIPE AND DUCT SIZES, AND CONDITIONS PRIOR TO WORK. OWNER WILL NOT APPROVE ANY CHANGE

ORDERS RESULTING FROM CONTRACTOR'S FAILURE TO FIELD VERIFY. DRAWINGS SHALL NOT BE SCALED TO DETERMINE

ACTUAL DIMENSIONS.

4. COORDINATE ALL WORK WITH GENERAL CONTRACTOR, ELECTRICAL CONTRACTOR AND CONTROLS CONTRACTOR. CONDUIT,

CONTROL WIRING AND PIPING SHALL BE ROUTED TOGETHER IN CHASES.

5. PROPER FIRE WATCH TO BE MAINTAINED AT ALL TIMES DURING WELDING OR OPEN FLAME USE.

6. ALL PENETRATIONS SHOULD BE REUSED TO EXTENT POSSIBLE. PATCH NEW AND EXISTING PENETRATIONS TO MATCH

EXISTING WALL CONSTRUCTION. TREAT CORRIDORS AND THE FLOOR AS FIRE RATED, FIRE CAULK ANY PENETRATIONS IN FIRE

WALLS.

7. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. COORDINATE WORK SO THAT UTILITIES ARE OPERATIONAL WHEN

NEEDED IN OCCUPIED AREAS AND FACILITY OPERATIONS ARE NOT INTERRUPTED. THIS MAY REQUIRE WORK ON WEEKENDS

AND NIGHTS.

8. HANGERS MUST BE SECURED TO STRUCTURE.

9. TYPICAL OF ALL SPACE TEMPERATURE SENSORS, NO EXPOSED SURFACE WIRING IS TO BE USED UNLESS THERE IS

CONFIRMATION THE NEW WIRING CANNOT BE RUN CONCEALED. DO NOT INSTALL SENSOR WIRING UNTIL AFTER A REVIEW WITH

THE ENGINEER.

10. ANY CONTROL WIRING ROUTED ABOVE THE CEILING SHOULD BE PLENUM RATED. WIRING SHOULD BE BUNDLED AND TIED UP

HIGH ON STRUCTURE.

11. DAMPER OPERATION VERIFICATION: CONTRACTOR SHALL VERIFY THE OPERABILITY OF ALL EXISTING CONTROL DAMPERS BEING

CONTROLLED UNDER THIS PROJECT. THE CONTRACTOR SHALL REMOVE THE EXISTING DAMPER ACTUATOR, SPRAY LIQUID

WRENCH AT ALL ROTATING LOCATIONS AND MANUALLY MANIPULATE THE DAMPER TO CONFIRM OPERATION. NOTIFY THE

ENGINEER OF ANY ISSUES.

12. THE CONTRACTOR IS RESPONSIBLE FOR FINDING AND ROUTING DEDICATED 120v CIRCUITS FOR THE DDC SYSTEM.

KEYED NOTES:

Existing pneumatic temperature sensor to be replaced with new DDC temperature sensor. Remove old pneumatic temperature sensor and patch/paint

wall to match existing. Route control wiring to sensor inside in the wall, using the existing pneumatic tubing, to the sensor plate at 48" AFF. Coordinate

final sensor location with Engineer. Typical.

AHU-11 in Mechanical loft above. Remove existing control valves and piping to approximately 6' from unit. Install new isolation valves, control valves w/

actuators and new run out piping to coils. Install new isolation and control valves to allow for wider unit in a future project. See Existing AHU Information

Schedule for valve Cv.

AHU suspended overhead. Remove existing control valves and piping. install new isolation valves, control valves w/ actuators and new run out piping to

coils. Install new isolation and control valves to allow for wider unit in a future project. See Existing AHU Information Schedule for valve Cv.

Provide new freezestats and damper actuators for AHU dampers. Adjust linkage as required for solid secure inner-connection. Confirm torque is

adequate for damper.

Install DDC control sensor in return air.

1

2

3

4

5

AutoCAD SHX Text
M-101 102 103 106 PARTIAL FIRST FLOOR PLAN - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM
Page 4: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

1102

1100176

178177 175 174

173

156155

172

154

179

185184

181

153

171

170

169168

167

190 189182

165

164

163

162

166

161

166A

193

192

191

188

188B

188A

194

158 160 157A

187

183A

183B

183

186

159

157

AHU-14

AHU-13

AHU-12 & 13

H & V

UNIT-1

H & V

UNIT-2

AHU-12

T

T

SU

PP

LY

SU

PP

LY

OUTDOOR AIR

OUTDOOR AIR

GYMNASIUM

CAFETERIA

BOYS LOCKER RM.

GIRLS LOCKER RM.

RETURN AIR RETURN AIR

2

3" CHW S&R

1-1/2" HW S&R

3" CHW S&R

1-1/2" HW S&R

MAIN LOBBY

NOTE:

PIPING SHOWN IS SCHEMATIC.

ACTUAL PIPING MAY VARY.

1

1

3

TO MECHANICAL

ROOM 249

6

6

PLATE TYPE SENSOR

PLATE TYPE SENSOR

EXST.

STARTER

LOCATION

EXST.

STARTER

LOCATION5

5

CAMPUS KEY PLAN

NTS

A

B

C

M-102

ME

CH

AN

IC

AL F

LO

OR

P

LA

NS

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.V

ALV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

LS

CONSULTANT

M-102

13/32" = 1'-0"

PARTIAL FIRST FLOOR - AREA B - DDC CONSTRUCTION

KEYED NOTES:

New electronic damper actuators to be installed on units. Existing control valves to be left in place and locked fully open. One set of new valves

will be installed near mechanical room 249.

Existing pneumatic temperature sensor to be replaced with new DDC temperature sensor. New sensor to be non-adjustable plate type, rated for

hard to break application. Remove old pneumatic temperature sensor and patch/paint wall to match existing. Route control wiring to sensor inside

room 173 and through the wall to the sensor plate at 48" AFF. Coordinate final sensor location with Engineer.

Existing pneumatic temperature sensor to be replaced with new DDC temperature sensor. New sensor to be non-adjustable plate type, rated for

hard to break application. Remove old pneumatic temperature sensor and patch/paint wall to match existing. Route control wiring to sensor inside

in the wall, using the existing pneumatic tubing, to the sensor plate at 48" AFF. Coordinate final sensor location with Engineer.

New 2-way electronic control valve with actuator and new electronic damper actuator to be installed on unit. Valve to be controlled by new DDC

temperature sensor. Wire damper actuator through freezestat.

Provide new freeze stats and damper actuators. Adjust linkage as required for solid secure inner-connection. Confirm torque is adequate for

damper.

Install DDC control sensor in return air.

1

2

3

4

5

6

AutoCAD SHX Text
M-101 102 103 106 PARTIAL FIRST FLOOR PLAN - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM
Page 5: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

106

105

1155

112111110109

108107

1131

1132

1131A

1125

1124

104 103 102

102A

101A

101 100

100A

1124

1130

11291128

1127

1126

1124

11071106A

11061105

1103

1104

1108

1112

11111110 1109

111511141113

1113A

1113B

1101

1116

11171118

1119

1120

1121

1121A

1122

1122A

1123

1154

135A

135C

1102

1100

T

T

T

T

T

T

T

T

T

T

T

TTT

T

HW

3-5

3-5

3-43-3

2-1

3-23-1

2-4

1-61-5

1-4

1-3

1-21-1

3-4

3-3

3-2

3-1

2-3

2-1

2-4

1-6 1-5 1-4

1-3

1-2

1-1

HW

HW

HW

HW

HW

HW

HW

HW HW HW HW

HW

HW

HW

2-3

2-2

2-2

T

AHU-4

EXISTING DUCT BOOSTER

HEATING COIL, DUCT NOT

SHOWN (TYPICAL)

EXISTING DUCT BOOSTER

HEATING COIL, DUCT NOT

SHOWN (TYPICAL)

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

1TYP

TYP

TYP

TYP

LIBRARY

OFFICE

1

3

2

1

3

1

2

1

2

3

2

2

2

4TYP

4TYP

4TYP

4TYP

TO MECHANICAL

ROOM 249

MAIN

ENTRANCE

CORRIDOR

EXST.

STARTER

LOCATION

CAMPUS KEY PLAN

NTS

A

B

C

M-103

ME

CH

AN

IC

AL F

LO

OR

P

LA

NS

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.V

ALV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

LS

CONSULTANT

M-103

13/32" = 1'-0"

PARTIAL FIRST FLOOR - AREA C - DDC CONSTRUCTION

KEYED NOTES:

New 2-way electronic control valve with actuator to be installed on hot water coil. Valve to be controlled by new DDC

temperature sensor. See Detail on M-500.

Existing pneumatic temperature sensor to be replaced with new DDC temperature sensor. Remove old pneumatic

temperature sensor and patch/paint wall to match existing. Route control wiring to sensor inside in the wall, using the

existing pneumatic tubing, to the sensor plate at 48" AFF. Coordinate final sensor location with Engineer. Typical of all

room sensors.

Existing duct mounted hot water booster heater (typical).

In Alternate M1, install a 12x12 access door. Seal and glue edge of liner. Clean existing hot water coil using dry foam

spray, soft brush and vacuum. Typical of all coils.

1

2

3

4

AutoCAD SHX Text
M-101 102 103 106 PARTIAL FIRST FLOOR PLAN - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM
Page 6: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

AHU-4

AHU-2

AHU-1

241

242

209210

211

213

211B

211A

209D

209C

209B

209A

243

208263

207 262

207A

264

265

266

267

268

261

212A

212 214

203 200

257

256

255

253

201202

204

206

259

260

259A

206A

258

205

252

201B

201A

251

249

248

247

246

242A

244 245

250

254

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW HW

HW

HW

HW

HW

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

HW

HW

HW

TT

6-10

6-9

5-5

5-4

6-6

5-3

5-2

6-5

5-1

HW

AHU-3

AHU-7

AHU-6

AHU-5

7-1

5-1

5-2

6-6

5-3

6-76-8

5-4

5-5

6-9

6-10

6-5

7-5

7-5

7-4

7-3

7-47-3

7-2

7-1

6-1

6-2

6-3

6-4

6-8

7-2

6-1

6-2

6-3

6-4

6-7

EXISTING DUCT BOOSTER

HEATING COIL, DUCT NOT

SHOWN (TYPICAL)

EXISTING DUCT BOOSTER

HEATING COIL, DUCT NOT

SHOWN (TYPICAL)

TYP

TYP

TYP1

3

TYP2

TYP2

TYP1

TYP2

TYP1

TYP2

TYP3

TYP2

TYP2

TYP1

TYP3

TYP2

TYP4

TYP4

TYP4

TYP4

MECHANICAL

ROOM

REFER TO M-105

FOR WORK IN

MECHANICAL ROOM

1

CAMPUS KEY PLAN

NTS

A

B

C

M-104

PA

RT

IA

L S

EC

ON

D F

LO

OR

- A

RE

A C

- D

DC

C

ON

ST

RU

CT

IO

N

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.V

ALV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

CONSULTANT

M-104

13/32" = 1'-0"

PARTIAL SECOND FLOOR - AREA C - DDC CONSTRUCTION

KEYED NOTES:

New 2-way electronic control valve with actuator to be installed on hot water coil. Valve to be controlled by new DDC temperature

sensor. See Detail on M-500.

Existing pneumatic temperature sensor to be replaced with new DDC temperature sensor. New sensor to be non-adjustable plate

type, rated for hard to break application. Remove old pneumatic temperature sensor and patch/paint wall to match existing. Route

control wiring to sensor inside in the wall, using the existing pneumatic tubing, to the sensor plate at 48" AFF. Coordinate final

sensor location with Engineer. Typical of all room sensors.

Existing duct mounted hot water booster heater (typical).

In Alternate M1, install a 12x12 access door. Seal and glue edge of liner. Clean existing hot water coil using dry foam spray, soft

brush and vacuum. Typical of all coils.

1

2

3

4

AutoCAD SHX Text
M-104 105 PARTIAL SECOND FLOOR PLAN - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM
Page 7: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

AHU-4

AHU-2

M

AHU-1

251

249

248

247

250

AHU-3

AHU-7

AHU-6

AHU-5

M

M

M

M

M

M

HW

P-13

OPEN RETURN BELOW

SUPPLY

AIR DOWN

RETURN AIR

BELOW

RETURN

AIR BELOW

SUPPLY

AIR DOWN

OPEN RETURN BELOW

O.A.

OPEN RETURN BELOW

O.A.

O.A.

O.A.

O.A.

O.A.

O.A.

O.A.

O.A.

O.A.

O.A.

O.A.

RETURN

AIR BELOW

SUPPLY

AIR DOWN

RETURN

AIR BELOW

SUPPLY

AIR DOWN

O.A.

O.A.

O.A.

O.A.

REL.

AIR

REL.

AIR

REL.

AIR

REL.

AIR

REL.

AIR

OA LOUVERS

3-1/2" CHWS&R

2" HHWS&R

TO GYMNASIUM

TO GYMNASIUM

NEW AHU-7

CONTROLLER

NEW AHU-3

CONTROLLER

NEW AHU-6

CONTROLLER

NEW AHU-5

CONTROLLER

NEW AHU-2

CONTROLLER

NEW AHU-1

CONTROLLER

NEW AHU-4

CONTROLLER

EXST. ELEC. GUTTER

AND MOTOR STARTERS.

EXST.

ELEC. PNL.

2" CHW S&R

1-1/4" HW S&R

3" CHW S&R

1-1/2" HW S&R

2-1/2" CHW S&R

1-1/4" HW S&R

2-1/2" CHW S&R

1-1/4" HW S&R

3" CHW S&R

1-1/2" HW S&R

4" CHW S&R

2" HW S&R

2-1/2" CHW S&R

1-1/4" HW S&R

6" CHW S&R

4" HW S&R

CAMPUS KEY PLAN

NTS

A

B

C

M-105

ME

CH

AN

IC

AL R

OO

M 249 - E

NLA

RG

ED

F

LO

OR

P

LA

N - D

DC

CO

NS

TR

UC

TIO

N

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.V

ALV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

LS

CONSULTANT

M-105

11/4" = 1'-0"

MECHANICAL ROOM 249 - ENLARGED FLOOR PLAN - DDC CONSTRUCTION

KEYED NOTES:

AHUs to get new control valves and isolation valves. Install isolation valves within 1 foot of the mains running down the center of the

mechanical room. Route new piping over to AHU coils. Reuse existing circuit setter. Record setting. Do not adjust circuit setter, label

associated AHU before removal. Match existing run out size. Existing unions can be reused if in good condition. 3-way valves will be

converted to 2-way except where otherwise noted.

Provide new freeze stats and damper actuators for AHU dampers. Adjust linkage as required for solid secure inner-connection.

Confirm torque is adequate for damper.

Install new DDC controllers for AHUs where shown on drawing. For AHUs 1, 2 & 4, fabricate support stands, for mounting panels,

out of 1-5/8" slotted channel. Provide post bases by channel manufacturer and secure stands to the floor. Coordinate final location

of the supports with the engineer.

Provide actuators as needed for relief damper operation.

Provide new 3-way control valves for both chilled and hot water pipes going to the gymnasium. Provide isolation valves on all sides

of new control valve. Provide a new DP sensor in the chilled water piping near the new valve per Detail 9/M500.

1

2

3

4

5

1

1

1

1

1

1

1

2

2

2

2

2

2

2

4 4

3

3

3

3

3

3

5

AutoCAD SHX Text
OA LOUVERS
AutoCAD SHX Text
OA LOUVERS
AutoCAD SHX Text
M-104 105 PARTIAL SECOND FLOOR PLAN - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM
Page 8: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

196A

113

145

141

140

143

EXST.

SWITCH

BOARD

(ELEC)

PANEL

'BB'

PANEL

'BA'

CHILLER #1

P-5

MECHANICAL

ROOM

P-9P-8

CT-1

BOILER #1

BOILER #2

MUSIC

P-12

P-3

P-4

P-6

P-7

P-9 VSD

P-12 VSD

CT-1 FAN VSD

AIR COMP.

P-2 P-1

3-WAY MIXING

CONTROL VALVE

NEW DDC

PANEL

LOCATION

DHW

TANK

#1

DHW

TANK

#2

EXST. ELECTRICAL GUTTER,

STARTERS AND DISCONNECTS

FOR MECHANICAL EQUIPMENT.

THREE-WAY CONDENSER

WATER BY-PASS VALVE

CAMPUS KEY PLAN

NTS

A

B

C

M-106

ME

CH

AN

IC

AL F

LO

OR

P

LA

NS

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.V

ALV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

LS

CONSULTANT

M-101

11/4" = 1'-0"

MECHANICAL ROOM 143 - ENLARGED FLOOR PLAN - DDC CONSTRUCTION

1

2

3

KEYED NOTES:

Install tower basin temperature sensor in existing well at basin outlet. Wire to fan vibration alarm switch. Route new control conduit

with piping.

Existing cooling tower VSD installed in concurrent tower project. Provide cooling tower fan speed control.

Install sensors in existing wells for condenser water supply and return near chiller. Provide control of the three-way valve to maintain

a minimum CWS temperature of 75°F.

Existing CHW pump P-9 VSD installed in concurrent tower project. Provide pump P-9 speed control based on new DP in AHU

mechanical room 249.

Pick up start/stop and alarm output of existing chiller #1. Control primary chilled water pump P-8 and building pump, and condenser

water pump to come on with the chiller.

Existing condenser water pump P-12 VSD installed in concurrent tower project. Provide start/stop and run at constant speed at Hz

to be determined at start-up.

In Base Bid provide relay that actives when system is in heating. In Alternate M2: Pick up control of each boiler start/stop. Provide

surface mounted supply temperature sensors on each boiler. Provide 2" insulation over new sensors.

In Alternate M2 pick up start/stop of all heating HW pumps to come on with the boiler(s). Boiler pump P-4, zone pumps P-3, P-5,

P-6, P-7 in this mechanical room and P-13 located in AHU mechanical room 249.

Use surface mounted temperature sensors, with 2" insulation, on common building supply and return piping. Consult with engineer

on location before installation.

In Alternate M2, install temperature sensors on DHW storage tanks and start/stop pumps P-1 & P-2 based on tank temperature.

In Alternate M3, install new three-way mixing valve for boilers. Install surface mounted temperature sensor on return water to boiler.

Valve to maintain 120°F minimum return water temperature to boilers. Valve will also be used to do hot water reset. Initial reset

schedule; 160°F @ 30°F OA and below, reset to 120°F @ 50°F OA and above.

4

5

6

7

8

9

10

11

1

2

3

4

5

5

6

7

7

8

8

9

10

11

AutoCAD SHX Text
M-101 102 103 106 PARTIAL FIRST FLOOR PLAN - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM
Page 9: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

ISOLATION

VALVE

3 WAY

CONTROL

VALVE

COIL

UNION

DRAIN

VALVE

UNIONUNION

SQUARE

COCK

SQUARE

COCK

UNION

DRAIN

VALVE

SUPPLY

RETURN

NEW

ISOLATION

VALVE

NEW 2 WAY

CONTROL

VALVE

COIL

NEW

UNION

EXISTING

DRAIN

VALVE

NEW

UNION

EXISTING

SQUARE

COCK

EXISTING

DRAIN

VALVE

SUPPLY

RETURN

NEW

UNION

COIL

SUPPLY

RETURN

NEW

ISOLATION

VALVE

NEW 3 WAY

CONTROL

VALVE

NEW

UNION

EXISTING

DRAIN

VALVE

NEW

UNION

EXISTING

SQUARE

COCK

EXISTING

DRAIN

VALVE

NEW

UNION

2 WAY

CONTROL

VALVE

COIL

SQUARE

COCK

DRAIN

VALVE

UNION

UNION

SUPPLY

SQUARE

COCK

RETURN

NEW 2 WAY

CONTROL

VALVE

COIL

EXISTING

DRAIN

VALVE

NEW

UNION

SUPPLY

RETURN

EXISTING

SQUARE

COCK

EXISTING

SQUARE

COCK

EXISTING

UNION

NEW 3 WAY

CONTROL

VALVE

COIL

NEW

UNION

SUPPLY

RETURN

EXISTING

SQUARE

COCK

EXISTING

UNION

EXISTING

SQUARE

COCK

EXISTING

DRAIN

VALVE

NEW

UNION

OUTDOOR AIR

T

RETURN AIR

T

T

CHWR

CHWS

HWR

HWS

MIXING BOX

SUPPLY

AIR

M

RELIEF

DAMPER

FS

OUTDOOR AIR

M

MIXING BOX

T

RETURN AIR

SUPPLY

AIR

T

T

CHWR

CHWS

HWR

HWS

RELIEF

DAMPER

FS

M-500

DE

TA

ILS

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.V

ALV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

LS

CONSULTANT

GENERAL NOTES: CONSTRUCTION (APPLY TO ALL CONSTRUCTION SHEETS)

1. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND INDICATE APPROXIMATE LOCATION OF EQUIPMENT, PIPING, AND

DUCTWORK. MINOR ADJUSTMENTS AND OFFSETS SHALL BE PROVIDED WHERE REQUIRED AT NO ADDITIONAL COST TO THE

OWNER. COORDINATE CHANGES IN PIPE/DUCT ROUTING OR OTHER WORK WITH ENGINEER PRIOR TO PROCEEDING.

2. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND THE NORTH CAROLINA

STATE MECHANICAL CODE.

3. THE BUILDING PLANS ARE BASED ON INFORMATION PROVIDED BY THE OWNER. THE CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, QUANTITIES, PIPE AND DUCT SIZES AND CONDITIONS PRIOR TO WORK. OWNER WILL NOT APPROVE ANY CHANGE

ORDERS RESULTING FROM CONTRACTOR'S FAILURE TO FIELD VERIFY. DRAWINGS SHALL NOT BE SCALED TO DETERMINE

ACTUAL DIMENSIONS.

4. COORDINATE ALL WORK WITH GENERAL CONTRACTOR, ELECTRICAL CONTRACTOR AND CONTROLS CONTRACTOR. CONDUIT,

CONTROL WIRING AND PIPING SHALL BE ROUTED TOGETHER IN CHASES.

5. PROPER FIRE WATCH TO BE MAINTAINED AT ALL TIMES DURING WELDING OR OPEN FLAME USE.

6. ALL PENETRATIONS SHOULD BE REUSED TO EXTENT POSSIBLE. PATCH NEW AND EXISTING PENETRATIONS TO MATCH

EXISTING WALL CONSTRUCTION. TREAT CORRIDORS AND THE FLOOR AS FIRE RATED, FIRE CAULK ANY PENETRATIONS IN FIRE

WALLS.

7. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. COORDINATE WORK SO THAT UTILITIES ARE OPERATIONAL WHEN

NEEDED IN OCCUPIED AREAS AND FACILITY OPERATIONS ARE NOT INTERRUPTED. THIS MAY REQUIRE WORK ON WEEKENDS

AND NIGHTS.

8. HANGERS MUST BE SECURED TO STRUCTURE.

9. TYPICAL OF ALL SPACE TEMPERATURE SENSORS, NO EXPOSED SURFACE WIRING IS TO BE USED UNLESS THERE IS

CONFIRMATION THE NEW WIRING CANNOT BE RUN CONCEALED. DO NOT INSTALL SENSOR WIRING UNTIL AFTER A REVIEW WITH

THE ENGINEER.

10. ANY CONTROL WIRING ROUTED ABOVE THE CEILING SHOULD BE PLENUM RATED. WIRING SHOULD BE BUNDLED AND TIED UP

HIGH ON STRUCTURE.

11. DAMPER OPERATION VERIFICATION: CONTRACTOR SHALL VERIFY THE OPERABILITY OF ALL EXISTING CONTROL DAMPERS BEING

CONTROLLED UNDER THIS PROJECT. THE CONTRACTOR SHALL REMOVE THE EXISTING DAMPER ACTUATOR, SPRAY LIQUID

WRENCH AT ALL ROTATING LOCATIONS AND MANUALLY MANIPULATE THE DAMPER TO CONFIRM OPERATION. NOTIFY THE

ENGINEER OF ANY ISSUES.

M-500

1

NO SCALE

EXISTING AHU PIPING DETAIL

M-500

2

NO SCALE

NEW TWO-WAY CONTROL VALVE AHU PIPING DETAIL

M-500

3

NO SCALE

NEW THREE-WAY CONTROL VALVE AHU PIPING DETAIL

M-500

4

NO SCALE

EXISTING DUCT BOOSTER COIL PIPING DETAIL

M-500

5

NO SCALE

NEW TWO-WAY CONTROL VALVE DUCT BOOSTER COIL PIPING DETAIL

M-500

6

NO SCALE

NEW THREE-WAY CONTROL VALVE DUCT BOOSTER COIL PIPING DETAIL

M-500

8

NO SCALE

NEW THREE-WAY CONTROL VALVE AHU CONTROL SCHEMATIC

M-500

7

NO SCALE

NEW TWO-WAY CONTROL VALVE AHU CONTROL SCHEMATIC

M-500

9

NO SCALE

DIFFERENTIAL PRESSURE SENSOR INSTALLATION DETAIL

AutoCAD SHX Text
FAN SECTION
AutoCAD SHX Text
HW COIL
AutoCAD SHX Text
CHW COIL
AutoCAD SHX Text
REMOVE HW COIL. CLEAN BOTH COILS AND REINSTALL HW COIL.
AutoCAD SHX Text
FS
AutoCAD SHX Text
DP
AutoCAD SHX Text
FAN SECTION
AutoCAD SHX Text
HW COIL
AutoCAD SHX Text
CHW COIL
AutoCAD SHX Text
REMOVE HW COIL. CLEAN BOTH COILS AND REINSTALL HW COIL.
AutoCAD SHX Text
DP
AutoCAD SHX Text
SUPPLY PIPING
AutoCAD SHX Text
RETURN PIPING
AutoCAD SHX Text
DIFFERENTIAL PRESSURE SENSOR
AutoCAD SHX Text
0-60 PSI LIQUID FILLED PRESSURE GAUGE WITH SNUBBER
AutoCAD SHX Text
M-500 501 DETAIL.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM
Page 10: VALVE REPLACEMENT AND DDC CONTROL SYSTEM …

M-501

SC

HE

DU

LE

S

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

6/18/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.V

ALV

E R

EP

LA

CE

ME

NT

A

ND

D

DC

CO

NT

RO

L S

YS

TE

M

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

LS

CONSULTANT

EXISTING AHU INFORMATION

MARK MOTOR HP

CHW HW

VALVE

TYPEFLOW (GPM)

BRANCH

SIZE (IN)

FLOW

(GPM)

BRANCH

SIZE (IN)

AHU-1 3 56.4 2.5 15 1.25 2-WAY

AHU-2 5 110 3 20 1.5 2-WAY

AHU-3 3 42.2 2 15 1.25 2-WAY

AHU-4 5 88.8 3 21 1.5 2-WAY

AHU-5 3 63.5 2.5 15 1.25 2-WAY

AHU-6 7.5 168 4 32 2 2-WAY

AHU-7 3 52.4 2.5 17.5 1.25 2-WAY

AHU-8 1.5 21.3 1.5 7 1.25 3-WAY

AHU-9 1.5 26.6 1.5 10 1.25 2-WAY

AHU-10 NOT USED

AHU-11 7.5 150 3.5 32 2 2-WAY

AHU-12 5 80 3 18 1.5 NOTE 3

AHU-13 5 80 3 18 1.5 NOTE 3

AHU-14 3 63.4 2.5 15 1.25 3-WAY

NOTES:

1. CONTROL VALVE CV TO BE 1/2 COIL GPM

2. CONTROL VALVE SIZE MAY STEP DOWN 1 PIPE SIZE (ALL PIPE SIZES)

3. AHU-12 AND AHU-13 WILL SHARE ONE COMMON 3-WAY VALVE LOCATED IN MECHANICAL ROOM 249

4. ALL MOTORS ARE 480 V, 3 PH.

EXISTING BOOSTER COIL INFORMATION

MARK

HW

VALVE

TYPE

FLOW

(GPM)

BRANCH

SIZE (IN)

1-1 1.5 0.5 2 WAY

1-2 2 0.5 2 WAY

1-3 1.5 0.5 2 WAY

1-4 1.5 0.5 2 WAY

1-5 1.5 0.5 2 WAY

1-6 2 0.5 2 WAY

2-1 1.5 0.5 2 WAY

2-2 1 0.5 2 WAY

2-3 1.5 0.5 2 WAY

2-41 0.5 2 WAY

3-1 1.5 0.5 2 WAY

3-2 2 0.5 2 WAY

3-3 1 0.5 2 WAY

3-4 1 0.5 2 WAY

3-5 1.5 0.5 2 WAY

5-1 1 0.5 2 WAY

5-2 2 0.5 2 WAY

5-3 2 0.5 2 WAY

5-4 2 0.5 2 WAY

5-5 2 0.5 2 WAY

6-1 1 0.5 2 WAY

6-2 1 0.5 2 WAY

6-3 8 1 2 WAY

6-4 1 0.5 2 WAY

6-5 1 0.5 2 WAY

6-6 1 0.5 2 WAY

6-7 2 0.5 2 WAY

6-8 1.5 0.5 2 WAY

6-9 1 0.5 2 WAY

6-10 4 0.8 2 WAY

7-1 1.5 0.5 2 WAY

7-2 1.5 0.5 2 WAY

7-3 1.5 0.5 2 WAY

7-4 1.5 0.5 2 WAY

7-5 2 0.5 2 WAY

NOTES:

1. CONTROL VALVE CV TO EQUAL GPM

2. COORDINATE WITH ENGINEER FOR ONE

VALVE TO BE A 3-WAY

AutoCAD SHX Text
M-500 501 DETAIL.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
6/19/2018 11:15 AM

Recommended