Volume: XII Chapter: 4 Page No: 209
TABLE NO:1
GENERAL DESCRIPTION
CATCHMENT WATERSHED NO
MICRO WATERSHED NO AREA(HA) DISTRICT NAME TEHSIL/BLOCK VILLAGE PHOTO
Satluj Sq4 Sq4d 2409 Kinnaur Nichar Taranda, Nigulsari, Nanspo, Thach
C:\MWS_21\Photo\SQ4D\Table 1\Table1.jpg
LATITUDE LONGITUDE ALTITUDE SLOPE IN DEGREE RAINFALL(mm) SNOWFALL(mm) TEMPERATURE(Cen) NO OF HOUSE HOLD
31'29' to 31'35'
77'51' to 77'55'
1360m to 4212m 30' to 80' NA NA NA 299
POPULATION MALE FEMALE
CATTLE PROPOSED NO/NAME
PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM DESCRIPTION MILTCH OTHER
1664 788 876 192 2111 NA NA NA
TABLE 1 PHOTO
Sq4d
Volume: XII Chapter: 4 Page No: 210
TABLE NO:2
A. STATUS OF LAND USE IN MICRO WATERSHED(HA) B.AREA UNDER FOREST CATEGORY WISE :
LAND USE GOVT AREA PRIVATE AREA COMMU AREA TOTAL CATEGORY DPF/RESERVE UPF PASTURE OTHERS
AGRICULTURE LAND 0 153 0 153 NAME
Kandlu Chaunda, Tikrang, Taranda, Devlodhar NA NA NA
FOREST LAND 1536 0 0 1536 AREA (HA) 1536 NA NA NA
WASTE LAND 620 0 0 620 SPECIES Kail, Deodar, Fir, Spruce, Robinia, Alunthus NA NA NA
OTHERS LAND 0 100 0 100 DENSITY 0.2 to 0.8 NA NA NA
TOTAL 2156 253 0 2409 TABLE NO:3
AREA UNDER PLANTATIONS FOR LAST 15 YEARS
NAME LATITUDE
AND LONGITUDE
TOTAL AREA (HA)
SAMPLE AREA (HA)
SPECIES PLANTED
SAMPLE GAP
FILLING AREA(HA)
SURVIVAL %
TOTAL GAP
FILLING AREA(HA)
AREA NEEDED NEW
PLANTATION (HA)
FENCING REQUIRE
D (RM)
REASONS FOR
FAILURE
FINAL PRESCRIPTION(Enrichment (HA))
RATE/ HAC
COST (Rs)
Chaura 31'56'66" 77'86'43"
132
5 Rubinia, Alinthus, Deodar
2 60
48 24 54600
Due to fire.
Enrichment = 110
35000 3850000
Deorang
31'56'25" 77'89'18"
5 Chulli, Bemi, Rubinia, Khanor
1 80 Due to grazing.
Jale 31'56'19" 77'89'39"
5 Bemi, Chulli,
Rubinia 2 60
Due to grazing.
Koti 31'55'67" 77'87'69"
3
Chulli, Bemi, Rubinia, Reetha, Poplar, Kunish
1 66.67 Due to grazing.
Taranda-I
31'55'30" 77'90'09"
2 Deodar, Rubinia,
Chulli, Bemi. 0 100
Due to grazing.
Taranda-II
31'55'28" 77'89'79"
4 Deodar 2 50 Due to grazing.
Energy Plantation
= 4
138000
552000 Thach 31'56'12" 77'87'02"
5 Rubinia, Alinthus, Deodar
2 60 Due to fore.
UF Thach
31'54'77" 77'88'04"
4 Chulli, Bemi,
Rubinia 2 50
Due to grazing.
TOTAL :
132 33 12 48 24 54600 4402000
Volume: XII Chapter: 4 Page No: 211
TABLE 3 PHOTOS Chaura Taranda-I Taranda-II
Jale UF Thach Koti
Thach Deorang
Volume: XII Chapter: 4 Page No: 212
TABLE NO:4
SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS
NAME OF AREA
LATITUDE/LONGITUDE
PRESCRIPTION QUANTITY
AVAILABILTY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING(QUANTITY)
FINAL PRESCRIPTION
RATE/CUM COST(Rs)
NEW PRESCRIPTION
NEW QUANTITY
Chaura 31'56'66" 77'86'43"
CheckDams
2x1.5x1.5m=26 Nos
Stone & local species NA
Trenching
1x.30x.30m= 1200 Nos
9.9
11880
3x1.5x1.5m=8 Nos
Live Hedge 800 Rms
Trenching 1x.50x.30m=2000 Nos
Brushwood 15 Rms
Deorang 31'56'25" 77'89'18"
Trenching 1x.50x.30m=1000 Nos
Stone & local species NA
Trenching
1x.30x.30m= 1200 Nos
9.9
11880
CheckDams 2x1.5x1.5m=22 Nos
Live Hedge 500 Rms
CheckDams 3x1.5x1.5m=10 Nos
Jale 31'56'19" 77'89'39"
Trenching 1x.50x.30m=500 Nos
Stone & local species NA
Trenching
1x.30x.30m= 800 Nos
9.9
7920
CheckDams
3x1.5x1.5m=18 Nos
2x1.5x1.5m=32 Nos
Live Hedge 250 Rms
Koti 31'55'67" 77'87'69"
CheckDams
3x1.5x1.5m=14 Nos
Stone & local species NA
Trenching
1x.30x.30m= 1200 Nos
9.9
11880
2x1.5x1.5m=18 Nos
Trenching 1x.50x.30m=1100 Nos
Live Hedge 300 Rms
Taranda-I
31'55'30" 77'90'09"
CheckDams 3x1.5x1.5m=14 Nos
Stone & local species NA
Trenching
1x.30x.30m= 1600 Nos
9.9
15840
Live Hedge 700 Rms
Trenching 1x.50x.30m=1500 Nos
Brushwood 18 Rms
CheckDams 2x1.5x1.5m=16 Nos
Taranda-II
31'55'28" 77'89'79"
Trenching 1x.50x.30m=1200 Nos
Stone & local species NA
Trenching
1x.30x.30m= 1200 Nos
9.9
11880
CheckDams
3x1.5x1.5m=12 Nos
2x1.5x1.5m=34 Nos
Live Hedge 400 Rms
Brushwood 20 Rms
Thach 31'56'12" 77'87'03"
Trenching 1x.50x.30m=1200 Nos
Stone & local species NA
Trenching
1x.30x.30m= 800 Nos
9.9
7920
Live Hedge 600 Rms
CheckDams 3x1.5x1.5m=11 Nos
Brushwood 20 Rms
CheckDams 2x1.5x1.5m=39 Nos
UF Thach
31'54'77" 77'88'04"
Trenching 1x.50x.30m=1200 Nos
Stone & local species NA
Trenching
1x.30x.30m= 1600 Nos
9.9
15840
CheckDams 2x1.5x1.5m=16 Nos
Live Hedge 700 Rms
CheckDams 3x1.5x1.5m=8 Nos
Volume: XII Chapter: 4 Page No: 213
TABLE 4 PHOTOS Chaura Taranda-I Taranda-II
Jale UF Thach Koti
Thach Deorang
Volume: XII Chapter: 4 Page No: 214
TABLE NO:5
AGROFORESTRY
PRESENT STATUS FUTURE REQUIREMENT TYPE OF TREE
PRESENT NOs PRESENT SPECIES
FUTURE NOs FUTURE SPECIES
NEED FOR EXTENSION
SOURCE OF PLANTING STOCK(Nearest Nursery)
TREES 600 Deodar, Kail, Poplar, Rubinia, Kimu 1400 Deodar, Kail, Poplar, Rubinia, Kimu Y Taranda & Barakash Nursery.
WILD FRUIT 460 Fegra, Chulli, Khanor, Bemi, Walnut 2800 Fegra, Chulli, Khanor, Bemi, Walnut Y Taranda & Barakash Nursery.
MEDICINAL 1900
Patish, Karu, Hatpanja, Mohra, Cbhora, Narbishi, Kashmal, Bhekal, Tirmur, Guchhi, Discoria, Dhoop, Kuth 2800
Patish, Karu, Hatpanja, Mohra, Cbhora, Narbishi, Kashmal, Bhekal, Tirmur, Guchhi, Discoria, Dhoop, Kuth Y Taranda & Barakash Nursery.
TABLE NO:6
GRAZING LANDS
Name LATITUDE/LONGITUDE
AREA (HA)
SPECIES
WEED REMOVAL
SEEDING CLOSURES Other PEOPLES SUGGESTION
Rate/ Hac (Rs) Cost(Rs)
Jale 31'56'31"77'89'28" 62
Grass & Cheel Yes Yes No
Requirement of 12400 fodder plants
Improved seeds be seeded in the grazing lands. 27000 1674000
Tikran
31'55'12"77'88'09" 62
Brass, Cheel, Bushes Yes Yes No
Requirement of 12400 fodder plants
Improved seeds be seeded in the grazing lands. Approach roads for the grazing lands is required. 27000 1674000
TABLE 6 PHOTOS
Tikran Jale
Volume: XII Chapter: 4 Page No: 215
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA
NAME AREA(HA) LATITUDE/LONGITUDE SPECIES GAP FILLING MAINTENANCE NEW PLANTATION
SOIL CONSERVATION MEASURES(QUANTITY)
NA NA NA NA NA NA NA NA
TABLE NO:8
PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads)
NAME OF AREA
LATITUDE/ LONGITUDE PRESCRIPTION QUANTITY
AVAILABILITY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR (QUANTITY)
LIFT IRRIGATION (HT/ACERAGE)
FINAL PRESCRIPTION
RATE/ UNIT
COST (Rs)
NEW PRESCRIPTION NEW QUANTITY
Chounda Nala (8 Kms)
31'54'77" 77'88'01"
CheckDams
10x3x4m=68 Nos
Stone & local species
Check Dams=2 Nos, Retaining Walls=5 Nos NA
CheckDams
10x3x4m=22 Nos 29131 6408820
15x2.5x3.5m=47 Nos 15x2.5x3.5m=15 Nos 17277 3887325
Live Hedge 2000 Rms Live Hedge 2400 Rms 9.6 23040
Retaining Wall in Gabion
10x2x2.5m=62 Nos
Retaining Wall Gabion
10x2x2.5m=20 Nos 17277 3455400
20x2x2.5m=76 Nos 20x2x2.5m=24 Nos 17277 8292960
5x1.5x1.5m=62 Nos 5x1.5x1.5m=20 Nos 10033 1003300
Brushwood 1200 Rms Brushwood 400 Rms 62 24800
Tach Nala (3 Kms)
31'55'87" 77'87'10"
Live Hedge 700 Rms
Stone & local species NA NA
Live Hedge 900 Rms 9.6 8640
CheckDams 5x1.5x1.5m=56 Nos CheckDams 5x1.5x1.5m=18 Nos 10033 902970
Retaining Wall in Gabion
10x1.5x1.5m=67 Nos Retaining Wall Gabion
10x1.5x1.5m=21 Nos 10033 2106930
5x1.5x1.5m=38 Nos 5x1.5x1.5m=18 Nos 10033 902970
Brushwood 500 Rms Brushwood 150 Rms 62 9300
Taranda Nala (4 Kms)
31'55'22" 77'09'91"
Live Hedge 1000 Rms
Stone & local species NA NA
Live Hedge 1200 Rms 9.6 11520
Brushwood 800 Rms Brushwood 200 Rms 62 12400
CheckDams
4x2x2.5m=22 Nos
CheckDams
4x2x2.5m=7 Nos 17277 483756
6x2x2.5m=28 Nos 6x2x2.5m=9 Nos 17277 932958
8x2x2.5m=6 Nos 8x2x2.5m=2 Nos 17277 276432
Volume: XII Chapter: 4 Page No: 216
TABLE 8 PHOTOS Taranda Nala Chounda Nala Tach Nala
TABLE NO:9
PERFORMA FOR LANDSLIDE NAME OF AREA/ LOCATION
TYPE OF SOIL AND ROCK
DEGREE OF SLOPES/ SEVERITY
OCCURRENCE (Season)
DAMAGE/ RISK TO LIFE & PROPERTY
ROAD CONSTRUCTION QUARRY
OTHER CONSTRUCTIONS NATURAL
MEASURES TAKEN
SUGGESTED MEASURES PHOTOS
NA NA NA NA NA NA NA NA NA NA NA NA
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP)
1.Fruits FRUIT NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Apple Royal, Red Royal, Golden, Red Golden, Spur, Delicious Yes Yes
Technical guidence is required. Wild animals destroys the crops.
Apricot Local No No
Chulli Local No No
Pears Local No No
Plum Sentaroza No No
Walnut Local No No
Volume: XII Chapter: 4 Page No: 217
2.CROPS : CROPS NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Barley Local No No
Technical guidence is required. Wild animals destroys the crops.
Bithu Local No No
Chilai Local No No
Fafra Local No No
Koda Local No No
Kolth Local No No
Maize Local No No
Masur Local No No
Moong Local No No
Ogla Local No No
Potato Local No No
Rajmash Local No No
Urd Local No No
Wheat Local No No
3.VEGETABLE : VEGETABLE NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Tomato Local No No
Technical guidence is required. Wild animals destroys the crops.
Brinjal Local No No
Cabbage Local No No
Capsicum Local No No
Cauliflower Local No No
Ladyfinger Local No No
Peas Local No No
Radish Local No No
4. LIVE STOCK : LIVE STOCK(NO) BREED WHETHER SELLING THE PRODUCT PROBLEM FACED
Cow - 191 Local & Jersey Yes
Vaterinary is away at 8 Kms distance hence services are not satisfactory.
Goat/Sheep - 1997 Local No
Horse/Mule - 21 Local No
Ox - 95 Local No
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT REQUIREMENT AVAILABILITY GAP PERCENTAGE SOURCE
FUEL Yes 25% 75% Forests
FODDER Yes 30% 70% Forests
Volume: XII Chapter: 4 Page No: 218
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS EXISTING NAME SUGGESTIONS
Patish Patish
People be educated technically about the MFPs.
Karu Karu
Hathpanja Hathpanja
Mohra Mohra
Chora Chora
Narbishi Narbishi
Kashmal Kashmal
Bhekal Bhekal
Tirmur Tirmur
Guchhi Guchhi
Discoria Discoria
Dhoop Dhoop
Kuth Kuth
PEOPLES PARTICIPATION:
MAIN PROBLEMS SUGGESTION FOR IMPROVEMENT PEOPLES PRIORITIES
All the villages are not connected with the roads hence the people face carriage problem.
Link roads be made fro Chaunda to Taranda (4 Kms), Chaunda to Taranda Rest House via Nanspo(5 Kms).
Priority.
Drinking and irrigated water shortage is faced in most of the areas.
Drinking and irrigated water scheme be given from Khurgo Purgo to Tranda village at distance of 9 Kms covering four villages. Approx fifteen drinking and irrigated water storage tanks be made.
Vaterinary is not available in the nearest area i.e. 8 Kms away from the villages. Vaterinary be opened in the nearest and Central point for getting timely services.
Health care system for men is of very low category. Existing PHC be upgraded to Hospital having 5 beds and sufficient staff and medicines.
Problem of higher education is faced in the area. Existing Middle School be upgraded to High School.
No common toilets are held in the villlages. Common toilets be made in each villages.
Drainage system for rain water is not held in any of the village. Proper drainage of rain water be made in all the villages.
The condition of village paths is very poor. Maintenance of village paths is required.
There is no shelter at cremotorium site. Rain shed be made at cremotorium site.
Heavy transmission line of electricity are destroying the forests as well as crops of the public. Improved system for transmission lines be adopted to save the nature.
Carriage of daily needs is the main problem as the Road is much far from the villages.
Span with Electric Motor be provided from NH 22 to Tranda village, Kanda to Taranda, Thanacha to NH 22 and Kutangi to Ghushani Tranda Road.
Top Priority.
Volume: XII Chapter: 4 Page No: 219
PEOPLES PARTICIPATION
COSTING:
TABLES TABLE 3 TABLE 4 TABLE 6 TABLE 8 TABLE 9 TOTAL
COST 4402000 95040 3348000 28743521 0 36588561