+ All Categories
Home > Technology > Vision for surface water management

Vision for surface water management

Date post: 24-May-2015
Category:
Upload: hydrologywebsite1
View: 111 times
Download: 3 times
Share this document with a friend
Popular Tags:
29
by by Shri Sanjiv Aggarwal Shri Sanjiv Aggarwal Chief Engineer (P&D) Chief Engineer (P&D) Central Water Commission Central Water Commission New Delhi New Delhi
Transcript
Page 1: Vision for surface water management

bybyShri Sanjiv AggarwalShri Sanjiv Aggarwal

Chief Engineer (P&D)Chief Engineer (P&D)Central Water CommissionCentral Water Commission

New DelhiNew Delhi

Page 2: Vision for surface water management

Water is a valuable but finite resource. Annual Water AvailabilityTotal Precipitation(including snowfall):4000 BCMPrecipitation during monsoon :3000 BCMWater availability :1869 BCMUtilisable water availability :1123 BCM

Surface water-690 BCMGround water-433 BCM

Page 3: Vision for surface water management

» High variability in space and time

> 1,000 cm in north eastern region to < 10 cm in western part of Rajasthan

(75% annual rainfall in four months)

(Rainfall in cm)

1.24 1.33 2.123.46

6.03

15.42

23.76

19.89

14.19

7.69

3.451.42

0

5

10

15

20

25

Percent

Page 4: Vision for surface water management

Reducing per capita water availability

Per capita water availability in m3/year

Water stress 1700 m3/capita/year

Water scarcity 1000 m3/capita/year

Page 5: Vision for surface water management

Increasing demands of water for various purposes

Year

Wat

er D

eman

d in

BCM

(km

3 )

Page 6: Vision for surface water management

» Food grain production to be doubled by 2050.˃ Necessitate increased water demand for irrigation.

» Water demand for other sectors also on rise.» Water availability for irrigation to go down.» Challenge is to produce more food grain as

well as meet increased demand of other sectors with limited water availability.

» Increasing urbanization is posing another challenge to the water demands

CHALLENGES FACEDCHALLENGES FACED

Page 7: Vision for surface water management

» There are increase incidents of flooding attributed to intense rainfall/ cloud burst and GLOF (glacial lake outburst flood)

» There is progressive deterioration of water quality in surface water bodies

» Increased demand for maintaining ecological flow in the rivers.

» Increasing issues of salinity ingress in coastal area, siltation of river and reservoir sedimentation

CHALLENGES FACED CHALLENGES FACED CONTD...CONTD...

Page 8: Vision for surface water management

» Need to conserve monsoon flows & use water efficiently for sustainable management.

» Need to prepare for perceived adverse impact of climate change.

» CRISES leads to CONFLICT.» These water related issues calls for better water

management.» A scientifically managed Hydrological Information

System can provide the basic input to achieve this objective as the challenges posed a multifaceted.

CHALLENGES FACED CHALLENGES FACED CONTD...CONTD...

Page 9: Vision for surface water management

Hydrological information in India is primarily provided by various agencies of the Central and State Government.

HIS is the process of capturing reliable data on the quantity and quality of hydro-meteorological, hydrological and hydro-geological systems on space and time.

It promotes the use of computerized databases for planning, design and management of water resources systems.

Page 10: Vision for surface water management

» In the HIS, procedures of observation, processing and dissemination of water resources data were standardized.

» It aimed at expansion of Hydrological and Meteorological data collection network in 5 Central Agencies and 9 State Agencies.

» 380 data centers and 31 data storage centers were established by IA’s of Centre and States.

Page 11: Vision for surface water management

» At Central Level National Surface Water Data Centre (NSWDC) was established in CWC for storage of Hydro-meteorological Data as Central Depository.

» Data Entry Software (SWDES), Software for Primary & Secondary validation & processing (HYMOS) and Data Storage and Dissemination software (WISDOM) were developed.

» IA’s got the exposure to the system and developed particular level of expertise in these software.

» Institutional strengthening through capacity building was promoted.

Page 12: Vision for surface water management

» With the advent of newer technologies especially robust internet system in remote locations, cloud based computing facilities and modern Mobile devices, it become imperative to introduce this new concept and consolidate the gains made during HP-I.

» Development of web based software eSWIS combining functionalities of all the three software developed in HP-I i.e. SWDES, HYMOS & WISDOM has been taken up under HP-II.

Page 13: Vision for surface water management

» To standardize Hydrological Design Practices in the form of Design Aids for uniform use, all over the country, using State of the Art Technology to the extent possible, Hydrological Design Aids (HDA-SW), a tool for Assessment of Water Resources Potential Availability/Yield Assessment (HDA-Y), Estimation of Design Flood (HDA-F) and Estimation of Sediment rate (HDA-S) are under development.

Page 14: Vision for surface water management

» 3 Real Time Water Quality Monitoring System (RTWQMS) have been installed by CWC.

» DSS has been developed by NIH.

» Purpose Driven Studies were undertaken.

Page 15: Vision for surface water management

» The spread is limited to 13 States and 8 Central Agencies only. The benefits to reach throughout Country covering all river basin and States.

» Building of effective co-ordination mechanism amongst different IA’s.

» Making available all data at a Central Location.» Standardization of specification of latest equipment.» Sustainability of the system/assets

developed/created.» Training of staff/officers for O&M of the system

created.

SUSTAINABILITY OF HIS SUSTAINABILITY OF HIS

Page 16: Vision for surface water management

To evolve mechanism for updating of data at regular interval.

Integration of Ground Water Information system.

Integration of Water Utilisation data, agriculture data by State Governments as these databases will be useful for reassessment of water resources availability study, Basin Planning etc.

Bringing IMD, CPCB, Agriculture Ministry on India-WRIS platform. Only then complete data on water resources will be available.

SUSTAINABILITY OF HIS SUSTAINABILITY OF HIS CONTD..CONTD..

Page 17: Vision for surface water management

Prime role of HIS beyond Hydrology Project will be two folds:

» Integration of tools developed in HP-I and HP-II in design, planning and operation practices throughout the country.

» Generating technological inputs for future ramping up of data management operation qualitatively and quantitatively.

PRIME ROLE OF HIS BEYOND HYDROLOGY PROJECT

Page 18: Vision for surface water management

» Supporting the IA’s/States in maintenance of HIS in lieu of sharing of Data with central depository.

» Need to integrate HIS developed by IA’s/States with Centre.

Need to standardize the data collection methods, equipments required and communication system for HIS so that ramping up operations are smooth.

Need to create Hydro-meteorological instrument Data Bank/Guidelines and empanelment of Firms/Supplier to help the IA’s for easy procurement and maintaining the uniformity in HIS.

Page 19: Vision for surface water management

» Spreading of HIS in the entire country.» Institutional Strengthening & Capacity Building

required for sustainability of HIS developed during HP such as implementation of HDA, eSWIS.

CWC/Central Government to play a crucial and essential role in management and coordination of above activities.

Page 20: Vision for surface water management

» Responsibility to manage the various Control Boards such as Cauvery Management Board, Krishna Dispute Implementation Board, Ganga Management Board etc. in view of rising Inter-state water Disputes for which CWC/Central Government is being mandated.

» Role of neutral DSS through CWC/Associated Organisations in providing real time inflow forecast for reservoir operation to individual units being operated by independent agencies in Cascade development of hydropower in the country which is gaining importance now a days.

Page 21: Vision for surface water management

» Operation and management issues of reservoirs, canals etc. of various Inter-state rivers require more number of sites and their data on real time basis.

» Expansion of H.O & Met network throughout the country covering all river basin upto Tributary/Sub-Tributary level. (800 new sites in 12th Five Year plan).

» Modernization, integration and real time collection & transmission of data.

Page 22: Vision for surface water management

» Developing Design Aids for Hydraulics Structures and integration in design/planning practice.

» Extension of Development of Regional Models.

» Integration and expansion of various RTDAS and coupled DSS.

» Installation of more no. of RTWQMS at major/important surface water bodies.

» Development of Flood Inundation modeling/Generation of DEM.

Page 23: Vision for surface water management

» Development of Mobile based applications for eSWIS.

» Flood Risk Zoning- River Front Development » Bringing all Water Resource Information

under one umbrella under India-WRIS which has been developed by CWC in collaboration with NRSC.

» Creation of National Water Informatics Centre.

Page 24: Vision for surface water management

Thank youThank you

http://www.cwc.nic.inhttp://www.cwc.nic.in

Page 25: Vision for surface water management

» India-WRIS will provide a comprehensive, credible and contextual view of India’s water resources data along with allied natural resources data and information to all stakeholders in water resource sector.

Page 26: Vision for surface water management

» It will allow users to Search, Access, Visualize, Understand, Analyze, Look into context and Study spatial patterns.

» ‘Single Window’ solution of all water resources and related data in a standardized GIS format in national framework for:

• Water resource assessment and monitoring,• Water resource planning and development, • Integrated water resources management

(IWRM) & provide foundation for advanced modeling purposes

Page 27: Vision for surface water management

Integration of PMP Atlas being developed by CWC

Integration of Hydrological Tools (e-SWIS, e-GEMS, HDA) being Developed under HP-II

Crowd sourcing (Involving of Public) for collecting data especially in respect of smaller water bodies, water polluting locations etc.

Page 28: Vision for surface water management

ISRO-BhuvanISRO-

Bhuvan

India Meteorologic

al Department

India Meteorologic

al Department

Survey of

India

Survey of

India

Ministry of

Agriculture

Ministry of

Agriculture

Ministry of

Rural Development

Ministry of

Rural Development

Regional Node

(State Water Data Centre –

SDWC)

National Water

InformaticsCentre

Environmental Data

(CPCB)Water Quality

data

Environmental Data

(CPCB)Water Quality

data

Census & StatisticsCensus & Statistics

Conceptual Framework for Inter-Institutional Linkages – NWIC

CWC Observational

Network( Real-time River

G, G&D , Reservoir Level

Data)

CWC Observational

Network( Real-time River

G, G&D , Reservoir Level

Data)

India-WRISIndia-WRIS

National Surface Water Data Centre

(e-SWIS, HDA (SW),SWDES )

National Surface Water Data Centre

(e-SWIS, HDA (SW),SWDES )

GWIS (CGWB)

(GW Levels, quality)

GWIS (CGWB)

(GW Levels, quality)

CWC Monitoring

units

CWC Monitoring

units

CWC Dte at headquarter

s

CWC Dte at headquarter

s

data.gov.indata.gov.in

Page 29: Vision for surface water management

Inter- State Water Disputes Act 1956 (amended in 2002) section 9A


Recommended