“Railway Electrification Works Between RANI (Excl) - SWARUPGANJ (Excl) Volume - II (PREAMBLE, EXPLANATORY NOTES, BOQ FOR PACKAGE 1) DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV, 50HZ, SINGLE PHASE, TRACTION HIGH RISE OVER-HEAD EQUIPMENT, SWITCHING STATIONS, TRACTION SUB-STATIONS, SCADA, GENERAL ELECTRICAL SERVICES WORKS ALONG WITH CIVIL ENGINEERING WORK ie. SERVICE BUILDINGS, QUARTERS AND OTHER ASSOCIATED WORKS AND ALSO SIGNALING & TELECOMMUNICATION WORKS BETWEEN RANI (Excl.) SWARUPGANJ (Excl.) 86 RKM / 198 TKM SECTION IN AJMER DIVISION OF NORTH WESTERN RAILWAY IN THE STATE OF RAJASTHAN , INDIA
Transcript
Page 1: Volume 2 Package 1 03-03-2015

“Railway Electrification Works Between

RANI (Excl) - SWARUPGANJ (Excl) ”

Volume - II

(PREAMBLE, EXPLANATORY NOTES, BOQ FOR PACKAGE – 1)

“ DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV,50HZ, SINGLE PHASE, TRACTION HIGH RISE OVER-HEAD EQUIPMENT,SWITCHING STATIONS, TRACTION SUB-STATIONS, SCADA, GENERALELECTRICAL SERVICES WORKS ALONG WITH CIVIL ENGINEERINGWORK ie. SERVICE BUILDINGS, QUARTERS AND OTHER ASSOCIATEDWORKS AND ALSO SIGNALING & TELECOMMUNICATION WORKSBETWEEN RANI (Excl.) –SWARUPGANJ (Excl.) 86 RKM / 198 TKM SECTIONIN AJMER DIVISION OF NORTH WESTERN RAILWAY IN THE STATE OFRAJASTHAN , INDIA

Page 2: Volume 2 Package 1 03-03-2015

 

Page 3: Volume 2 Package 1 03-03-2015

Volume II – Price Proposal

Execution of

Package- 1 - “ DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV, 50HZ,

SINGLE PHASE, HIGH RISE TRACTION OVER-HEAD EQUIPMENT, SWITCHING STATIONS,

TRACTION SUB-STATIONS, SCADA, GENERAL ELECTRICAL SERVICES WORKS ALONG WITH CIVIL

ENGINEERING WORK ie. SERVICE BUILDINGS, QUARTERS AND OTHER ASSOCIATED WORKS

AND SIGNALING & TELECOMMUNICATION WORKS BETWEEN RANI (Excl.) TO SWARUPGANJ

(Excl.) SECTION OF 86 RKM/198 TKM IN AJMER DIVISION OF NORTH WESTERN RAILWAY IN

THE STATE OF RAJASTHAN, INDIA.”

FEB 2015

Corporate Office:

RAIL VIKAS NIGAM LIMITED First floor, August Kranti Bhavan,

Bhikaji Cama Place, New Delhi – 110 066

Tele : + 91-11-26738191 , Fax : + 91-11-26182957, web : www.rvnl.org

Page 4: Volume 2 Package 1 03-03-2015

 

Page 5: Volume 2 Package 1 03-03-2015

Table of Content

Bill of Quantities

Preamble

Summary sheet of bill of quantities

Bill of quantities(Electrical Engineering)

Bill of quantities(Civil Engineering)

Bill of quantities (Signal & Telecom Engineering )

Explanatory Note( Signal & Telecom Engineering)

Explanatory Notes (Electrical Engineering )

Page 6: Volume 2 Package 1 03-03-2015

 

Page 7: Volume 2 Package 1 03-03-2015

Volume – II

Bill Of Quantities

Package-1

Page 8: Volume 2 Package 1 03-03-2015

 

Page 9: Volume 2 Package 1 03-03-2015

Preamble

Page 10: Volume 2 Package 1 03-03-2015

 

Page 11: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 1 of 16

Bill of Quantities PREAMBLE

PREAMBLE(Civil Engineering)

1. The Bill of Quantities shall be read in conjunction with the Instructions to Bidders,

General Conditions, Particular Conditions of Contract, Works Requirement (Technical Specifications, and Drawings).

2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide a common basis for bidding. The basis of payment will be the actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where applicable, and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.

3. In the Bill of Quantities, quantity and unit rates and thereby the amount against each

item have been indicated. From this, the estimated price of each bill has been worked out and indicated in the summary sheet in BOQ. The Bidder shall quote rates as percentage above/below/at par for each schedule in the summary sheet. If no percentage as above, below or par is indicated for any particular bill, the same will be considered as percentage at par.

4. The rates for each bill shall be written in indelible ink or type written in the summary sheet against each bill in words and figures as percentage above /below/at par with RVNL’s cost. Thereby, quoted price for each bill shall be calculated and written against each bill. The total price, as sum of quoted price for all the bills shall be shown at the bottom of the summary sheet. The total price shall also be written in words and figures.

5. General directions and descriptions of work and materials are not necessarily repeated

or detailed in the Bill of Quantities. References to the relevant specifications and sections of the contract documentation should be made before quoting rates in the Bill of Quantities.

6. The rates and prices Bid in the priced Bill of Quantities shall, except as otherwise

provided under the Contract, include all construction equipment, plant, labour, supervision, materials, erection, maintenance, insurance, profit, royalty, octroi, taxes and duties, together with all general risks, liabilities and obligations set out or implied in the Contract.

7. The rates are deemed to be inclusive of all lead (except as otherwise specifically

provided in the description of the particular item), lifts, ascend, descend, handling, re-handling crossing of nallah/streams/tracks any other obstructions.

Page 12: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 2 of 16

8. All enabling works for executing the work e.g. approach road to site, launching arrangements, procuring right of way, arrangement of water and electricity etc is to be arranged by the contractor at his own cost and deemed to be included in the quoted rates.

9. Storage of Material: All the material at site will have to be properly stacked & stored so

as to facilitate inspection. The material should be properly protected from the detrimental effects of nature and fire, theft etc. The contractor shall be responsible for watch & ward and any loss or deterioration on account of above shall lead to rejection of material and contractor has to replace the same at his own cost.

10. The method of measurement of completed work for payment shall be in accordance

with provisions in Works Requirements (Specifications) except as otherwise specifically provided in the description of item or particular bill of quantities or explanatory notes to the particular bill of quantities.

11. (a) In items of Bill No. 6: (Building and related items) and Bill No.9: (Site facilities), the

rates are inclusive of cost of all materials including cement, steel, etc. required to deliver the final product.

(b) In items of bill No.2: (Bridges), Bill No.5: (track linking), and Bill No.7: (Platforms,

passenger amenities and Misc works) where ever cement, reinforcement steel and HTS wire (strands) are required to be consumed in the item, the rates are exclusive of cost of these materials and the same shall be paid separately under relevant items for supply of these materials.

(c) In items of Bill No.4: (P. Way supply) the rates are inclusive of all materials including cement, steel and HTS wire (strands). Rails required for manufacture of item under Bill No.4 shall be issued free of cost by RVNL.

12. NOTES SPECIFIC TO EACH BILL OF QUANTITIES. 12.1. BILL NO.1 FOR EARTH WORK IN FORMATION 12.1.1 The earth work in formation and blanketing has to be executed as per latest RDSO

guidelines for earthwork in railway projects with up to date correction slips. If naturally available material in the project area is not suitable for using as blanketing material directly then the blanketing material conforming to RDSO specification has to be produced by blending various naturally available materials in required proportion in a pug mill.

12.1.2 Obtaining prior permission for felling of trees including payment of royalty and taxes etc

shall be contractor’s responsibility and deemed to be included in the rates.

Page 13: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 3 of 16

12.1.3 Joining of new formation with existing embankment has to be done with benching of 30 cm (V), 60 cm (H) in the existing bank slope. The rate of earthwork includes the cost of benching.

12.1.4 Locations where blasting is warranted, prior permission of the employer must be

obtained to ascertain whether blasting is permitted or prohibited. Rate of rock cutting includes the cost of all precautionary measures necessary for safety during blasting of rock.

12.2 BILL NO.2: BRIDGES AND BILL NO.7: PLATFORM, PASSENGER AMENITIES AND

MISCELLANEOUS WORK FOR CC, RCC AND PSC ITEMS. 12.2.1 All material, equipment, labour, casting beds, stress frames, from work staging,

scaffolding, etc is to be arranged by the contractor within the quoted rates. 12.2.2 1:4:8, 1:3:6 and 1:2:4 indicates concrete prepared using volumetric mix in proportion of

cement: coarse sand: stone aggregate of specified size, respectively. 12.2.3 All design mix concrete shall be machine batched with automatic weigh batcher,

machine mixed and machine vibrated or Ready Mix Concrete prepared in depot and transported by transit mixer to the site of work.

12.2.4 Prior to demolishing of any structure measurements have to be taken, scheme of

dismantling has to be got approved from the Engineer. 12.3 BILL NO.4: (PERMANENT WAY SUPPLY) 12.3.1 All P. Way materials shall be procured only from suppliers included in part I list of RDSO

approved suppliers for the particular item. Where, such a list is not maintained by RDSO,

prior approval of source of supply shall be obtained from the employer.

12.3.2 All P. Way materials shall be inspected by the inspecting authority as prevalent over

zonal railway for the particular material. However, employer reserves the right to

nominate any authority or its own representative to inspect the material.

12.3.3 The price quoted also includes RITES/RDSO inspection and testing charges unless

otherwise specified in the bill of qty or technical specification. The prices quoted also include RITES/RDSO inspection and testing charges unless otherwise specified in the bill of quantities or Technical Specification. In case of change of inspection from RDSO/RITES to RVNL/consignee, 1% of cost of material to be deducted by RVNL, as inspection charges.

Page 14: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 4 of 16

12.3.4 If the rails required for manufacture of the finished material are to be issued free of cost by the Employer, as specified in the description of item, the employer shall issue such rails either in project area or from Bhilai . The quoted rates include cost of handling and transportation of rails to the manufacturer’s workshop and finished materials from the manufacturer’s workshop to the site of work.

12.3.5 All P. Way material shall be neatly stacked and stored in the project area and protected

against loss/ deterioration by proper watch and ward staff, insurance, etc, the cost of

which is deemed to be included in the rates.

12.4 BILL NO.5: (PERMANENT WAY LINKING) 12.4.1 Painting of rails for loops & platform lines shall be done before fixing in position and

touching to be done after laying in position. 12.4.2 Rates include day as well as night working and lighting arrangement as per requirement

and to the satisfaction of the engineer. 12.4.3 The welds found defective in USFD, shall have to be replaced by the contractor at his

own cost. 12.4.4 During the maintenance of track after commissioning, all arrangement for

transportation of labour , T&P etc will have to be done by contractor at his own cost. Necessary T&P for track maintenance will be procured by the contractor including consumables. The rate includes all such requirements.

12.4.5 The payment of rail cuts and drilling holes will be done as per final layout of

mainline/loop line/sidings and turnouts etc. Rail cuts/hole drilling required for temporary working will not be paid.

12.5 Bill No.8: (Supply of Cement): Payment for supply shall only be made after the quantity

is consumed in the related item of work. The consumption of cement shall be worked out based on cement consumption coefficients as given below or the actual consumption whichever is less.

COEFFICIENTS FOR CEMENT CONSUMPTION

S. No

Item Unit Cement consumption coefficients per unit in

Kg. (Maximum)

Cement Concrete

1. 1:3:6 (1 Cement 3 coarse sand, 6 graded stone aggregate)

Cum 220

Page 15: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 5 of 16

S. No

Item Unit Cement consumption coefficients per unit in

Kg. (Maximum)

2. 1:2:4 (1 cement, 2 coarse sand, 4 graded stone aggregate)

Cum 320

3. M20 Cum 400

4. M25 Cum 410

5. M30 Cum 420

6. M35 Cum 428

7. M40 Cum 435

8. M45 Cum 480

9. M50 Cum 500

Cement Mortar

1. Cement Mortar 1:2 (1 Cement: 2 Sand) Cum 680

2. Cement Mortar 1:3 (1 Cement: 3 Sand) Cum 510

3. Cement Mortar 1:4 (1 Cement: 4 Sand) Cum 380

4. Cement Mortar 1:5 (1 Cement: 5 Sand) Cum 310

5. Cement Mortar 1:6 (1 Cement: 6 Sand) Cum 250

Brick Work

1. Cement Mortar 1:4 (1 cement: 4 coarse sand)

Cum 95

2. Cement Mortar 1:6 (1 cement: 6 coarse sand)

Cum 62.5

3. Cement Mortar 1:3 (1 cement: 3 coarse sand) half brick

SqM 14.28

4. Cement Mortar 1:4 (1 cement: 4 coarse sand) half brick

SqM 10.64

Note: Cement consumption for any item if not mentioned above is to be worked out as per

CPWD DSR 2012.

12.6 Bill No.10: (NWR SOR Works) Specification and mode of measurements will be as per NWR specification

Page 16: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 6 of 16

Preamble to SBOQ for Railway Electrification and General Electrical Works

A. General Instructions

1. The bill of quantities (BOQ) shall be read in conjunction with the Instruction to bidders, General Conditions of Contract, Particular Conditions of Contract, Works requirements, Technical specifications & Drawings, Explanatory notes detailed after BOQs of RE & General Electrical works seperately, Payment conditions, pre-bid clarifications and Addenda and Corrigenda if any.

2. The summary of schedules is as under:

SN Schedule No. Description

1 16000 RE-General

2 17000 Switching Post Building

4 19000 OHE - Ferrous other than steel

structures and SPS

5 20000 OHE - Non Ferrous ’A’

6 21000 OHE - Non Ferrous ’B’

7 24000 TSS

8 27000 TSS-Spares

9 28000 Tools & Plants

10 29000 SCADA

11 30000 Common Items for OHE/TSS

12 33000 General Electrical Works

3. The quantities given in the Bill of Quantities are estimated and provisional, and are given

to provide a common basis for bidding. The basis of payment will be the actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where applicable, and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract. The Surplus quantities, if any after execution & not required by Railway, as determined by the engineer during the progress of the work or at the completion of the work, shall be taken back by the contractor and the recovery of such material will be adjusted from the pending claims.

Page 17: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 7 of 16

4. In the Bill of Quantities, quantity and unit rates and thereby the amount against each item have been indicated. From this, the estimated price of each bill has been worked out and indicated in the summary sheet in BOQ. The Bidder shall quote rates as percentage above/below/at par for each schedule in the summary sheet. If no percentage as above, below or at par is indicated for any particular bill, the same will be considered as percentage at par.

5. The rates for each bill shall be written in indelible ink or type written in the summary

sheet against each bill, in both words and figures, while clearly indicating whether the percentage quoted is above/below/at par over the estimated rate in the respective columns. The price for each bill shall accordingly be calculated and written against each bill in both words and figures. The total price, as the sum of prices of all bills shall be shown at the bottom of the summary sheet. The total price shall also be written in both words and figures.

6. General directions and descriptions of work and materials are not necessarily repeated

or detailed in the Bill of Quantities. References to the relevant specifications and sections of the contract documentation should be referred to before quoting rates in the Bill of Quantities.

7. The rates and prices Bid in the priced Bill of Quantities shall, except as otherwise

provided under the Contract, include all construction equipment, plant, labour, supervision, materials, erection, maintenance, insurance, profit, royalty, octroi, taxes and duties, together with all general risks, liabilities and obligations set out or implied in the Contract.

8. The rates are deemed to be inclusive of all lead (except as otherwise specifically

provided in the description of the particular item), lifts, ascend, descend, handling, rehandling crossing of nallah/streams/tracks any other obstructions.

9. All enabling works for executing the work e.g. approach road to site, launching arrangements, procuring right of way, arrangement of water and electricity etc is to be arranged by the contractor at his own cost and deemed to be included in the quoted rates. Where a temporary tube well or any other water source are constructed by the contractor in the railway land for the purpose of taking power /water for construction purposes, no charge would be recovered from the contractor but written permission will however, be obtained by the contractor from the Engineer who may, at his discretion, refuse such permission for such construction of temporary arrangement. The contractor shall also be required to restore the site to its proper condition as directed by the Engineer.

10. Storage of Material: All the material at site will have to be properly stacked & stored so as to facilitate inspection. The material should be properly protected from the detrimental effects of nature and fire, theft etc. The contractor shall be responsible for watch & ward and any loss or deterioration on account of above shall lead to rejection of material and contractor has to replace the same at his own cost. All the disposable material should be disposed off outside the railway boundary at a designated place as directed by the Engineer.

Page 18: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 8 of 16

11. The method of measurement of completed work for payment shall be in accordance with provisions in Works Requirements (Specifications) except as otherwise specifically provided in the description of item or particular bill of quantities or explanatory notes to the particular bill of quantities.

12. Trees falling in the alignment or any other site of the works which belongs to the railways will be trimmed and stacked at a nominated place at his /their own cost as directed by Engineer and the same will be Railway/Employer’s property. Trees of the forest department will be trimmed and deposited in the nearest forest depot. No separate payment on this account shall be made to the contractor.

B. Instructions for quoting by the bidders

1. The prices for supply of materials and erection are in accordance with the technical

specifications, approved drawings and designs. The contractor should note that no item

of materials, equipment, fittings and components shall be supplied by the Employer.

2. UNIT PRICE:

i) The unit price indicated under “Supply” in the bills is the all inclusive price of

materials and all incidental charges for transport, loading/unloading and handling etc.

ii) The price also include taxes, duties, levies (including octroi) applicable on Works

contracts, insurance/bank guarantee/indemnity bond charges etc.

iii) The prices also include provision for losses and wastages in transit and erection.

iv) The price quoted also include RITES/RDSO representative inspection and testing

charges unless otherwise specified in the bill of quantities or Technical

Specification. In case of change of inspection from RDSO/RITES to

RVNL/CONSIGNEE, 1% of the cost of material will be deducted by RVNL as

inspection charges.

(v) The unit price indicated under “Erection” in the bills should be inclusive of the cost

of erection and testing and also include all cost of administration of the contract,

insurance premia, banker’s charges, cost of stamps/storage/loading/unloading and

handling of materials and also include the cost of transportation which the

contractor may incur for carriage of material to the site of works. The unit prices

should also include cost of works and adjustment that may become necessary

during or after the tests for commissioning.

3. The whole cost of complying with the provisions of the contract shall be included in the

items/bills provided in the BOQ and, where no items/bills are provided, the cost shall

be deemed to be distributed among the rates and amount entered for related Items of

Works.

Page 19: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 9 of 16

C. NOTES SPECIFIC TO PAYMENT: INVOICING PROCEDURE

1. All invoices shall be submitted with original supporting documents or certified

true copies of supporting documents wherever these are acceptable to the

Engineer as per contract. Where copies of original documents are required in

support of several invoices, true certified copies of the original documents may

be forwarded to the Engineer, with his consent.

2. Invoices shall be submitted only on the basis of provisions in Contract

Agreement and prices. The quantities and measurement of works completed

should be approved by the Engineer prior to the submission of invoices. For this

purpose, the schedule of quantities and measurement submitted by the

contractor for approval of the Engineer may be only up to the extent of work

completed except in the case of payments on Provisional Acceptance.

D. PAYMENT PROCEDURE

1. ON ACCOUNT PAYMENT AGAINST SUPPLY OF MATERIAL

On Account Payment will be made as described below:

(i) “On Account Payment” shall be made for the items specified in detailed

terms of payment of each schedule under clause No. 4.0 of this

preamble.

(ii) „On Account Payment‟ shall be made to the extent of 85% of the

accepted supply rate, after receipt, acceptance, accountal, proper storage and protection against loss, damage or deterioration on the items mentioned in each schedule.

(iii) „On Account Payment‟ made to the contractor will subsequently be

adjusted against progress payments and against payment due on

provisional acceptance.

(iv) All invoices shall be accompanied with the following, for the purpose of

arranging „On Account Payment‟ against the contract:

a. Supplier’s Delivery Challans.

b. Inspection certificate granted by the authorized approved

agency/Purchaser’s representative as per contract agreement.

c. Certificate of receipt of material at Contractor’s depot/work sites duly

accepted by the Engineer.

d. Comprehensive Insurance Policy for supply and safe custody of

material.

e. Bank Guarantee issued by a Scheduled Bank of the equivalent

amount for which On Account Payment is claimed. Such Bank

Guarantee shall be released after erection of the material and on

certification by the Engineer.

f. Quality assurance documents.

Page 20: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 10 of 16

2. PROGRESS PAYMENT AGAINST SUPPLY AND ERECTION OF MATERIAL:

On completion of each item of BOQ, the contractor shall receive payment to the

extent of 95% of the supply and erection costs after making any recoveries and

adjusting of On Account Payment, which may be due.

3. REMAINING 5% PAYMENT: The balance 5% of each item of the BOQ shall be

paid to the contractor after commissioning of the portion of the work or handing

over of the installation/material to the employers/Railways representative. This is

applicable for all schedules.

4.0 PROCEDURE OF SCHEDULE WISE PAYMENTS 4.1 Schedule 16000:

(i) Schedule No. 16001 (Design & Drawing)

The payment shall be made as under:

(a) 50% of Scheduled rates shall be paid after “in principle approval

of design/drawings by RVNL”.

(b) 45% of Scheduled rates shall be paid after the submission &

acceptance of as erected/ completion drawings by RVNL.

(ii) All other items except item No. 16001:

(a) On Account Payment shall be made only for item Nos. 16009 &

16010 and as per terms and conditions given in clause No. D (1) under “Payment Procedure”.

(b) The Progress Payment to the extent of 95% of all the items in the

schedule shall be paid for the supply and erection prices after

adjustment of “On Account payment” & other recoveries, if any,

wherever applicable.

4.2 Schedule 17000:

i) 50% of the Schedule rate shall be paid on Casting of the Roof of the Switching Station Building.

ii) 45% of the Schedule rate shall be paid on completion of the building in all respects and certification by the Engineer.

4.3 Schedule 19000:

(i) On Account Payment will be made only for item No. 19004 and as per

terms and conditions given in clause No. D (1) under “Payment Procedure”.

Page 21: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 11 of 16

(ii) Schedule No. 19003: On completion of erection of bracket assemblies,

the contractor shall receive payment to the extent of 85% of prices for supply and erection of bracket assemblies. After final adjustment of OHE and SED checking, contractor shall receive another 10% payment”.

(iii) The Progress Payment to the extent of 95% of all the items in the

schedule shall be paid for the supply and erection prices after adjustment

of “On Account payment” & other recoveries, if any, wherever

applicable.

4.4 Schedule 20000:

(i) On Account Payment will be made only for item Nos. 20002 & 20003

and as per terms and conditions given in clause No. D (1) under “Payment Procedure”.

(ii) Item No. 20001: On completion of erection of the items the contractor shall receive payment to the extent of 85% of the prices for supply and erection.

(iii) The Progress Payment to the extent of 95% of all the items in the

schedule shall be paid for the supply and erection prices after final

adjustment of OHE and SED checking and after adjustment of “On

Account payment” & other recoveries, if any, wherever applicable.

4.5 Schedule 21000:

(i) On Account Payment will be made only for item Nos. 21003, 21004, 21005 & 21014 and as per terms and conditions given in clause No. D(1) under “Payment Procedure”.

(ii) The Progress Payment to the extent of 95% of all the items in the

schedule shall be paid for the supply and erection prices after adjustment

of “On Account payment” & other recoveries, if any, wherever

applicable.

4.6 Schedule 24000:

(i) Item No. 24001 (Design & Drawing of TSS)

(a) 50% of Scheduled rates shall be paid after the “in principle

approval of design/drawings by RVNL”.

(b) 45% of Scheduled rates shall be paid after the submission &

acceptance of as erected/ completion drawings by RVNL.

Page 22: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 12 of 16

(ii) On Account Payment will be made only for item Nos. 24004 to 24014,

24032 to 24036 and as per terms and conditions given in clause No. D(1) under “Payment Procedure”.

(iii) The Progress Payment to the extent of 95% of all the items in the

schedule shall be paid for the supply and erection prices after adjustment of “On Account payment” & other recoveries if any

wherever applicable except item No. 24001 which will be paid as per (i) above.

4.7 Schedule 27000 & 28000:

95% of the accepted price shall be paid on receipt & accountal of material at site or required destination after inspection and production of documents as listed below:

(i) Supplier’s Delivery Challans.

(ii) Inspection certificate granted by the authorized approved

agency/Purchaser’s representative as per contract.

(iii) Certificate of receipt of material at Contractor’s depot/work sites duly

accepted by the Engineer.

(iv) Quality Assurance Documents including Guarantee/Warrantee, if any.

4.8 Schedule 29000:

(i) Item No. 29001 (Design & Drawing of SCADA)

(a) 50% of Scheduled rates shall be paid after the “in principle

approval of design/drawings by RVNL”.

(b) 45% of Scheduled rates shall be paid after successful completion

of the work and handing over of the soft & hard copies of as

erected/completion drawings & software to RVNL.

(ii) On Account Payment shall be made only for item Nos. 29002 to 29005 &

29007 and as per terms and conditions given in clause No. D(1) under “Payment Procedure”.

(iii) The Progress Payment to the extent of 95% of all the items in the schedule shall be paid for the supply and erection prices after adjustment of “On Account payment” & other recoveries if any wherever applicable

except item No. 29001 which will be paid as per clause (i) above.

4.9 Schedule 30000:

(i) (a) On Account Payment shall be made only for item Nos. 30001 to

30003 and 30005 and as per terms and conditions given in clause No. D(1) under “Payment Procedure”.

Page 23: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 13 of 16

(b) The progress payment of the above items to the extent of 95% of

the supply and erection prices shall be paid after adjusting of “On

Account payment” & other recoveries.

(ii) Item Nos. 30006, 30007: On completion of foundation work, the

Contractor shall receive payment to the extent of 75% of the prices (for

supply and erection taken together) of foundation and another 20%

after mast erection, muffing, backfilling etc.

(iii) Item No. 30008: On completion of work, Contractor shall receive

progress payment to the extent of 95% of the prices.

(iv) Item No. 30009: On completion of erection of structures, the

Contractor shall receive payment to the extent of 85% of the prices for supply and erection of structures and another 10% after erection of respective bracket assemblies/equipment.

4.10 SCHEDULE No. 33000 (General Electrical Works):

(i) 85% of the accepted supply rate shall be paid on receipt of material at site, after inspection & against submission of an indemnity bond.

(ii) Further payment of supply & erection cost to cover 95% of the total item

cost shall be paid on completion of the work and on certification by the

Engineer after adjusting already paid amount & other recoveries if any.

5. FINAL SETTLEMENT

On expiry of the defect liability period and issue of the taking over certificate of the entire installation, the Bank Guarantee for Performance security shall be released to the contractor after adjustment of any dues payable by the contractor.

6. RECOVERIES FROM THE CONTRACTOR

All the recoveries for materials supplied and services rendered by the Purchaser to

the Contractor and other refunds due from the Contractor shall be made by

deductions from payments due to the Contractor covering the value of supply and

erection in the progress payment and from payments due on provisional

Acceptance.

7. TAXES AND DUTIES

(i) All taxes, duties and levies (including octroi, works contract tax, service tax) arising

out of the transactions between the contractor and his sub-contractor/Suppliers for

this work will be deemed to be included in the accepted rates, unless otherwise

specified in the BOQ or technical specification.

Page 24: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 14 of 16

(ii) Where the law makes it statutory for the Purchaser to deduct any amount towards

sales tax or any other taxes on works contract, the same shall be deducted and

remitted to the concerned authority.

8. PRICE VARIATION

Coefficients governing the adjustment of changes in cost to be read with clause

13.8 of GCC applicable to various schedules are also included.

Page 25: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 15 of 16

Signal & Telecommunication Works

1 Bill No.11: (Signal & Telecommunication Works)

2 The bill of quantities (BOQ) shall be read in conjunction with the instruction to Bidders, General Conditions of contract, Particular Conditions of Contract, Works requirements, Technical Specifications, Explanatory Notes, Payment conditions, pre-bid clarifications and Addenda and Corrigenda if any.

BOQ has been divided in four groups‟ i.e.

GROUP C Items starting with Series

38,40 & NS

Contains SUPPLY items on which PVC to be

paid as per RBI indices

GROUP D Items starting with Series

39,40 & NS

Contains EXECUTION items on which PVC

to be paid as per RBI indices

Arrangement for water supply for execution of different items of works will be made by the contractor at his / their own cost.

3 The unit prices for “Supply items” in the bills is the all inclusive price of materials and all incidental charges for transport, loading/unloading

and handling. The prices also include taxes, duties, levies (including octroi) applicable on works contract, insurance / bank guarantee / indemnity bond charges etc. The prices also include provision for losses and wastages in transit and erection. The prices also include RITES/RDSO or other agencies inspection and testing charges unless otherwise specified in the bill of quantities or Technical Specification. In case of change of inspection from RDSO/RITES to RVNL/consignee, 1% of cost of material to be deducted by RVNL, as inspection charges.

4 The unit price for “Erection items” in the bills are inclusive of the cost of erection and testing/commissioning and also include all cost of administration of the contract, insurance premium, banker’s charges, cost of stamps/storage /loading/ unloading and handling of materials and also include the cost of transportation which the contractor may incur for carriage of material to the site of works. The unit prices also

Page 26: Volume 2 Package 1 03-03-2015

RVNL/RANI-SRPJ/RE

Page 16 of 16

include cost of works and adjustment that may become necessary during or after the commissioning test.

5 All invoices for S&T work shall be accompanied with the following, for the purpose of arranging payment against supply of item:

i. Supplier’s Delivery Challan ii. Inspection certification granted by the authorized approved agencies/Purchaser’s

representatives as per contract.

iii. Certificate of receipt of material at contractor’s depot’s duly accepted by the Engineer in good condition without damage.

iv. Comprehensive insurance policy for supply and safe custody of material.

v. Quality assurance document like Manufacture / Supplier warranty certificate.

6 80% of the accepted cost of material supplied for which installation is to be done by the contractor will be paid on receipt of the material duly inspected by the inspecting authority. Balance 10% of the accepted cost of materials for which installation is to be done by the contractor will be paid after the installation and testing of the work. Balance 10% of the accepted cost of material for which installation is to be done by the contractor will be paid after the commissioning of the work station/IBH/gate wise portion opened for traffic.

7 100% will be paid for spares, tool kits etc on receipt of equipment, duly inspected by inspecting agency and Engineer.

8 For the items of designing / installation / erection, 100% payment will be made after completion for the activity acceptable to the RVNL.

9 Before placing the supply order for STM/MUX counter specific approval of RVNL to be obtained.

The same is required to maintain uniformity in telecom in the section.

10 Released communication items will require shifting to other stations and installed.

******

Page 27: Volume 2 Package 1 03-03-2015

Summary of Bill of Quantities

Page 28: Volume 2 Package 1 03-03-2015

 

Page 29: Volume 2 Package 1 03-03-2015

Percentage in Figures Percentage in Words Write whether Percentage

quoted in Col. 4 & 5 is

above/below/at par over

estimated rates

In Figures In Words

1 2 3 4 5 6 7 8

1 Earthwork in Formation 24,14,940

2ABridge work (Other than Steel

works)

17,58,350

2CBridge work (Supply of Steel items

)

12,17,930

3 Ballast Supply 8,44,500

4 AP.Way Supply (Other than steel

items)

7,18,424

4 B P.Way Supply (Steel Items) 5,46,973

5 APermanent Way Linking:

Installation Works

5,76,083

5 BPermanent Way Linking: Supply

and Installation Works

2,96,280

6 Buildings 317,24,528

7A

Platform, Passenger Amenities and

Miscellaneous Works : Other than

Steel items

33,08,568

7BPlatform, Passenger Amenities and

Miscellaneous Works : Steel items

144,71,760

8 Supply of Cement

28,08,000

9 Site Facility 152,91,100

10 SOR Items 6,30,172

Group C 227,03,363

Group D 151,03,972

Name of work - Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer Division of North Western Railway Summary

Sheet of Bill of Quantities Package-1

Sr. No. Description of Schedule Estimated Cost in Rs.

Rate quoted by Contractor as percentage above/ below/ at par over the

estimated rates Price in Rs.

11

Summary Sheet of bill of quantities

Signature of Contractor

Package-1 of RANI-PNU Electrification Project Page 1 of 2

Page 30: Volume 2 Package 1 03-03-2015

16000 RE General 138,25,863

17000 Swithing Post Building 7,02,649

19000 OHE Ferrous 1000,62,133

20000 OHE Non -ferrous 2285,90,826

21000 OHE Insulators 200,57,517

24000 Traction Sub-station 448,41,680

27000 Maintenance Spares (TSS) 9,13,533

28000 Maintenance Tools & Plants (PSI) 8,58,748

29000 SCADA 94,31,550

30000Common items required for OHE &

TSS

2283,41,816

33000 General Eelctrical Works 189,79,066

Miscellaneous Miscellaneous items 31,94,698

Total Estimated cost 7842,15,022

Note:

(e) Bidder should ensure that the rates are filled with due care and caution so as not to lead to any omission or discrepancy or ambiguity.

Total Quoted Price =

(a)      Please refer to ITB 14 and 32 while filling the rates in the summary sheet.

(b)      Please mention the percentage rate, in both figures and words, for each schedule in columns 4 & 5 respectively. Please also mention in column 6 whether the percentage rate mentioned in columns 4 & 5

are above or below or at par over the estimated rates.

(c)      The price for each bill shall be calculated and written against each bill, in both figures and words, in columns 7 & 8 respectively.

(d)      The total price, as sum of the price of all the bills/ schedules shall be shown, in both figures and words under columns 7 & 8 respectively in the last row of the summary sheet.

Summary Sheet of bill of quantities

Signature of Contractor

Package-1 of RANI-PNU Electrification Project Page 2 of 2

Page 31: Volume 2 Package 1 03-03-2015

Bill of Quantities

(Civil Engineering)

Page 32: Volume 2 Package 1 03-03-2015

 

Page 33: Volume 2 Package 1 03-03-2015

BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

1001 Earthwork in filling in Embankment Fill and Top Layer of formation including trolley refuges,

etc using contractor's earth of approved quality as per RDSO Guidelines and specifications for

Design of Formation For Heavy Axle Load, Nov 2009 for 25 T Axle Load (using SQ1/SQ2/SQ3

soil with CBR value of 3 or more in Lower Embankment Fill and using either SQ1 soil with CBR

value of 4 or more generally but not less than 3 in isolated cases in Top Layer of 1 meter

thickness or SQ2/SQ3 soil with CBR value of 6 or more generally but not less than 5 in

isolated cases in Top Layer of 0.5 meter thickness), procured from outside railway land

including site clearances, setting out and demarcation, benching, initial compaction of subsoil

after levelling the surface after site clearance, spreading loose earth in 30 CM layers using

grader up to extra width of 0.5 M beyond designed profile, compaction using vibratory

compactors, top and side dressing and removal of extra earth from sides to provide final

formation as per designed profile as per RDSO Guidelines. The rate shall include cutting of

trees with girth upto 30 CM, making good the pockets and depressions left in soil during

clearing and uprooting of jungle/trees at site and one round of heavy rolling of sub-soil

thereafter. The rate shall not include cutting of trees of girth beyond 30 CM and compaction

which shall be paid separately. The minimum Ev2 Criteria as mentioned in the guidelines is

not applicable. The rate shall also not include cost of CBR tests which will be paid vide

separate BOQ item.

Note: 1) Undrained shear strength, CU from Unconfined Compression (UCC) test or Vane Shear

Test and Penetration Number ( N- Value) from Standard Penetration Test of the subsoil will

also be carried out by the bidder before carrying out the work of Earthwork. The quoted rates

are deemed to include these tests.

Note:- 2) Pleasenote that shrinkage allowance shall be deducted as per provisions of para

7.1.1.5 of RVNL standard specifications.

4000 Cum 175.00 700000

BILL No.1 : EARTHWORK IN FORMATION

Page 1 of 20

Page 34: Volume 2 Package 1 03-03-2015

BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

1002 Earthwork in excavation by mechanical means (Hydraulic excavator) in cutting, in

formation, trolley refuges, side drains, yard drains, catch water drains, etc. including

leading usable cut spoils up to 200 M and making formation in filling using the cut

spoils, site clearances, setting out and demarcation, disposing off surplus unusable cut

spoils as per directions of the engineer, and top and side dressing to provide final

formation as per designed profile. The rate shall not include cutting of trees with girth

above 30 CM and compaction, which shall be paid separately.

Note- Rock spoils such as stones, boulders, pebbles, gravels etc available from

excavation, if are found suitable for use in works as per required specifications even

after modifications etc., can be used free of cost but the legally payable royalty and

taxes are to be paid by the contractor to the concerned authorities.

1002 a Soil excluding rock. 1000 Cum 146.00 146000

1002 b Rock not requiring blasting. 75 Cum 227.00 17025

1002 c Hard Rock requiring blasting. 75 Cum 387.00 29025

1002 d Hard Rock requiring blasting, but blasting not permitted hence to be excavated by

chiselling.50 Cum 485.00 24250

Page 2 of 20

Page 35: Volume 2 Package 1 03-03-2015

BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

1005 Providing and laying blanketing materials of specifications as per RDSO Guidelines and

Specifications for Design of Formation for Heavy Axle Load - Nov 2009 for 25 T Axle

Load in layers of 30 CM in loose state using graders and compaction using vibratory

compactors, top and side dressing to provide final formation as per designed profile.

The rate shall not include compaction, which shall be paid separately.

NOTE :

1) If naturally available materials do not meet the laid down specifications, blanket

material has to be produced by mechanical process using mechanical crushing or

mechanical blending method or combination of these two methods as given in the

Annexure C of RDSO Guidelines and Specifications for Design of Formation for Heavy

Axle Load -2009. The quoted rates are deemed to include the production of material

by mechanical process.

2) The filter criteria and minimum EV2 Criteria as mentioned in the guidelines is not

applicable.

3) The rate shall not include cost of CBR tests which will be paid vide separate BOQ

item.

1400 Cum 977.00 1367800

1006 Mechanical Compaction of Earth and Blanket materials in layers of about 30 CM (or

more or less) in loose state using vibratory compactor (of adequate capacity) so as to

achieve compaction as per RDSO Guidelines and Specification for Design of Formation

for Heavy Axle Load – Nov 2009. Minimum EV2 Criteria as mentioned in the

guidelines is not applicable

5400 Cum 13.94 75276

1009 Cutting down trees and uprooting of roots including transporting the wood to nearby

railway store or forest godown as per direction of the engineer.

Note:

(i)    Cutting of trees with girth less than 30 cm and their clearance is covered under

item No. 1001 & 1002. Girth will be measured at a height of 1 M above ground level.

(ii)   Contractor will arrange necessary forest clearance on behalf of RVNL before

cutting/felling trees.

1009 d Girth above 180 CM and up to 270 CM 1 Each 1339.00 1339

Page 3 of 20

Page 36: Volume 2 Package 1 03-03-2015

BOQ for Railway Elecrification works between RANI(Excl.)-SRPJ(Excl.)sectin 198 TKM of Ajmer Division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

1015 Providing barricading with the help of fencing along the running track where the work

is to be done in close vicinity of the track. The fencing shall be minimum 1.5m high

with 2.2m wooden balli/bamboo posts, 25cm girth (min) placed every 2.0m apart,

embedded in cement concrete (1:2:4) blocks of size 0.23 x 0.23 x 0.23M and every

15th post (or nearer, if there is abrupt change of ground slope), last but one end post

and corner post shall be strutted on both sides and end post one side only and struts

embedded in cement concrete (1:2:4) block of size 0.23 x 0.23 x 0.23M, provided with

3 horizontal wooden/bamboo ballies fixed with G.I. staples/binding wire/nail driven

into the posts including 2 bands (red and white) 300 mm long shall be painted with

water bound paints on the ballies from top and two bands (100mm apart) of yellow

reflective tape of width 50mm shall be pasted on top white band. The rate includes

cost of all materials including cement. After execution of all works requiring safety

fencing in particular stretch, the fencing shall be removed with the approval of the

Engineer-in-charge and formation shall be repaired to its profile and released

materials will be contractor’s property.

225 meter 241.00 54225

Total for Bill No. 1 (Carried forward to Summary) 2414940.00

Page 4 of 20

Page 37: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANi(Excl.)-SRPJ(Excl.)section 198 TKM of Ajmer Division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

2001 Earth work in excavation in foundation of bridges to desired profile including

backfilling, compaction of back fill, and disposal of surplus earth as per directions

of the Engineer.

2001 a Soil excluding rock. 40 Cum 233 9320

2001 b Rock not requiring blasting. 15 Cum 246 3690

2001 d Hard Rock requiring blasting, but blasting not permitted, hence to be excavated

by chiselling.10 Cum 492 4920

2004 Providing and laying design mix control concrete M20/M25 in piers, retaining

walls, wing walls, return walls, bottom/top plug of wells and protection work

etc. using well graded stone aggregate of 40 MM/20 MM nominal size.35 Cum 4183 146405

2005 Providing and laying Design mix control concrete M25/M30/M35/M40 in cast-in-

situ RCC works of raft, pile cap, pier, abutment, well steining, RCC well kerb,

well cap, pier cap, Jacketing, dirt wall, return wall, wing wall, fly wing wall,

retaining wall, approach slab, foot path slab, wearing course, ballast retainers,

RCC railing, inspection platform, pedestal, boxes and other miscellaneous works

using well graded stone aggregate of 20 MM nominal size.

300 Cum 5202 1560600

2042 Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2

Cement and ordinary sand mortar including testing of joints but excluding earth

work with all labour and material as a complete job. Cement for mortar will be

paid separately.

2042f 1200 mm dia 5 Meter 6683 33415

Total for Bill No.2A (Carried forward to Summary) 1758350

BILL No.2 : BRIDGES

Bill No. 2A: Bridge work (Other than Steel items)

Page 5 of 20

Page 38: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.)- SRPJ(Excl.)section 198 TKM of Ajmer division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

2076 Supplying TMT Fe-500 reinforcement steel conforming to IS:1786-1985

including decoiling, straightening, cutting, bending, placing in position,

binding with 1MM dia GI binding wire.

Note : Reinforcement, shall be measured in length for different diameters

used in the works and then paid as per standard weights as per IS 1732.

Wastages, overlaps, coupling, welded joints, space bars, chairs and binding

wire shall not be measured and cost of these items shall be deemed to be

included in the rates.

17.5 MT 69596 1217930

Total for Bill No.2C (Carried forward to Summary) 1217930

BILL No.2 : BRIDGES

Bill No. 2C: Supply of Steel items

Page 6 of 20

Page 39: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer divisionof North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in

Rs.

Amount in Rs.

3001 Supply of machine-crushed stone ballast on cess as per RDSO specifications for track

ballast: IRS-GE-1 of June, 2004 from outside railway limits stacked in specified quantities

alongside the proposed alignment on either side of track, in yards and at locations as per

site requirement as directed by the Engineer.

Note 1:

Payment will be made on actual stack measurement for gross quantities without any

deduction for voids in following stages: (i) 95% on receipt at site, acceptance,

measurement, account, proper storage and protection against loss, damage or

deterioration; and (ii) balance 5% after training out.

Note 2:

i)      Wherever sufficient railway land is not available, contractor will have to arrange

land for supply and stacking of ballast at his own cost for which extra payment as per

item no. 3001a will be admissible.

ii) The rate also includes levelling, dressing of ground for stacking of ballast.

1000 Cum 837.00 837000

3001 a Extra over item no. 3001 if ballast is to be stacked in private land in case sufficient

railway land is not available. 250 Cum 30.00 7500

844500

BILL No.3 : BALLAST SUPPLY

Total for Bill No. 3 (Carried forward to summary)

Page 7 of 20

Page 40: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

4001 Supply of P.Way Components

4001 a GFN Liners to RDSO Drg. No. T-3706. 1240 Each 9.09 11271.6

4001 b Combination GFN liners to RDSO Drg. No.T-3707 and T-3708. 1240 Set 29.53 36617.2

4001 c GRSP to RDSO Drg. No.T-3711. 1240 Each 24.99 30987.6

4002 Supply of glued insulated rail joints G3 L 6.5 M long with 10 MM thick end post on PSC sleepers. Rails will be

issued free of cost by the Employer @ 6.5 M for each joint.

4002 a 60 KG Kg rail section as per RDSO Drg No. RDSO/T-5843 10 Each 10923 109230

4002 b 52 KG rail section as per RDSO Drg No. RDSO/T-5361 10 Each 9559 95590

4010 Supplying at site of work including leading, loading, unloading and stacking of Special PSC Monoblock

Sleepers (pre-tensioned type) for B.G. 1 in 8½ Derailing Switch as per RDSO Drg. No.-T-6068 to suite both

52/60 kg rails as per RDSO Design and IRS Specifications No. T-45-96 (2nd Edition) as amended from time to

time with contractor's labour, materials, tools & Plant, equipment and machinery, transport etc complete .1 Set 126917 126917

4012 Supplying at site of work including leading, loading, unloading and stacking PSC turnout sleepers and

approach sleepers for fanshaped layout of 60 kg 1 in 8.5 turnout for B.G 60 Kg. (UIC) rail/52 kg rails to RDSO

Drg. No. T-4865 Alt-5 (for general layout) and drawings thereof with latest alterations if any, complete set

with contractor's labour, materials, tools & Plant, equipment and machinery, transport etc complete .

1 Set 240121 240121

4017 Supply of Grooved Rubber Sole Plates for 1 in 8.5 turnouts for layout Drg no. T-4865 with latest alterations if

any, complete set for the turnout as per IRS specification for Grooved Rubber Sole Plate (6mm thick) for

placing beneath rails Sl. No. T-47-2006 with up to date corrigendum if any

1 Set 29272 29272

4018 Supply of Grooved Rubber Sole Plates for 1 in 12 turnouts for layout Drg no. T-4218 with latest alterations if

any, complete set for the turnout as per IRS specification for Grooved Rubber Sole Plate (6mm thick) for

placing beneath rails Sl. No. T-47-2006 with up to date corrigendum if any

1 Set 38418 38418

718424.4

Payment Conditions for items of this Bill:

d) Indemnity bond for entire cost of material supply.

(2)       The remaining 10 % payment shall be made after commissioning of the portion of the work or handing over of the material to the employer's / Railway's

Representative, required for maintenance purposes.

Note: The transportation charges from sleeper manufacturing plant to supply point in the project area as directed by Engineer are inclusive in the rates of special

sleepers. Item No.5031 of Bill No. 5 is for the further movement of the sleeper in project area if required as per the site conditions.

c) Quality Assurance documents.

BILL No.4 : PERMANENT WAY SUPPLY

Bill No. 4 A: P.WAY SUPPLY (Other than Steel Items)

(1)  90% payment shall be made on receipt, acceptance, accountal and taking into custody of complete materials. The invoices shall be accompanied by the following :

a) Supplier's challan and manufacturer's challan.

b) Inspection certificate issued by Employer's/Engineer's nominated inspecting agency.

Total for Bill No. 4A (Carried forward to summary)

Page 8 of 20

Page 41: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

4021 Supply of P.Way Components

4021 a ERC to RDSO Drg. No.T-3701 2480 Each 70 173600

4021 b ERC "J" to RDSO Drg. No.T-4158 25 Each 77 1925

4021 d Supply of rail screws to RDSO Drg. No.T-1035/10675 10 Each 31.74 317.4

4022 Supply of Fish plates

4022 a 60 KG as per Drawing No. T -1898 20 Each 1324 26480

4022 b 52 KG as per Drawing No. T- 090 (M) 20 Each 834 16680

4024 Supply of fish bolts with nuts for 60 KG, 52 KG rails as per RDSO Drawing No.T-1899, T-11501. 50 Each 62 3100

4025 Supply of joggled fish plates (2 No. per set) with 4 pair clamps, 4 No. Bolts & Nuts and 8 No. special

washers.

4025 a For 60 KG as per RDSO Drawing No. T -4016/T-5849 4 Set 3620 14480

4025 b For 52 KG as per RDSO Drawing No. EDO/T-620 or T-5848 2 Set 2837 5674

4026 Supply of Fish plates one meter long as per standard drawing of RDSO

4026 a 60 KG rail (As per RDSO Drg.No.T-5916/T-5851 ) 2 Each 1597 3194

4026 b 52 KG rail (As per RDSO Drg. No. T-5915/ T-5850 ) 2 Each 1280 2560

4029 Supply of 52 kg 1 in 8.5, 6400mm OR Switch confirming to RDSO Drg. No. T-4866 with latest

alteration, if any complete with all parts as listed in the drawing with check rails (excluding fish plates,

Fish bolts & nuts, GRSPs, Liners and ERCs).

1 Set 73312 73312

4031 Supply of 52 KG 1 in 8½ Derailing Switch conforming to RDSO Drg No. 5836 with latest alteration, if

any complete with all parts as listed in the drawing including GRSPs (excluding fish plates, fish bolts &

nuts, Liners and ERCs).Note: Rails will be issued free of cost by the employer.1 Set 45346 45346

4032 Supply of 52 kg CMS Crossing for 1 in 8½ PSC Layout conforming to Drg No. T-4867 with latest

alterations complete with all parts as listed in the drawing (excluding fish plates, fish bolts & nuts,

GRSPs, Liners and ERCs).

1 Nos 164805 164805

NS 4039 Supply of plate scews to RDSO Drawing No T-3912500 each 31 15500

546973

Payment Conditions for items of this Bill:

d) Indemnity bond for entire cost of material supply.

(2)       The remaining 10 % payment shall be made after commissioning of the portion of the work or handing over of the material to the employer's / Railway's Representative, required for maintenance purposes.

BILL No.4 : PERMANENT WAY SUPPLY

Bill No. 4 B: P.WAY SUPPLY (Steel Items)

Total for Bill No. 4B (Carried forward)

(1)       90% payment shall be made on receipt, acceptance, accountal and taking into custody of complete materials. The invoices shall be accompanied by the following :

a) Supplier's challan and manufacturer's challan.

b) Inspection certificate issued by Employer's/Engineer's nominated inspecting agency.

c) Quality Assurance documents.

Page 9 of 20

Page 42: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

5001 Leading upto 100m lead and putting in track/formation of ballast from measured stacks along

side track or on formation or unloaded ballast by contractor's own means and putting the same

into track uniformly to form profile as per IRPWM in following phases: (i) Laying of first layer to form

level bed for sleepers with top surface dressed including mechanical compaction; (ii) Filling ballast in

cribs and making up shoulders; and (iii) Recouping shortages after each packing and finally making

profile as per IRPWM.

1000 Cum 91 91000

5004 Cutting of 60 KG, 52 KG, 90 R rails with contractor’s Abrasive Disc Cutter complete including men,

material, fuel etc. true to square.300 Each 290 87000

5005 Drilling 26.5 MM, 32 MM diameter holes with Rail Drilling Machine in web of 60 KG, 52 KG, 90 R

rails in track or on cess at correct locations including chamfering. 100 Each 70 7000

5006 Transportation of rails, switches, crossings, etc. (supplied by RVNL) from point of issue to their final

location of laying in track

5006 a Average lead, from the place of issue upto the middle point of location of laying in each KM, upto 10

KM 70 MT 272 19040

5006 b Incremental rate for lead beyond 10 KM under item 5006 (a) above 2280 MT KM 5.53 12608.4

5007 Installation of BG track as per methodology specified in para 4.0 of Section 5: Specifications in the

Bidding Documents or any other methodology approved by the Employer in all locations e.g.

straight, curves, bridges, level crossings, yards, etc including installation of SEJ and glued joints

including installation and dismantling of auxiliary track. Note: 60% of the rate shall be paid after

placement of the sleepers, rails, fastening, initial squaring and correcting sleepers spacing

450 Track Meter 314 141300

5008 Installation of PSC fan shape turnouts, derailing switches 60 KG / 52 KG including lead rails as per

RDSO layout drawings including katcha packing with bars or off track tampers for 20 KMPH speed.

Activities of rail cutting, drilling of holes, welding of joints and transportation are not included in this

item and shall be paid separately under relevant items.

5008 b Turnouts 1 in 81/2 1 Each 42249 42249

5008 c Derailing switches 1 Each 10618 10618

5016 Provision of Buffer stop of 60 KG, 52 KG, 90 R rail section as per plan including painting with

luminous paint etc. as directed by the engineer.

Note: Rail required for this item will be issued free of cost by the Employer.

1 Each 31521 31521

5026 Dismantling of existing BG track, turnouts, derailing switches, dead ends, sand humps, etc. of any

rail section and any type of sleepers of any density and transporting all released material including

sleepers, rails, switches, crossings and fittings & fastenings to the nearest station or manned level

crossing or road loading point as directed by the Engineer.

5026 a Plain track including SEJ and Glued Joints and track at level crossing, bridge & bridge approaches and

sharp curves with check rails50 Track Meter 104 5200

5028 Scarifying, digging existing caked Ballast upto the depth as directed by the Engineer, removal and

screening of Ballast, removal and disposal of muck, dressing of formation to the required profile and

putting back the screen ballast in track.

50 Per Track meter 66 3300

5030 USFD testing of 60 KG, 52 KG rail welds (Flash Butt / SKV) as per RDSO Manuals and submitting

reports on proforma as directed by the Engineer. 90 Each 47.56 4280.4

BILL No.5 : PERMANENT WAY LINKING

Bill No. 5A : P.Way Linking (Installation Work)

Page 10 of 20

Page 43: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway Package-1

5031 Transportation of PSC sleepers including special sleepers for SEJs, check rails, guard rails and turn

out sleepers from the place of issue (in case of sleepers issued free of cost by RVNL) and from

stacking place acceptable to Engineer at work site ( in case of supplied by the contractor ) to their

final location of laying.

Note:

1. For the purpose of payment each turnout sleeper will be considered as 1.5 No. of ordinary line

sleeper. All other special sleepers shall be considered on par with ordinary line sleeper.

(2) 100% payment shall be made on transportation to designated site as directed by

employer/engineer.

(3) The item is intended for transportation of sleepers issued free of cost by the employer or

supplied by the contractor in P.Way supply schedule in the project area. However, if the sleepers to

be issued free of cost by the employer are made available at the sleeper plant and loading of

sleepers is done by concrete sleeper plant even then the rate quoted in the item shall be applicable

subject to recovery @ Rs.10/- per track sleeper.

(4) Rate includes multiple handlings.

5031 a Average lead upto 2 KM (from place of issue to middle point of kilometer of laying in track) 693 Sleeper 49.77 34490.61

5031 b Incremental rate for lead beyond 2 KM for every km additional lead upto 30 kms over item (a)

above 19404 Sleeper KM 1.66 32210.64

5031 c Incremental rate for lead beyond 30 KM for every KM additional lead upto 60 KM over item (a) & (b)

above20790 Sleeper KM 0.63 13097.7

5031 d Incremental rate for lead beyond 60 KM for every KM additional lead upto 250 KM over item (a),

(b) & (c ) above110880 Sleeper KM 0.36 39916.8

5033 Painting of particulars of 1 in 16, 1 in 12 and 1 in 8 ½ turnouts and derailing switches including turn

in curves on the inside web of outer rail with stencils of specified height in black enamel paint on

surface of specified length painted with two coats of yellow enamel paint over a primer coat painted

after cleaning the surface free from dust and dirt.

1 Turn Out 774 774

5034 Fouling marks of size 150x250x225 MM in M20 grade cement concrete including engraving the

letters “FM”, white washing with two coats and painting the letters in black enamel paint indicating

the numbers of vehicles duly fixed at site.

1 Each 476 476

576082.55

NOTE:

4)    Track laying -

a)       For mechanized laying of track only service rails will be made available by RVNL. All other materials such as wooden blocks, fish plates, rail screw etc. will have to be arranged by contractor. The rails will be

b)       Manual linking of track may be permitted by the Engineer where mechanical linking is not feasible due to constraints in working. Only 90% of the accepted rates shall be payable in case of Manual linking.

5)    During the maintenance of track after commissioning, all arrangement for transportation of labour, T&P etc will have to be done by contractor at his own cost. Necessary T&P for track maintenance will be

produced by the contractor including consumables. The rate includes all such requirements.

6)    The payment of rail cuts and drilling holes will be done as per final layout of mainline/loop line /sidings and turnouts etc. Rail cuts/ hole drilling required for temporary working will not be paid.

3)    The welds found defective in USFD, shall have to be replaced by the contractor at his own cost.

Total for Bill No. 5A (Carried forward)

1)    In case of work being executed under traffic block, extra payment will be made for the item of work over and above the accepted rate of the item @ 50% of the accepted rate of the item for day time working

under traffic block and @ 100% of the accepted rate of the item for night time working under traffic block for BOQ item no. 5007, 5008, 5010 & 5026. Rates include lighting arrangement as per requirement and to the

satisfaction of the Engineer

2)    Rates for all the items of this bill except those mentioned in note 1) above include day as well as night working and lighting arrangement as per requirement and to the satisfaction of the Engineer.

Page 11 of 20

Page 44: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North western Railway Package-1

S. No. Description of Item Qty Unit Rate in

Rs.

Amount in Rs.

5053 Alumino thermit welding of 60kg/52 kg rail joints or combination joints of 60kg/52kg rail by

pre-heat (SKV) welding technique using compressed air petrol/LPG for preheating, three piece

moulds and automatic tapping thimbles with all labour, materials including supply of portion,

tools and plants, aligning of rails, placing & fixing of mould, preheating, welding, mechanised

trimming, grinding with profile grinder (including riser), testing, marking, painting with one

coat of high build epoxy paint (two pack conforming to RDSO specification no. M&C/PCN-

111/88) on the welded area up to 10 cm on either side. The work is to be completed in all

respects as per IRS: T-19-1994 with latest updates and in accordance with “RDSO Manual for

Fusion Welding of Rails by Alumino Thermic Process with up to date correction Slips. The work

to be done under supervision of trained welding supervisor and carried out by trained welder

having valid competency certificate from RDSO/TPP, Lucknow. Ultrasonic testing of welded

joints shall be paid separately under relevant items.

Note: 1) In case only portion is supplied by the contractor but welding is not done the rate

shall be payable @ 60% of the item rate.

2) In case welding portion is supplied free of cost by RVNL, the rate shall be payable @ 40% of

the item rate.

3) The above provision in note (1) & (2) shall be operated with the specific approval of CPM.

90 Each 3292 296280

296280

BILL No.5 : PERMANENT WAY LINKING

Bill No. 5B : P.Way Linking (Supply and Installation works)

Total for Bill No. 5B (Carried forward)

Page 12 of 20

Page 45: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway Package-1

S.No. Description of Item Qty Unit Rates in Rs Amount in Rs6001 a Service building of single storey (foundation to be designed to take load of double storey) with

open foundation upto 1.2 m depth from ground level and plinth height upto 0.6m from ground

level with floor height upto 3.35m.

712.5 Sqm 15750 11221875

6001 e Extra payment for provision of internal sanitary and water supply installations

265.5 Sqm 630 167265

6001 f Extra for every 0 .3 m or part thereof higher plinth over normal plinth height of 0.6m(on ground

floor area only) 0 Sqm 283.5 0

6002 Construction of residential buildings for staff accommodation near railway stations, level crossings

or any other nominated location as per layout drawings and standard railway plans for each type of

staff quarters, provided by the employer and detailed specifications provided in para 4.3 of

section 5: works requirements of the bidding documents including structural design and

preparation of detailed structural drawings. Rate includes cost of cement steel, internal water

supply and sanitary installations and all other materials and labour.

6002 a Type I,II,III Single storeyed floor height upto 2.9 m 663 Sqm 12180 8075340

6002 b Type IV Single storeyed floor height upto 2.9 m 227.5 Sqm 13440 3057600

6002 l Extra for every 0 .3 m or part thereof higher plinth over normal plinth height of 0.6m (on ground

floor area only) 0 Sqm 283.5 0

6002 a Type I,II,III double storeyed floor height upto 2.9 m 663 Sqm 11865 7866495

NS 6006 Extra payment for provision of internal sanitary and water supply installations for (A)

Type I,II,III Single storeyed floor height upto 2.9 m663 Sqm 1461.6 969040.8

NS6007 Extra payment for provision of internal sanitary and water supply installations for staff qtrs( B) Type

IV Single storeyed floor height upto 2.9 m227.5 Sqm 1612.8 366912

31724527.8

BILL No.6 : BUILDINGS

TOTAL VALUE FOR BILL No.6

Page 13 of 20

Page 46: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North Westetn Railway Package-1

S. No. Description of Item Qty Unit Rate in

Rs.

Amount in Rs.

7002 Providing and laying 1:3:6 cement concrete in foundation and floor using well graded stone

aggregate of 40 mm/20 mm nominal size.550 Cum 2188 1203400

7003 Cement Concrete 1:2:4 (cast in-situ/precast ) for Rail level platform wall, coping of platforms,

drains and in other miscellaneous works.400 Cum 2058 823200

7004 Earth work in filling with contractor's earth of approved quality in platform, circulating area,

level crossing and other areas including all lead and lift in layers not exceeding 30 CM in depth

including mechanical compaction and watering to achieve the desired compaction as per

specifications.

2500 Cum 175 437500

7005 Earth work in cutting in foundation, trenches, drains, etc in all kinds of soil including dressing of

sides, ramming of bottoms, back filling of trenches, getting out the excavated soil and disposal of

surplus excavated soil with all lead and lift as directed by the Engineer.

7005 a In all kinds of soil 1750 Cum 131 229250

7016 Providing and fixing pre-painted galvanised sheet 0.6 MM thick with corrugated or trafford

design on previously erected purlins or wall frame work for roofing. The colour coating shall be

polyester coating over hot dipped galvanised sheet and the sheets will be of minimum high tensile

strength of 275 MPa variety. The fixtures used for fixing the sheets shall be as per manufacturer's

specifications. Measurement shall include area of MS sheet, valley gutter, ridges etc excluding

overlaps. The rate includes provision of 110 MM dia PVC rain water pipes, j bolts & other fixtures,

painting of station name on both ends of COP in tri-lingual format.

527.5 SqM 659 347622.5

7017 Providing GI pipes including laying & jointing with all fittings making connections to water

hydrants including connection to source along with excavation & refilling etc. complete. (External

Water supply only)

7017 a 15 MM Dia 112.5 Meter 118 13275

7017 b 20 MM Dia 112.5 Meter 146 16425

7017c 25 MM Dia 35 Meter 197 6895

7021 Brick work with bricks of class designation 75 for miscellaneous works in:

7021 a Cement motor 1 : 6 (1 cement : 6 coarse sand) 100 Cum 2310 231000

3308567.5

Note :

BILL No.7: PLATFORM, PASSENGER AMEINITIES AND MISCELLANEOUS WORKS

TOTAL VALUE FOR BILL No.7A (Carried forward to summary)

1.     All materials, equipment, labour, casting beds, stress frames, form work staging, scaffolding, etc. is to be arranged by the contractor within the

quoted rates.

2.     All design mix concrete shall be machine batched with automatic weight batcher, machine mixed and machine vibrated or ready mix concrete

prepared in depot and transported by transit mixer to the site of work.

3.     Prior to demolishing of any structure measurements have to be taken, scheme of dismantling has to be got approved from the Engineer.

Page 14 of 20

Page 47: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North Westetn Railway Package-1

4.     Wherever, cement, Reinforcement steel are required to be consumed in the item, the rates are exclusive of cost of these materials unless otherwise

specified and the same shall be paid separately under relevant items for supply of these materials.

Page 15 of 20

Page 48: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.)-SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in

Rs.

Amount in Rs.

7061 Providing FOB, platform shelters, height gauge, columns, beams, trusses and other steel

components of miscellaneous works duly launched in position with or without traffic block as

directed by Engineer with contractors steel conforming to IS:2062-1999 including fabrication,

assembly, erection, launching, riveting/welding, bolting, initial coats of zinc chromate priming

conforming to relevant IS specification and three subsequent coats of aluminum paint of approved

quality conforming to IS:2339 after final erection on all surfaces complete. Rate is inclusive of

supply and fixing of MS holding down bolts for IRS type platform shelters and FOBs with required

angles.

170 MT 85128 14471760

14471760

Note :

BILL No.7: PLATFORM, PASSENGER AMEINITIES AND MISCELLANEOUS WORKS

Bill No. 7B: Platform, Passenger amenities and miscellaneous works (Steel items)

5.     Wherever, cement, Reinforcement steel are required to be consumed in the item, the rates are exclusive of cost of these materials unless

otherwise specified and the same shall be paid separately under relevant items for supply of these materials.

TOTAL VALUE FOR BILL No.7B (Carried forward to summary)

1.     All materials, equipment, labour, casting beds, stress frames, form work staging, scaffolding, etc. is to be arranged by the contractor within the

quoted rates.

2.     1:4:8, 1:3:6 and 1:2:4 indicate, concrete prepared using volumetric mix in proportion of cement : coarse sand : stone aggregate of specified size

respectively.

3.     All design mix concrete shall be machine batched with automatic weight batcher, machine mixed and machine vibrated or Ready mix concrete

prepared in depot and transported by transit mixer to the site of work.

4.     Prior to demolishing of any structure measurements have to be taken, scheme of dismantling has to be got approved from the Engineer.

Page 16 of 20

Page 49: Volume 2 Package 1 03-03-2015

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North Western Railway Package-1

S. No. Description of Item Qty Unit Rate in Rs. Amount in Rs.

8001 Supply of 43 grade cement OPC conforming to IS: 8112 with latest amendments and using

the same in the work as per RVNL's approved mix design as per RVNL's prescribed rates of

consumption including all lead lift, labour, loading unloading, ascent, descent, crossing of

Railway lines(s), royalty, taxes, transport (contractor's own), tools and plant complete.

5000 Bag of 50kg. 312 1560000

8002 Supply of 53 grade cement OPC conforming to IS: 12269 with latest amendments and using

the same in the work as per RVNL's approved mix design as per RVNL's prescribed rates of

consumption including all lead lift, labour, loading unloading, ascent, descent, crossing of

Railway lines(s), royalty, taxes, transport (contractor's own), tools and plant complete.

4000 Bag of 50kg. 312 1248000

2808000

Bill No.8 : Supply of Cement

TOTAL VALUE FOR BILL No.8 (Carried forward to summary)

Note : OPC cement has to be supplied as per requirement of the work in terms of RVNL standard specifications for material and works. Payment against

supply will be made only after consumption of cement in the relevant items of work.

Page 17 of 20

Page 50: Volume 2 Package 1 03-03-2015

BOQ of RaNI -SRPJ Package -1

9001 Providing site offices for Employer with Contractor's material, Labour,

Tools and Plant, Equipment etc. including provision of Water Supply,

Drainage, Power arrangements, office maintenance as per the details

mentioned in clauses 3.1 to 3.2.8 & 3.5 to 3.5.2 of Chapter 3 (Site Facilities

for the Employer and the Engineer) of Section 5 (Work's Requirement) of

Tender Documents.

Note 1: This item is provided with the contention that new site offices will

be constructed for this purpose and 75% payment of the accepted rates will

be made after making available functional office, balance 15% payment

shall be made at the end of the completion period and the remaining 10%

will be paid after clearance of site by the contractor .

Note 2: Alternatively if suitable accommodation is available on hire basis at

suitable location acceptable to the employer, the contractor can arrange the

same under the item but in such a case the payment shall be regulated as

below.

(a) 10% payment shall be made on completion of one month from the date

of making available the office fit for functioning.

b) Remaining 90% payment shall be paid in equal monthly instalments that

is (0.9xQuoted rate) / (Stipulated Completion period in months + defect

liability period in months). In case stipulated period gets extended on any

account no additional payment shall be made for the item.

Per Sq.m.

of Plinth

area

10657 204 2174028

9002 Providing Furniture as given under clauses 3.3, 3.3.1 of Chapter 3 (Site

Facilities for the Employer ) of Section 5 (work's Requirement) of Tender

Documents.

Note : Payment shall be made @ 75% of the accepted rate after making

available the furniture items in functional office, balance 15% payment shall

be made at the end of the completion period and the remaining 10% will be

paid after clearance of site by the contractor.

L S Per

Site Office827760 1 827760

9003 Providing Road Vehicle mentioned below for the use of

Engineer/Employer as per the Conditions mentioned in Clause 3.4.3, i.e

3.4.3.1 to 3.4.3.3 of Chapter 3 (Site Facilities for the Employer and the

Engineer) of Section 5 Work's Requirement) of Tender Documents.

9003a Tavera , Innova or similar Vehicle

months

44492 813603852

9003b Tata Sumo, Bolero or similar Vehicle

months

38284 225 8613900

9003c Extra for running and maintenance of Every additional Km over and

above Kms included under item 9000-3aPer km 10.35 2386 24695

9003d Extra for running and maintenance of every additional Km over and

above Kms included under item 9000-3bPer km 8.28 5660

46864.8

15291100

Grand total carried forward to summary 15291100

Total value for bill no. 9

BRIEF DESCRIPTION OF ITEMS Unit

BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer

Division of North Western Railway

SITE FACILITIES

Rates as

per SBDQty

Total Cost in

Rs.

Page 18 of 20

Page 51: Volume 2 Package 1 03-03-2015

BOQ of RaNI -SRPJ Package -1

Page 19 of 20

Page 52: Volume 2 Package 1 03-03-2015

Package-1

BOQ for Railway Electrification works between RANI (Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer division of North western Railway

Item No.DESCRIPTION of North-Western Railways Unified Standard Schedule of

Rates 2010 Quantity Unit

Rate in %age

above

Amount in

Rs

10001

Execution of item(s) of works covered by chapter 1 to 25 of USOR -2010

of North Western Railway.

Note: This bill will be operated for only those works wwhich can not be

executed by operation of BOQ items in bill no. 1 to 9.

562151 Rs 12.1 630172

630172

630172

Bill No. 10 (Other items of work not covered in Bill No. 1 to 9

Total

Total for Bill no.10 ( Carried forward)

Page 53: Volume 2 Package 1 03-03-2015

Bill of Quantities

(Signal & Telecom

Engineering)

Page 54: Volume 2 Package 1 03-03-2015

 

Page 55: Volume 2 Package 1 03-03-2015

S.No. ITEM NO DESCRIPTION OF WORK UNIT Rate QTY. total Amount

Group - C

1 38651 Supply of underground Jelly filled 0.9 mm dia 6 Quad Telecom cable. Kms 245057.79 14 3430809.06

2 38653 Supply of PIJF cable of size: 10 PAIR X 0.63 MM. Kms 63470.81 18 1142474.58

3 38654 Supply of PIJF cable of size: 20 PAIR X 0.63 MM. Kms 95087.39 18 1711573.02

4 38657 Supply of 24 Fibre armoured Optical fiber cable as per SPEC No.IRS.TC-

55/2006 ver.-1 with ammendments.

Kms 57079.00 60 3424740.00

5 38701 Supply of RCC pipes 150mm dia, 2 Mtr long along with collars Mtrs. 119.35 682 81396.70

6 38702 Supply of DWC pipe of size 120 mm outer dia & 102 mm inner dia. Mtrs. 189.92 682 129525.44

7 38703 Supply of SPLIT DWC pipe of size 200 mm outer dia & 175 mm inner dia. Mtrs. 236.62 27273 6453337.26

8 38704 Supply of Galvanized Iron pipe 100 mm dia `B' class with end clamps Mtrs. 820.90 455 373509.50

9 38705 Supply and jointing of Quad cables with theromoshrinkable jointing kits Nos. 4077.52 14 57085.28

10 38902 Supply of Electronic magneto telephone desk type. Nos. 2407.70 10 24077.00

11 40004 Supply of 4 wire way station equipment as per Spec. no. TC. 38/97 or latest. Nos. 4630.21 41 189838.61

12 40005 Supply of Power Supply for telecom installation at way side equipment as per

TEC Spcn. IRS.TC-72/97 Amdt.1 or latest.

Nos. 3623.41 41 148559.81

13 40006 Supply of portable Emergency telephone 4 wire as per spec. no. IRS TC:75-99

with latest amendment

Nos. 2205.55 18 39699.90

14 40008 Supply of Emergency Socket Box with socket six pin flat to RDSO Spec No.

IRS: TC. 42/87. Amdt. 1 or latest.

Nos. 2205.55 9 19849.95

15 40009 Supply of VF Tapping Transformer to RDSO Spec. No. IRS.TC-22-76 of type

470:1120, 600:470, 600:1120. exact break up to be decided in consultation

with engineer.

Nos. 580.26 182 105607.32

16 40102 Supply of FCPC To SCPC 10 meter long patch cords with 0db adaptors as

TEC spec G/OJC-01/03 JAN99 Or latest.

Nos. 1473.55 68 100201.40

17 40103 Supply of managed Expendable rack type STM-1 ADM L 1.1 as per

Technical Spec. No. TEC GR No. GR/SDH-04/02 Mar 02 with amendment 1 ,

2 ,3 & 4 or latest with STM-1 aggregate interface , 21 E1S and 4 Numbers of

10/100 Base T Ethernet Port order wire, power supply unit, sub rack

installation material and accessories manual etc.The equipment should be fully

wired for its ultimate capacity and provide redundency for power supply and

synchronisation and other detail as given in chapter 3 (model - TJ 100 MC1).

Nos. 154131.91 15 2311978.65

18 40104 Supply of SMPS based battery chargers for telecom use 48v, 25 amps in N+1

configuration using 2 modules of 25 A (FR/BC) with automatic switching

between the modules N=2.

Nos. 55184.04 15 827760.60

19 40105 Supply of 200 AH capacity LM batteries 24 Nos. at each station with required

no. of porcelene insulator. The suitable wooden rack for keeping batteries

shall also be supplied and it should be painted with 2 coats acid resistnt paint.

Nos. 49860.40 15 747906.00

BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR

Page 56: Volume 2 Package 1 03-03-2015

S.No. ITEM NO DESCRIPTION OF WORK UNIT Rate QTY. total Amount

Group - C

BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR

20 40356 Supply of Speaker cable 2 Core Shielded & screened of size 47/0,193 as per

IS-694Cable for modification of existing PA System

Mtrs. 41.21 12273 505770.33

Total of SOR Items (Group C) 21825700.41

NS Items:

21 NS 3 Supply, Installation and commissioning of 4 wire DTMF Control Office

equipment and emergency control office equipment and connecting to the

power supply equipment.

Nos. 14870.65 5 74353.25

22 NS 7 Supply of Earth tester - Digital Motwane make Nos. 14468.00 2 28936.00

23 NS 8 Supply & fixing of PVC Conduit pipe 25 mm dia and thickness 1.5 mm with

suitable clamps at interval of 1 mtr.

Mtrs. 44.85 1227 55030.95

24 NS 9 Supply of Network Monitoring System (NMS) including associated application

software for 2 mb drop insert mux and its associated item as per technical

spec. and office stipulation detailed with all accessories incl. Power supply as

well as one soft copy of software. (Refer. Telecom special conditons : Chapter-

3).

Nos. 106030.00 1 106030.00

25 NS 10 Supply of Network Monitoring System (NMS) including associated application

software for STM-1 and its associated item as per technical spec. and office

stipulation detailed with all accessories incl. Power supply as well as one soft

copy of software. (Refer. Telecom special conditons : Chapter-3).

Nos. 106030.00 1 106030.00

26 NS 11 Supply of local craft terminal as per technical spec. and other stipulations

complete with all accessories compataible with NMS.(Refer. Telecom special

conditons : Chapter-3).

Nos. 54970.00 1 54970.00

27 NS 12 Supply of remote service terminal as per tech. Spec.and other stipulations with

all accessories compataible with NMS. It should be possible to plug in remote

service terminal at any of the station. It should be capable to programme any

network element from any location of network and read the full status of any

element in the network from remote service terminal, as well as one soft copy

of the software .(Refer. Telecom special conditons : Chapter-3)

Nos. 129668.25 1 129668.25

28 NS 13 Supply & Provision of Surge protection device for AC Power line incoming,

complete for Single phase power protection

Nos 24955.00 12 299460.00

29 NS 14 Supply of 2T Transformer . Nos. 1008.00 23 23184.00

Total Cost of NS Items (Group-C) 877662.45

TOTAL (Group-C) carried forward to summary 22703362.86

Page 57: Volume 2 Package 1 03-03-2015

S.NO

.

ITEM

NO

DESCRIPTION OF WORK UNIT Rate QTY. Total Amount

Group - D

1 39652 Excavation of cable trench of 1 m. depth & 300 mm.

wide across the track crossing, road crossing, level

crossing, platform & refilling.

Kms. 51262.94 40 2050517.60

2 39653 Providing chase in hard rock. Mtrs. 94.98 4545 431684.10

3 39654 Perforation and Fixing of GI pipes on girder bridges,

RCC bridges, drains, culverts, rocky places

tunnels/deep cutting.

Mtrs. 36.44 455 16580.20

4 39655 Fixing/ laying of DWC/RCC pipes(FOR SIGNALING

& TELECOM WORK)

Kms. 30018.70 2 60037.40

5 39656 Laying of signaling / power / telecom / quad/OFC

cable of various sizes in trench and pipes.include

Testing of point to point insulation / continuity test for

all laid out cables, Measuring Parameters and

preparing the records

Kms. 4115.00 41 168715.00

6 39657 Placing of half round ( Split DWC ) pipe over the laid

cable in open trenches.

Kms. 2669.33 20 53386.60

7 39658 Supply and Fixing of 20 pair CTB and termination of

quad/ jelly filled cable.

Nos. 3324.24 27 89754.48

8 39901 Supply and Installation of Maintenance Free

Earthing and Bonding System as per RDSO

specification

Nos. 33770.34 20 675406.80

9 40502 Installation and commissioning of 4 wire way station

equipments, power supply unit at SP/SSP/Station/

TSS/AEN/PWI/SI offices/ Residences. The

installation of way station equipment and power

supply unit (supply covered under a separate item)

shall be mounted on a MS angle rack. All the

materials for installation, commissioning of 4 W

equipment and power supply unit shall be provided

by contractor.

Nos. 2331.19 41 95578.79

BOQ OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ (PKG-I) OF NWR

Page 58: Volume 2 Package 1 03-03-2015

S.NO

.

ITEM

NO

DESCRIPTION OF WORK UNIT Rate QTY. Total Amount

Group - D

10 40503 Installation of emergency socket box including

socket on the Rail Post in the section and yard at

every one Km distance as pertapping chart supplied

by the survey team. this will include wiring and

termination of quad cable on the socket box

mounted at 1 mtr hight, clamped with 2 nos. U-

Clamps, provision of concreate foundation of rail

post in such a way that the rail post is one meter

above the earth level. The concrete shall be in ratio

of 1:3:6 of cement, sand & stone chips. The

contractor shall jointly test with RVNL Engineer for

its satisfactory operation. This includes painting of

emergency socket post with alternate yellow and

black strip of 6" width and paiting of the socket box

with gray colour paint and painting of arrows on the

telephone posts/cable markers to show the nearest

Emergency socket as instructed by engineer at site.

Rail Posts and MS pipes of required lengths for

fixing Emergency sockets will also be supplied and

installed by the Contractor.

Nos. 1858.19 10 18581.90

11 40601 Supply and installation of OFC cable joint enclosure

as per TEC No. G/OJC-01/03 Jan 99 or latest and

splicing o optical fibre cables (24 Fibre) and testing.

Nos. 8649.87 45 389244.15

Page 59: Volume 2 Package 1 03-03-2015

S.NO

.

ITEM

NO

DESCRIPTION OF WORK UNIT Rate QTY. Total Amount

Group - D

12 40603Supply of 2 MB programmable primary digital drop

insert multiplexer with conference facility as per

specifications IRS:TC/68/2004 with latest

amendments & other stipulations of tender

document fully wired for 30 channels complete with

power supply unit, remote control supervision facility

& all other accessories installation materials,

manuals etc. It should have facility to accomodate

data interface cards in multi drop mode & should be

able to support card needed for video conference.

NOTE : 1) in case the cards contain less than 8

circuits or 6 circuits as mentioned above suitable

number of cards to equal the total requirements of

circuits must be supplied. 2) If the card contains

more than 2/6/8 ports per card as mentioned in the

schedule, the tenderer shall still supply the number

of cards asked for. The number shall not be scaled

down as per the number of ports.

Nos. 92372.01 11 1016092.11

13 40604 (i) 4 wire, E&M, VF interface cards (8 circuits per

card).

Nos. 30712.42 0 0.00

14 40604 (ii) subscriper loop interface cards (6 circuits per

card).

Nos. 27487.94 11 302367.34

15 40604 (iii) ISDN Interface (Two BRI Ports per card) Nos. 19761.66 11 217378.26

16 40604 (iv) Exchange loop interface cards (6 circuits per

card).

Nos. 23993.54 11 263928.94

17 40604 (v) G 703, 64 kbps data interface cards with a

minimum of 8 ports per card.

Nos. 29453.54 11 323988.94

Page 60: Volume 2 Package 1 03-03-2015

S.NO

.

ITEM

NO

DESCRIPTION OF WORK UNIT Rate QTY. Total Amount

Group - D

18 40605Supply, installation testing & commisning including

earthing of 42 u 19" covered racks for housing SDH

and P- MUX equipments, DDF, FMS, MDF, using

krone module etc. Complete with all fittings, wired

and equipped with integrated protection modules

for all channels and adequate numbers of cooling

fans ,AC/DC power supply distribution panels, U-

Link panels and other hardware like runway, ladders

etc. It should be possible to lock all the equipments

with only order wire telephone remaining outside the

rack. The rack should be of APW President/Rittal

make. The components of the rack are specified

below. Broad description of rack is detailed below

.Rack size 2200(mm) H x 600(mm) W x 600( mm)

D. Fixed side panels 42 U x 600 (mm) D front glass

door plain 42 U x 600 (mm) D rear MS door plain 42

U x 600 (mm) D leveling screws - 4 numbers .Fan

directly mounted on top 48 V DC 90 CFM - 2 Nos.

earth connectivity kit - 1 No. Cable manager with

cable loops-2nos.

Nos. 35779.77 11 393577.47

19 40106 Blowing of armoured Optical Fiber Cable into duct

by using blowing machine and associated works

.Before blowing the duct integrity shall be tested .If

any defect shall be found during duct integrity test ,

the entire length of HDPE duct from one chamber to

another chamber chamber is to be replaced by

Contractor at free of cost.

Kms. 9901.92 30 297057.60

20 40806 Supply and placing of second class bricks of size

225x100x75 mm (9 bricks per mtr) horizentally

breath wise in the trench after covering the laid

cable with soft soil of 50 mm thickness.

Nos. 4.85 327273 1587274.05

Total Cost of SOR Item (Group D) 8451151.73

NS Items:

Page 61: Volume 2 Package 1 03-03-2015

S.NO

.

ITEM

NO

DESCRIPTION OF WORK UNIT Rate QTY. Total Amount

Group - D

21 NS-18 Excavation of cable trench 1.2m deep x 300mm

width as per Technical Specifications 51.2, at track

& roads crossing, laying of DWC pipes, as per Drg.

No. RVNL/S&T/SG 024/2005, refilling of trench,

ramming. HDPE pipe shall be laid at the bottom of

the trench and after refilling with seived earth by 150-

200 mm, 6 quad cable shall be laid and restoring the

earth to original condition.

Kms. 67620.00 51 3448620.00

22 NS-19Horizontal directional drilling for laying of HDPE

125/200mm dia pipe 1.4 Meter to 2.1 meter below

the formation of Earth level below ballast, As per

drawing and instruction of Engineer at site. Terms &

Conditions A) The rate shall include Horizontal

direction drilling at any intermediate obstruction,

either natural or manmade any boundary strata. B)

The rate is inclusive of all material equipments and

labour required during trench less horizontal

directional drilling under. C) The pipes are to be laid

under Railway track/Platform/Pucca Circulating area

etc. Necessary arrangement to be provided and all

precautions are to be taken so that bore coming out

at either end is not deviated from the Horizontal

level by more than 250mm in horizontal. D) The rate

is inclusive of detection and protection of

underground utility encountered during boring. E)

The payment shall be made for boring only when

HDPE pipe is provided in the above

Mtrs. 1500.00 1700 2550000.00

23 NS-20 Testing & commissioning of complete OFC system. System

(Nos.)

230000.00 1 230000.00

24 NS-25 Initial charging of Secondary cells:- 0.00

25 NS-28 2 Volts, 200 AH Nos. 266.00 360 95760.00

26 NS-29 Supply of 20 Pair Krone terminal complete with

mounting arrangements.

Nos. 850.00 23 19550.00

Page 62: Volume 2 Package 1 03-03-2015

S.NO

.

ITEM

NO

DESCRIPTION OF WORK UNIT Rate QTY. Total Amount

Group - D

27 NS-30 Supply of Krone insertion/ extrusion tool Krone

make

Nos. 1150.00 5 5750.00

28 NS-31 Supply & installation of wire insulator for wire

operating, Level Crossing Lifting barriers/Signals as

per Specification No. IRS S-47-74

No.of wire

Insulator

(Nos.)

555.00 90 49950.00

29 NS-32 supply and installation of Insulator of Point rodding

at function end and lever end as per Technical

specification.

No.of rod

insulator

(Nos.)

591.00 90 53190.00

30 NS-33 Provision of GPS Clock in Stations Nos. 20000.00 10 200000.00

Total Cost of NS Item 6652820.00

Grand Total of Group D(Carried forward to summary) 15103971.73

Page 63: Volume 2 Package 1 03-03-2015

Bill of Quantities

(Electrical

Engineering)

Page 64: Volume 2 Package 1 03-03-2015

 

Page 65: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

16001 OHE-1

Preparation and submission of designs and drawings

for Overhead Equipment, Switching Station,

Sectioning diagram,Power supply diagram,

Schematic diagram of Switching Stations, Traction

working rule diagram and Instructions etc. required

for commissioning of OHE

TKM 198 996 14440 197208 2859120 3056328

Supply and Erection of large Span wire (130 sq.mm)

including its fittings with insulators:

(a) With Porcelain Insulators 1050mm CD Mtr 1500 439 36 658500 54000 712500

(b) With Composite Insulators 1050mm CD Mtr 444 415 36 184260 15984 200244

Supply and Erection of materials for Termination of

single conductor of overhead equipment or a

terminating wire

(a) With Porcelain Insulators 1050mm CD Each 275 5871 538 1614525 147950 1762475

(b) With Composite Insulators 1050mm CD Each 78 4704 538 366912 41964 408876

Supply and Erection of materials for Termination of

all aluminum 25 KV feeder conductor single (spider)

including feeder wire

(a) With Porcelain Insulators 1050mm CD Mtr 1600 293 118 468800 188800 657600

(b) With Composite Insulators 1050mm CD Mtr 473 275 118 130075 55814 185889

Supply and Erection of material for Termination of

copper cross feeder with gantries including cross

feeder wire

(a) With Porcelain Insulators 1050mm CD Set 12 24874 631 298488 7572 306060

(b) With Composite Insulators 1050mm CD Set 5 22540 631 112700 3155 115855

16006 OHE-6Supply and Erection of Terminal boards in control

cubicles,Each 5 5985 269 29925 1345 31270

16007 OHE-7Supply and Erection of iron clad 240V AC and 110V

D.C. board with fuse box in control cubicles,Set 5 3967 123 19835 615 20450

16008 OHE-8Supply and Erection of Lead Acid Batteries 40 AH

with Battery Chargers:Set 5 142372 5061 711860 25305 737165

Supply, Erection, Oil Filtration, Testing and

Commissioning of 25 KV/240 Volt, 5 KVA, LT supply

transformer with 25 KV D. O. fuse switch assembly,

anticlimbing device, post insulators, copper jumper

and earth electrode etc:

(a) With Porcelain Insulators 1050mm CD Set 15 58472 8586 877080 128790 1005870

(b) With Composite Insulators 1050mm CD Set 3 57305 8586 171915 25758 197673

Supply, Erection, oil Filtration, Testing and

Commissioning of 25 KV/240 Volt, 25 KVA, LT

supply transformer with 25 KV D. O. fuse switch

assembly, anticlimbing device ,post insulators,

copper jumper and earth electrode etc:

(a) With Porcelain Insulators 1050mm CD Set 1 165899 16387 165899 16387 182286

(b) With Composite Insulators 1050mm CD Set 1 164732 16387 164732 16387 181119

16011 OHE-10 Modification to existing OHE Mtr 0 0 22 0 0 0

16012 OHE-11 Manning of switching station i.e. SP/SSP and TSS:Per

month155 0 25265 0 3916075 3916075

16013 OHE-12(a)Electrification of switching station building as per

specification Each 4 0 21660 0 86640 86640

16014 OHE-12(b) Supply & Erection of Earthing arrangement at

switching stationJob 4 10420 4952 41680 19808 61488

16015 OHE-13

Loading/Unloading transportation and handing over

of all type of materials etc. other than contractor

material

MT/KM 0 0 38 0 0 0

Total 6214394 7611469 13825863

Grand Total carried forward to summary 13825863

16010

OHE-5

OHE-9(a)

OHE- 9(b)

OHE-4

OHE-3

Unit Qty Supply

(In Rs)

Grand total in

Rs

16003

16004

16005

16009

Erection

(In Rs)

Schedule 16000

RE General

OHE-216002

Item No SOR ITEM DescriptionTotal supply in

Rs

Total Erection

(In Rs)

BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

OHE-16 Page 1 of 25

Page 66: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

17001 OHE-15

Construction of Switching Station building, RCC work

,plastering, brick masonry, retaining wall, filling,

compacting and leveling work etc as per RDSO

standard drawing and supply and erection of name

board of switching station

Each 5 140394 701970

17001(a) OHE-15(a)

Extra for every 0.3 m or part there of higher plinth

over normal plinth height (On ground floor area only) Sq.m 1 174

174

17001(b) OHE-15(b)

Extra for every 0.3 m or part there of deeper

foundations over normal depth (On ground floor area

only)

Sq.m 1 174 174

17001(c) OHE-15(c)

Extra for open foundation on poor soil having every

0.3 m or part there of higher plinth over normal

plinth height (On ground floor area only) Sq.m 1 331 331

Total cost 702649

Grand Total carried forward to summary 702649

BOQ for Railway Electrification works between RANI(Excl.) -SRPJ(Excl.) section 198 TKM of Ajmer Division

of North Western Railway

Schedule 17000

Switching Post building

Item No SOR ITEM Description UnitRate (In

Rs.)Qty

Grand Total

Rs.

OHE-17 2 of 25

Page 67: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

19001 OHE-16 Supply and Erection of a guy rod assembly. Each 641 4651 722 2981291 462802 3444093

19002 OHE-17 Supply and Erection of protective screen on FOBs/ROBsSq M 28 2408 260 67424 7280 74704

Supply and Erection of bracket assembly with insulators

as per OHE plan:

(a) With Porcelain stay & bracket Insulators 1050mm

CDEach 5000 11104 622 55520000 3110000 58630000

(b) With Composite stay & bracket Insulators 1050mm

CDEach 1653 9937 622 16425861 1028166 17454027

19004 OHE-19 Supply and Erection of regulating equipment (3 pulley

type) with counter weight assembly for conventional

OHE

Each 345 36645 2690 12642525 928050 13570575

Supply and Erection of material for termination of double

Overhead Equipment conductor

(a) With Porcelain Insulators 1050mm CD Each 40 7784 679 311360 27160 338520(b) With Composite Insulators 1050mm CD Each 12 6617 679 79404 8148 87552Supply and Erection of anti-creep with galvanized steel

wire(a) With Porcelain Insulators 1050mm CD Each 125 18268 1908 2283500 238500 2522000(b) With Composite Insulators 1050mm CD Each 30 15934 1908 478020 57240 535260

19007 OHE-22 Supply and Erection of a structure bond/longitudinal

bond/ transverse and special bond:. TKM 198 13039 4160 2581722 823680 3405402

Total93371107 6691026 100062133

Grand total carried forward to summary

100062133

19006

OHE-20

OHE-21

OHE-18

Item NoSOR

ITEM

Schdule 19000

OHE - Ferrous other than steel structures and SPS

19003

19005

Description Unit Qty Supply

(In Rs)

Erection

(In Rs)

Total

supply in

Rs

Total

Erection

In Rs

Grand

Total In Rs

BOQ for Railway electrification works between RANI (Excl.) -SRPJ(Excl.) section 198 TKM Of Ajmer Division of North Western Railway

OHE-19 3 of 25

Page 68: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-I

20001 OHE-23(a)

Supply and Erection of Over Head

Equipment i.e. contact & catenary wire

(excluding cost of supply of contact &

catenary wires), jumper wire, dropper

wire, contact/catenary clips, fasteners

and all other material required at turn

out/overlaps/diamond crossings etc.

Final checking of OHE and adjustment,

inspection to be done by tower wagon

for commissioning of conventional OHE.

TKM 198 0 41112 0 8140176 8140176

20002 OHE-23(b)Supply of contact wire (HDGCC 107

Sq.mm) only. MT 215 629859 0 135419685 0 135419685

20003 OHE-23(c)Supply of cadmium copper catenary wire

(65 Sq. mm) only MT 135 629859 0 85030965 0 85030965

Total 220450650 8140176 228590826

Grand total carried forward to summary 228590826

Schedule 20000

OHE - Non Ferrous 'A'

Item No SOR ITEM Description Unit QtyTotal Supply

in Rs

Total

Erection

in Rs

Grand Total in

Rs

Supply (In

Rs)

Erection

(In Rs)

BOQ For Railway Electrification works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North

Western Railway

OHE-20 4 of 25

Page 69: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

Supply and Erection of anti-creep with cadmium copper

catenary wire.

(a) With Porcelain Insulators 1050mm CD Each 8 55520 3970 444160 31760 475920

(b) With Composite Insulators 1050mm CD Each 2 53186 3970 106372 7940 114312

Supply and erection of section insulator assembly and

associated fittings & fasteners for OHE with Bar

Insulator

(a) With Porcelain Insulators 1050mm CD and Bar

InsulatorEach 55 64506 4241 3547830 233255 3781085

(b) With Composite Insulators 1050mm CD and

Porcelain Bar InsulatorEach 14 63339 4241 886746 59374 946120

21003 OHE-26Supply and Erection of PTFE type short neutral section

assemblyEach 4 761250 4349 3045000 17396 3062396

21004 OHE-27Supply and Erection of 25 KV, S.P Isolators and with

insulator with/without earth contact assembly:Each 72 66512 4386 4788864 315792 5104656

21005 OHE-28Supply and Erection of 25 KV double pole isolator and

with insulator with/without earth contact assembly:Each 19 103400 4803 1964600 91257 2055857

21006 OHE-29 Supply and Erection of all types of copper jumpers Each 130 5790 320 752700 41600 794300

21007 OHE-30Supply and Erection of insulated catenary cable in the

span under over-line structure.Mtr 261 2634 82 687474 21402 708876

21008 OHE-31

Supply of materials and erection of a large copper

jumper (160sqmm) between aluminium bus / OHE and

cross feeder with all associated fittings:

Each 63 7452 320 469476 20160 489636

21009 OHE-32Supply and Erection of solid copper busbar 18 mm dia.

Mtr 358 1523 138 545234 49404 594638

21010 OHE-33

Supply and Erection of all types of connectors for

aluminium/copper bus bar required for commissioning of

switching stations with fasteners.

Each 285 4081 56 1163085 15960 1179045

21011 OHE-34Dismantling of traction structure, portals,TTC and

associated SPS by cutting: MT 0 0 1197 0 0 0

21012 OHE-35

Supply and Erection of safety items i. e. Fire

extinguishers, set of fire bucket with stand and first aid

box, key box with suitable key chain, locks and other

misc items required for commissioning of switching

station.

Set 6 10844 1796 65064 10776 75840

21013 OHE-36

Supply and Erection of 25 KV AC OHE danger

board/danger board for height gauge, public/staff caution

board and special boards required for commissioning of

OHE/SWSs

Each 267 122 107 32574 28569 61143

21014 OHE-37

Supply, Erection and commissioning of light weight

section insulator assembly 25 KV as per drawing

no.6.2758.0 RDSO spec.no. TI/Spec/OHE/LWDSI/007Each 1 265310 23882 265310 23882 289192

21015 OHE-38

Supply, installation and commissioning of the

maintenance free earth as per RDSO specification No.

RDSO/PE/SPEC/PS/0109(REV.O)-2008

Each 1 0 324501 0 324501 324501

Total 18764489 1293028 20057517

Grand total carried forward to summary 20057517

21002

21001 OHE-24

OHE-25

Unit QtySupply

(In Rs)

Erection

(In Rs)

TotalSupply

(In Rs)

Total

Erection

(In Rs)

Grand

Total in

Rs

Schedule 21000

OHE - Non Ferrous ''B'

DescriptionItem NoSOR

ITEM

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ ( Excl.) section 198 TKM of Ajmer Division of North Western Railway

OHE-21 5 of 25

Page 70: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

24001 TSS-1

Design and drawings for 220/27 or 132/27 KV or

110/27 KV traction sub-station including feeding post

and capacitor bank

Each 1 0 80242 0 80242 80242

24002 TSS-2 DELETED 0 0 0

24003 TSS-3Construction of baffle wall complete with

reinforcement, brick work, plastering etcCum 0 2420 761 0 0 0

24004 TSS-4(a)

Supply, erection, testing & commissioning of 132 KV

double pole SF-6 gas circuit breakers with interlock Each 0 581714 5118 0 0 0

24005 TSS-4(b)

Supply, erection, testing & commissioning of 220 KV

double pole SF-6 gas circuit breakers with interlock Each 1 1096604 5118 1096604 5118 1101722

24006TSS-

5(a)

Supply and erection of 132 KV double pole isolators

(manually operated)Each 0 235013 2220 0 0 0

24007TSS-

5(b)

Supply and erection of 220 KV double pole isolators

(manually operated)Each 2 235013 2220 470026 4440 474466

24008 TSS-6(a)Supply & erection of 132 KV current transformer

assembly (400-200/5A) Each 0 197215 1145 0 0 0

24009 TSS-6(b)Supply & erection of 220 KV current transformer

assembly (200-100/5A) Each 3 197215 4327 591645 12981 604626

24009A TSS-6(c )Supply & erection of 110 KV current transformer

assembly (400-200/5A) Each 0 131033 1145 0 0 0

24009B TSS-6(d)Supply & erection of 132 kV current transformer

assembly (1200-800-400/5-5-5A)Each 0 246611 1145 0 0 0

24010 TSS-7 (a) Supply & erection of 120 KV lightning arrestors Each 0 115399 811 0 0 0

24011 TSS-7 (b) Supply & erection of 198 KV lightning arrestors Each 4 115399 1414 461596 5656 467252

24011A TSS-7 (c ) Supply & erection of 96 KV lightning arrestors Each 0 48045 811 0 0 0

24012 TSS -8(a)

Supply, erection, testing & commissioning of 25 KV

single pole Vacuum circuit breaker with interlocking of

rating 1600 ampsEach 4 303780 3594 1215120 14376 1229496

24012A TSS -8(b)

Supply, erection, testing & commissioning of 25 KV

single pole Vacuum circuit breaker with interlocking of

rating 2000 ampsEach 0 359578 3594 0 0 0

24013 TSS -9(a)Supply & erection of 25 KV current transformers

(1500-750/5A)Each 4 55163 473 220652 1892 222544

24013A TSS -9(b)Supply & erection of 25 kV current transformers

(3000-1500/5 Amps)Each 0 63755 473 0 0 0

24013B TSS -9(c )Supply & erection of 25 KV current transformers (200-

100/5A)Each 0 41645 2790 0 0 0

24014 TSS-10 Supply, erection, testing and commissioning of

control & relay numeric panel suitable for double

transformer traction sub -stations of 220/27 or

132/27 KV or 110/27 KV

Each

1 1477300 9279 1477300 9279 1486579

24015 TSS-11 Supply & erection of tubular aluminum bus bars

50mm x 39mm dia

Mtr180 417 32 75060 5760 80820

24016 TSS-12 Supply & erection of ‘Zebra’ ACSR conductor Mtr 350 257 7 89950 2450 92400

24017 TSS-13

Supply & erection of all type of connectors, bus splice

& TEE connectors etc required for commissioning of

TSS equipments

Each 160 1595 20 255200 3200 258400

24018 TSS-14Supply & erection of copper jumper with fittings and

fasteners required for TSSEach 35 2396 331 83860 11585 95445

24019 TSS-15(a)Supply & erection of 110/132 KV support insulators

with fittings and fastenersEach 0 24072 384 0 0 0

24020 TSS-15(b)Supply & erection of 220 KV support insulators with

fittings and fastenersEach 10 24072 600 240720 6000 246720

24021 TSS-16Supply & erection of 25 KV support insulators with

fittings and fastenerEach 20 2943 110 58860 2200 61060

24022 TSS-17(a)Supply & erection of 110/132 KV termination

with/without adjuster complete with disc insulatorsEach 0 8726 200 0 0 0

24023 TSS-17(b)Supply & erection of 220 KV termination with/without

adjuster complete with disc insulatorsEach 14 8726 306 122164 4284 126448

24024 TSS-18Supply & erection of low maintenance lead acid

batteries set with 2 nos. of suitable battery chargerSet 1 612306 6736 612306 6736 619042

24025 TSS-19Supply & erection of 240Volt AC and 110 V DC

Distribution boards in the control roomEach 3 22548 479 67644 1437 69081

24026 TSS-20 Supply and erection of earth electrode Each 30 1885 734 56550 22020 78570

24027 TSS-21Supply and erection of earth leads 75 x 8 mm mild

steel flat laid in the ground or exposed as per site

requriment

Mtr 900 133 39 119700 35100 154800

24028 TSS-22

Supply and erection of earth leads 50 x6 mm mild

steel flat laid in the ground or exposed as per site

requriment

Mtr 1200 65 31 78000 37200 115200

24029 TSS-23 Supply and erection of 8 SWG GI Wire for earthing Mtr 100 12 13 1200 1300 2500

24030 TSS-24Supply and erection of 32mm dia MS rod for earth

matMtr 2000 153 13 306000 26000 332000

Schedule-24000

TRACTION SUB- STATION

Item No SOR ITEM Description Unit qty Supply

(In Rs)

Erection

(In Rs)

Total

supply in

Rs

Total

Erection

(In Rs)

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ ( Excl.) section 198 TKM of Ajmer Division of North Western Railway

Grand total in

Rs

TSS 6 of 25

Page 71: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

24031 TSS-25Supply & erection of earth screen wire including

terminationMtr 250 169 9 42250 2250 44500

24032 TSS-26(a)

Suppy, erection, testing & commissioning of 132/27

KV, 21.6/30.24 MVA, ONAN/ONAF, single phase

traction power transformers

Each 0 24091345 184047 0 0 0

24033 TSS-26(b)

Suppy, erection, testing & commissioning of 220/27

KV, 21.6/30.24 MVA, ONAN/ONAF, single phase

traction power transformers

Each 1 33895503 184047 33895503 184047 34079550

24033A TSS-26(c )

Suppy, erection, testing & commissioning of 110/27

KV, 21.6/30.24 MVA, ONAN/ONAF, single phase

traction power transformers

Each 0 17228475 184047 0 0 0

24033B TSS-26(d)

Suppy, erection, testing & commissioning of 132/27

KV, 30/42 MVA, ONAN/ONAF, single phase traction

power transformers

Each 0 27838617 184047 0 0 0

24034 TSS-27(a)Supply and erection of 25 Kv double pole isolator

1600 Amp with insulatorsEach 5 66784 2127 333920 10635 344555

24034A TSS-27(b)Supply and erection of 25 Kv double pole isolator

3150 Amp with insulatorsEach 0 133680 2127 0 0 0

24035 TSS-28(a)Supply and erection of single pole isolator 1600 Amp

with insulatorsEach 8 36927 2127 295416 17016 312432

24035A TSS-28(b)Supply and erection of single pole isolator 3150 Amp

with insulatorsEach 0 67826 2127 0 0 0

24036 TSS-29

Supply, erection, testing & commissioning of 25 KV

shunt capacitor bank of 2400 KVAR rating at 25 KV

including lowloss sereis reactor, 25 KV neutral current

transformer, and other accessories etc.,

Each 1 2018938 42292 2018938 42292 2061230

24037 TSS-30

Excavation of Earth to the depth of 2 meter below

ground level for burying 13mtrs long rail and

connecting it as per RDSO drawing (Rail will be

supplied by RVNL)

Each 0 0 2184 0 0 0

44286184 555496 44841680

44841680

NOTE: 1 Provision of cross track, control room building and approach road shall be made in the civil portion of the estimate. 2. Provision of yard lighting and water jet pump shall be made in the general electrical portion of the estimate.

2

Total

Grand total carried forward to summary

Provision of yard lighting and water jet pump shall be made in the general electrical portion of the estiate.

TSS 7 of 25

Page 72: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Paackage-1

Item No Description of item Unit Qty SOR rates in Rs Total supply in Rs

27001 SF-6 Gas Cylinder with filling arrangement Each 0 29590 0

27002 25KV CB Bushing Each 1 31527 31527

27003 Interruptor Bushing Each 1 11298 11298

27004 Earth fault Relay Each 1 7209 7209

27005 Buchholz Relay Each 1 16140 16140

27006 Relay Testing Kit Set 1 146334 146334

27007 HRC fuse 2A, 4A, 10A, 15A, 32 Amp Set 10 1076 10760

27008 Transformer Oil Litre 5000 28 140000

27009 Capacitor unit of capacitor bank Set 1 550265 550265Total 913533

913533

Schedule 27000

TSS Spares

Grand total carried forward to summary

BOQ for Railway Electrification works between RANI(Excl.)-SRPJ (Excl.) section 198 TKM of Ajmer Division of North

Western Railway

Page 73: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

Item No Description Unit Qty Rate Total supply

28001 Tirfor 2.5T/1.5T Nos 1 6672 6672

28002 Trifor 5T/3T Nos 1 9118 9118

28003 Pull lift 3 T Nos 1 8285 8285

28004 Pull lift 3/4 T Nos 1 3670 3670

28005 Aluminium / Light weight metal conduit Platform ladder trolley Nos 1 9453 9453

28006 Rail jumpers with clamps at both ends Nos 3 1023 3069

28007 Earthing discharge rod complete Nos 6 7228 43368

28008 Aluminium Straight ladder extensive (11 M) Nos 2 4893 9786

28009Portable Electric Drill 21mm, single phase, 230V (for drilling) Ralli

Wolf, Hitachi, Black & Decker makes only

Nos 1 94539453

28010 First aid box filled with medicines as per standard Nos 1 1112 1112

28011 Stretcher Nos 1 722 722

28012Fire bucket (10 Ltrs) capacity with one stand and cover for set of 4/6

buckets at each switching station/TSS

Nos 5 134670

28013 Portable fire extinguisher dry chem. Powder (10 Ltr) Nos 2 3892 7784

28014 Portable fire extinghuisher foam type (cap 9 Ltr) Nos 2 4226 8452

28015 D' Shackles set of on each (1", 3/4", 5/8", 1/2") Nos 2 1112 2224

28016 Set of Steel sling with Eye each end of 2 M & 3 M Nos 8 1390 11120

28017 Micro meter Mitutoyo make/ as required by Railway Nos 1 1501 1501

28018 Bench Vice 6" Nos 1 1112 1112

28019 Canvass Tarpaulin 12 m x 12m Nos 2 2224 4448

TESTING AND MEASURING EQUIPMENTS 0

28020 Insulation Megger 250V Nos 1 5561 5561

28021 Binoculars Nos 1 556 556

28022 Vernier Callipers Mitutoyo make/ as required by Railway Nos 1 834 834

28023 Walkie Talkie Sets (2W output) Nos 4 5561 22244

28024 Digital Multimeter Nos 3 4448 13344

28025 Magic Pole ladder 8' Nos 1 6672 6672

28026 Drop out fuse pull rod Nos 2 1112 2224

280271/2" square drive socket set containing 19 sockets with 6 attachments Nos 2 1112

2224

28028 Transformer oil Acidity testing Kit Nos 1 5561 5561

28029 Motor operated insulation tester 5 Kv Nos 1 4671 4671

28030 Pocket size clip on Tong tester Nos 1 1669 1669

28031 A.C. Voltmeter 0 - 150 V Nos 2 890 1780

28032 A.C Voltmeter 0 - 500 V Nos 2 1669 3338

28033 Digital time interval meter 15 - 1000 seconds Nos 2 1112 2224

28034 Insulation tester 2.5 KV Nos 1 2780 2780

28035 Earth tester Nos 2 4448 8896

28036 Insulation Megger 500 V Nos 1 7228 7228

28037 Transformer Oil BDV testing Kit Nos 1 14456 14456

28038 125 Litre cap oil filtration plant Nos 1 111207 111207

28039 Auto transformer 2 A capacity Nos 1 1669 1669

28040 Load cell tester suitable for 40 AH and 200 AH battery Nos 1 1112 1112

28041 Emergency Telephone Nos 3 5005 15015

28042Spanner set double ended, 24 size 12 pieces set (6mm to 42mm)

Gedore or Tapraia make with ISI Mark

Set 4 534721388

28043 Cogex or Similar 52 pieces socket set (box spanners) Set 1 4010 4010

28044 Primary current injection testing kit (0 - 3000 amps) Each 0 789735 0

28045 Digital Insulation testing meter (5 KV Megger) Each 1 290615 290615

28046 Digital earth resistance meter Each 2 58123 116246

28047 Thermal Imaging camera with software Each 0 1076933 0

28048 Tan delta field test set Each 0 796547 0

28049

Supply, installation, testing & commissioning of GPS based OHE

monitoring & current collection system as per RDSO spec No.

TI/SPC/OHE/OLIVIR/0050(01/06) or latest

Each 0 398800

0

Total(schedule items) 809543

NON SCHEDULE ITEMS

NS-1 Dielectric tester 0 to 75 kv with accessories. Each 1 45835 45835

NS-2Digital thermometer (Motwani/Meco/Testica or similar reputed make)

Each 1 1790 1790

NS-3 Cutting plier (Good Quality) 9 inches Each 5 158 790

NS-4 Nose plier (Good Quality) 9 inches long Handle insulated for 2 KV Each 5 158 790

Total (Non schedule items) 49205

858748

SCHEDULE -28000

Tools & Plants (OHE & PSI)

BOQ for Railway Electrification works between RANI(Excl.) - SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

Grand total (schedule & non schedule items) carried forward to Summary

Page 9 of 25

Page 74: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

29001 SCADA-1Preparation and supply of Design & Drawing for

SCADA at RCC,TSS,SP & SSP. Job 1 0 736096 0 736096 736096

29002 SCADA-2 Supply of SCADA equipments & Software for RCC. Set 1 3710933 0 3710933 0 3710933

29003 SCADA-3(a) Supply of RTUs for FP/TSS Each 2 347373 0 694746 0 694746

29004 SCADA-3(b) Supply of RTU for SP. Each 3 223178 0 669534 0 669534

29005 SCADA-3(c) Supply of RTUs for SSP. Each 5 223178 0 1115890 0 1115890

29006 SCADA-4(a)Supply of Maintenance Free/Low Maintenance type

Lead Acid battery.Set 1 192502 0 192502 0 192502

29007 SCADA-4(b) Supply of UPS. Set 1 198711 0 198711 0 198711

29008 SCADA-5 Supply of furniture. Set 1 186292 0 186292 0 186292

29009 SCADA-6Supply of Data logging Printer for Remote Control

Centre.Nos. 2 31049 0 62098 0 62098

29010 SCADA-7(a)Erection, testing & commissioning charges for

items SCADA-2 to SCADA-6.Job 1 0 436502 0 436502 436502

29011 SCADA-7(b)Integration of new SCADA system to existing

system at RCC.Job 1 0 220828 0 220828 220828

29012 SCADA-8(a)Erection, integration, testing & commissioning for

existing and new equipments for TSS.Job 1 0 176661 0 176661 176661

29013 SCADA-8(b)Erection, integration, testing & commissioning for

existing and new equipments for SSP.Job 1 0 58887 0 58887 58887

29014 SCADA-8(c)Erection, integration, testing & commissioning for

existing and new equipments for SP.Job 1 0 147218 0 147218 147218

29015 SCADA-9Supply of Equipment and Components (As per list

B)Set 1 371342 0 371342 0 371342

29016 SCADA-10 Supply of Spl. T & P (As per list C) Set 1 453310 0 453310 0 453310

Total 7655358 1776192 9431550

Grand total carried forward to summary 9431550

Schedule-29000

SCADA

Item No SOR ITEM Description UnitSupply (In

Rs)

Grand

total (In

Rs)

QtyErection

in Rs

Total

supply in

Rs

Total

erection

in Rs

BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl.) section 198 TKM of Ajmer Division of North Western Railway

SCADA 10 of 25

Page 75: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

30001 CS-1Supply and erection of 25 KV,1600 Amp vacuum

InterruptorEach 16 241008 2755 3856128 44080 3900208

30002 CS-2Supply and erection of 25 KV Potential Trasformer

Type-I or Type-IIEach 16 49111 518 785776 8288 794064

30003 CS-3Supply and erection of 42 KV Lightning Arrestor

with surge monitor, counter and cableEach 19 17710 363 336490 6897 343387

30004 CS-4 Supply and installation of cables for SWS/TSS Mtr 3758 137 11 514846 41338 556184Supply, erection, oil filteration, testing &

commissioning of 25KV/240V 10 KVA Auxiliary

(LT) Supply Transformers oil type with DO fuse

switch, anti climbing device, pedestal insulators,

copper jumper and earth electrode etc.

(a) With Porcelain Insulators 1050mm CD Set 19 63719 8506 1210661 161614 1372275(b) With Composite Insulators 1050mm CD Set 6 62552 8506 375312 51036 426348

30006 CS-6 Providing and laying of Concrete For Foundation

and Plinth In Other Than Hard and Rocky soilCUM 12696 3102 1004 39382992 12746784 52129776

30007 CS-7 Providing and laying of Concrete For Foundation

and Plinth In all types of soils and soft rock.CUM 125 3205 1493 400625 186625 587250

30008 CS-8

Providing and laying of Reinforced Concrete for

Pier/Coloumn/Pile, Cable Trench and Trench

Cover

CUM 57 263340

30009 CS-9Supply and erection of all types of galvanised

Steel Structures, Small Parts Steel etc. MT 2382 66552 2103 158526864 5009346 163536210

30010 CS-10Supply and erection of Fencing Panels, Uprights,

Gate and Anti-Climbing device Mtr 1783 1956 66 3487548 117678 3605226

30011 CS-11Supply and erection of Aluminium Jumper with

FastnersEach 21 1540 163 32340 3423 35763

30012 CS-12Supply and erection of Copper Strips for

equipment earthingMtr 106 929 98 98474 10388 108862

30013 CS-13Supply and erection of Aluminium Bus Bar

36mmx28mmMtr 239 229 34 54731 8126 62857

30014 CS-14Supply and spreading of gravel/ ballast in the

swich yard (TSS/SP/SSP)Cum 284 698 5 198232 1420 199652

30015 CS-15

Dismantling of redunant foundation with

compressor powered machines/manually with

contractor's own men and material including

consumables like Diesel Oil etc.

Nos 10 0 1875 0 18750 18750

30016 CS-16

Monthly charges for one crane operator for full

time operation for one crane including Monthly

charges for one Watch&Ward for one crane.

Per-

Month15 0 15548 0 233220 233220

30017 CS-17

Supply and Erection of anti theft transformer 240

volt/2.2 KV 5 KVA, with DO Fuse switch

excavation of cable trench, laying of cables,

earthing, jumpering, DG set including dismantling

of above equipments.

each

location2 49677 34545 99354 69090 168444

Total 209623713 18718103 228341816

Grand total carried forward to summary 228341816

4620 263340

30005 CS-5

Item NoSOR

ITEM Description Qty

BOQ for Railway Electrical works between RANI(Excl.)- SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

Common Schedule of OHE/TSS

UnitSupply

(In Rs)

Grant total

(In Rs)

Erection in

Rs

Total

Supply in

Rs

Total

Erection in

Rs

Common OHE 11 of 25

Page 76: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

Supply Erection Total supply Total Erection Grant total

1 2 3 4 5 6

33001

Electrification of staff quarter complete with point wirings, circuit wirings,

sub main wirings etc. with Fire Retardant (FR) PVC insulated,

multistranded, copper conductor, single core cable on surface /in

recessed PVC conduits, along with provision of luminaries with lamps,

call bells, ceiling & exhaust fans, distribution boards, loose wire box,

geyser, energy meters in M.S. box including earthing with G.I. pipe

electrode etc. as per Scale of fittings,and cable sizes, nos. of points

permissible in each circuit and sub main/s etc.for each type of quarter as

indicated in Explanatory Notes.

i) Type - I quarter Each 0 0 23379 0 0 0

ii) Type - II quarter Each 16 0 24591 0 393456 393456

iii) Type - III quarter Each 4 0 30867 0 123468 123468

iv) Type - IV quarter Each 1 0 57106 0 57106 57106

v) Type - V quarter Each 0 0 78371 0 0 0

vi) Extra for stair case light point controlled with two nos. two way switches Each 10 0 502 0 5020 5020

33002

Electrification of gate man lodge complete with point wirings, circuit

wirings etc. with Fire Retardant (FR), PVC insulated, multistranded,

copper conductor, single core cable on surface/in recessed PVC

conduits including provision of luminaries with lamps, ceiling fan,

distribution board, earthing with G.I.pipe electrode etc. as per Scale of

fittings, Cable sizes, no. of points permissible in each circuit and sub

mains as indicated in Explanatory Notes.

Each 2.00 0.00 14546.00 0 29092 29092

33003 (i)

Wiring for light/ceiling fan/exhaust fan/call bell/light plug/group etc. points

including circuit wiring, sub-main wiring with Fire Retardant (FR), PVC

insulated, multistranded, copper conductor, single core cable on

surface/in recessed PVC conduits, distribution boards, sub distribution

boards, earthing etc as required. Wiring shall be done as per sizes of

cables, no. of points permissible in each circuit and sub main as

indicated in Explanatory Notes.

Point 490.00 0.00 908.00 0 444920 444920

BOQ for Railway Electrification works of between RANI(Excl.)-SRPJ(Excl.) section 198 TKM of Ajmer Division of North Western Railway

SCHEDULE -33000

Bill No.33 :GENERAL SERVICES ELECTRICAL WORKS

This schedule shall be read in conjunction with its Explanatory Notes and Technical Specifications for detailed description for various items included therein.

Amount in Rs

SECTION - A :

BOQ item No. Description of Items Unit Qty

Rate (in Rs.)

ELECTRIFICATION OF STAFF QUARTERS

ELECTRIFICATION OF GATE MAN LODGES AT LEVEL CROSSINGS

ELECTRIFICATION OF SERVICE BUILDINGS & PASSENGER SHELTER AND SHED

GEW Page 12 of 25

Page 77: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33003 (ii)

Wiring for power plug point including circuit wiring, sub main wiring, with

Fire Retardant (FR) PVC insulated, multistranded, copper conductor,

single core cable on surface/in recessed PVC conduits, distribution

boards, sub distribution boards, earthing with G.I.pipe electrode etc as

required. Wiring shall be done as per sizes of cables, no. of points

permissible in each circuit and sub main as indicated in Explanatory

Notes.

Point 54.00 0.00 1666.00 0 89964 89964

33003 (iii)Extra for provision of industrial type iron clad plug socket with 32A DP

MCB in M.S.Box Point 10.00 0.00 455.00 0 4550 4550

ELECTRIFICATION OF PASSENGER SHELTER AND SHEDS

33004 (i)

33004 (ii)

33004 (iii)

SECTION -B :PROVISION OF LUMINARIES,FANS,WATER COOLERS ETC.

33005 (i)

Supply, installation, testing and commissioning of prewired 1x28watt, T-5,

energy efficient, surface type luminary with epoxy powder coated CRCA

sheet steel housing with reflector cover, complete with electronic ballast,

T-5 tube etc. & earthing etc. as required.

No. 286 1214 191 347204 54626 401830

33005 (ii)

Supply, installation, testing and commissioning of prewired 2x28watt, T-5,

energy efficient, surface type luminary with epoxy powder coated

CRCA sheet steel housing with reflector cover, complete with electronic

ballast, T-5 tube etc. & earthing etc. as required.

No. 16 1657 414 26512 6624 33136

33006 (i)

Supply, installation, testing and commissioning of prewired 2x28watt, T-5,

energy efficient street light luminary , complete with T-5 tubes, electronic

ballast etc.on bracket pipe of erected pole or on wall bracket of GI class

"B" pipe & connections from junction box/overhead line/light point etc. to

luminary with 1.5 sq.mm FRLS PVC insulated multistranded copper

conductor single core/three cable as instructed & earthing etc as

required.

No. 0 2456 386 0 0 0

33006 (ii)

Supply, installation, testing and commissioning of prewired 1x28watt, T-5,

energy efficient street light luminary , complete with T-5 tubes,

electronic ballast etc.on bracket pipe of erected pole or on wall bracket of

GI class "B" pipe & connections from junction box/overhead line/light

point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded

copper conductor single core/three cable as instructed & earthing etc as

required.

No. 0 1703 426 0 0 0

33006 (iii)

Supply, installation, testing and commissioning of prewired 2x14 watt, T-

5, energy efficient street light luminary complete with T-5 tubes,

electronic ballast etc.on bracket pipe of erected pole or on wall bracket of

GI class "B" pipe & connections from junction box/overhead line/light

point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded

copper conductor single core/three cable as instructed & earthing etc as

required.

No. 125 3132 783 391500 97875 489375

Deleted

GEW Page 13 of 25

Page 78: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33006 (iv)

Supply, installation, testing and commissioning of prewired 4x14 watt, T-

5, energy efficient street light luminary , complete with T-5 tubes,

electronic ballast etc.on bracket pipe of erected pole or on wall bracket of

GI class "B" pipe & connections from junction box/overhead line/light

point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded

copper conductor single core/three cable as instructed & earthing etc as

required.

No. 0 5810 1452 0 0 0

33006 (v)

Supply, installation, testing and commissioning of prewired 4x24 watt, T-

5, energy efficient street light luminary complete with T-5 tubes,

electronic ballast etc on bracket pipe of erected pole or on wall bracket of

GI class "B" pipe & connections from junction box/overhead line/light

point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded

copper conductor single core cable & earthing etc as required.

Nos. 0 6207 1552 0 0 0

33007

Supply, installation, testing and commissioning of metal halide street light

luminary complete with MH/HPSV lamp, on bracket pipe of erected pole

or on wall bracket of class"B"G.I.pipe & connections from junction

box/overhead line/ light point etc. to luminary with 1.5 sq.mm FRLS PVC

insulated multistranded copper conductor, single core/three cable as

instructed & earthing etc as required.

(i) 1 x 70 Watt. No. 5 4453 699 22265 3495 25760

(ii) 1 x 150 Watt No. 0 5196 815 0 0 0

33008

Supply, installation, testing and commissioning of 230V A.C. ceiling fan

with double ball bearing and suitable capacitor complete with wiring with

1.5sq.mm FR, PVC insulated, copper conductor, single/three core

cable as instructed, etc. as required.

i) 1200 mm (without Regulator) No. 65 1255 196 81575 12740 94315

ii) 1400 mm (without Regulator) No. 5 1363 214 6815 1070 7885

33009

Supply and fixing of stepped type, electronic fan regulator, 300 watts,

on the existing phenolic laminated sheet cover plate/modular plate of

switch box, including connections,testing & commissioning as required.

No. 70 256 57 17920 3990 21910

33010

Supplying, installation, testing and commissioning of 11-23 watts, 250

volts, 2 pin, compact fluorescent lamp (CFL) complete with electronic

ballast etc. as required.

No. 23 134 21 3082 483 3565

33011

Supplying, erection, testing and commissioning of exhaust fan suitable

for 1-phase, 230 volts, AC supply system complete with capacitor, louver

shutters, grouting bolts with nuts, making opening/modification in the wall

to suit the size of the fan, making good the damages, connections with

1.5sq.mm, FR, PVC insulated, multistranded copper conductor, single

core /three cable as instructed, earthing etc. as required.

(i) AC exhaust fan 300 mm 900 rpm with/without louver shutters. No. 20 2024 317 40480 6340 46820

GEW Page 14 of 25

Page 79: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33012

Supply, installation, testing and commissioning of self contained drinking

water cooler 150 liters capacity complete with all connected standard

fittings, accessories etc. and 5KVA , wall mounted, I.C. controlled

electronic auto-voltage corrector with time delay relay, connection to

earthing system etc as required.

Each 4 51938 8157 207752 32628 240380

SECTION - C: L.T.SWITCH BOARDS AND FEEDER PILLAR

33013Supply, installation, testing & commissioning of cubical type, wall

mounted, dust & vermin proof, LT switch board of different capacities,.

LT Switch Board 125 Amp comprising of the items indicated as

under:

i) Incoming MCCB 125A, 4 pole, 35kA, fixed type (Ics=100%Icu) - 1 No

ii) Outgoing MCCB 63A, 25kA, fixed type (Ics=100%Icu) - 4 Nos

iii) Outgoing MCB 40A, 4 pole, 10kA - 4 Nos

iv) Outgoing MCB 32A, double pole, 10kA - 6 Nos

v) Sleeved/Epoxy coated copper bus-bar 250 A in bus bar chamber

vi) CT's, Indication lights

LT Switch Board 63 Amp comprising items indicated as under:

(i) Incoming MCCB 63A, 4 pole, 35kA, fixed type (Ics=100%Icu) - 1 No

(ii) Outgoing MCCB 40A, 4 pole, 25kA, fixed type (Ics=100%Icu) - 3 Nos

(iii) Outgoing MCB double pole, 6-32A, 10kA - 20 Nos

(iv) Sleeved/Epoxy coated copper bus-bar 200A in bus bar chamber

(V) Indication Lights

33014 Deleted

33015Supply, installation, testing & commissioning of weather proof, L.T.

feeder pillar of different capacities

LT Feeder Pillar 63 Amp comprising of the items indicated as under:

(i) Incoming MCCB 63A, 4 pole, 35kA, fixed type (Ics=100%Icu) - 1 No

(ii) Outgoing MCCB 40A, 4 pole, 25kA, fixed type (Ics=100%Icu) - 4 Nos

(iii) Outgoing MCB double pole, 40A, 10 KA - 4 Nos

(iv) Sleeved/Epoxy coated copper bus-bar 200A in bus bar chamber -

2 set .

(v) Indication lights

17550 129282No.

(a)

111732

(b) No

2 55866 8775

No. 1 57765

2 50929 7999

9072

(i)

101858 15998 117856

57765 9072 66837

GEW Page 15 of 25

Page 80: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

LT Feeder Pillar 125 Amp comprising of the items indicated as

under:

(i) Incoming MCCB 125A, 4 pole, 35kA (Ics=100%Icu) - 1 No

(ii) Outgoing MCCB 63A, 4 pole, 25kA (Ics=100%Icu ) - 4 Nos

(iii) Outgoing MCB 40A, 4 pole, 10kA - 4 Nos

(iv) Outgoing MCB 32A, DP, 10kA - 6 Nos

(v) Modular digital time switch and 3 phase contactor 63 A -- 2 set.

(vi)Sleeved/Epoxy coated copper bus-bar 250 A in bus bar chamber

(vii) Indication lights

LT Feeder Pillar 250 Amp comprising of the items indicated as

under:

i)Incoming MCCB 250 A FP 35KA(Ics=100%Icu) Fixed Type-1 No

ii)Outgoing MCCB 125 A FP 35KA(Ics=100%Icu) Fixed Type- 2 Nos

iii) Outgoing MCCB 63 Amps FP 25KA (Ics=100%Icu) Fixed Type - 4 Nos

iv) Outgoing MCB 40 Amps FP 10 KA -4 Nos

v) Outgoing MCB 32 Amps DP 10 KA-6 Nos

(vi) Modular digital Time switch and3 phase contractor 63 A- 2 set

(vii) Sleeved / Epoxy coated Copper bus-bar 400 A in Bus Bar chamber

(viii)Indication lights

33016 Deleted

Supply and erection of different length , swaged type steel tubular pole ,

complete with the following:

a) Double door, weather proof M.S. junction box (degree of protection not

less than IP54) complete with MCB 6 amps, copper bus bar for looping 4-

core, 3 nos. LT cables and clamping with pole, as required.

b) Casting of foundation with concrete of M10 grade and providing

muffing up to 300 mm above ground level,as required

c) Erection of GI pipe class 'B' ISI marked up to junction box for passing

cable.

(Payment of G.I. pipe shall be made against the relevant BOQ item).

i)7 Meter long pole with canopy type single pipe bracket (for one

luminary)No. 0 8677 1363 0 0 0

ii)7 Meter long pole with canopy type double pipe bracket (for two

luminaries)No. 0 8955 1407 0 0 0

iii) 9 Meter long pole with canopy type single pipe bracket No. 0 13025 2047 0 0 0

(iii) No. 0 106892 16788

1 68942 10828 (ii) No. 68942 10828 79770

0 0 0

SECTION - D : EXTERNAL ELECTRIFICATION WORKS

33017

GEW Page 16 of 25

Page 81: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33018 Deleted

33019

Supply of GI pipe - class' B' ISI marked with accessories including bends

etc. for support of cable with erected pole/recessing in wall/floor/passing

earth strip OR passing cable as required:

i) 32 mm dia Meter 0 173 28 0 0 0

ii) 40 mm dia Meter 250 206 32 51500 8000 59500

iii) 50 mm dia Meter 400 267 42 106800 16800 123600

iv) 65 mm dia Meter 0 337 54 0 0 0

v) 80mm dia Meter 0 448 70 0 0 0

vi) 100mm dia Meter 150 631 99 94650 14850 109500

vii) 150mm dia Meter 50 1027 162 51350 8100 59450

33020

Supply, erection, testing & commissioning of control and distribution

panel for colour light signalling supply in 25kV AC traction system as per

RDSO technical specifications No.TI/SPC/PSI/CLS/0023 including latest

amendment.

(i) For 10kVA AT No 10 47669 7487 476690 74870 551560

(ii) For 25kVA AT No 1 101421 15929 101421 15929 117350

ELECTRIFICATION OF FOOT OVER BRIDGE

33021

Electrification of foot over bridge complete with 3.5 meter long, 50 mm

dia, G.I. pipe pole with GI pipe bracket, luminary with lamp, M.S. junction

box, connection from junction box to luminary with 1.5 sq.mm, Flame

Retardant (FR), PVC insulated, copper conductor cable and connection

to earthing system. etc. and as per scale of fittings indicated in

Explanatory Notes.

No 2.00 0.00 8451.00 0 16902 16902

SECTION - E: POWER SUPPLY DISTRIBUTION ARRANGEMENT

33022

Supply, installation, testing and commissioning of 11kV/415 Volt,

Delta/Star connected, copper wound, power distribution transformer

(outdoor type) conforming to IS:2026 (Latest Version) complete with all

accessories as required.

(i) 100 kVA No. 2 172543 31565 345086 63130 408216

(ii) 250 kVA No. 1 279389 51112 279389 51112 330501

(iii) 500 kVA No. 0 359714 65806 0 0 0

(iv)Extra for providing fencing /enclosure for above item as indicated in

Explanatory Notes. Kg 200 53 12 10600 2400 13000

(v)Extra for construction of foundation for transformer installation as

required Cu.M 25 3339 944 83475 23600 107075

GEW Page 17 of 25

Page 82: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33023

Supply, erection, testing and commissioning of 3 pole, 11kV, 400amps,

gang operated switch complete with drop out fuses etc. as required. No. 2 20391 3731 40782 7462 48244

33024

Supply, installation, testing and commissioning of 11kV, 350 MVA, 630 A

draw out type manually operated, 3 panel HT VCB board complete

with CTs, PTs etc as required.

Set 0 1143754 209240 0 0 0

Supply, installation , testing & commissioning of , 17 panel LT switch

board comprising of following:

i) Incoming ACB 800A, 4 pole, 50kA (manual draw out type) with CTR

400/5A - 2 Nos

ii) ACB bus coupler 800A, 4 pole, 50kA (fixed type) - 1 No

iii) On load change over switch 400A, 4 pole, utilisation cat. AC 23 - 1

No.

iv) Out going switch fuse unit/fuse switch unit cat AC23 (TPN) with HRC

fuses (250 Amp) - 4 Nos

v) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC

fuses 125 Amp - 4 Nos.

vi) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC

fuses 63 Amp - 5 Nos.

vii) Sleeved/epoxy coated copper bus-bar - 800A for phases and 400A

for neutral.

Supply, erection, testing & commissioning of 20 panel LT switch

board comprising of the following:

i). Incoming ACB 800A, 4 pole, 50kA (manual draw out type) with CTR

800/5A - 2 Nos

ii). ACB bus coupler 1600A, 4 pole, 50kA (fixed type) - 1 No

iii). On load change over switch 800A, 4 pole, cat AC 23 - 1 No.

iv). Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC

fuses 400 Amp) - 3 Nos

v). Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC

fuses 250 Amp) - 4 Nos

vi) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC

fuses 125 Amp - 4 Nos.

vii) Out going switch fuse unit/fuse switch unit cat AC 23 (TPN) with HRC

fuses 63 Amp - 5 Nos.

Sleeved/epoxy coated copper bus-bar - 1600A for phases and 800A for

neutral.

33027(i) Deleted

33027(ii) Deleted

33028 Deleted

33025 No. 0 765235 75673

0 0 00 1180859 11677333026 No.

0 0 0

GEW Page 18 of 25

Page 83: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33029

Supply, erection/fixing of Fire extinguishing equipments (ISI)

Marked,Rubber mat (ISI marked) ,GI fire buckets filled with clean dry

sandheld on free standing steel stand,First Aid Box with medicines (ISI

marked) and associated materials,shock treatment chart on aluminum

frame,Schematic diagram of HT/LT installation & transformer data on

white hylem sheet with aluminium frame & fixing / providing in the sub

stationarea as per details in explanatory notes.

Set 5 45449 7138 227245 35690 262935

33030

Supply, installation, testing and commissioning of DG set with acoustic

enclosure, complete with AMF panel and all other accessories and

construction of plinth etc,

(i)82.5 kVA DG set with 160 amp, 4-pole, MCCB 50kA (Ics=100%Icu), 250

amps copper bus-bars, 4 pole contactors 250amp.Set 1 863493 85389 863493 85389 948882

(ii)160 kVA DG set with 250 amp, 4-pole MCCB 50 KA(Ics=100%Icu), 400

amps copper bus-bars, 4 pole contactors 400amps Set 1 1367729 135252 1367729 135252 1502981

(iii)250 kVA DG set with 400 amp, 4-pole MCCB 50kA (Ics=100%Icu), 600

amp copper bus-bars, 4 pole contactors 600amps. Set 0 1961462 193966 0 0 0

33031

Supply, erection, testing & commissioning of 125 kVAR Automatic Power

Factor Controller panel (capacitor bank) complete and connection with

the main panel as per site requirement.

No. 1 363114 35907 363114 35907 399021

SECTION - F: EARTHING ARRANGEMENT

33032

Earthing with 3 meter long, 50 mm dia, G.I. pipe class 'B' earth

electrode, adding of charcoal or coke and salt , providing masonry

enclosure and cover plate with lifting arrangement etc. including

connections with 4mm G.I.wire from earth electrode to switch

board/electrical equipment as required.

Job 56 1907 300 106792 16800 123592

33033

Earthing with 600mmx600mmx6mm thick G.I. earth plate, adding of

charcoal or coke and salt , providing masonry enclosure and cover plate

with lifting arrangement, watering pipe etc. as required.

Job 30 2118 332 63540 9960 73500

33034

Earthing with 600mmx600mmx3mm thick copper earth plate, adding of

charcoal or coke and salt , providing masonry enclosure and cover plate

with lifting arrangement, watering pipe etc. as required.

Job 16 3742 587 59872 9392 69264

EARTH CONNECTIONS

33035(i)Supply and laying 25 mm x 6 mm G. I. strip at not less than 0.50 meter

below ground or in recess as required.Meter 400 43 8 17200 3200 20400

33035(ii)Supply and laying 40 mm x 6 mm G. I. strip at not less than 0.50 meter

below ground or in recess as required.Meter 10 70 11 700 110 810

33035(iii)Supplying and fixing 40 mm x 5 mm copper strip on surface or in recess

or in 50 mm dia G.I. pipe as required. Meter 160 555 87 88800 13920 102720

GEW Page 19 of 25

Page 84: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

SECTION - G : CABLING

33036

Supply, laying . 1.1 KV grade LT XLPE insulated armoured, aluminum

conductor cable , making good the damages, end terminations with

aluminium crimping sockets/lugs, provision of cable route markers,

testing and commissioning etc. as required as per Technical

specifications: i) 2 Core 16 Sq.mm Meter 250 185 42 46250 10500 56750

ii) 2 core 25sq.mm meter 500 213 50 106500 25000 131500

iii) 2 Core 70 Sq.mm Meter 0 364 58 0 0 0

iv) 2 Core 185 Sq.mm Meter 100 752 74 75200 7400 82600

v) 4 Core 16 Sq.mm Meter 8500 238 53 2023000 450500 2473500

vi) 3.5 Core 35 Sq.mm Meter 1517 337 54 511229 81918 593147

vii) 3.5 Core 70Sq.mm Meter 500 537 85 268500 42500 311000

viii) 3.5 Core 120Sq.mm Meter 250 848 84 212000 21000 233000

ix) 3.5 Core 185Sq.mm Meter 250 1187 118 296750 29500 326250

x) 3.5 Core 300Sq.mm Meter 50 1923 90 96150 4500 100650

xi) single core 400 sq.mm Meter 0 618 98 0 0 0

xii) Extra for provision of cable route marker No. 500 224 11 112000 5500 117500

SECTION - H : ELECTRIFICATION BY HIGH MASTS

33037

Supply, erection, testing & commissioning of hot dipped galvanised , high

mast system complete with all accessories, foundation, carriage

arrangement suitable for 9 luminaries symmetrically arranged & control

gear boxes and lighting finial etc., twin dome aviation obstruction lights,

control panel, multi core flexible copper conductor cable, connection to

earthing system and fencing panel as per requirement.

i)16 Meter high mast system with 6 nos. 2x400 watts MH luminaries and

MH lamps Job 2 613453 60664 1226906 121328 1348234

ii)16 Meter high mast system with 9 nos. 2x400 watts MH luminaries and

MH lamps Job 0 654135 64685 0 0 0

SECTION - I : LAYING OF 11 KV / 33 KV CABLES

33038Supply and laying of following sizes XLPE (E) insulated, armoured,

aluminium conductor HT cable .

(i) 11 KV, 3 core 70 sq mm Meter 50 970 153 48500 7650 56150

(ii) 11 KV, 3 core 185 sq mm Meter 400 1655 164 662000 65600 727600

(iii) 33 KV, 3 core 300 sq mm Meter 125 3679 173 459875 21625 481500

(iv) 33 KV, 3 core 400 sq mm Meter 0 5189 173 0 0 0

33039 Deleted

GEW Page 20 of 25

Page 85: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33040

Supply of outdoor type, heat shrinkable, end termination kit, suitable for

following cable sizes XLPE(E) insulated, armoured aluminium conductor

cable and making termination, connections with overhead conductor,

testing & commissioning etc. (i) 3 core 11 KV 70 to 185 sq mm No. 9 7469 1173 67221 10557 77778

(ii) 3 core 33 KV 240 to 400 sq mm No. 2 23425 2317 46850 4634 51484

33041 Deleted

33042

Supply and erection of pre-stressed, cement concrete (PSCC) double

pole structure 9-11 meters long suitable for 330 KG working load with top

section 200 mm X 105 mm and bottom section 410 mm X 140 mm

complete with 4 nos. channel cross arms & 2 nos. cross bracing angles,

clamps, bolts, nuts , galvanized stay set , anti climbing devices,

Danger plates on the erected pole galvanised stay rod, casting of

foundation for poles & stays etc. as required.

No. 4 45127 4462 180508 17848 198356

33043

Supply and erection of 11 KV Porcelain Disc insulator complete with

galvanised iron hardware etc. including terminating with 11KV / 33 KV

overhead conductor and dismantelling, handing over works as required.

No. 18 813 80 14634 1440 16074

33044 (i)

Supply and laying of 200 mm dia RCC hume pipe, ISI marked, NP-4

under the Railway track/road etc, digging of trench and back filling

with excavated earth after laying of pipe and making good the damages

as required.

Meter 300 301 30 90300 9000 99300

33044 (ii)

Supply and laying 200 mm dia RCC hume pipe, ISI marked , NP-4

under the Railway track with trench less method and making good the

damages as required

Meter 150 301 1210 45150 181500 226650

SECTION - J: PROVISION OF PUMPS

33045

Supply, installation, testing & commissioning of submersible pump set

suitable to operate on 3 phase, 415V, 50 Hz AC supply along with control

panel etc complete for supplying water at suitable discharge and head as

per site requirements:

(i) 7.5 HP pump set Job 2 52952 5236 105904 10472 116376 (ii) 5 HP pump set Job 0 48492 4796 0 0 0

33046

Co-ordination/liasoning and chasing with State Utility Company for

availing new electrical connection/augmentation of sanctioned load at

stations, level crossings etc. including applying for load, collection of

estimates for loads, modification of power line crossings, arranging

payment from RVNL, depositing payment to State Utility Company,

arranging release of load & other related works. Payment to be made to

SEB for new connection, load augmentation, modification of power line

crossings etc. shall be made by RVNL .

Each Location 5 0 5650 0 28250 28250

SECTION - K: MISC. WORKS

GEW Page 21 of 25

Page 86: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33047

Design and preparation of working & completion drawings of all HT/LT

electrical installations of the project section where work is carried out

such as platform lighting, internal electrification of staff quarters, level

crossings, station building, offices, power line crossings, power supply

distribution arrangements of stations /sub stations, electrification of sub-

station buildings etc.& approval from the competent authority.

Job 1 0 116451 0 116451 116451

Conducting check survey of the complete project section to compile

details of all the existing LT, HT and EHT Power Line Electrical overhead

and underground power/telegraphic/other lines running along or accross

the track and recording measurements of horizontal distances of

structures from the existing & proposed tracks, vertical clearances of

conductors & guard wire from rail level, angle of crossings w.r.t. track,

height and type of towers/poles and preparation of lists as below:

i) List of Overhead/Underground Crossings infringing and requiring

modification. Proposed modification may also be indicated.

ii) List of Overhead/Underground Parallel Alignments infringing and

requiring modification. Proposed modification may also be indicated.

iii) List of Overhead/Underground Crossings/Parallel Alignments in

conformity with the rules/regulations and not requiring modification

.

SECTION - L : GLOW SIGN BOARDS

33049

Supply, installation, testing & commissioning of out door type, single

side, /Double side Glow sign boards/Pictorial signage boards with

suspension /side mounting/wall mounting type arrangements as

required,. (Payment for Double sided glow sign board shall be made @

150% of the rate of single sided glow sign boards)

Sq.Feet 750 236 36 177000 27000 204000

SECTION - M BATTERY CHARGING & PRE - COOLING ARRANGEMENT

33050

Supply, installation, testing & commissioning of Silicon rectifier battery

charging set conforming to relevant IS (latest), suitable for operation on

3 phase 4 wire, 415 volts AC supply system, 125 Volts to 150 Volts DC

output, 200 Amps. capacity as per Tech. Specification including

earthing, etc. as required.

No. 1 79175 12435 79175 12435 91610

33051

Fabrication, supply, installation, testing and commissioning of 110 volts

Battery charging point suitable for operation on 150 volts DC supply

system including erection on MS channel, foundation etc complete.

Job 1 2863 450 2863 450 3313

33052Fabrication, supply, installation, testing and commissioning of , pre-

cooling point as per details given in explanatory notes. Job 0 7747 1217 0 0 0

SECTION -N : DISMANTLING WORKS

9193533048 Job 0 919351 0 91935

GEW Page 22 of 25

Page 87: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33053

Dismantling of wiring installations of buildings, sheds, quarters etc.

complete with luminaries, fans, distribution boards, L.T. Panels and

associated cables including accountal,stocking, transportation and

handing over of released materials to Electrical department as directed

by the Engineer and making temporary arrangements if required.

Each Station/ gate lodge/ 3 0 5358 0 16074 16074

33054(i)

Dismantling of erected pole/overhead conductor, GI wire, cross arm

brackets, insulators, stay, luminary etc including accountal , stocking,

handing over the released material to railway’s authorized official as

instructed by the Engineer and making temporary arrangements if

required.

No. 100 0 536 0 53600 53600

33054 (ii)

Dismantling of Sub-Station equipments such as transformers, DG Set,

HT & LT Panels, cables etc. at site including transporting, stocking and

handing over to Electrical department as instructed by the Engineer and

making temporary arrangements if required.

Job 1 0 10175 0 10175 10175

SECTION -O : (N.I.Works)

33055 (i)

Provision of temporary lighting arrangement with 1x40 watt F.L. tube light

fittings/CFL fittings /flood light/halogen fittings and pedestral/ceiling fans,

desert coolers in temporary tents, buildings, goomties, on tracks, in yard

area including wiring, cabling, earthing etc.as directed by the Engineer

and as per site requirement for pre/post/during non - interlocking period,

including providing stand by D.G set of suitable capacity and deployment

of staff for operation of DG set as per site requirement.

Note: Normal power supply may be used, up to sanctioned load, if

surplus available at site.

Per day 5 0 16073 0 80365 80365

33055 (ii)

Extra for operation and maintenance of temporary wiring installations,

replacement of consumables, supply of diesel oil, lub oil etc for operation

of DG set etc.

Per day 25 0 3189 0 79725 79725

33056

Supply, installation, testing and commissioning of A.C.Unit, complete with

LCD display cordless remote suitable for 1-phase 230 ± 10% voltage AC

supply including supply & installation of 5 KVA, wall mounted, I.C.

controlled electronic auto voltage corrector

(a) 2.0 Tonne window type AC (Not less than 3 star energy rating) No 5 31108 2143 155540 10715 166255

(b) 1.5 Tonne split type AC (5 star rating) No 5 30562 2143 152810 10715 163525

33057

Supply & erection of G.I Octogonal pole including digging of pit, making

foundation with cement, sand & concrete in ratio 1:2:6, muffing,

accomodating G.I. Pipe in foundation for cable loop-in-loop out of

suitable size as required

i) 5 meters long No 100 6898 1693 689800 169300 859100

ii) 7 meters long No 0 9562 2347 0 0 0

iii) Additional cost of single arm bracket suitable for street light fixture No 90 288 71 25920 6390 32310

iv) Additional cost of double arm bracket suitable for street light fixture No 10 341 84 3410 840 4250

GEW Page 23 of 25

Page 88: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

33058

Supply installation testing & commissioning of cubical type mast mouted,

dust & vermin proof, L.T control switch board conforming to IS:8623

(latest version), complete.

i)a) with TPN MCCB 32A, 35KA, fixed type (Ics=100%Icu) - 1 No

b) copper busbars 200A (for 5 KVA AT)No 14 8723 2141 122122 29974 152096

ii)a) with TPN MCCB 63A, 35KA, fixed type (Ics=100%Icu) - 1 No

b) copper busbars 200A (for 10 KVA AT)No 22 10217 2507 224774 55154 279928

iii)a) with TPN MCCB 150A, 35KA, fixed type (Ics=100%Icu) - 1 No

b) copper busbars 300A (for 25 KVA AT)No 2 12138 2979 24276 5958 30234

Total (A) 14638747 4005148 18643895

Section -P Non Schedule Items

NS-1

Supply, erection ,testing & commissioning of control and distribution

panel for colour light signalling supply in 25 KV AC traction system as per

RDSO technical specifications No. TI/SPC/PSI/CLS/0023 includind latest

amendment for 5 KVA AT

No 7 32133 5670 224931 39690 264621

NS-2

Supply, installation, testing & commissioning of fabricated Double door

distribution board confirming to IS ; 13031,IS:8623 With degree of

protection not less than IP 42 as per IS 13947/Pt.1/1993 with powder

coated finish for Non Emergency Load complete with MCB's ,Copper bus

bar of 100 Amps , Neutral link,inter

connections,ammeter,Voltmeter,Indication lights etc,and shall be suitable

for operation on three phase 4 wire 415 volts AC supply system

,comprising

No 1 4651 1163 4651 1163 5814

(i)MCB FP 63 Amps --- 1 No. incomming

(ii)MCB TPN 40 Amps -- 1 No. outgoing

(iii) MCB SP 16 Amps - 3 No. outgoing

(iv) MCB SP 10 Amps - 5 No. outgoing

NS-3

Supply,fixing,testing & commissioning of energy efficient light fittings

model MAR 114 FTL HF (l1612) of GE with Tube rod complete in all

respect with clear Polycorbonate cover with high frequency warm start

electronic ballast and wide input voltage range as per spec- Make-

Bajaj/Philips/ Cromption/GE

No 34 1523 381 51782 12954 64736

Total (NON Schedule Items) (B) 281364 53807 335171

G. Total ( SOR AND NON SCHEDULE ITEMS) (A+B) 14920111 4058955 18979066

Grand total carried forward to summary 18979066

GEW Page 24 of 25

Page 89: Volume 2 Package 1 03-03-2015

BOQ of RANI-SRPJ Package-1

Misc Items

ITEM Description Unit QTY Supply (In

Rs)

Erection

(In Rs)

TOTAL

SUPPLY

(In Rs)

TOTAL

ERECTION

(In Rs)

GRAND

TOTAL

(In Rs)

M-1Drilling of 50mm dia holes in the existing RCC tresle

beam/pier/mass concrete beam to the depth between

450mm to 1000mm with pneumatic drillers, compressor

etc. and making the hole surface fit insertion of bolts with

all lead and lift. Manufacture and supply of galvanized MS

bolts of size 32/25 mm dia with threaded at both ends of

varying lengths including nuts, check nuts, washers etc.,

(All labour and materials by the contractor). Pressure

Grouting the drilled holes (50mm dia) by epoxy grouting at

a minimum pressure of 7Kg/sqcm of approved quality of

epoxy resin hardner and thinner Payment for bolts and

nuts will be paid under separate item.

Loc 100 19182 4796 1918200 479600 2397800

M-2

Shifting of mast along with foundation block by excavating

surrounding earth, un-supporting the OHE and pushing

the foundation manually using Hydraulic jack of required

capacity, alignment of mast back filling of earth, supporting

OHE and compaction (Maximum shift of 60 cm)

Nos 10 0 11270 0 112700 112700

M-3Supply, fixing, connecting and commissioning of Street

light energy efficient flourescent tube light fitting single

phase 50Hz, 230 Volt supply conforming to IS:10322 part -

5 section 3 or latest and as per IP - 65 protection with 2

feet 4 x 24 watt (T-5) day light tube rod and premium

control control gears one control gear for each tube rod

and aluminium body with clear acrylic cover UV treated

similar to CGL,OSRAM,BAJAJ, PHILLIPS

Nos 1 7263 6537 7263 6536.7 13800

M-4Clearing of Ballast/rails/sleepers stacked to enable to cast

foundations.

Each 50 0 960 0 48000 48000

M-5Manning of anti theft transformer in Night

Man

Month

36 0 12000 0 432000 432000

M-6Landscape filling of specified arears with 1:3 mixture of

farmyard manure to red earth, for a minimum depth of 0.3

m, including levelling, making to required shape, grading,

tamping, soddig, with Mexican carpet grass in 0.6x0.3 m

pieces, ensuring no visible joints and proper slope for

surface water drainage maintenance upto six months with

free replacement of any mortality including watering upto

22 ltrs per sq.m per day including materials, labour, tools,

plant, all lead and lift, water etc. complete as per

specifications and as directed by the Engineer.

Sq.Mtr 250 700 53 175000 13250 188250

M-7Excavation of earth to the depth of 2 mtrs below ground

level for buring 13 meter long rail and connecting it as per

RDSO drawing(Rail will supplied by RVNL)

Each 1.00 0 2148 0 2148 2148

Total 2100463 1094235 3194698

Grand total carried forward to summary 3194698

BOQ for Railway Electrification works between RANI (Excl.) - SRPJ (Excl) Section 198 TKM of Ajmer Division of North Western Railway

Page 25 of 25

Page 90: Volume 2 Package 1 03-03-2015

 

Page 91: Volume 2 Package 1 03-03-2015

Explanatory Notes

( Signal & Telecom

Engineering)

Page 92: Volume 2 Package 1 03-03-2015

 

Page 93: Volume 2 Package 1 03-03-2015

S.No ITEM NO EXPLAINATORY NOTES INSPECTION

AGENCY

Group - C

1 38651 Supply of Railway underground jelly filled , 0.9 mm dia, 6 Quad cable as

per spec. No. TC/30/2005 Amndt-2 or latest.

RDSO

2 38653 Supply of PIJF-Polythene insulated polythene sheathed jelly filled

telephone cable with poly-AL moisture barrier with armoured of size: 10

PAIR X 0.63 MM. as per specification IRS:TC-41/97 amendment no. 1 or

latest

RDSO

3 38654 Supply of PIJF-Polythene insulated polythene sheathed jelly filled

telephone cable with poly-AL moisture barrier with armoured of size: 20

PAIR X 0.63 MM. as per specification IRS:TC-41/97 amendment no. 1 or

latest

RDSO

4 38657 Supply of 24 Fibre armoured Optical fiber cable as per SPEC No.IRS.TC-

55/2006 ver.-1 with ammendments.

RDSO

5 38701 Supply of RCC pipes 150mm dia, 2 Mtr long along with collars as per

Specn. No. IS/458/1971 for use near OHE Substation for cable

protection.

RITES

6 38702 Supply of DWC pipe with one snap fit coupler and 'O' ring conforming to

IS 14930 (part 2 : 2001), Non metallic, corrugated, multiwalled, normal

duty, pliable, without protection against chemical attack and Non flame

propagating in 6 meter length of size 120 mm outer dia & 102 mm inner

dia.( Permitted tolerance in dia = +/- 2 mm).

RITES

7 38703 Supply of SPLIT DWC pipe conforming to IS 14930 (part 2 : 2001), Non

metallic, corrugated, multiwalled, normal duty, pliable, without protection

against chemical attack and Non flame propagating in 2 meter length of

size 200 mm outer dia & 175 mm inner dia.( Permitted tolerance in dia =

+/-2 mm) ( TWO half round pipe constitute one split pipe)

RITES

8 38704 Supply of Galvanized Iron pipe 100 mm dia medium grade with screw

end both side and fitted with sockets as per specn. No.IS-1239, part 1 /

1990 in length of approx 6 meters

RITES

9 38705 Supply and jointing of Quad cables with theromoshrinkable jointing kits.

This includes:

RDSO

a Supply of theromoshrinkable jointing kits as per RDSO Spec.

No. IRS. TC77-2000/Amdt.1 ( or latest) suitable for 6 quad cable

RDSO

b Supply of 2T type small VF transformer (470:1120) for quad derivation

joints suitable for 6 quad cable - required only for derivation joints.

ENGINEER

MODIFICATION OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ

(PKG-I) OF NWR

Page 94: Volume 2 Package 1 03-03-2015

S.No ITEM NO EXPLAINATORY NOTES INSPECTION

AGENCY

Group - C

MODIFICATION OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ

(PKG-I) OF NWR

c Making of Joint on Quad cable as Straight through joint with out

transformer or derivation joint with 2T Transformer as directed by

engineer at site.The derivation joint includes tapping of nominated quad

of 6 quad cable at specific location to 10 pair PIJF cable already laid in

the ground. This also includes supply of all other materials required for

the work. After jointing the cable thorough test such as insulation test,

continuity test etc., to be carried out jointly with Engineer and in case of

defective joints, same will be rejected along with jointing material.

ENGINEER

10 38902 Supply of Electronic magneto telephone desk type as per specn.No.IRS

:TC79/2000.with latest amendment

ENGINEER

11 40004 Supply of 4 wire way station equipment as per Spec. no. TC. 38/97 or

latest.

RDSO

12 40005 Supply of Power Supply for telecom installation at way side equipment as

per TEC Spcn. IRS.TC-72/97 Amdt.1 or latest.

ENGINEER

13 40006 Supply of portable Emergency telephone 4 wire as per spec. no. IRS

TC:75-99 with latest amendment

RDSO

14 40008 Supply of Emergency Socket Box with socket six pin flat to RDSO Spec

No. IRS: TC. 42/87. Amdt. 1 or latest.

ENGINEER

15 40009 Supply of VF Tapping Transformer to RDSO Spec. No. IRS.TC-22-76 of

type 470:1120, 600:470, 600:1120. exact break up to be decided in

consultation with engineer.

RDSO

16 40102 Supply of FCPC To SCPC 10 meter long patch cords with 0db adaptors

as TEC spec G/OJC-01/03 JAN99 Or latest.

ENGINEER

17 40103 Supply of managed Expendable rack type STM-1 ADM L 1.1 as per

Technical Spec. No. TEC GR No. GR/SDH-04/02 Mar 02 with

amendment 1 , 2 ,3 & 4 or latest with STM-1 aggregate interface , 21

E1S and 4 Numbers of 10/100 Base T Ethernet Port order wire, power

supply unit, sub rack installation material and accessories manual

etc.The equipment should be fully wired for its ultimate capacity and

provide redundency for power supply and synchronisation and other

detail as given in chapter 3 (model - TJ 100 MC1).

RDSO

18 40104 Supply of SMPS based battery chargers for telecom use 48v, 25 amps in

N+1 configuration using 2 modules of 25 A (FR/BC) with automatic

switching between the modules N=2. RDSO/SPN/TC/ 102-2013 Ver0.0

with Amendments.

RDSO

19 40105 Supply of 200 AH capacity LM batteries 24 Nos. at each station with

required no. of porcelene insulator. The suitable wooden rack for keeping

batteries shall also be supplied and it should be painted with 2 coats acid

resistnt paint. (IRS: S 88/2004 Version 1.0 or latest)

RDSO

20 40356 Supply of Speaker cable 2 Core Shielded & screened of size 47/0,193 as

per IS-694Cable for modification of existing PA System

ENGINEER

Page 95: Volume 2 Package 1 03-03-2015

S.No ITEM NO EXPLAINATORY NOTES INSPECTION

AGENCY

Group - C

MODIFICATION OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP GANJ

(PKG-I) OF NWR

NS Items:

21 NS 3Supply of DTMF based headquarter equipment (2/4 wire) with all accessories

for control office as per RDSO spec no. IRS TC:60/2007 or latest including

12V power supply unit to suit RDSO spec. no. IRS TC 72/97 with latest

amendments and to be procured from RDSO approved firms only.

RDSO

22 NS 7 Supply of Earth tester - Digital Motwane make ENGINEER

23 NS 8 Supply & fixing of PVC Conduit pipe 25 mm dia and thickness 1.5 mm

with suitable clamps at interval of 1 mtr.

ENGINEER

24 NS 9 Supply of Network Monitoring System (NMS) including associated

application software for 2 mb drop insert mux and its associated item

as per technical spec. and office stipulation detailed with all accessories

incl. Power supply as well as one soft copy of software. (Refer. Telecom

special conditons : Chapter-3).

ENGINEER

25 NS 10 Supply of Network Monitoring System (NMS) including associated

application software for STM-1 and its associated item as per

technical spec. and office stipulation detailed with all accessories incl.

Power supply as well as one soft copy of software. (Refer. Telecom

special conditons : Chapter-3).

ENGINEER

26 NS 11 Supply of local craft terminal with minimum intel core i5 - 4210U

Processor, windows 8.1 OS, 4GB RAM/1TB HDD, Sparkling Black / 15.6,

2GB Graphic Card as per technical spec. and other stipulations complete

with all accessories compataible with NMS (Refer. Telecom special

conditons : Chapter-3).

ENGINEER

27 NS 12 Supply of remote service terminal as per tech. Spec.and other

stipulations with all accessories compataible with NMS. It should be

possible to plug in remote service terminal at any of the station. It should

be capable to programme any network element from any location of

network and read the full status of any element in the network from

remote service terminal, as well as one soft copy of the software .(Refer.

Telecom special conditons : Chapter-3)

ENGINEER

28 NS 13 Supply & Provision of Surge protection device for AC Power line

incoming, complete for Single phase power protection as per RDSO

specification RDSO/SPN/244/2004 or latest shall be procured from

RDSO approved/recommended sources only.

ENGINEER

29 NS 14 Supply of 2T Transformer small transformer (470:1120) for quad

derivation joints suitable for 6 quad cable as per RDSO Spen No.

IRS:TC:76/2000 with latest amendments.

ENGINEER

Page 96: Volume 2 Package 1 03-03-2015

S.No ITEM

NO

EXPLAINATORY NOTES INSPECTION

AGENCY

Group - D

1 39652Trenching up to depth of 1000mm with 300mm wide base in all

types of soil and backfilling after laying of HDPE pipe / OFC cable

and 6 quad/PIJF cable etc. at 1000mm & 800 mm depth

respectively. Ramming and consolidation of soil in trenches as well

as disposal of the soil if any. This includes supply & provision of all

protective works as per specifications, drawings and stipulations of

tender documents and as per cable route plan such as GI pipe with

socket, RCC pipe/RCC split pipe, M.S. cable route markers and

bricks etc. This also includes cutting of armour of cable as per para

17 of Section III, chapter III of Tender document.

ENGINEER

2 39653 Providing chase in hard rock deep enough to fix GI pipe for laying of

S&T cable and minimum 100 mm concreting over GI pipe after

providing suitable U clamp to GI pipe. Chase to be provided where

optimum depth(minimum 0.6 mtrs) is not possible and which is

verified and agreed by engineer in charge of the work or his

representative NOTE: Where digging of depth as specified is not

possible, the depth can be reduced with the approval of the

engineer in charge and the payment shall be made proportionately

ENGINEER

3 39654 Perforation ( 24 to 36 perforation in a pipe) and Fixing of GI pipes

for entry of cable on girder bridges, RCC bridges, drains, culverts,

rocky places tunnels/deep cutting or at places as advised by the

engineer in charge of the work & concreting the ends with brick

channeling at both ends as per drg. The pipes are to be fixed on the

bridges by suitable bridge fixtures or MS clamps or brick support at

an interval of 3.0 mts (max) or as per approved drawing and

directives of Railway Engineers. On masonry bridges or in rocky

place if required the entire length of the pipe by cement, sand and

15-25 mm chips. All the fixing materials nut & bolts, clamps,

materials for construction of pillars. MS channel etc. will be supplied

by the contractor.

ENGINEER

4 39655 Fixing/Laying of RCC pipe(at TSS/SP/SSP), DWC pipes with

collars for laying of cables in open trench or underneath the track,

road, platform etc. as directed by Engineer and drg. Issued.

ENGINEER

MODIFICATION OF S&T ARRANGEMENT IN CONNECTION WITH RE WORK OF RANI - SWARUP

GANJ (PKG-I) OF NWR

Page 97: Volume 2 Package 1 03-03-2015

S.No ITEM

NO

EXPLAINATORY NOTES INSPECTION

AGENCY

Group - D

5 39656 Laying of various sizes and types of cables in trenches: Laying of

signaling / power / telecom / quad/OFC cable of various sizes in the

excavated trench and through laid pipes. This includes

loading/unloading & transportation of cables to site. Whenever

several cables are to be laid separation of cables should be as

advised by site engineer. This includes unwinding of cable drum

using proper jigs without causing damage to cable.

ENGINEER

6 39657 Placing of half round ( Split DWC ) pipe over the laid cable in open

trenches in yards between Home signal to Home signal and tieing

pipe with cable with loose armouring as per Drg.

ENGINEER

7 39658 Supply of 20 pair CT Box and fixing on Hylam board on wall and

termination of quad/ telecom cable at station/ SP/ SSP/ TSS/ LC

gate/ Relay room/ office/ residences as per requirement and details

given by engineer at site. The CT box after termination shall be

sealed by pouring paraffin wax.

ENGINEER

8 39901 Supply and Installation of Maintenance free Earthing and Bonding

System as per RDSO specification. This includes:

ENGINEER

a Supply of MAINTENANCE FREE EARTHING AND BONDING

SYSTEM (Two Earth Pit) as per RDSO specification no:

RDSO/SPN/197/2008 consisting of (a) Earth electrodes made of

high tensile low carbon steel circular rods, molecular bonded with

copper on outer surface as per RDSO spn - 2 no. (b) RDSO

approved Earth Enhancing compound (c) (MEEB) Main

equipotential earth busbar of Copper of 300x25x6 mm (Min) and

(SEEB) Sub equipotential earth busbar of copper 150x25x6 mm

(Min) (d) Multistrand single core PVC insulated copper cable as per

IS:694 -(i) of size 10 sqmm to connect individual equipment to

SEEB using copper lugs with stainless steel nuts and bolts, (ii) of

size 16 sqmm to connect SEEB to MEEB using copper lugs with

stainless steel nut and bolts (iii) of size 16sqmm to connect Surge

protection devices (SPD) to MEEB using copper lugs with stainless

steel nut and bolts (iv) of size 35 sqmm (duplicated) to connect

MEEB to main earth electrode (e) Copper tape of size 25x2mm to

connect the two earth pits, (f) Earthpits x 150 mm to terminate on

earth electrode.

RDSO

b Construction of earthpit and making of earth as per RDSO

specification no. RDSO/SPN/197/2008 and drawing no:

SDO/RDSO/E&B/001, Equipotential Earth bus bar and its

connection to equipments and surge protection devices in the

equipment room as RDSO Drg. no. SDO/RDSO/E&B/002.

Provision of Exothermic weld connections, fixtures for mounting the

Copper tape in the relay room, weld materials, tools & fixtures for

the weld shall be arranged by the contractor.

Engineer

Page 98: Volume 2 Package 1 03-03-2015

S.No ITEM

NO

EXPLAINATORY NOTES INSPECTION

AGENCY

Group - D

9 40502 Installation and commissioning of 4 wire way station equipments,

power supply unit at SP/SSP/Station/ TSS/AEN/PWI/SI offices/

Residences. The installation of way station equipment and power

supply unit (supply covered under a separate item) shall be

mounted on a MS angle rack. All the materials for installation,

commissioning of 4 W equipment and power supply unit shall be

provided by contractor.

ENGINEER

10 40503 Installation of emergency socket box including socket on the Rail

Post in the section and yard at every one Km distance as

pertapping chart supplied by the survey team. this will include wiring

and termination of quad cable on the socket box mounted at 1 mtr

hight, clamped with 2 nos. U-Clamps, provision of concreate

foundation of rail post in such a way that the rail post is one meter

above the earth level. The concrete shall be in ratio of 1:3:6 of

cement, sand & stone chips. The contractor shall jointly test with

RVNL Engineer for its satisfactory operation. This includes painting

of emergency socket post with alternate yellow and black strip of 6"

width and paiting of the socket box with gray colour paint and

painting of arrows on the telephone posts/cable markers to show

the nearest Emergency socket as instructed by engineer at site.

Rail Posts and MS pipes of required lengths for fixing Emergency

sockets will also be supplied and installed by the Contractor.

ENGINEER

11 40601 Supply and installation of OFC cable joint enclosure as per TEC No.

G/OJC-01/03 Jan 99 or latest and splicing o optical fibre cables (24

Fibre) and testing.

ENGINEER

12 40603 Supply of 2 MB programmable primary digital drop insert

multiplexer with conference facility as per specifications

IRS:TC/68/2004 with latest amendments & other stipulations of

tender document fully wired for 30 channels complete with power

supply unit, remote control supervision facility & all other

accessories installation materials, manuals etc. It should have

facility to accomodate data interface cards in multi drop mode &

should be able to support card needed for video conference. NOTE

: 1) in case the cards contain less than 8 circuits or 6 circuits as

mentioned above suitable number of cards to equal the total

requirements of circuits must be supplied. 2) If the card contains

more than 2/6/8 ports per card as mentioned in the schedule, the

tenderer shall still supply the number of cards asked for. The

number shall not be scaled down as per the number of ports.

RDSO

13 40604 (i) 4 wire, E&M, VF interface cards (8 circuits per card). RDSO

14 40604 (ii) subscriper loop interface cards (6 circuits per card). RDSO

15 40604 (iii) ISDN Interface (Two BRI Ports per card) RDSO

Page 99: Volume 2 Package 1 03-03-2015

S.No ITEM

NO

EXPLAINATORY NOTES INSPECTION

AGENCY

Group - D

16 40604 (iv) Exchange loop interface cards (6 circuits per card). RDSO

17 40604 (v) G 703, 64 kbps data interface cards with a minimum of 8 ports

per card.

RDSO

18 40605 Supply, installation testing & commisning including earthing of 42 u

19" covered racks for housing SDH and P- MUX equipments, DDF,

FMS, MDF, using krone module etc. Complete with all fittings, wired

and equipped with integrated protection modules for all channels

and adequate numbers of cooling fans ,AC/DC power supply

distribution panels, U-Link panels and other hardware like runway,

ladders etc. It should be possible to lock all the equipments with

only order wire telephone remaining outside the rack. The rack

should be of APW President/Rittal make. The components of the

rack are specified below. Broad description of rack is detailed

below. Rack size 2200(mm) H x 600(mm) W x 600( mm) D. Fixed

side panels 42 U x 600 (mm) D front glass door plain 42 U x 600

(mm) D rear MS door plain 42 U x 600 (mm) D leveling screws - 4

numbers .Fan directly mounted on top 48 V DC 90 CFM - 2 Nos.

earth connectivity kit - 1 No. Cable manager with cable loops-2nos.

ENGINEER

19 40106 Blowing of armoured Optical Fiber Cable into duct by using blowing

machine and associated works .Before blowing the duct integrity

shall be tested .If any defect shall be found during duct integrity test

, the entire length of HDPE duct from one chamber to another

chamber chamber is to be replaced by Contractor at free of cost.

ENGINEER

20 40806 Supply and placing of second class bricks of size 225x100x75 mm

(9 bricks per mtr) horizentally breath wise in the trench after

covering the laid cable with soft soil of 50 mm thickness.

ENGINEER

NS Items:

21 NS-18 Excavation of cable trench 1.2m deep x 300mm width as per

Technical Specifications 51.2, at track & roads crossing, laying of

DWC pipes, as per Drg. No. RVNL/S&T/SG 024/2005, refilling of

trench, ramming. HDPE pipe shall be laid at the bottom of the

trench and after refilling with seived earth by 150- 200 mm, 6 quad

cable shall be laid and restoring the earth to original condition.

ENGINEER

Page 100: Volume 2 Package 1 03-03-2015

S.No ITEM

NO

EXPLAINATORY NOTES INSPECTION

AGENCY

Group - D

22 NS-19 Horizontal directional drilling for laying of HDPE 125/200mm dia

pipe 1.4 Meter to 2.1 meter below the formation of Earth level below

ballast, As per drawing and instruction of Engineer at site. Terms &

Conditions A) The rate shall include Horizontal direction drilling at

any intermediate obstruction, either natural or manmade any

boundary strata. B) The rate is inclusive of all material equipments

and labour required during trench less horizontal directional drilling

under. C) The pipes are to be laid under Railway

track/Platform/Pucca Circulating area etc. Necessary arrangement

to be provided and all precautions are to be taken so that bore

coming out at either end is not deviated from the Horizontal level by

more than 250mm in horizontal. D) The rate is inclusive of detection

and protection of underground utility encountered during boring. E)

The payment shall be made for boring only when HDPE pipe is

provided in the above

ENGINEER

23 NS-20 Testing & commissioning of complete OFC system. ENGINEER

24 NS-25 Initial charging of Secondary cells:- ENGINEER

25 NS-28 2 Volts, 200 AH ENGINEER

26 NS-29 Supply of 20 Pair Krone terminal complete with mounting

arrangements.

ENGINEER

27 NS-30 Supply of Krone insertion/ extrusion tool Krone make ENGINEER

28 NS-31 Supply & installation of wire insulator for wire operating, Level

Crossing Lifting barriers/Signals as per Specification No. IRS S-47-

74

ENGINEER

29 NS-32 supply and installation of Insulator of Point rodding at function end

and lever end as per Technical specification.

ENGINEER

30 NS-33 Provision of GPS Clock in Stations RDSO

Page 101: Volume 2 Package 1 03-03-2015

 

Page 102: Volume 2 Package 1 03-03-2015

Explanatory Notes

(Electrical Engineering)

Page 103: Volume 2 Package 1 03-03-2015

 

Page 104: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 1 of 48

EXPLANATORY NOTES OVER HEAD EQUIPMENTS

SOR ITEM OHE-1

PREPARATION AND SUBMISSION OF DESIGNS AND DRAWINGS FOR

OVERHEAD EQUIPMENT SWITCHING STATION, SECTIONING DIAGRAM,

POWER SUPPLY DIAGRAM, SCHEMATIC DIAGRAM OF SWS, TRACTION

WORKING RULE DIAGRAM AND INSTRUCTIONS etc REQUIRED FOR

COMMISSIONING OF OHE

The price shall cover preparation and submission of overhead equipment plans indicating

location of structures in stages, and preparation of all drawings and designs relevant to the

tendered works and required to be finalized by the Contractor. The price shall include the

following:

(i) Preparation and submission of pegging plans layout plans incorporating span, height,

chainage, curves, gradients, type of masts/portals, foundations, ATD locations, stagger,

location of cut-in-insulators, signal locations etc, making minor modifications with the

approval of the Employer/Engineer to the layout of the structures and overhead

equipment, if necessary.

(ii) Preparation and submission of cross section drawings and structure erection drawings

for each structure location.

(iii) Choice of type and size of foundations to suit soil and loading conditions

(iv) Preparation and submission of long section drawings of overhead equipment

where such drawings are required including detailed study of over line structures such

as foot over bridges, road over bridges etc. for maintaining the specified height of

contact wire and requisite clearances.

(v) Preparation and submission of other designs and drawings including drawings of small

parts steel work (other than those for which RDSO standard drawings

are available) and detailed designs for LT. Supply Transformer stations, design of

OHE structures for bridges etc.

(vi) Supply of requisite number of copies of Bonding Plan drawings.

(vii) Design, preparation and submission of switching station drawings including

survey, investigation of soil bearing pressure from NABL accredited agency,

preparation of cross section drawings, preparation of general arrangement drawings,

detailed layout of equipment, bus-bar connections and insulators, layout of earthing

system and earth connections, cable run layout, detailed designs and drawings for steel

work and structural support, excluding the ones for which supply is made by the

Employer/Engineer, suitable concrete plinths for equipment and drawings for

equipments, components, fitting and materials supplied by the Contractor. The price

shall include supply of requisite number of copies of all drawings, including

completion drawings.

(viii) Preparation, supply and fixing of Sectioning / Schematic / TSWR diagram boards for

stations / Cabins / SWS / RCC and 25 Kv AC Traction Station Working Rule

instructions including supply & fixing of shock treatment chart etc.

(ix) Supply of requisite no. of soft (in Auto Cad) and hard copies of all drawings, including

completion/approved/as erected drawings for OHE and Switching stations.

Page 105: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 2 of 48

SOR ITEM OHE-2

SUPPLY AND ERECTION OF A LARGE SPAN WIRE (130 Sq.mm)

INCLUDING ITS FITTINGS WITH INSULATORS:

The price shall cover supply of all components including large span wire, , adjusters,

terminal fittings and mast attachments required to attach a large span wire or a Head

span wire or Cross span wire or Steady span wire or a Support span wire for

supporting contact wire only, at both ends, to traction masts/structures or special

brackets, solid core insulators The price shall cover erection of all components

including mounting arrangements, span wire, 9 Ton solid core insulators and all small

part steel work if any.

SOR ITEM OHE-3

SUPPLY AND ERECTION OF MATERIALS FOR TERMINATION OF

SINGLE CONDUCTOR OF OVERHEAD EQUIPMENT OR A TERMINATING

WIRE WITH INSULATORS:

The price shall cover supply of all material necessary for the termination of single

conductor of overhead equipment or terminating wire on a traction mast or structure, all

SPS work as required including appropriate mast anchor fittings, clevis assembly,

NOTES FOR MEASUREMENTS: For the purpose of payment against this item,

the length of track shall be measured as under :-

1. General: By the difference in the chainages of the length under consideration, as

incorporated in the layout plans.

2. Turnouts: The track taking off shall be deemed as starting from the SRJ of the

Turnout.

3. Cross-over’s: The length of track shall be taken as the difference in the

chainages of the toes of switches of the two turnouts constituting the crossover.

4. Diamond crossing with or without slips: The two tracks crossing each other

shall be measured independently as per note 1 above as though there were no

crossing. No extra payment shall be provided for slip points.

5. Dead ends and tops of loops: The lengths for payment under this item shall be

up to the chainage of anchor mast of the terminating OHE.

6. Feeders and return feeders from grid sub-station to feeding station: This item

will also be applicable independently in case of feeders / return feeders / conductors

from grid sub­station to overhead equipment feeding stations or in a case of feeders

/ conductors running on independent structures (not supporting OHE) along or

across tracks.

In such a case the length of line to be considered for purpose shall be measured by

(a) the distance between the center of gantries of the grid sub-station and feeding

stations in case of feeder / return feeders / conductors line from grid sub-station, or

(b) by the distance between the center line of the two structures to which the feeders

/ return feeders / conductors are anchored in case of feeders running along the track

if such feeder / return feeders / conductors are running completely on independent

structures or (c) by the distance between the center of the two structures supporting

the OHE on either side of the first and last independent structure or (d) in case of

feeders / return feeders / conductors running along the track supporting OHE.

7. No extra payment shall be made for any revision/changes/Modification in

OHE/PSI drawings on account of changes in ESP/SIP/L-section etc.

Page 106: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 3 of 48

adjuster, anchor double straps, ending clamp for the catenary or contact wire or

terminating wire and fittings including 9-tonne insulators. The price shall cover erection

of all materials including 9-tonne insulator assembly and terminating wire, if any.

Note: In case of “V” type anchorage is adopted for terminating a single conductor such

an arrangement would be counted as two off under this item for the purpose of

payment.

SOR Item OHE-4

SUPPLY AND ERECTION OF MATERIALS FOR TERMINATION OF ALL

ALUMINUM 25 KV FEEDER (SPIDER) INCLUDING FEEDER WIRE WITH 9-

TONNE INSULATORS:

The price shall cover supply of all materials required for the termination of an all-

aluminum 25 KV feeder (SPIDER), all SPS work as required including appropriate

mast anchor fittings, adjuster, strain clamp and fittings including feeder wire and 9-

tonne insulators. The price shall cover erection of all materials including 9-tonne

insulators assembly.

SOR Item OHE-5

SUPPLY AND ERECTION OF MATERIAL FOR TERMINATION OF COPPER

CROSS FEEDER WITH GANTRIES INCLUDING CROSS FEEDER WIRE

WITH 9-TONNE INSULATORS:

The price shall cover the supply of all materials required for termination of copper cross

feeder wire (37/2.25mm HDBC) all SPS work as required including appropriate mast

anchor fitting (3231), 18mm single clevis (5040), 9-tonne adjuster (5020-2), feeder

ending clamp (1130), double clevis (3010) and other components as necessary

including feeder wire (37/2.25 mm HDBC) and 9- tonne insulator assembly. The price

shall also cover the erection of all these materials/components including 9 ton insulator

and termination of cross feeder at either ends. Fittings/Components required for

termination of one cross feeder at both ends constitute one set.

SOR Item OHE-6

SUPPLY AND ERECTION OF TERMINAL BOARDS IN CONTROL

CUBICLES:

The price shall cover supply and erection of a wall mounted terminal boards with six

numbers of two way terminal blocks for connecting the cables from the outdoor

equipment of a switching station as per RDSO Drawing.

SOR Item OHE-7

SUPPLY AND ERECTION OF AN IRON CLAD 240V AC AND 110V D.C.

BOARD WITH FUSE BOX IN CONTROL CUBICLES:

The price shall cover supply and erection of a 15A, 240V, A.C. iron clad 4 way

fuse box and a 15A, 110V DC iron clad two way fuse box on the wall inside the

remote control cubicles. The fuse boxes shall be complete with four fuses and two

fuse carriers‟ and bases respectively.

Page 107: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 4 of 48

SOR Item OHE-8

SUPPLY AND ERECTION OF LEAD ACID BATTERIES 40 AH WITH

BATTERY CHARGERS:

The price shall cover supply and erection of 110V, 40AH, lead acid batteries with

two no. of suitable battery chargers for 110V 40 AH lead acid battery complete

with stand of approved design, accessories, tool board with hydrometer,

thermometer, connecting lead and plug for connection to 230V AC supply to the

battery charger. The price for erection shall include installation and connecting up

of the battery, filling up of electrolyte, initial/final charging, mounting of the

charger in position and connecting it up to 230V AC distribution board including

the cost of connecting cables.

SOR item OHE-9(a) & (b)

SUPPLY, ERECTION, OIL FILTRATION, TESTING AND

COMMISSIONING OF 25 KV/240 VOLT, 5/25 KVA, LT SUPPLY

TRANSFORMER WITH 25 KV D.O. FUSE SWITCH ASSEMBLY,

ANTICLIMBING DEVICE, INSULATOR, COPPER JUMPER AND

EARTH ELECTRODES etc:

The price shall cover Supply of 25KV/240V, 5/25 KVA LT supply transformer

with suitably filled transformer oil, DO fuse assembly (including fuse carrier) and

all other mounting accessories, SPS as required at site, as per the RDSO‟s latest

specification and erection of the same complete with terminal connectors on a mast

or gantry. The price shall also be applicable for transformers mounted on steel

pedestals at switching stations also. The price shall cover supply and erection of an

enameled number plate of approved design. The price shall also cover oil filtration

and pre- commissioning tests as approved by the Employers or Engineer. The

contractor shall make his own arrangement for oil filtration equipments, as well as

power supply required for the same. All necessary tools, equipments, instruments

required for carrying out oil filtration/checks/tests/commissioning shall be arranged

by the contractor. The price shall also cover supply & erection of a DO fuse switch

assembly complete with all mounting accessories, post/pedestal insulator for DO

fuse switch assembly.

The price shall also cover on a lump sum basis the supply and erection of anti-

climbing device consisting of galvanized steel fixtures mounted on the masts below

the transformer.

The price shall also cover supply and erection of conductor/ jumper wires and the

supply of all components including parallel clamps, bi-metallic and Aluminium-

copper Al-Cu strips wherever required. The price shall also cover the erection of

complete jumper assembly including conductor/jumper wire to be provided

between the Over Head Equipment and L.T. Transformers, drop out switch

assembly.

The price shall also cover supply and erection of an earthing station with a single

pipe embedded into the ground by driving or otherwise complete with protective

concrete box and lugs suitable for directly connecting two mild steel flats of

minimum size 50 mm x6 mm and copper earthing strip 25X3 mm at LT side

earthing point to mast.

The price shall not include cost of and supply and provision of structure bond

connecting LT transformer with structure and then to rails which will be paid for

under item OHE-22.

Page 108: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 5 of 48

NOTE: 1.Contractor at his own cost shall do the replacement of the transformer oil

on account of testing and leakages during the warranty period.

SOR Item OHE-10

MODIFICATION TO EXISTING OVERHEAD EQUIPMENT:

The item price covers all inclusive cost of all the associated works of OHE

modification including transfer, dismantling/erection, slewing/re-

slewing/readjustment, extension of OHE by providing splices or otherwise etc of

all the components of OHE including brackets, insulators, feeder wire/return

conductor, terminations, ATDs, isolators, traction bonds cross over OHE etc in a

particular length of track except items which are excluded specifically under this

schedule.

The price shall cover transfer of overhead equipment to a bracket assembly on a

new mast or support and dismantling of the existing erected bracket assembly from

old mast or support, supply and provision of a multiple cantilever cross arm

wherever required and erection of bracket assemblies on the multiple cantilever

cross arm, and consequent adjustment to overhead equipment required such as re-

spacing of droppers, leveling etc.

The price shall not include supply and erection of an additional bracket assembly,

which will be paid for under item OHE-18.

Dismantling of masts/portals/TTC/DA are covered under item OHE-34.

The price shall also cover the re-adjustment of the head span polygon to enable the

additional equipments to be suspended from the head span. Payment for the

suspension of additional overhead equipment shall be made for under item OHE-2

as extra to this item.

The price shall also cover the cost of dismantling of overhead equipment including

terminations, auto tensioning devices, guy rod assemblies, anti-creep, suspension

assemblies, super masts, feeder, return conductor, section insulator, an isolator,

single or gang operated, including dismantling of connections to the overhead

equipment, a pedestal/ pin insulator including dismantling of jumper connections

and traction bonds if any, temporary slewing or lowering of erected OHE adjusted

and/or unadjusted to ground for special works and restoration and readjustment of

the equipment after completion of special works and associated small parts steel

work.

The price shall also cover the cost of splicing of terminated overhead equipment for

extension and consequent adjustment of the affected equipment. The extended

overhead equipment shall be deemed as starting from the centre line of the structure

preceding the old terminating structure and the extended overhead equipment shall

be paid for under item OHE 23 (a).

The price under this item shall cover various modifications required to be carried

out to the existing overhead equipment, under power block, on account of

electrification of the section provided such modifications are not on account of

non-compliance of specifications, approved drawings and instructions given by the

Employer for the execution of the work from time to time, during the progress of

the work.

All the prices are on a flat rate all inclusive basis and cover only the important and

most frequent type of modifications required to compensate the contractor for the

work involved. No extra payments shall be admissible for any other associated

Page 109: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 6 of 48

work, minor modifications, which may be necessary in the course of work. All

work done shall be paid for at normal rates as per BOQ.

In all these cases, the dismantled equipment shall be handed over by the contractor

to the Employer‟s Engineer at the Employer‟s godown/depot as required by

Engineer. The cost of loading / unloading and transportation shall be paid under

item OHE-13.

Where prices under this item are applicable, the contractor shall finalise the

quantities of work jointly with the Engineer before taking the work in hand.

NOTES:

1. In case modification / dismantling is carried out at particular location i.e.

dismantling of an isolator, bracket assembly, pin/ post insulator, guy rod etc.,

for the purpose of payment, half of the span on both ends will be considered.

2. All claims under this item have to be supported by the following certificate to

be furnished by the contractor on the connected bill.

a) The modifications are not on account of non-compliance of specifications

approved and instructions given by the Engineers for execution of works.

b) The quantities of work involved for modification have been finalised jointly

with the Engineer-in-charge before taking the work in hand.

c) The dismantled materials shall be/has been handed over to

Engineer‟s/Railway‟s representative.

3. The price of SPS work complete with bolts & nuts wherever required, is not

included in the item and will be payable under Item CS-9.

SOR Item OHE-11

MANNING OF SWITCHING STATION INCLUDING TSS:

The prices shall cover the payment/wages to the staff to be deployed at each

switching station including TSS as directed by Employer‟s Engineer on flat rate

basis per month per location. Manning shall be done round the clock. The staff,

holding minimum ITI qualification, shall be deployed in each shift. They shall be

fully conversant with operation of various equipments installed in the switching

station. The staff shall be deployed after test and trial by Employer/Engineer and on

issue of competency certificate. The staff deployed shall act in accordance with

instructions / directions given by Traction Power Controller (TPC)/representative

of Employer. The staff shall not leave the working place (Switching station) in any

case without permission of Employer‟s representative. The price shall cover

conveyance charges to the staff for going and coming to the working place. The

period of manning shall be decided by the Employer during the execution of

contract and manning shall commence on receipt of intimation in writing from the

Employer one month in advance.

Note: Unit of the item shall be „per month each location‟.

SOR Item OHE-12(a)

ELECTRIFICATION OF SWITCHING STATION (SP/SSP) BUILDING AS

PER SPECIFICATION:

The price shall cover all cost of supply, erection, testing and commissioning of

wiring work as per approved wiring diagram. Wiring work shall be done in

accordance with IE rules, IS-732, RVNL tech specifications The various activities

Page 110: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 7 of 48

involved in the work are as follows:-

i) Fixing of PVC conduits in recess on wall and drawing of wires for circuit

and point wiring.

ii) Provision of MS switch boxes of appropriate size concealed in wall

at appropriate height with modular PVC/fibre sheet for fixing of

switches, plugs etc.

iii) Provision of main board and distribution boards and connection thereof.

iv) Provision of light fittings, exhaust fan, outdoors luminaries complete with

tubes and lamps.

v) Provision of earthing station and connection between earthing station to

main board with the help of 8 SWG GI wires. Earthing work shall be

done in accordance with IS: 3043/1987.

vi) Materials such as light fittings, ceiling fan, exhaust fan, switches, sockets,

ceiling rose, socket outlets all shall be with ISI mark and shall be one of the

make mentioned in technical specification. Light fittings shall be 1X28W

T5 energy efficient or equivalent LED fitting as decided by engineer. All

switches, plug points and sockets shall be modular type. Ceiling fan and

exhaust fan shall have min 3 star energy rating.

vii) Provision of switches, sockets out lets, ceiling roses on respective switch

boards and points in appropriate numbers and connection thereof.

viii) Provision of 150 watts HPSV street light fitting/other energy efficient

luminaries with better luminosity as decided by engineer, complete in all

respect including lamp on the wall of the building.

ix) After completion of wiring work necessary testing of wiring and

earthing station shall be done and results submitted to the site-in-charge

duly signed by representatives of both the contractor and purchaser.

Note: - Scale of fitting shall be as per latest RDSO guidelines and RVNL

specifications. Drawing/fittings shall be got approved by the Engineer

before taking up the work.

SOR Item OHE-12(b)

SUPPLY & ERECTION OF EARTHING ARRANGEMENT AT

SWITCHING STATION

The price shall cover supply and erection of an earth bus, earthing stations with a

single pipe embedded into the ground by driving or otherwise complete with

protective concrete box & lugs suitable for directly connecting two mild steel flats

of minimum size 50mm x 6mm.

The price shall also cover supply of all materials including 50 mm x 6 mm mild

steel flats for providing earth bus. The price shall also cover erection of earth bus

either buried at a depth of 300 mm below ground level painted with 02 coats of red

oxide zinc chromate primer and 02 finishing coats of bitumen or fixed on wooden

gutties on walls. It shall include connecting the earth bus to earth electrodes and to

various floor-or-wall-mounted equipment‟s or structures to be earthed and also

connections to non-track-circuited rails, wherever required. It shall also cover the

cost of making recesses in concrete foundation blocks for floor or cubicles and

Page 111: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 8 of 48

covering them up. The connection of earth strips to each other shall be made either

by riveting or by welding. The connection of earth strips to various equipment,

structures or fencing post shall be made with G.I. bolts and nuts and spring

washers/locknuts.

The price shall cover supply and erection of 8 SWG G.I. wire used for earthing for

all LT electrical equipments including remote control cubicles and fencing panels.

Price shall also cover measuring and painting of earth values of all the earth pits,

combined earth value etc as per standard.

SOR Item OHE-13

LOADING/UNLOADING TRANSPORTATION AND HANDING OVER OF

ALL TYPE OF MATERIALS ETC. OTHER THAN CONTRACTOR

MATERIAL

The price shall cover loading/unloading and transportation charges to (from)

site/depot and handing over of material (if required) for all type of steel structures,

portals, copper/ aluminum conductors, SPS, CBs, BMs, ATs, PTs, CTs, LAs and

other electrical equipments etc. into/from BFR/ trailer/ truck for other than

contractor‟s material for the completion of the present work as instructed by the

engineer.

SOR Item OHE-14

EXTRA ON ERECTION RATE OF WORK UNDER POWER BLOCK:

Deleted.

SOR item OHE-15, 15(a), (b), (c)

CONSTRUCTION OF SWITCHING STATION BUILDING, RCC WORK,

PLASTERING, BRICK MASONARY, RETAINING WALL, FILLING,

COMPACTING AND LEVELLING WORK PITCHING WORK etc. &

SUPPLY AND ERECTION OF NAME BOARD FOR SWITCHING

STATION.

The price shall cover the construction of Control room of SP/SSP building and will

include labour/erection and material cost for the entire work all inclusive including

following works:

i) RCC, PCC, masonry work, including earthwork, leveling, stone pitching

in high embankment (if required).

ii) RCC work in plinth, lintels, chhajja, Roof slab.

iii) Pre-cast RCC Slab, RCC jali.

iv) Cement concrete in flooring and cable trenchs.

v) Brick masonry in walls.

vi) Plastering works.

vii) Provision of Doors, Windows, Grills, Rolling shutters, Water pipe line ,

Ventilators and painting thereof.

viii) White washing and colour washing and painting of doors/windows.

ix) Acid proof or painting of floor and wall in battery room.

x) Supply and spreading of stone metal shall be payable under CS-14.

xi) Provision of RCC pipe etc.

xii) Any other item of work required to complete the work which has not

been mentioned/included above shall also be done by the contractor and

nothing extra shall be paid for the same.

Page 112: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 9 of 48

Construction of Switching station shall be done as per RDSO‟s drawing No:

ETI/C/0067(Mod- B) or latest and Technical specifications.

The price shall cover the provision of all shuttering, frame works, arrangement of

water, all tools and plants required for the work, consumable, materials etc.

The materials used for the work such as brick, sand, stone aggregates, steel for door

frame, grill / rolling shutters; RCC Pipe shall be of best quality in accordance with

Railway‟s specification.

The price shall cover the cost of concreting required for foundation with 40 mm

stone ballast rammed in layers of 15 mm thick in cement and sand ratio 1:4:8, RCC

work for construction of column, brick work, retaining wall drainage etc required

for building.

The price shall also cover the provision of opening on the wall of suitable size, for

installation of exhaust fan in the battery room.

The price shall also cover the cost of supply and erection of name board for

switching station.

The payment shall be on uniform basis. The price shall also include supply of

necessary clamps, nuts, and bolts etc., required for the erection of the boards. Name

boards shall be made in bi-lingual or Hindi/English and vernacular language. The

boards to be supplied shall be as per the standard size and standard specification of

RDSO/Railways.

However, keeping in view local soil type and its bearing pressure, firm may adopt

different design for foundation/plinth adhering to the min inside dimensions as per

RDSO drawing and taking prior approval of the engineer. No extra payment is

payable for such redesigned basic structure except as detailed under 15(a) to (c).

SOR Item OHE-16

SUPPLY AND ERECTION OF A GUY ROD ASSEMBLY:

The price shall cover supply and erection of a guy rod assembly of various lengths

for traction masts/Portals/TTC, feeder line towers or supports etc complete with

mast guy rod fittings, guy rod with adjustments and part/s to be grouted in the

anchor block. The price shall not include the cost of supply and erection of a dwarf

or stub mast with anchor plates drilled and welded in position, where required for

anchorage, and small parts steel work, complete with bolts and nuts etc., if any for

attaching the mast guy rod fittings to the mast/structure which shall be paid for

separately under the relevant item.

Page 113: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 10 of 48

COMPONENTS REQUIREMENT

Rly. Id No.

Description of components

Qty. for unit

1 2 3

3232 Mast guy rod fitting (welded) complete

with 4 short bolts, nuts, lock nuts and

washers for attachment to mast/S.P.S

including appropriate fittings

1 off

5001/5001-1

or

5001-3

Anchor bolts (complete with nuts, lock

nuts and split pins)

1 Set

5002 Guy rod stirrup 1 off

5004 or

5005 or 5006-

1 or

5070 or 5071

Guy rod with nut, washer and split pin

1 off

5007-1 Anchor 'v‟ bolt 1 off

5008 Anchor loop 1 off

5220 Guy rod double strap assembly 1 off or 2 off (as

required )

NOTE : 1. In case the Contractor desires to adopt a different design for guy rod assembly,

the same shall be indicated by him in the Tender and the components required

should be clearly listed under this item as deviation.

2. Supply and erection of guy rod assembly at anticreep portals will also be paid for

under this item.

SOR Item OHE-17

SUPPLY AND ERECTION OF PROTECTIVE SCREEN ON FOBS/ROBS:

The price shall cover the cost of supply and erection of protective screen on

ROBs/FOBs/ etc. The price shall cover the cost of all material required for

fabrication of protective screen including MS Angle, Tee, expanded metal (Jali), GI

sheet, paints, suitable fixtures for fixing on the ROB/FOB etc. The price shall also

include the labour cost for fabrication, erection on ROB/FOB and painting. The

fabrication and erection work shall be done as per RDSO Drg.. No. ETI/C/0068

(07/09) Rev-H.

SOR Item OHE-18

SUPPLY AND ERECTION OF BRACKET ASSEMBLY WITH

INSULATORS AS PER OHE PLAN: The price shall cover on a flat rate basis for supply and erection of any bracket

assembly on a traction mast or support or drop arm and shall include those on

Page 114: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 11 of 48

high/low level platform, in the vicinity of turnouts, over bridges or over-laps and at

locations with reduced encumbrance or terminating wires. The price shall include

the cost of supply of all components including galvanized steel tube, dropper wires

and small parts steel work complete with bolts and nuts etc., if any. The price

shall cover erection of all components including solid core insulators and dropper

wires, small parts steel work, if any. However, this does not include the anticreep

arrangement at masts/ structures.

The price shall include the cost of following components:

Rly. Id No. Description of components Qty.

for unit

1 2 3

3020 Mast fitting for hook insulator with 2 off

bolts, nuts, lock nuts and washers of 16 mm

dia.

1 set

2400 Tubular stay arm assembly (including

galvanised steel tube).

1 set

2110/

2130/2380

Catenary suspension bracket assembly or

hook bracket

1 off

1160 Suspension clamp 1 off (as

required)

2120/2140/

2040/2080

Bracket tube assembly complete with tube

cap and sleeve where required (including

galvanised steel tube).

1 set

3070-1/2 Mast bracket fitting assembly including 2

off bolts, nuts, lock nuts and washers of 16

mm for attachment to structure or to small

part steel work.

1 set

2150-1 &

2160-1

Register arm hook assembly complete with

bolts, nuts and lock nuts.

1 off

2420 or

2430

Register arm assembly or raised register arm

assembly (including galvanised steel

tube).

1 set

2270-4 or 5,

2460 Style- 02

or

2470 Style ­ 02

Register arm dropper assembly including

dropper wire complete with bolts, nuts etc.

1 set

2390/2540/

2520

BFB steady arm or bent steady arm ( As

required)

2360/2490-2 25 mm steady arm drop bracket/clamp -do-

1220/1370/-1 Contact wire swivel clip or raised register

arm

1 off

2550-1/2 Anti wind clamp As

required

7mm/5mm inclined copper/steel dropper

(on girder bridges use steel wire droppers)

As

required

Bracket insulator/Stay arm insulator one set

The price is also applicable for the provision of any additional fitting & required to

support an additional OHE on a single bracket assembly payable under this item.

Page 115: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 12 of 48

The price shall include supply of all extra fittings including the double contact wire

swivel clip.

SOR Item OHE-19

SUPPLY AND ERECTION OF REGULATING EQUIPMENT (3 PULLEY

TYPE) WITH COUNTER WEIGHT ASSEMBLY FOR CONVENTIONAL

OHE:

The price shall cover supply and erection of a 3-Pulley type counter weight

assembly including 9 ton adjuster with double strap assembly and normal/anti-theft

guide tube assembly, the supply of regulating equipment, provision of adequate

length pipe on Hex-Tie rod at crossovers and short tension length ATDs wherever

required and stainless steel wire rope required for the regulating equipment, anti

slipping device assembly (Spacer Angles as per RDSO DRAWING NO.

TI/DRG/OHE/ATD/RDSO/00009 and small part steel work, if any. The price shall

also cover adjustment of the entire regulating equipment. The price shall not

include supply and erection of termination, which will be paid under SOR item

OHE-20.

SOR ITEM OHE-20

SUPPLY AND ERECTION OF MATERIAL FOR TERMINATION OF

DOUBLE OVERHEAD EQUIPMENT CONDUCTOR WITH INSULATORS:

The price shall cover supply of all material necessary for the yoked termination of

two overhead equipment conductors on a traction mast or structure , including all

SPS such as appropriate mast anchor fittings, clevis assembly , two adjusters,

ending clamps for catenary and contact wires, anchor double strap assembly,

equalizing/compensating plates, and double eye distance rods (if required) and

fittings and terminating wire ,if any including 9- ton insulators assembly The price

shall also cover erection of all materials with 9 ton insulator.

SOR Item OHE-21

SUPPLY AND ERECTION OF ANTI CREEP WITH GALVANIZED STEEL

WIRE INCLUDING INSULATORS.

The price shall cover supply of all materials for an anti-creep including adjusters,

galvanized steel wire, mast anchor fittings at its terminations on either side of

structures, ending clamps, fittings and including 9- ton insulators assembly

conforming to RDSO specification.

The price shall cover erection of all materials including 9- ton insulator assembly

with small parts steel work, if any.

Page 116: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 13 of 48

Rly. Id No.

Description of components

Qty. for unit

1 2 3 3

- Galvanized steel wire (19/2.50 mm As required

1360 Steel wire ending clamp 2 off

5020-1/

5020-2

9 -ton adjuster 2 off

5030 Anchor double strap assembly As required

3010/5040 Clevis assembly 2 off

3231 Mast anchor fitting with bolts, nuts etc. 2 sets.

1170 Double suspension clamp 1 off

Less 1160 Suspension clamp (-) 1 off

5183 Double eye distance rod As required.

NOTE -1.In case the anti-creep extends beyond one span on either side of anti

creep center, payment for the supply and erection of extra length shall be paid

additionally at the rate of 20% of the rate per extra span.

SOR ITEM OHE-22

SUPPLY AND ERECTION OF A STRUCTURE BOND/ A LONGITUDINAL

BOND/ TRANSVERSE AND SPECIAL BOND:

The price shall cover supply of all materials including mild steel flats size 40 x 6

mm required to provide all kinds of bonds such as a structure bond connecting a

traction mast or structures to the nearest non-track-circuited rail, or earth electrode,

including all fastenings at both ends. The price shall include shaping and drilling of

the bond and erection of all materials including provision of heat shrinkable PVC

tube for structure bond under track circuit rail. This would also cover connection or

earthing terminals of equipments like LT Transformers with structure and then to

rails as per relevant drawings.

The price shall cover provision of connection of buried rails to running rail as per

RDSO drawing No. ETI/OHE/G/05306 & shall include supply, fabrication and

erection of all connections (including drilling at both ends) and refilling of buried

rail pit.

The price shall cover the supply of all materials including mild steel flats size 40 x

6 mm, fasteners etc. required to provide longitudinal bond / transverse bonds

connecting to rails at the rail joint at the locations to be specified by the Employer.

The price shall include shaping and drilling of the bond and erection of all

materials including the bonds.

The price shall also cover the supply of all materials including mild steel flats size

40 x 6 mm to provide special bonds at level crossings, foot over/road over

bridge/protective screen, girder bridge, metallic sheds, fencing etc. for which the

location will be specified by the Employer. The price shall include shaping and

drilling of the bond and erection of all materials including the bond.

The item covers the new bonds to be provided in the yard due to modifications

involved as per revised bonding plan of the station.

Page 117: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 14 of 48

SOR ITEM OHE 23 (a)

SUPPLY AND ERECTION OF OVER HEAD EQUIPMENT i.e. CONTACT

AND CATENARY WIRE (EXCLUDING COST OF CONTACT AND

CATENARY WIRES), JUMPER WIRE, DROPPER WIRE,

CONTACT/CATENARY CLIPS, FASTENERS AND ALL OTHER MATERIAL

REQUIRED AT TURN OUT/OVERLAPS/DIAMOND CROSSINGS etc FINAL

CHECKING OF OHE AND ADJUSTMENT, INSPECTION TO BE DONE BY

TOWER WAGON FOR COMMISSIONING OF CONVENTIONAL OHE.

The price shall cover supply & erection of complete overhead equipment with all

components and wire and conductors including contact wire, catenary wire droppers, all

types of jumpers including anti-theft jumpers (50/65/105 sq mm), and terminating

wires at turn outs/ overlaps/ diamond crossings/ cross overs etc, if any. [Excluding the

cost of contact & Catenary which will be paid under Item No. 23(b) & (c)].

The price shall also cover supply & erection of contact wire as false contact wire (if

demanded by zonal Railways in place of insulated catenary wire) under overline

structures with all associated components [Cost of contact wire shall be payable under

SOR OHE 23(b). Provision of insulated catenary shall be payable under OHE-30)]

Provision of long cross type G-jumper on parallel run side instead of cross-over/turn out

side as per RDSO drawing No ETI/OHE/G/02141 Rev „C‟ or latest shall be ensured.

The price shall also cover supply of all components including dropper clips, parallel

clamps for jumpering and splices (where their use is approved), dropper wire, jumper

wire and terminating wire/small parts steel works complete with bolts and nuts etc. for

attachment of number plates to mast/structure, if any.

The price shall include provision of enameled/retro reflective number plates,

enameled/retro reflective sigma boards on masts before stop signals, different types of

boards required to be provided as per ACTM (caution/warning, DJ ON/OFF, DJ

ON/OFF for MEMU, 500m, 250m neutral section boards, unwired section, engine stop

board, power block limit board etc on traction masts or structures. Sigma

marking/boards shall be provided before signals on OHE masts/structures as per Rly

Board letter no 2001/Elect(G)/170/1 pt dt.7.5.2012 as decided by engineer.

The price shall also include the cost of painting the setting distance of masts/structures,

rail level on masts/structures, stenciling of symbol for direction of emergency telephone

socket and Y marking at BWA locations as per temperature and local instructions. This

price also includes supply and erection of different type caution warning boards on

OHE Structure.

Page 118: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 15 of 48

All the warning boards provided on OHE structure shall be of retro reflective type as

per latest Rly. Board/RDSO guidelines. Similarly structure Number plates on OHE

mast at specific locations should be retro reflective types as per latest Rly. Board/RDSO

guidelines.

Separate DJ close Boards to be provided for MEMU/EMU wherever required for

MEMU/EMU operation.

The price shall cover supply of all components required for a pull-off arrangement to

pull one equipment only including head-span mast fittings complete with M.S. angle,

equalizing plate assembly, steady-arm, catenary wire dropper clip, contact wire swivel

clip and fittings including solid core insulators. The price shall cover erection of all

components including solid core insulators, small jumper wire, large jumper wire and

conductors.

The price shall cover supply and erection of all additional fittings required including the

supply of required conductors/jumper wires, in case the pull off pulls more than one

equipment.

The price shall cover final checking, adjustment and inspection of OHE by tower car.

Further details are given in Section 5 Chapter 2 of Volume-1 of bid document

Rly. Id No. Description of components

Qty. for

unit

1 2 3

1040-2 or SK-534/1 & SK-575/2 or SK-576/1 & SK-535/2 or 1041-3

Contact wire parallel clamp small As required

1180/SK-572/1 & SK-572/2

Contact wire dropper clip(107) -do-

1192 Catenary dropper clip complete with bolts, nuts etc.

-do-

7501 Enameled number plates complete with 2 Galva. MS. bolts m 10x35/30, nuts and lead washer for m 10 bolts but excluding SPS for attachment of number plate to masts/structures.

-do-

1110-2 Contact wire ending clamp -do-

1120 Catenary ending clamp -do-

1140 Large span wire clamp (130) -do-

5020-1/5020-2 Adjuster -do-

5030 Anchor double strap assembly -do-

5191/5192 Compensating plate/Equalizing plate. -do-

Page 119: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 16 of 48

SOR ITEM OHE 23 (b)

SUPPLY OF HDGCC 107 SQ MM COPPER CONTACT WIRE The price shall cover the cost of supply of hard drawn grooved continuous cast copper

contact wire 107 sq mm for overhead equipment. The cost of erection of contact wire

shall be payable under Item No. 23(a). Reconciliation of material should be done as per

actual use taking into account anchor and overlap. The measurement will be from centre

line of anchoring mast. Unused contact wire pieces/drums shall be on the contractor

account.

SOR ITEM OHE-23 (c)

SUPPLY OF 65 SQ MM COPPER CATENARY WIRE

The price shall cover the cost of supply of stranded copper catenary wire for overhead

equipment. The cost of erection of catenary wire shall be payable under Item No. 23(a).

Reconciliation of material should be done as per actual use taking into account anchor

and overlap. The measurement will be from centre line of anchoring mast. Unused

catenary wire pieces/drums shall be on the contractor account.

SOR ITEM OHE-24

SUPPLY AND ERECTION OF ANTI CREEP WITH CADMIUM COPPER

CATENARY WIRE INCLUDING INSULATORS.

The price shall cover supply and erection of all materials for anti-creep including

cadmium copper catenary wire, adjusters, mast anchor at its terminations on either side

of structure, ending clamps & fittings, 9 ton insulators assembly and SPS work if any.

The price shall cover erection of all materials for anti-creep including 9 ton insulators

assembly and SPS work if any.

RDSO drawing No. TI/DRG/OHE/GENL/RDSO/00001/12/0 REV „0‟ or latest,

Ref.ETI/OHE/G/02111 Rev-A dt.23.10.2012 or latest is to be followed for use of

catenary wire in place of GI wire at ACC locations in polluted area as decided by zonal

Railways.

SOR ITEM OHE-25

SUPPLY AND ERECTION OF A SECTION INSULATOR ASSEMBLY WITH

INSULATORS AND ASSOCIATED FITTINGS & FASTENERS FOR OHE:

The price shall cover supply, erection and adjustment of all components required for a

standard section insulator assembly (serving both the overhead equipment conductors)

including 9 ton insulator, bar insulator special droppers etc. for supporting the

equipment and all terminal fittings for conductors and the section insulator assembly,

dropper wires as required,.

Page 120: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 17 of 48

Rly. Id No Description of components Qty. for unit 1 2 3

1120/or SK/436 or 1122

&

1123

Catenary ending clamp 2 off

1192/ETI/OHE/SK/333 Catenary dropper clip assembly As required

6170 Parallel clamp for double contact

wire

12 off

6180 Section insulator dropper

assembly

3 sets

6100 Section insulator assembly To be supplied bythe

contractor

6020 9 ton insulator assembly

6110 Bar insulator -do-

SOR ITEM OHE-26

SUPPLY AND ERECTION OF PTFE TYPE SHORT NEUTRAL SECTION

ASSEMBLY:

The price shall cover supply, erection and adjustment of PTFE type short neutral

sections assembly. The price shall also cover supply and erection of, all fittings for

contact and catenary wire as necessary including supply of required dropper wire.

SOR ITEM OHE-27

SUPPLY AND ERECTION OF 25 KV S.P ISOLATORS WITH INSULATOR

WITH/ WITHOUT EARTH CONTACT ASSEMBLY, WITH/WITHOUT

INTERLOCK:

The prices shall cover supply and erection of isolator switches of approved make 1250

Amp capacity, complete with arcing horns, operating rods, operating rod guides, and

mounting base including supply and erection of 25 KV Solid Core Post and Operating

rod insulator.

The price shall also cover supply and erection of a number plate of approved design,

supply and erection of small parts steel work complete with bolts and nuts etc. for

support of each isolator and for support of operating rods on gantries/ masts, jumper

connectors and post insulator to support jumper. The price shall also cover supply and

erection of pad lock, integral lock and interlock if required. The price excludes

provision of pipe electrode earthing.

Note: Payment of jumper shall be payable under SOR item OHE-29

SOR ITEM OHE-28

SUPPLY AND ERECTION OF 25 KV DOUBLE POLE ISOLATOR WITH

INSULATOR WITH/WITHOUT EARTH CONTACT ASSEMBLY WITH/

WITHOUT INTERLOCK:

The price shall cover supply and erection of a double pole isolator 1250 Amp capacity

complete with mounting base, operating rod, operating rod guides required for the

operation of the isolator, jumper connectors. The price shall also cover supply and

erection of alluminium-copper strips, a pad–lock, integral lock and interlock if required,

a number plate of approved design for each isolator, supply and erection of small parts

Page 121: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 18 of 48

steel works for support of isolators and for support of operating rods on gantries masts

including supply and erection of 25 KV Solid Core Post and Operating rod insulator.

The price shall also cover for supply and erection of an earth contact assembly in the

isolator. The price shall cover the cost of supply and erection of 3 x 25 mm copper

connections between earth contact assembly and the structures.

The price shall cover supply and erection of an inter locking mechanism on an

isolator along with small parts steel if any, to permit working of two or more isolators.

The price excludes provision of pipe electrode earthing.

Note :

1. All Isolators are to be supplied with required numbers of 25 kV operating rod

insulators with complete accessories and small parts steel. Isolator key box of

appropriate size shall be provided for at each station on the section, one number at

the nearby OHE depot in charge of the section and one number at SSP/SP, as

desired by the Engineer at site.

2. Payment of jumper shall be payable under SOR item OHE-29

SOR ITEM OHE-29

SUPPLY AND ERECTION OF ALL TYPES OF COPPER JUMPERS :

The price shall cover the supply of large jumper wire size 105 sq. mm (19/7/1.02mm),

small copper jumper size 50 sq. mm (19/1.80mm), 65 sq. mm Cadmium copper

conductor, 5 mm dia. dropper wire made of annealed 100% pure copper conductor as

per RDSO‟s spec No. ETI/OHE/3 (2/94) with „A‟ & „C‟ Slip No.1 and on a flat rate

basis, the supply of all components and fittings required for providing a flexible, and

bolted type terminal connectors wherever required for connection, including supply of

parallel clamps, bi-metallic and aluminum-copper strips, wherever required, and bolted

type terminal connectors wherever required.

The prices shall also cover the erection of the complete jumper assembly including

jumper wire. The price shall not, however, be applicable for jumper connections already

included under a particular item (e.g. OHE-23, OHE-9(a) & (b), CS-3, CS-5 etc), but

shall be applicable for any jumper connection in any combination between feeders,

isolators and booster stations. Continuity jumper at boom anchor anti-creep will be

payable under this item.

SOR ITEM OHE-30

SUPPLY AND ERECTION OF INSULATED CATENARY CABLE IN THE

SPAN UNDER OVER-LINE STRUCTURE:

The price shall cover supply of insulated catenary wire, catenary wire splice (1090) for

each location and required dropper clip and erection of the same for each location. The

prices shall also cover erection and adjustment of special droppers wherever required.

The insulated catenary wire to be supplied shall be as per RDSO‟s specification No.

TI/SPC/OHE/INSCAT/0000 (04/00) or latest. The work shall be executed in

accordance with drawing No.ETI/OHE/ SK/570. The price shall also cover the cutting

of existing Catenary wire, supply and erection of all materials and components

including adjustment of dropper wires. Insulated catenary is to be provided under all

Page 122: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 19 of 48

ROB/FOB as per RDSO maintenance instruction No. TI/MI/0036 (09/99) Rev „0 as

directed by RVNL/ Zonal Railway.

SOR ITEM OHE-31

SUPPLY OF MATERIALS AND ERECTION OF A LARGE COPPER JUMPER

(160 SQMM) BETWEEN ALUMINIUM BUS/OHE AND CROSS FEEDER

WITH ALL ASSOCIATED FITTINGS:

This jumper shall be provided between 36 mm aluminium bus/OHE and the copper

cross feeder at SSP, SP and FP.

The price shall cover the supply of 160 sq. mm flexible copper jumper wire made of

annealed stranded 100% pure copper conductor as per RDSO‟s spec No. ETI/OHE/3

(2/94) with A & C Slip No.1 or latest, all components and fittings required for

providing a flexible copper jumper 160 sq. mm and connection between 36 mm

aluminium bus/OHE & copper cross feeder including terminal connector 19 mm

multiple hole bolted type (1009), parallel clamp (1050-3) aluminium-copper bimetallic

strips fasteners etc.

The price shall also cover the erection of the complete jumper assembly including

jumper wire, connectors and fasteners etc.

SOR ITEM OHE-32

SUPPLY AND ERECTION OF SOLID COPPER BUSBAR 18 MM DIA:

The price shall cover supply and erection of solid copper bus bar 18 mm and its

terminal connector. The price shall include bending and shaping of bus bar.

SOR ITEM OHE-33

SUPPLY AND ERECTION OF ALL TYPES OF CONNECTORS REQUIRED

FOR ALUMINIUM/COPPER BUS BAR REQUIRED FOR COMMISSIONING

OF SWITCHING STATIONS WITH FASTENERS.

The price shall cover supply and erection of solid copper bus bar junction and

connectors of various type specified including bolts, nuts etc. required at junction or

termination of aluminum bus bars/solid copper bus bar etc.

SOR ITEM OHE-34

DISMANTLING OF TRACTION STRUCTURES, PORTALS, TTC AND

ASSOCIATED SPS BY CUTTING

The price shall cover on flat rate basis dismantling of OHE structures or portals by

cutting the same from the top of the foundation and handing over the same to the

Employer‟s Depot. The price shall also include dismantling of drop arms and booms of

the portal and their all associated fittings like SPS, bonds etc. Crane charges for the

purpose are included in the flat rate. The transportation of dismantled structures shall be

payable under item no OHE-13.

SOR ITEM OHE-35

SUPPLY AND ERECTION OF SAFETY ITEMS i. e. FIRE EXTINGUISHERS,

Page 123: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 20 of 48

SET OF FIRE BUCKET WITH STAND AND FIRST AID BOX, KEY BOX

WITH SUITABLE KEY CHAIN, LOCKS AND OTHER MISC ITEMS

REQUIRED FOR COMMISSIONING OF SWITCHING STATION:

The price shall cover supply and erection of fire extinguishers, as per details given

below including mounting arrangements. Each set would consist of following and each

of 4-litre capacity.

i. CO-2 type - 01 Nos.

The fire extinguishers supplied shall be of approved brand and as per relevant

specification.

The price shall also cover supply and erection of standard first Aid box of made of GI

Sheet with pad lock as approved by the Employer. The list of items/medicines to be

supplied along with in the first aid box shall be obtained from employer/engineer.

The price shall cover supply and erection of six number of fire buckets with stand of

standard size, cover shed, and locking arrangement as per standard practice of

concerned Railway and as approved by the Employer.

The price shall also covers Supply and installation of key box in SSP/SP with suitable

key chains and locks, associated registers of appropriate size in printed profarma (if

required in newly electrified section and as per local Railway practice), 1 no wooden

stool of appropriate size,1 no steel arm cushion chair, gum boots- 1 pair, rubber gloves-

1 pair etc as directed by Employer/Engineer in charge.

The key box shall be of teak wood plank made of size 12inchesx18 inchesx5 inches.

SOR ITEM OHE-36

SUPPLY AND ERECTION OF 25 KV AC DANGER BOARD/DANGER BOARD

FOR HEIGHT GAUGE, PUBLIC/ STAFF CAUTION AND SPECIAL BOARDS

BOARD REQUIRED FOR COMMISSIONING OF OHE/SWSs.

The payment under this item shall cover supply and erection of 25 KV AC danger

board, danger board for height gauge, public/ staff caution boards and special boards

on uniform basis as decided by the engineer. Purchaser will advise the requirement of

the various types of boards and location to contractor. The above payment shall also

include supply of necessary clamps, nuts, and bolts etc., required for the erection of the

boards. Caution boards shall be made in bi-lingual or Hindi/English and vernacular

language, where ever required and same will be advised to contractor. The various

types of above boards to be supplied shall be as per the standard size and standard

specification of Railways/RDSO.

This item shall also cover special caution boards to be provided on all departmental

vehicles, track machines, platform shelters as per Railway board letter No.

2009/RE/161/4 FTS-748 dtd.26-08-14 as per directions of the engineer.

SOR ITEM OHE-37

SUPPLY, ERECTION AND COMMISSIONING OF LIGHT WEIGHT

SECTION INSULATOR ASSEMBLY 25 KV AS PER DRAWING NO.6.2758.0

RDSO SPEC.NO. TI/SPEC/OHE/LWDSI/007

The price shall cover supply, erection and commissioning of light weight section

insulator assembly of 25 KV including all accessories as per drawing no. 6.2758.0

RDSO spec. No. TI/Spec/OHE/LWDSI/007

Page 124: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 21 of 48

SOR ITEM OHE-38

SUPPLY, INSTALLATION AND COMMISSIONING OF THE MAINTENANCE

FREE EARTH AS PER RDSO SPECIFICATION NO.

RDSO/PE/SPEC/PS/0109(REV.O)-2008 INCLUDING ALL MATERIALS etc.

The price shall cover supply, erection and commissioning of a maintenance free earth

system as per RDSO specification no. RDSO/PE/SPEC/PS/0109(REV.O)-2008.The

price shall cover the cost of all the materials required for the earthing system including

bond strip size 40x6 mm and civil works. The price shall include the testing of earth

value and painting the particulars on the concrete box as decided by the engineer.

TRACTION SUBSTATION

SOR ITEM TSS-1

DESIGN AND DRAWINGS FOR 220/27 or 132/27 KV or 110/27 KV TRACTION

SUB-STATIONS INCLUDING FEEDING POST AND CAPACITOR BANK:

The price shall cover on a flat rate basis for preparation and submission of design and

drawings per sub-station, new or existing, including provision of additional bay, for

erection of transformer and associated equipments, replacement of existing transformer

with new one, augmentation of existing bus bars and various type of connectors and

terminals, per feeding station in addition to site survey, investigation of soil bearing

pressure and soil resistivity, preparation and submission of cross section drawings,

preparation and submission of general arrangement drawings, detailed layout of

equipment, bus-bar connections and insulators, layout of cable trenches outdoor and

inside the control room, layout of earthing system and earth connections, layout of earth

screen wire, design of supporting structures for 132 kV/27 kV equipments, detailed

designs and drawings for steel work and structural support, suitable concrete pedestals,

and foundation plinths for equipment and drawings for equipments, components,

fittings and materials and approval of the same by the Employer.

The prices shall also cover on a flat rate basis for preparation of all designs and

drawings required in connection with supply, erection, testing and commissioning of

Shunt Capacitor equipment at the traction sub-stations. The price shall cover on a flat

rate basis cost of site survey, investigation of soil bearing pressure and soil resistivity,

preparation of cross section drawings, general arrangement drawings, detailed layout of

equipments, bus bar connections and insulators, layout of cable trenches out door and

inside the control room, earthing system and earth connection layout, and design of

supporting structures.

The price shall also include supply of required number of copies in soft and hard copies

in Auto Cad with one tracing on RTF paper of designs, drawings, technical booklets of

proposed/approved and completion drawings (as erected) per substation, feeding station

and capacitor bank as mentioned in the tender specifications.

The price shall also cover supply of associated maintenance/record registers of

appropriate size in printed pro-farma (if required in newly electrified section and as per

local Railway practice) etc as directed by Employer/Engineer in charge.

NOTE: The design for Oil Soak pit and drain water sump will also be got approved

from the Employer.

Page 125: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 22 of 48

SOR ITEM TSS-2 : DELETED

SOR ITEM TSS-3

CONSTRUCTION OF BAFFLE WALL COMPLETE WITH

REINFORCEMENT, BRICK WORK, PLASTERING ETC.:

The price shall cover excavation and construction of brick baffle wall as per RDSO

Drg. No. ETI/C/0213 for wind pressure upto 112.5 kgf/sqm.. The price shall include

supply of steel for reinforcement and other materials. The price shall also include

bending/binding and laying of reinforcement, shoring, shuttering and scoff-folding

arrangement, required for the construction of baffle wall and its curing. The price shall

include dismantling of all connected temporary arrangements, back filling required and

removal of soil. The price shall also include the plaster (12mm thickness with cement

mortar 1:4 mix) on the baffle wall. The price shall also include dismantling of all

connected temporary arrangements and removal of soil. The price shall include the cost

of cement also. For RCC baffle wall as per RDSO Drg. No. ETI/C/0214 for wind

pressure upto 150 kgf/sqm, the payment shall be made under CS-8.

Note for TSS- 3 (1) The prices under this item shall be the same for any shape or size of concrete blocks,

& brick wall. In calculating the individual volume of concrete and brick wall

fraction of a cubic meter beyond the third decimal shall be rounded off to the

nearest third decimal.

(2) For purpose of computation of volume of concrete and brick wall under this item, the

volume of steel work embedded in the foundation block or muff shall be ignored.

(3) The prices shall include cost of embedded drain pipes, conduits for cable or earthing

flats wherever necessary.

(4) Dowel bars in special foundations and nominal reinforcement in other foundations

will be necessary. Such nominally reinforced in other foundation will be payable

under Item TSS-3. The steel for nominal reinforcement and dowel bars will be

supplied by the Contractor and the concrete mixture in such a case shall be same as

for the normal foundations i.e. 1:3:6.

(5) At each Traction substation one number Oil soak pit for main transformer and one

drain water sump for the cable trenches will be provided by the contractor.

SOR ITEM TSS-4 (a)

SUPPLY, ERECTION, TESTING & COMMISSIONING OF 132 KV DOUBLE

POLE SF-6 GAS CIRCUIT BREAKER WITH INTERLOCK:

The price shall cover erection of 132 kV double pole SF-6 Gas Circuit Breakers,

complete with operating mechanism, all fittings and accessories including terminal

connectors. The price shall cover grouting the supporting frame and Mechanism box on

the foundation block and mounting of other accessories in their respective places. It

shall also cover the testing and commissioning of the Circuit Breaker. The price shall

also cover the supply and erection of an enamelled number plate. The Contractor shall

make his own arrangement for filling of the SF-6 gas and power supply required for

testing purpose. All necessary tools, equipments, instruments required for carrying out

necessary checks, tests and commissioning shall be arranged by the Contractor.

The price shall cover erection of an Interlocking Mechanism on an Isolator to permit

Page 126: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 23 of 48

working of an Isolator and or earthing blade assembly in a desired sequence. The price

shall include supply and erection of interlock for Circuit Breaker.

SOR ITEM TSS-4 (b)

SUPPLY, ERECTION, TESTING & COMMISSIONING OF 220 KV DOUBLE

POLE SF-6 GAS CIRCUIT BREAKER WITH INTERLOCK:

Same as for item TSS-4(a) except that the price shall cover supply, erection, testing &

commissioning of 220 KV Double Pole SF-6 gas Circuit Breaker with Interlock.

SOR ITEM TSS-5(a)

SUPPLY AND ERECTION OF 132 KV DOUBLE POLE ISOLATORS

(MANUALLY OPERATED):

The price shall cover supply & erection and connecting of a 132 KV Double Pole

Isolator with a manually operated mechanism complete with mounting base and all

accessories required for its operation including terminal connectors. The price shall

include supply and erection of an enamelled number plate and padlock. The price shall

include mounting of the Isolator and the operating rod in position and their alignment

for smooth and trouble free operation. The prices shall also include the cost of 132 kV

solid core post insulator, operating rod and earthing blade assembly for 132 kV

Isolators.

SOR ITEM TSS-5(b)

SUPPLY AND ERECTION OF 220 KV DOUBLE POLE ISOLATORS

(MANUALLY OPERATED):

Same as for item TSS-5(a) except that the price shall cover supply and erection of 220

KV Double Pole Isolators (Manually operated).

SOR ITEM TSS-6(a)

SUPPLY & ERECTION OF 132 KV CURRENT TRANSFORMER ASSEMBLY

(400-200/5A):

The price shall cover supply & erection and commissioning of a 132 kV Current

Transformer (400-200/5A) complete with all fittings and accessories including terminal

connectors. It shall also include mounting of the transformer in position, and supply and

erection of an enamelled number plate as per the drawing ETI/PSI/P/7528.

SOR ITEM TSS-6(b)

SUPPLY & ERECTION OF 220 KV CURRENT TRANSFORMER ASSEMBLY

(200-100/5A):

Same as for item TSS-6(a) except that the price shall cover supply and erection of 220

KV Current Transformer assembly (200-100/5A).

SOR Item TSS- 6(c)

SUPPLY & ERECTION OF 110 KV Current Transformer (400-200/5A):

Same as for item TSS-6(a) except that the price shall cover supply and erection of 110

KV Current Transformer assembly (400-200/5A).

SOR Item TSS- 6(d)

SUPPLY & ERECTION OF 132 KV CURRENT TRANSFORMER ASSEMBLY

(1200-800-400/5-5-5A

Same as for item TSS-6(a) except that the price shall cover supply and erection of 132

Page 127: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 24 of 48

KV Current Transformer assembly (1200-800-400/5-5-5A) as per RDSO‟s specification

ETI/PSI/117 (7/88) with A&C Slip no 1 to 9.

SOR ITEM TSS-7(a)

SUPPLY & ERECTION OF 120 KV LIGHTNING ARRESTOR:

The price shall cover supply & erection and connecting up of a 120kV Lightning

arrestor with surge counters and leakage current monitor complete with all fittings and

accessories including terminal connector. It shall also include mounting of the

Lightning arrestor in position and supply and erection of enamelled number plate.

SOR ITEM TSS-7(b)

SUPPLY & ERECTION OF 198 KV LIGHTNING ARRESTOR

Same as for item TSS-7(a) except that the price shall cover supply and erection of 198

KV Lightning Arrestor.

SOR Item TSS- 7(c)

SUPPLY, ERECTION, TESTING & COMMISSIONING OF 96 KV,

LIGHTNING ARRESTOR

Same as for item TSS-7(a) except that the price shall cover supply and erection of 96

KV Lightning Arrestor.

SOR ITEM TSS -8(a)

SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV SINGLE

POLE VACUUM CIRCUIT BREAKER WITH INTERLOCKING:

The price shall cover supply and erection of 25 kV Vacuum Circuit Breaker (1600 Amp

Rating) complete with operating mechanism, all fittings, and accessories including

terminal connectors. The price shall cover grouting the supporting frame and

mechanism box on foundation block and mounting of other accessories in their

respective places. It shall also cover, testing and commissioning of the circuit breaker.

The price shall also cover the supply and erection of an enamelled number plate. The

Contractor shall make his own arrangement for power supply required for testing

purpose. The price shall also include supply of interlocks and shall be applicable

individually for each, Circuit Breaker. The supply of vacuum circuit breaker shall be as

per RDSO specification No. TI/SPC/PSI/CB/0000 with A&C slip No. 1 to 5 or latest.

SOR Item TSS- 8(b)

SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV SINGLE

POLE VACUUM CIRCUIT BREAKER (2000 Amps rated current) WITH

INTERLOCKING:

Same as SOR item TSS-8(a) except current rating of CB shall be 2000 amps with

relevant RDSO specifications.

SOR ITEM TSS -9(a)

SUPPLY & ERECTION OF 25 KV CURRENT TRANSFORMERS (1500-

750/5A):

The price shall cover supply & erection and connecting of a 25 kV Current Transformer

(ratio 1500-750/5A) complete with all fittings and accessories including terminal

connectors. It shall include mounting of the transformer in position and supply and

erection of an enamelled number plate. The price shall also include the cost of small

parts steel work if any.

Page 128: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 25 of 48

SOR Item TSS-9(b)

SUPPLY & ERECTION OF 25 KV CURRENT TRANSFORMERS (3000-

1500/5A):

Same as TSS-9(a) except rating of CT shall be 3000-1500/5A.

SOR Item TSS- 9(c)

Supply & erection of 25 kV Current Transformers (200-100/5A):

Same as TSS-9(a) except rating of CT shall be 200-100/5A as per RDSO‟s specification

ETI/PSI/90(6/95) Rev. 4(Jan‟03).

SOR ITEM TSS-10

SUPPLY, ERECTION, TESTING AND COMMISSIONING OF NUMERICAL

CONTROL & RELAY PANEL SUITABLE FOR DOUBLE TRANSFORMER

TRACTION SUB -STATIONS OF 220/27 or 132/27 KV or 110/27 KV:

The price shall cover supply, erection, testing and commissioning of Control & Relay

Panel complete with RDSO approved Numerical Type protective relays for Control,

monitoring and protection in the traction sub-station comprising of 132 and 25 KV

circuit breakers, 25 KV interrupters and 132/25 Kv single phase transformers, sub-

station equipments, 25 KV over head equipment (OHE) feeders, shunt capacitor banks

and transmission lines (if applicable) as per RDSO specification No

TI/SPC/PSI/PROTCT/6070 (9/08) with latest version.

The prices shall also include protective relays for 132 Kv and 25 Kv circuit breakers,

interrupters, isolators complete with all wiring, control switches, meters, protective and

auxiliary relays, mimic panels and suitable size rubber mat in front and back etc.

including erection , alignment, grouting and earthing of the panel in position and all

connection for its commissioning. The control panel shall cater for a TSS having two

bays of HV & LV side associated equipments along with 02 feeder circuit breakers.

SOR ITEM TSS-11

SUPPLY & ERECTION OF TUBULAR ALUMINUM BUS BARS 50MM X

39MM DIA:

The price shall cover supply and erection per meter length of 50x39mm dia. Aluminum

tube to serve as bus bar or equipment to equipment bus bar connection in the traction

sub-station, wherever required. The price shall include bending, shaping and connecting

/clamping of the Aluminium tube to the equipment terminals/ bus bar supports as

required.

NOTE- For purpose of payment for this item fraction of a meter in the total length used

at a sub-station shall be rounded off to the nearest meter (0.5 m and below being

ignored).

SOR ITEM TSS-12

SUPPLY & ERECTION OF ‘ZEBRA’ ACSR CONDUCTOR:

The price shall cover supply and erection per meter length of 61/3.18 mm (ZEBRA

ACSR) conductor to serve as bus bar or equipment to equipment bus bar connection in

Page 129: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 26 of 48

the traction sub-station, wherever required. The price shall include straightening,

shaping and connecting / clamping of the conductor to the equipment terminals /bus bar

supports as required.

NOTE: For purpose of payment, the length of aluminum conductor strung as bus-bar

between gantries shall be taken as horizontal distance between the interfaces of the

gantries. The total length used at a sub-station shall be rounded off to the nearest meter

(0.5 m and below being ignored).

SOR ITEM TSS-13

SUPPLY & ERECTION OF ALL CONNECTORS, BUS SPLICE & TEE

CONNECTORS etc REQUIRED FOR COMMISSIONING OF TSS

EQUIPMENTS:

The price shall cover supply and erection of a busbar junction and connector of the type

specified, including bolts, nuts, lock nuts, washers etc. required at the junction of bus

bars. The price shall also include supply and erection of ALCU bimetallic strip, if

required, to be provided at the junction.

NOTE:

1) For purpose of payment for this item fraction of a meter in the total length used at a

sub-station shall be rounded off to the nearest meter (0.5 m and below being

ignored).

SOR ITEM TSS-14

SUPPLY & ERECTION OF COPPER JUMPER WITH FITTINGS AND

FASTENER REQUIRED FOR TSS:

The price shall cover, on a flat rate basis, the supply and erection of jumper wire

complete with all components and fittings required for providing a flexible copper

jumper connection, including parallel clamps, bi-metallic and Aluminum -Copper

strips, wherever required, and terminal or Tee clamps at either end, including jumper

wire.

The price shall be applicable for any jumper connection in any combination between

feeders, L.T. Transformers drop out switch, lightening arrestors for overhead

equipments, isolators for overhead equipment and out going bus bars for switching

stations.

SOR ITEM TSS-15 (a)

SUPPLY & ERECTION OF 110/132 KVKV SUPPORT INSULATORS WITH

FITTINGS AND FASTENERS:

The price shall cover supply and erection of 132 kV support insulators complete with

fixing bolts, nuts and studs, Busbar jumper, clamps for clamping the busbar and SPS, if

required .

SOR ITEM TSS-15 (b)

SUPPLY & ERECTION OF 220 KV SUPPORT INSULATORS WITH

FITTINGS AND FASTENERS:

Same as for item TSS-15(a) except that the price shall cover supply and erection of 220

KV Support insulators with fittings and Fasteners.

Page 130: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 27 of 48

SOR ITEM TSS-16

SUPPLY & ERECTION OF 25 KV SUPPORT INSULATORS WITH FITTINGS

AND FASTENERS:

The price shall cover the supply and erection of a 25 kV solid core post insulator to

support Aluminum bus bars. It shall include supply of fixing bolts, nuts, locknuts,

washers and studs etc.

It shall also cover-erection of all components required for the assembly including post

insulator, Busbar jumper, clamps for clamping the busbar and SPS, if required.

SOR ITEM TSS-17(a)

SUPPLY & ERECTION OF 110/132 KV TERMINATION WITH/WITHOUT

ADJUSTER COMPLETE WITH DISC INSULATORS:

The price shall cover supply and erection of all materials for the termination of a single

ACSR conductor (61/3.18 mm ZEBRA) strung between gantries/portals, including

anchor fittings, single clevis assembly, adjuster, anchor double straps, string of 12 nos.

of 280mm (11”) Disc Insulators, strain clamps and arcing ring and other fittings to

complete the assembly. The assembly shall be of breaking strength of not less than

11500 kgf.

SOR ITEM TSS-17(b)

SUPPLY & ERECTION OF 220 KV TERMINATION WITH / WITHOUT

ADJUSTER COMPLETE WITH DISC INSULATORS:

Same as for item TSS-17(a) except that the price shall cover supply and erection of 220

KV Termination with/without adjuster complete with suitable number of disc

insulators.

SOR ITEM TSS-18

SUPPLY, ERECTION AND COMMISSIONING OF LOW MAINTENANCE

LEAD ACID BATTERIES SET WITH 2 NOs. OF SUITABLE BATTERY

CHARGER:

The price shall cover supply and erection of a 110 V, 200 AH low maintenance type

lead acid battery complete with stand as approved by engineer and accessories as

mentioned in relevant specification and a tool board with thermometer, hydro meter.

The price for erection shall include installation, connecting up, filling up of electrolyte,

initial/final charging, and commissioning of the battery.

The price for erection shall also include grouting of the chargers in position or

mounting it on the wall and connecting it to 240V single phase AC supply.

SOR ITEM TSS-19

SUPPLY, ERECTION AND COMMISSIONING OF 240V AC AND 110 V D.C.

DISTRIBUTION BOARDS IN THE CONTROL ROOM:

The price shall cover supply and erection of a 240V AC distribution board in the

control room. It shall include the grouting of the framework of the distribution board in

position or mounting it on the wall and necessary connections.

Page 131: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 28 of 48

The price shall also cover supply and erection of a 110 VDC distribution board in the

control room. The price shall include the grouting of the frame work of the distribution

board in position or mounting it on the wall and necessary connections.

SOR ITEM TSS-20

SUPPLY AND ERECTION OF EARTH ELECTRODE:

The price shall cover supply and erection of an earth electrode, a typical drawing of

which is included in RVNL‟s technical specification. The price shall cover the

provision of a protective concrete box with removable cover as shown in the drawing.

The price shall include the testing of earth value and painting the particulars on the box.

SOR ITEM TSS-21

SUPPLY AND ERECTION OF EARTH LEADS 75 X 8 MM MILD STEEL

FLAT LAID IN THE GROUND OR EXPOSED AS PER SITE REQURIMENT:

The price shall cover supply and installation per meter length of 75x8mm mild steel

flat, buried at a depth of 60 cm below ground level. The price shall also cover

connections of the steel flats to the earth electrodes to constitute the main earth ring and

to the earthed terminals of the 132/25 kV transformers etc. as required.

The price shall also cover supply and installation per meter length of 75x8 mm mild

steel flat, painted all around with two coats of painting with red oxide and two coats of

colour grass green shade-218 of IS:5 passing through cable trench or exposed above

ground level. The price shall also cover the connections of the steel flats to the earth

electrodes, to constitute the main earth ring and to the earthed terminals of the various

equipments as required.

SOR ITEM TSS -22

SUPPLY AND ERECTION OF EARTH LEADS 50 X6 MM MILD STEEL FLAT

LAID IN THE GROUND OR EXPOSED AS PER SITE REQURIMENT:

The price shall cover supply and installation per meter length of 50x6mm mild steel flat

buried at a depth of 60cm below ground level. The price shall also cover connections of

the steel flats to the main earth ring and to the steel structures and metallic frame work/

terminals of various equipments, as required.

The price shall cover supply and installations per meter length of 50x6 mm mild steel

flat painted all around with two coats of painting with red oxide and two coats of colour

grass green shade-218 of IS:5 passing through cable trench or exposed above ground

level. The price shall also cover the connections of the steel flats to the main earth ring

and to the steel structures and metallic frame work/terminals of various outdoor

equipments as required.

SOR ITEM TSS-23

SUPPLY AND ERECTION OF 8 SWG G.I. WIRE FOR EARTHING:

The price shall cover supply, shaping and erection of 8 SWG G.I wire per metre used

for earthing of control panels, LT, AC and DC distribution boards, battery chargers, etc.

at sub-station control rooms. The requirement of fencing panel earthing to the nearest

fencing upright shall also be included and paid for under this item.

Page 132: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 29 of 48

SOR ITEM TSS -24

SUPPLY AND ERECTION OF 32 MM DIA MS ROD FOR EARTH MAT:

The price shall cover supply and installation per meter length of bare mild steel rod of

dia 32mm to be buried at a depth of 60cm, below the ground level to form the earthing

grid & connected to earth electrodes. The price shall also cover jointing of the MS. rods

to form earthing grid and connection to MS. flats for system earthing.

NOTE FOR SOR ITEM TSS-21,22,23 and 24: For the purposes of payment, fraction

of a meter in the total length of earth lead of each type used at a substation shall be

rounded off to the nearest metre (0.5m and below being ignored).

SOR ITEM TSS -25

SUPPLY & ERECTION OF EARTH SCREEN WIRE INCLUDING

TERMINATION:

The price shall cover supply and stringing per meter length of 19/2.5mm (70 Kg/mm2)

galvanized steel stranded wire. It shall include the supply and erection of suitable

terminations using strain clamps adjuster (on one side only) etc. It shall also include

connecting by means of suitable terminal spades, the end of the earth screen wire to the

main members of the columns of portals gantries across which these wires are strung or

to 50x6mm MS. flat earth leads. For purposes of payment the clear span between the

structures on which earth wire is run shall be adopted. The clear span will be rounded

off to the nearest meter (0.5m and below being ignored).

SOR ITEM TSS-26 (a)

SUPPY, ERECTION, TESTING & COMMISSIONING OF 132/27 KV, 21.6/30.24

MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER

TRANSFORMERS:

The price shall include the cost of supply, erection, testing and commissioning of

transformer with all accessories, 132 and 25 KV side bushings, cooling fans etc as per

latest RDSO specifications. Price includes loading, unloading of transformer and

bringing it to the erection site for commissioning. The Contractor shall bring the

transformer on to its correct position on the foundation and erect all the accessories,

check up the alignment and make connections of HV and LV terminals to the 132 kV

and 27 kV busbars. The Contractor shall carry out oil filtration and pre-commissioning

tests as approved by the Employer and commission the transformers strictly in

accordance with the instructions of the transformer manufacturer or his commissioning

Engineer at site to the complete satisfaction of the Employer. The Contractor shall be

held responsible to ensure that the work is carried out to the highest standards, in

accordance with the relevant codes of practice and any special

conditions/guidelines/requirements as laid down by the manufacturer of the transformer

are properly complied with. Contractor shall notify the manufacturer regarding likely

date of commissioning, one month in advance, so that the manufacturer can depute his

representative if so desired by him at his own cost, for warranty obligation purposes.

Notwithstanding availability of manufacturer‟s representative or otherwise, it shall be

contractor‟s responsibility to ensure that the equipment is commissioned as per laid

down procedure. However, in case of any extra cost being incurred in this regard, due to

delay on the part of the Contractor the same shall be recovered from the Contractor. The

Contractor shall make his own arrangements for oil filtration equipment as well as

power supply required for the same. All necessary tools, equipment, instruments

Page 133: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 30 of 48

required for carrying out necessary checks and tests and commissioning of the

transformer shall be arranged by the Contractor.

SOR ITEM TSS-26 (b)

SUPPY, ERECTION, TESTING & COMMISSIONING OF 220/27 KV, 21.6/30.24

MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER

TRANSFORMERS:

Same as for item TSS-26(a) except that the price shall cover supply, erection, testing

and commissioning of 220/27 KV, 21.6/30.24 MVA ONAN/ONAF, single phase

Traction Power Transformer.

SOR Item TSS- 26(c)

SUPPY, ERECTION, TESTING & COMMISSIONING OF 110/27 KV, 21.6/30.24

MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER

TRANSFORMERS:

Same as for item TSS-26(a) except that the price shall cover supply, erection, testing

and commissioning of 110/27 KV, 21.6/30.24 MVA ONAN/ONAF, single phase

Traction Power Transformer. The transformer should be as per RDSO specification No.

ETI/PSI/118 A&C-10 or latest.

SOR Item TSS- 26(d)

SUPPY, ERECTION, TESTING & COMMISSIONING OF 132/27 KV, 30/42

MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER TRANSFORMERS

Same as for item TSS-26(a) except that the price shall cover supply, erection, testing

and commissioning of 132/27 KV, 30/42 MVA ONAN/ONAF, single phase Traction

Power Transformer as per RDSO Specification No.TI/SPC/PSI/30TRN/2070 or latest

with latest amendments.

SOR ITEM TSS-27(a)

SUPPLY AND ERECTION OF 25 KV DOUBLE POLE ISOLATORS (1600A)

WITH INSULATORS:

The price shall cover the supply and erection, alignment and connecting up 25 kV

Double Pole Isolator (1600Amp capacity) complete with mounting base, operating rod,

operating mechanism and all accessories required for its smooth and trouble free

operation. The price including solid core Post Insulator, operating rod insulator etc.

Price shall also cover supply and erection of an enamelled number plate and a pad lock

for each Isolator, Bus bar connector provided for making connection to Isolator

terminal pad shall be paid under Item TSS-13.

SOR Item TSS- 27(b)

SUPPLY AND ERECTION OF 25 KV DOUBLE POLE BUS COUPLER

ISOLATORS (3150A) WITH INSULATORS:

Same as for item TSS-27(a) except that the DP isolator shall be of 3150 amps capacity.

SOR ITEM TSS-28(a)

Supply & erection of 25 kV Single Pole Isolators (1600A) with insulator:

Page 134: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 31 of 48

Same as for item TSS-27(a) except that the price shall cover supply and erection of

single pole Isolator 1600 amps capacity instead of double pole Isolator

SOR Item TSS-28(b)

SUPPLY & ERECTION OF 25 KV SINGLE POLE ISOLATORS (3150A) WITH

INSULATORS :

Same as for TSS-27(a) except that the price shall cover supply and erection of single

pole Isolator of 3150 amps capacity instead of double pole Isolator.

SOR ITEM TSS-29

Supply, Erection, Testing & Commissioning of 25KV shunt capacitor bank of 2400

KVAR rating including low loss series reactor, 25KV Neutral Current

Transformer (NCT) etc.

The lump sum price shall cover supply, erection, testing and commissioning of 2400

KVAR (i.e.6600 KVAR at 40 KV) shunt capacitor bank at Traction substations,

complete with capacitor unit internal fuses, discharge devices, rack insulator assembly,

interconnector between units, insulators, suitable earthing lugs including terminal

connectors and other material and hard ware required for satisfactory working of the

unit. It shall also include mounting of the capacitor bank on the supporting structures

and its connecting up to other equipments. Payment for supporting structures shall

be made under item no CS-9 of schedule 30. The contractor shall carry out pre-

commissioning tests as approved by the purchaser and commission the shunt capacitor

bank strictly in accordance with the instructions of the shunt capacitor bank

manufacturer or his commissioning Engineer at site to the complete satisfaction of the

purchaser. The contractor shall be held responsible to ensure that the work is carried out

to the highest standards, in accordance with relevant code of practice and any special

conditions/ guidelines/ requirements as laid down by the manufacturer of the shunt

capacitor bank are properly complied with. The contractor shall notify the manufacturer

regarding likely date of commissioning, one month in advance so that the manufacturer

can depute his representative, if so desired by him, at his own cost, for warranty

obligation purposes. Notwithstanding availability of manufacturer‟s representative or

otherwise it shall be contractor‟s responsibility to ensure that the equipment is

commissioned as per laid down procedure. All necessary tools, equipments, instruments

required for carrying out necessary checks and commissioning of the shunt capacitor

bank shall be arranged by the contractor.

The price shall cover supply, erection & connecting up of series reactor suitable for

6600 KVAR rating (at 40KV) capacitor bank complete with all fittings and accessories

including connectors. It shall include mounting of the series reactor in position.

The price shall cover supply, erection of 25kv neutral current transformer for protection

of the capacitor bank. The price shall also cover connecting of neutral current

transformer with capacitor bank and control and relay panel. It shall also cover

mounting of the neutral current transformer on the supporting frame.

The price shall cover connecting up of control panel with protective and auxiliary relays

for circuit breakers, instrument transformers and capacitor bank as per RDSO latest

specifications with all wirings control switches and mimic diagram. LEDs annunciation

labels, alarm cancellation push buttons and local/remote switches. It shall also include

cost of wiring/terminal blocks required for providing the facility of remote operation.

The price for erection shall include alignment and grouting of the panels in positions

and all necessary connection to bring the control panel in operation. It shall also include

Page 135: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 32 of 48

the cost of connecting the frame of each control panel to the earth bus inside the control

room and suitable size rubber mat in front and back. The price of control and relay

panel for shunt capacitor bank is included in TSS-10.

SOR Item TSS- 30

EXCAVATION OF EARTH TO THE DEPTH OF 2 METERS BELOW

GROUND LEVEL FOR BURYING 13 METERS LONG RAIL.

The price under this item shall cover the cost of excavation of earth 13 meters in length

and two (02) meters in depth below ground level. The price shall also cover the cost of

burying 13 meters long rail and connecting it with mat in TSS as per latest RDSO

drawing (Rail will be supplied by RVNL). The price shall also cover the cost of

loading, unloading and transportation to site of work of rail.

SCHEDULE 29000 (SCADA)

1. Supply, erection, testing, protocol of hardware, software, communication

cable, colour codes of cable and various parameters of each of the

schedule item, shall conform to RDSO‟s Specification No.

TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest with up to date

amendment issued by RDSO and shall be obtained by the contractor.

SCADA shall be suitable to match and interface with existing SCADA of

RCC centre. Data transfer speed of Traction SCADA system should be

min 9600 bps as per RDSO instructions No. TI/IN/022(02/10) Rev 0.

2. The complete SCADA system shall be supplied, erected and

commissioned through Railway‟s approved vendors. The vender‟s list is

updated by RDSO/CORE Allahabad and shall be valid for the contractual

period. Vendors under trial period shall not be considered for this project.

3. Supply of furniture as per RDSO specifications equipments and

components (List B) and supply of special tools and plants (List C) as per

the schedule rate shall be done in consultation with the Engineer/RVNL

at site/RCC Centre. Items and costs are as per explanatory notes under

relevant items.

4. The work of SCADA of Supply, Erection, Testing & Commissioning

including maintenance & Warrantee shall govern by RDSO‟s

Specification No. TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest.

SOR Item SCADA-1

Preparation and supply of Design & Drawing for SCADA at RCC, TSS,

SP & SSP.

Price shall cover the cost of Design & Drawing for SCADA and shall give

all details of various items of equipment at remote control center and the

controlled stations with updated equipment numbering and shall comply

with details of RCC center corresponding mimic panel, the various

interface with the main computer and the monitor/console on which

traction power controllers will monitor status and execute the commands

Page 136: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 33 of 48

and ensure correct execution and tele-signals from control centre to various

remote controlled posts and vice-versa. The drawing shall show the details

of TSSs, SPs & SSPs with details of RTUs, layout of equipments, cable

colour codes, tag numbers, terminals numbers, in addition to various tele-

commands & tele-signals and panel indication. All drawings shall be got

approved by the client/engineer and Railways before commencement of

execution. All the „as erected‟ drawing & design in soft copies in CDs and

hard copies six numbers of each drawing shall be handed over to the

purchaser for final approval.

SOR Item SCADA-2

Supply of SCADA equipment at RCC. The lump sum price shall include the supply of standard Supervisory

Control and Data Acquisition system as per RDSO‟s Specification No.

TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest with up to date

amendment issued by RDSO. There shall be two work station (first of 3

PCs and second of 2 PCs) and main & standby computer and FEP process.

The price shall include supply of one supervisory console PC, one coloured

LAPTOP (Dual Core Intel Pentium Processor at 3.2 GHz or Higher) and

associated MODEMS for remote SCADA monitoring through a DOT Link

as per RDSO specification. The price shall also include the cost of any

steel cabinets required for housing the equipments and also the material

required for internal wiring and mounting the cabinets in the position. The

cost shall also cover testing of the system at the manufacturer‟s works. The

latest version of hardware shall be considered at the time of supply.

The price shall also cover the license fee for the supply and installation of

Standard Electric Traction SCADA software. The successful bidder has to

purchase this from the RDSO approved supplier for standard software as

per RDSO Specification No. TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014)

or latest.

SOR Item SCADA-3(a)

Supply of RTUs for FP/TSS.

The price includes the cost of RTU supplied for the controlled posts and

shall include necessary transducers, summation CTs, PT, supply change

over arrangement, digital/analog modules, limit setting, modems, CPU

cards. Power supply, surge arrestors, relay and contactors etc. at Traction

Sub-stations and feeding post for different analog parameters and

measurements. A tentative list of different telecommands, telesignals and

measurands are given in annexure as per RDSO‟s Specification No.

TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest.

SOR Item SCADA-3 (b)

Supply of RTUs for SP.

The price shall cover supply of RTUs for SP. The details given in Item

SCADA-3(a) above are applicable to the SP also except that the different

analog parameters and measurands required have to be suitable for SP.

Page 137: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 34 of 48

SOR Item SCADA-3 (c)

Supply of RTU for SSP.

The price shall cover supply of RTUs for SSPs. The details given in Item

SCADA-3(a) above are applicable to the SSPs also, the different analog

parameters and measurands required have to be suitable for SSPs.

SOR Item SCADA-4(a)

Supply of maintenance free type Lead Acid Battery

The price shall cover supply of Maintenance Free or low maintenance (if

former not available in approved list) Lead Acid type Battery of 110V DC

with adequate Amp. Hour capacity to work with UPS. The battery shall

meet the requirements as RDSO‟s standard specification No.

TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest and shall be

complete with all parts and accessories including stand, terminal board and

accessories required for its efficient operation.

SOR Item SCADA-4 (b)

Supply of UPS

The price shall cover supply of dual on-line UPS of 5 KVA capacity

suitable to work in standalone mode at remote control centre, so as to meet

the requirements, as enumerated in TI/SPC/RCC/SCADA/0130/Rev.1

(04/2014) or latest. The price shall not include the cost of Batteries which is

covered under item SCADA-4(a) above.

SOR Item SCADA-5

Supply of furniture

The lump sum price shall cover the supply of furniture at work station to

work independently and shall meet requirement as mentioned in RDSO

standard specification No. TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or

latest. The price shall also include furniture for switching posts as per

requirement.

SOR Item SCADA-6

Supply of Data logging Printer for control centre

The price shall cover, supply of diagnostic data logging printer, 2 nos. of

HP DeskJet, 1125C/Ink jet A3 size coloured and two DOT Matrix (132

column) A3 size printer for the section suitable to work as input output

terminal to computer for data logging purposes. The price shall also cover

the equipment (printer server etc.) needed to put these printers on LAN or

latest printer, standard accessories suitable to work with the existing data

logger at RCC, complete with spare black and colour ink cartridge,

connecting power plug and cable to connect the data logger.

SOR Item SCADA-7 (a)

Erection charges for items SCADA-2 to SCADA-6.

The price shall cover the cost of erection of various items of equipments the

supply of which is covered under above mentioned items at remote control

Page 138: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 35 of 48

center and the controlled stations. The cost of erection shall cover the cost

of transportation of equipments, their positioning, fixing and their

alignment for smooth trouble free operation. The price shall also cover the

cost of inter connecting cables, laying of cable in trenches of approved size,

wiring connection to batteries, UPS, surge arrestors, operator‟s console etc.

and all other works necessary for proper functioning of the equipments.

The price for erection shall also include carrying out liasion with software

supplier or at the site work to finalise any matching details between the

RCC software and the hardware vendor. The price for erection shall also

include the cost of adjustments, testing after erection at site, testing to work

all items or equipments specified, integration and commissioning as

considered necessary by the purchaser. The price for erection shall also

cover all cost of administration of the contract, insurance premia, bankers

charges for guarantee cost stamps, loading and unloading, handling of the

materials and for any road transport which the contractor use to carry the

materials between their depot and site of work. It shall also include cost of

erection of separate earthing, if required as per RDSO standard

specification No. TI/SPC/RCC/ SCADA/0130/Rev.1 (04/2014) or latest.

The price shall include complete finishing work at Remote Control Centre,

TSS, SP & SSPs to the satisfaction of the Employer.

SOR Item SCADA-7(b)

Integration of new SCADA system to existing system at RCC.

The price shall cover the integration of entire new SCADA system with

existing SCADA system at RCC. This shall also include the cost of any

hardware and software required to complete the work. The item covers the

administrative work of supply, transport, execution of contractual items of

work, liasoning, testing and commissioning as per specified protocol

mentioned in RDSO standard specification No.

TI/SPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest as well as for the

efficient working of complete SCADA installation and trouble free

commissioning of the above work in all respects.

SOR Item SCADA-8

Erection, integration, testing & commissioning for existing and new

equipments

(a) TSS RTU (b) SSP RTU (c) SP RTU

The price shall cover the adjustment charges (modification/upgradation in

existing RTUs and SCADA system) required during the execution and final

testing on RTUs at TSS, SP & SSP with remote control centre for final

commissioning.

Page 139: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 36 of 48

SOR Item SCADA- 9

Supply of Equipment and Components (List B) Schedule of item for spare equipments and components

Note: The above list is provisional and may be updated as per zonal railway or

specific sectional requirement within overall cost.

SOR Item SCADA-10

Supply of Special T&P (List C)

List of Maintenance Tools and Instrument for SCADA system

Sr.No. Description Qty.

1. 4-1/2Digit Multi meter MECO Model 235

MK-11

4 Nos.

2. Tong Tester 2 Nos.

3. Electrician Plier 8” 3 Set

4. Electrician Plier 6” 3 Set

5. Cutting Plier 3 Nos.

6. Nose Plier 3 Nos.

7. I.C. Extractor 3 Nos.

Sr.No. Description Qty. Unit

1. Transducers:

i) Current 1 Nos

ii) Voltage 1 Nos.

iii) Power Factor 2 Nos.

2. 8 Port serial Card 1 Nos.

3. Contactors/Interposing Relays 28 Nos.

4. RETI Modules :

i) PR-80 (Power supply module) 2 Nos.

ii) CPU Module 2 Nos.

iii) DO Module 3 Nos.

iv) AI Module 1 Nos.

v) DI Module 3 Nos.

vi) Modem Card 1 Nos.

vii) Input conditions PCB_ 3 Nos.

viii) Cat UV/PT fuse fail Module 6 Nos.

ix) CVT 1 Nos.

x) DC-DC convertor 1 Nos.

5. Key Board 1 Nos.

6. Power Supply Unit for servers

FEP

1 Nos.

7. Power Supply Unit for Work

Station

1 Nos.

8. 18 GB wide ULTRA-2 SCI-HDD 1 Nos.

9. 20 GB IDE HDD 1 Nos.

10. 16 port 10/100 Ethernet LAN

HUB

1 Nos.

11. Surge Arrestor (Set of 3) 1 Nos.

Page 140: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 37 of 48

8. Card Extenders 3 Nos.

9. Level meter – APLAB Model 2031A 2 Nos.

10. Wire Stripper 1 Nos.

11. Fault Analyser 1 Nos.

12. Dual trace oscilloscope (0-30 Mhz) 2 Nos.

13. Remote Terminal Test Unit (In P-IV Laptop

Computer kit)

2 Nos.

14. Tool kit consisting of -

a) Brief Case 1 Nos.

b) Stripper & Cutter 1 Nos.

c) Crimping Tool 1 Nos.

d) Screw Driver Kit (6 Blades) 1 Nos.

e) Screw Driver Kit (1 Set Start type 6

Blades)

1 Nos.

f) Desolding Pump 1 Nos.

g) Brush (To clean the RTU) 1 Nos.

h) Soldering wire (18 SWG) 100 gms.

i) Solder Sucker 3 Nos.

j) Soldering Iron 3 Nos.

k) Nose Plier 1 Nos.

l) Spanner 1 Nos.

COMMON ITEMS OHE/TSS

SOR Item CS-1

SUPPLY AND ERECTION OF 25 KV VACUUM INTERRUPTER:

The price shall cover supply of a 25 Kv AC 50 Hz Single Pole, Outdoor type 1600 Amp

rating vacuum interrupter with all accessories and components as per RDSO‟s latest

Specification at site and erection of the same with supporting framework and terminal

connectors with interlock .

The price for erection shall include preparation of its foundation alignment and grouting

of the interrupter on its foundation block and mounting of accessories, if any in their

respective positions. The price shall also cover supply and erection of enameled number

plates. All necessary tools, equipments, instruments, including power supply required

for carrying out necessary checks, tests and commissioning shall be arranged by the

contractor.

The supply of vacuum interruptor shall be as per RDSO specification No.

ETI/S/PSI/167(09/97) with A&C slip No. 1 & 2.

SOR Item CS-2

SUPPLY AND ERECTION OF A 25 KV POTENTIAL TRANSFORMER TYPE-

I OR TYPE -II:

The price shall cover supply and erection of a 25 KV Potential transformer Type-I or

Page 141: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 38 of 48

Type -II complete with all fittings and accessories as per relevant latest specification,

including terminal connectors and fixing bolts. The price for supply and erection shall

include proper alignment of the transformer in position. The price shall also cover the

supply and erection of an enameled number plate and fixing bolts. The price shall not

include the cost of any small parts steel work.

SOR Item CS-3

SUPPLY AND ERECTION OF A 42 KV LIGHTNING ARRESTOR:

The price shall cover supply and erection of a 42 kV lightning arrestor complete with

all fittings and accessories as per relevant latest specification including terminal

connectors. The cost of erection shall include proper alignment of the lighting arrestor

in position. The price shall cover supply and erection of cadmium copper jumper (65),

which will be paid under item OHE-29. The price shall not include the cost of any small

part steel work. The price shall also include supply and erection of surge counter with

leakage current monitor along with cable (unarmored PVC insulated copper cable size

35 Sq. mm 1100 volts grade). The surge counter shall be mounted on the structure at a

convenient height as per. Specification No. ETI/PSI/71 revision-1(1/87), A&C slip

No.1 to 7 or latest.

SOR Item CS-4

SUPPLY AND INSTALLATION OF CABLES FOR SWS/TSS:

The price shall cover supply, installation, and connecting-up the cable for control and

indication, (PVC 1100 V grade 2.5 sq mm copper conductor 7 core), from the

interruptor to the terminal board, supply and erection of terminal connectors at ends

if required and conduits wherever necessary, heater supply cable, (1100 V grade

PVC insulated heavy duty 2 core 4 sq mm aluminium conductor), from interruptor

to the 230 V fuse box mounted on wall inside the control cubicle and from this box

to LT distribution board inside the control cubicle, supply and erection of terminal

connector at each end, if required, conduit if any at the interruptor end, catenary

indication (240 V AC circuit cable, PVC1100 V grade 2.5 sq mm Copper conductor

2 core), between potential transformer Type-I and terminal board inside the control

cubicle and supply and erection of terminal connectors at both ends, if required and

conduit to be embedded between the steel work base and the cable trench and shall

include all fastenings on masts and structural members to support them, LT power

supply cable, (1100 V grade aluminium conductor XLPE insulated PVC sheathed

and steel armoured heavy duty cable conforming to IS7098/Pt.I/1988 2x25 sq mm

for 5 KVA AT, 2x70 sq mm for 10 KVA AT, 2x185 sq mm for 25 KVA AT),

between L T supply transformer at switching station and LT distribution board

provided in control cubicle and suitable cable boxes and connectors at both ends if

required, cable between 110V battery charger and battery, between battery and the

DC fuse box and between the DC fuse box and terminal board and etc. The price

shall include supply and erection of terminal connectors wherever required.

NOTES:

1 In case of feeding stations which are located within the traction sub-station

premises, the cables shall be run from individual equipment and terminated inside

the sub-station control room.

Page 142: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 39 of 48

2 Notwithstanding the sizes of cables given above, the bidder shall assure himself that

various cables would suit the ratings of equipments offered by him.

3 Price shall be payable on flat rate basis per meter irrespective of size of cable for

different types of cables used switching stations/TSS.

SOR item CS-5

SUPPLY, ERECTION, OIL FILTRATION, TESTING AND COMMISSIONING

OF 25 KV/240 VOLT, 10 KVA, AUXILIARY (LT) SUPPLY TRANSFORMER

OIL TYPE WITH 25 KV D. O. FUSE SWITCH, ANTICLIMBING DEVICE,

INSULATOR, COPPER JUMPER AND EARTH ELECTRODES etc:

The price shall cover Supply of 25KV/240V, 10 KVA LT supply transformer at site

with DO fuse assembly (including fuse carrier) and all other mounting accessories, as

per the RDSO‟s latest specification and its erection complete with terminal connectors

on a mast or gantry. The price shall also be applicable for transformers mounted on

steel pedestals at switching stations. The price shall also cover supply and erection of an

enameled number plate of approved design.

The price shall also cover oil filtration and pre- commissioning tests as approved by the

Employers or Engineer. The contractor shall make his own arrangement for oil filtration

equipments, as well as power supply required for the same. All necessary tools,

equipments, instruments required for carrying out oil filtration / checks / tests /

commissioning shall be arranged by the contractor. The price shall also cover supply &

erection of a DO fuse switch assembly complete with all mounting accessories,

post/pedestal insulator for DO fuse switch assembly.

The price shall also cover on a lump sum basis the supply and erection of anti-climbing

device consisting of galvanized steel fixtures mounted on the masts below the

transformer.

The price shall also cover supply of conductor / jumper wires on a flat rate basis and the

supply of all components including parallel clamps, bi-metallic and Aluminium copper

Al-Cu strips wherever required. The price shall also cover the erection of complete

jumper assembly including conductor/jumper wire to be provided between the Over

Head Equipment and L.T. Transformers, drop out switch assembly.

The price shall also cover supply and erection of an earthing station/ stations with a

pipe/pipes required to achieve permissible earth resistance value embedded into the

ground by drilling or otherwise complete with protective concrete box and lugs suitable

for directly connecting two mild steel flats of minimum size 50 mm x6 mm and copper

earthing strip 25X3 mm at LT side earthing point to mast.

The price shall not include cost of supply and provision of structure bond connecting

LT transformer with structure and then to rails which will be paid for under item

OHE-22.

NOTE:1. Contractor at his own cost shall do the replenishment of the transformer oil

on account of testing and leakages during the warranty period.

SOR Item CS-6

PROVIDING AND LAYING OF CONCRETE FOR FOUNDATION AND

Page 143: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 40 of 48

PLINTH IN ALL TYPES OF SOILS AND SOFT ROCK

The price shall cover excavation, supply and handling of all materials and accessories,

temporary arrangements for excavation in all types of soils and soft rock,

concrete/masonry drains/walls, shoring wherever necessary, casting concrete including

frame work wherever necessary, tamping of concrete, grouting of masts and finishing

the top of concrete foundation or anchor blocks. The price also includes dismantling of

all connected temporary arrangements, back filling with excavated earth and

compacting the same to the required height and width as per drawing to ensure safety of

foundation, confining the exposed height of foundation block to within 10 cm., and

removal of spoil. The price shall also include the cost of supply of cement.

Notes for measurement

1. The payable volume of the foundations under the above item shall be the designed

one as shown in the drawings for which the hole has been made, irrespective of the

actual configuration.

2. The depth of the excavation shall be measured from the formation level to the

maximum excavated point.

3. The prices shall be calculated for the individual volume of concrete, fraction of a

cubic metre beyond the third decimal shall be rounded off to the next nearest third

decimal.

4. The prices shall apply for concreting of all foundations for mast, gantries, portals,

anchor blocks for guy rods, and fencing uprights.

5. For purposes of computation of volume of concrete, the volume of steel work

embedded in the foundation block shall be ignored.

6 For the purpose of computation of volume of concrete, the volume of concrete shall

include the volume of sand and bitumen in sand cored foundation. However, for the

purpose of computation of quantity of cement utilised in sand core foundations, the

volume of the sand and bitumen used in core hole should be deducted from the

total volume of the foundation.

7 For purposes of computation of volume of concrete, the volume of each muff for all

masts shall be taken as 0.02 cu.m. except for masts with balance weights and for

each column of portal, mast, 2 or 3 track cantilever masts, and special fabricated

masts for which the volume of muff shall be taken as 0.08 cum. irrespective of the

size and shape of muff, on a flat basis.

8. The item shall also be applicable to include the concrete of equipments, at the

switching stations/traction sub-station (except building foundations) as well as

embedded drain pipes, wherever required.

9. The prices shall also cover the cost of diversion of masonry/earth drain wherever

necessary for casting of foundations.

10. (a)RDSO guidelines shall be followed for grade of concrete, type of foundations etc.

Generally concrete for foundation shall be nominal mix of Grade-M-10 and for

grouting, muffing, embedding of structure in foundation concrete of M-15 Grade as

per latest RDSO guidelines shall be used.

(b) In Soft/Hard rock, Foundation in contact/Buried under Non-aggressive soil/ground

water:

Foundation concrete shall be of M-15 grade and core concrete shall be of M-20

grade.

(c) In Soft/Hard rock Foundation in coastal area: Foundation as well as core concrete

shall be of M-20 grade.

11. No extra payment shall be made for foundation casted with steel reinforcement as

Page 144: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 41 of 48

per RDSO drawing. Similarly, no extra payment shall be made for foundations

casted as per 10(b), (c).

SOR Item CS-7

PROVIDING AND LAYING OF CONCRETE FOR FOUNDATION AND

PLINTH IN HARD AND ROCKY SOIL REQUIRING CHISELING/BLASTING:

The price shall cover excavation, supply and handling of all materials and accessories,

temporary arrangements for excavation in hard rock requiring chiseling/blasting and

concrete / masonry drains / walls. Shoring wherever necessary, casting concrete

including frame work where necessary, tamping of concrete, grouting of masts and

finishing the top of concrete foundation or anchor blocks.

The price also includes dismantling of all connected temporary arrangements, back

filling with earth and compacting the same to the required height and width as per

drawing to ensure safety of foundation, confining the exposed height of foundation

block to within 10 cm., and removal of spoil.

The Employer's Engineer shall certify where use of chisel and hammer or blasting has

been necessary. The contractor shall arrange for supply of explosives and all tools and

plants for blasting operations at his own cost. The price shall also include the cost of

supply of cement.

Notes for measurement

1. The payable volume of the foundations under the above item shall be the designed

one as shown in the drawings for which the hole has been blasted, irrespective of

the actual configuration assumed by the latter due to the blasting.

2. The depth of the excavation shall be measured from the formation level to the

maximum excavated point.

3. The prices shall be same for any shape or size of concrete blocks. In calculating the

individual volume of concrete, fraction of a cubic metre beyond the third decimal

shall be rounded off to the next nearest third decimal.

4. The prices shall apply for concreting of all foundations for mast, gantries, portals,

anchor blocks for guy rods, and fencing uprights.

5. If half or more of the volume of excavation is in hard rock requiring

chiseling/blasting, entire foundations shall be paid for under this item.

6. For purposes of computation of volume of concrete the volume of steel work

embedded in the foundation block shall be ignored.

7. For the purpose of computation of volume of concrete, the volume of concrete shall

include the volume of sand and bitumen in sand cored foundation. However, for the

purpose of computation of quantity of cement utilised in sand core foundations, the

volume of the sand and bitumen used in core hole should be deducted from the

total volume of the foundation.

8. For purposes of computation of volume of concrete, the volume of each muff for all

Page 145: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 42 of 48

masts shall be taken as 0.02 cu.m. except for masts with balance weights and for

each column of portal, each head span mast, 2 or 3 track cantilever masts, and

special fabricated masts for which the volume of muff shall be taken as 0.08 cum.

Irrespective of the size and shape of muff, on a flat basis.

9. The price under this item shall also include in cost of concrete at the switching

stations as well as embedded of drain pipes, wherever required.

10. The prices shall also cover the cost of diversion of masonry/earth drain wherever

necessary for casting of foundations.

11.(a) RDSO guidelines shall be followed for grade of concrete, type of foundations etc.

Generally Concrete for foundation shall be nominal mix of Grade-M-10 and for

grouting, muffing, embedding of structure in foundation concrete of M-15 Grade

as per latest RDSO guidelines shall be used.

(b) In Soft/Hard rock, Foundation in contact/Buried under Non-aggressive soil/ground

water:

Foundation concrete shall be of M-15 grade and core concrete shall be of M-20

grade.

(c) In Soft/Hard rock Foundation in coastal area: Foundation as well as core concrete

shall be of M-20 grade.

12. No extra payment shall be made for foundation casted with steel reinforcement

as per RDSO drawing. Similarly, no extra payment shall be made for foundations

casted as per 11(b), (c)

SOR Item CS-8

PROVIDING AND LAYING OF REINFORCED CONCRETE FOR

PIER/COLUMN/PILE, CABLE TRENCH AND TRENCH COVER

The price shall cover excavation and providing and laying of all reinforced

concrete work for pier/column/pile, cable trench and trench cover and other materials

including bending, binding, laying of the reinforcement, shoring where necessary,

casting concrete including frame work where necessary, grouting and finishing the tops

of foundation blocks with the required slope/muff but excluding supply of steel

for reinforcement. The price shall also include dismantling of all connected temporary

arrangements, back filling as required and removal of spoil. The price shall also include

the cost of supply of cement.

Notes for measurement

1. The Concrete for cable trenches/trench cover/pier/column/pile shall be nominal mix

of 1:2:4(M-15 grade)

2. The prices shall be same for any shape or size of concrete blocks. In calculating the

individual volume of concrete, fraction of a cubic metre beyond the third decimal

shall be rounded off to the next nearest third decimal.

3. The prices shall apply for concreting of all foundations for mast, gantries, portals,

anchor blocks for guy rods, and fencing uprights.

4. For purposes of computation of volume of concrete the volume of steel work

embedded in the foundation block shall be ignored.

5. The price under this item shall also include the cost of concrete cable trenches and

Page 146: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 43 of 48

trench covers at the switching stations/traction sub-station as well as embodiment of

drain pipe, where required.

6. The prices shall also cover the cost of diversion of masonry/earth drain wherever

necessary for casting of concrete.

7. The payment for required steel shall be made under Civil Engineering BOQ Item

2076. However cost of cable support and trays is payable under BOQ item CS-9

SOR Item CS-9

SUPPLY AND ERECTION OF ALL TYPES OF GALVANISED STEEL

STRUCTURES, SMALL PARTS STEEL etc:

The price shall cover the cost of supply, erection, alignment and setting before grouting

of individual mast of finished traction mast fabricated from rolled mild steel beam

(BFB) 152 mm x 152mm x 37.1Kg/m. designated SC-150, table 3.1 of IS-808/1989

duly drilled as per RDSO‟s Specification No. ETI/OHE/C/00144 Mod- B or latest and

galvanized as per speciation No. ETI/OHE/13(4/84) with A&C slip No. 1 to 3 or latest.

The length of mast will be 9.5 or 8.5 meter as required.

The price shall also cover the cost of supply, erection, alignment and setting before

grouting of individual traction masts and main masts of switching stations including

those for head spans. of traction mast, main mast of switching stations fabricated from

Rolled Mild Steel Joist (RSJ) 203 mmX152 mm x 52.0 Kg/m designation WB-200,

Table 2.2 of IS- 808/1989 duly drilled as per RDSO drawing nos. given below for

various type of masts and galvanized as per specification No. ETI/OHE/13(4/84) with

A & C slip No.1 to 3 or latest. The price shall also cover the cost of supply of any other

structures fabricated out of RSJ beam.

Drg. Nos. (i) ETI/OHE/C/0000144 Mod- 09.5 M long

(ii) ETI/C/0030 Mod-F 11.4 m (S1)

(iii) ETI/C/0031 Mod-D 11.4 m (S2)

(iv) ETI/C/0036 Mod-E 08.0 m (S4)

(v) ETI/C/0181 Mod-C 12.4 m (S6)

(vi) ETI/C/0184 Mod-B 09.4 m (S9)

The price shall also cover the cost of supply of O, N and R type portals with necessary

components as per following RDSO Drawing Nos., cost of erection, alignment and

setting before grouting, wherever required, of portals assembly of boom components

and erection of the same. The prices shall also include supply and erection of

galvanized bolts, nuts washers etc. wherever required as per approved designs and

drawings. The price shall cover assembling, adjustment and erection of all types of

booms including TTC booms and any special structures across the track, not covered

under this item.

The structures shall be fabricated and galvanized from steel conforming to IS-2062 or

„A‟ as per concerned specification i.e. IS:2062/1984, IS-808/1989 and RDSO

specification No. ETI/OHE/13 (4/84) with A&C slip Nos 1 to 3 or latest.

(i) ETI/C/0008 Sheet No. 2 to 6 latest Mod for „N‟ type

(ii) ETI/C/0017 Sheet No. 2 to 6 latest Mod for „O‟ type

Page 147: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 44 of 48

(iii) ETI/C/0011/69 Sheet No. 2 to 6 latest Mod for „R‟ type

The price shall also cover the cost of supply of B-Series traction mast 9.5 m long i.e. B-

150, B-175 and B-200 etc fabricated and galvanized as per RDSO Drg No. ETI/C/0071

(Mod-E) and specification No. ETI/OHE/13 (4/84) or latest. The price shall also cover

the supply of any other size of B-series or K-Series mast required, that has not been

mentioned in this item.

Note : For the purpose of payment, the weights of individual traction mast and

masts of head span shall be determined for each type on the basis of the payable

weight per meter length shown below for standard types, For special types, the

payable weight per meter length will be indicated by the Employer at the time of

approval of designs.

PAYABLE UNIT WEIGHTS FOR STANDARD MASTS

S. No. Type of masts Weight in Kg per meter

including galvanization

1 2 3

1 6"x6" BFB 38.03

2 162x154 BFB 38.00

3 200x200 BFB 51.20

4 8"x6" RSJ 53.39

5 S1 53.30

6 S3 76.40

7 S4 53.39

8 S5 111.53

9 S6 53.39

10 S7 76.40

11 S8 111.53

12 K 100 23.70

13 K 125 30.30

14 K150 38.18

15 K175 43.72

Page 148: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 45 of 48

16 K200 49.87

17 K225 57.50

18 K250 66.72

19 B100 27.71

20 B125 32.47

21 B150 39.07

22 B175 44.61

23 B200 50.76

24 B225 61.50

25 B250 70.72

26 S 100 23.72

27 S101 19.98

28 Other Sections As & when issued by

RDSO/market survey etc

The price shall also cover the cost of supply of special fabricated and galvanized steel

structures (other than BFB/RSJ/‟B‟ Series Masts and Portals). The structure to be

supplied under this item TTC, „G‟ Type, BFB Type portals, Bridge masts, Emergency

masts and Double/Fabricated „S‟ Series masts such as S-3, S-5, S-7, S-8, S-100, S-101,

T-150, cable trays etc., Any other similar structure required during the execution of

work shall also be supplied under this item.

The price shall also include the cost of steel, fabrication, galvanization and supply at

site for erection. Steel shall be conforming to IS:2062 Grade „A‟ SK 1984 (Latest), Zinc

conforming to IS:209/1997 (Latest) and galvanization to RDSO‟s specification

No.ETI/OHE/13 (4/84) with „A‟ & „C‟ slip No. 1 to 3 or latest. The various structures

covered under this item are .

S.No

Description

Drawing No

Mod.

1 2 3 4

1 TTC with 5.5/8.0 mtrs boom ETI/C/0009

Sheet 2 to 5

„B‟

2 „G‟ type Portal Up right and End Pieces ETI/C/0056 „C‟

3 BFB Portal ETI/C/0026

Sheet 2

„A‟

4 S-7, 12.4 MTRS Length ETI/C/0182 „C‟

5 S-8, 12.4 Mtrs Length ETI/C/0183 „C‟

6 S-100, for LT Transformer at SWS ETI/C/0043 „B‟

Page 149: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 46 of 48

7 S-101, for Isolators inside SWS ETI/C/0180 „A‟

8 S-3, 11.4 Mtrs ETI/C/0180 „C‟

9 S-5, 11.4 Mtrs ETI/C/0042 „E‟

10 T-150, for LT Supply Transformer ETI/PSI/037 „C‟

The price shall cover cost of erection, alignment and setting before grouting, wherever

required, gantries, including tower / steel tower / steel work for feeders for traction sub-

station, drop arms, standard super masts and suspension brackets for feeders and return

conductors. Dwarf masts of stub masts for anchoring, complete with anchor plates

drilled and welded in position multiple cantilever cross arm, chairs, adopters for bracket

assemblies and all other small part steel works, the erection of which is carried out by

the contractor irrespective of whether they are supplied by purchaser/contractor. The

prices shall also include supply and erection of galvanized bolts, nuts washers etc.,

wherever required as per approved designs and drawings.

The steel shall be conforming to IS-2062/1992 (latest) Gr „A‟ SK zinc conforming to

IS-209/1992 or latest.

The price shall also include the cost of repairing of platform shelters in case the shelter

is dismantled/removed/damaged during the course of erection of a mast / portal at

platforms.

Note:

(i) The prices for the items shall also include the cost of stenciling of location number

on masts/portal uprights in the manner as directed by the Purchaser.

(ii) The price shall also include straightening of masts/portals uprights wherever

approved by the purchaser and cutting of mast/portals/upright to suit the site

condition.

(iii)The payment shall be made on the basis of the final lengths/weight of the

structures, in case the same are cut or modified as indicated above before erection.

The price shall also cover the cost of supply of all fabricated steel work excluding

fasteners which are required to be supplied by the Contractor. The cost of erection for

such steel work, if carried out by the Contractor shall be paid for under relevant item

For standard fabricated steel work for which RDSO'S approved drawings are available,

the weight of steel work as specified in RDSO'S drawings shall be considered for

payment. However, in case the unit sectional weight of any member indicated in

RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS

specification, the weight of the fabricated steel work shall be calculated on the basis of

latest IS specification and the same will be considered for payment. For the non-

standard fabricated steel work, the calculated weight to be considered for payment

under this item shall be included in the relevant drawing based on, latest IS sectional

weight at the time of submitting the designs for approval of the Employer.

NOTES :

1 For the purpose of payment against items, weight of structures or fabricated steel

work will be calculated according to the weight of black steel given in section

books for the lengths of various members shown in the approved drawings. There

will be no addition for increased weight due to galvanizing or painting or weld

material or reduction for holes or skew cuts.

2 The rates against item shall be applicable to the erection of small part steel work

which are not covered under the various other items of work.

Page 150: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 47 of 48

SOR Item CS-10

SUPPLY AND ERECTION OF FENCING PANELS, UPRIGHTS, GATE, AND

ANTI-CLIMBING DEVICE:

The price shall include supply and erection of fencing panels painted with two coats of

red oxide zinc chromate primer to IS: 2074 and finished with two coats of aluminium

paint. The prices shall also include supply and erection of fencing upright, anti-climbing

devices including the cost of fasteners and the price shall be for a meter length of the

panels 2.4 m height measured in the plan view of the appropriate approved drawings.

The prices shall be on the basis of black weight of the steel with no deduction for holes

or skew cuts or no increase for weld materials.

The price shall also cover supply and erection of an anti-climbing device consisting of

galvanized steel fixtures mounted on the fencing panels as per approved design. The

price shall be per meter length of the panel. Fencing panel shall be manufactured with 8

SWG GI wire as per CORE drawing no CORE/ALD/PSI/001 Mod „B‟.

SOR Item CS-11

SUPPLY AND ERECTION OF ALUMINUM JUMPER WITH FASTENERS:

The price shall cover on flat rate basis the supply and erection of an aluminum jumper

complete with all components and fittings required for providing jumper connection

including parallel clamps, bi-metallic Aluminium-Copper strips wherever required and

terminal or tee clamps at either end. The price shall be applicable for any aluminum

jumper/ connection in any combination between feeders, return conductors, overhead

equipment, isolators, and out-going bus bars or switching stations and booster stations.

Jumper connections for 25 kV feeding stations will also be paid under this item.

SOR Item CS-12

SUPPLY AND ERECTION OF COPPER STRIPS FOR EQUIPMENT

EARTHING:

The price shall cover supply and erection of 25mm x 3mm copper strips to connect the

earth terminals of equipment like potential transformers, lighting arrestor, and LT

supply transformers to the main masts of the gantries on which they are mounted. The

price shall also cover all fastenings required for fixing the copper strip along any

structure member of the gantry.

SOR ITEM CS-13

SUPPLY AND ERECTION OF ALUMINIUM BUS BAR 36MMx28MM:

The price shall cover supply and erection of aluminium bus bar 36mmx 28 mm including bending, shaping and clamping on to insulators, connectors or equipment terminals. SOR ITEM CS-14

SUPPLY AND SPREADING OF GRAVEL/ BALLAST IN THE SWITCH YARD

(SP/SSP/TSS):

The price shall be per cubic metre rate and shall cover supply and spreading of

uniformly graded gravel/ballast of size 20mm as per IS:383-1970 in the outdoor switch

yard/TSS after completing all the works and levelling the switch yard area, but before

commissioning of the sub-station. The gravel/ballast shall be of good quality and free

from any dust and dirt. Prior approval of ballast shall be taken from the Employer for

the gravel samples. The gravel/ballast shall be spread out uniformly to a depth of

minimum 10cm. over the area indicated by the Employer‟s Engineer.

Page 151: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 48 of 48

SOR Item CS-15

DISMANTLING OF REDUNDANT FOUNDATIONS WITH COMPRESSOR

POWERED MACHINES:

The price under this item shall cover the cost of breaking of redundant foundations with

compressor powered machines or manually with required tools. The price shall also

cover the cost of any required material including consumables like HSD Oil etc

required for breaking of foundation block and shifting the broken material from site to

a place/location and refilling the excavated pit with earth as directed by employer at

site of work. No price is payable for dismantling of any foundation due to fault of

contractor.

SOR Item CS-16

MONTHLY CHARGES FOR ONE CRANE OPERATOR, WATCH AND WARD

STAFF FOR ONE CRANE/UTV.

The price under this item shall cover monthly charges on lump sum basis to be paid for

one crane operator in day/night time as per work requirement for OHE mast/structure

erection, loading/unloading of material etc. Price shall also cover monthly charges to be

paid to Watch & Ward staff to be deputed for the crane round the clock at site of work

for security and miscellaneous works as per requirement. The deployment shall be done

as per directions of the engineer at site.

Note: Unit of the item shall be „per month’.

SOR Item CS-17

SUPPLY AND ERECTION OF ANTI-THEFT TRANSFORMER 240 VOLT/2.2

KV 5 KVA , DO FUSE SWITCH ASSEMBLY, EXCAVATION OF CABLE

TRENCH, LAYING OF CABLES, EARTHING, JUMPERING, DG SET,

INCLUDING DISMANTLING OF ABOVE EQUIPMENTS.

The price under this item shall cover all items required for anti theft arrangement of

OHE at each location including supply and erection of a Anti-theft single phase

transformer of 230 volt/2.2 KV, 5 KVA capacity at site, mounting it on structure or

gantry with suitable mounting and tripping arrangement as per the RDSO specification.

Price shall also cover supply and erection of a DO Fuse switch assembly complete with

all mounting accessories, post/pedestal insulators, DG set of 5 KVA capacity. The price

shall also cover the supply and erection of anti-climbing device consisting of galvanized

steel wire with fixtures mounted on the mast below the transformer. The price shall also

cover supply and erection of a copper jumper along with suitable clamps and bi-

metallic strips wherever required between OHE/cable and transformer, drop out switch

assembly. The price shall also cover supply, mounting of a 230 Volt 63 Amp. ICDP

switch on transformer structure and its connections. The price shall also cover

excavation of cable trench from supply point to transformer structure wherever

required, supply and laying of suitable size cables. The price shall also cover

dismantling of the complete system when advised by the Engineer. The price shall not

cover the provision of structure bond connecting anti-theft transformer with structure

and then to rails which will be paid for under item OHE-22. Local electricity if

available at station may be used for the purpose free of charge after approval. The price

shall cover cost of diesel, lub oil etc required for running of DG set when electricity is

not available.

Page 152: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 1 of 40

Schedule-33000(GENERAL ELECTRICAL WORKS) (Quarters, Service buildings, Pumps, Track crossings etc.)

1. Explanatory notes for various items of work in Electrical General Services Schedule are given below:

i All electrical works should comply with Indian Electricity Act 2003 and Rules framed there under.

ii All electrical installations shall conform to the relevant Indian Standard and shall be carried out as per the relevant safety Code of

Practices and guidance for Safety Procedures in Electrical Works as per IS:5216/Pt I & II/1982.

iii Notwithstanding the ratings specified in the BOQ, all components proposed to be used in the installations, shall be of appropriate

rating of voltage, current and frequency without any additional financial implication on RVNL. Discrepancies, if any, in this regard,

shall be brought to the notice of the Engineer by the Contractor.

iv All minor items viz. hardware items, foundation bolts, termination lugs for electrical connections etc. as required and necessary for

proper working of the equipment shall be deemed to have been included in the Bill of Quantities, whether such items are

specifically mentioned or not.

v (a) The basic quantities of components & materials required to make up a unit of work for selected items are approximate. The Contractor shall plan the work, estimate the actual quantities required and get the same approved by the Engineer before placing orders.

(b) In estimating the prices for various items of work, provision for loss or wastage in transit and erection including freight, handling, taxes and duties, insurance if any etc. should be taken into account and firm unit price offered for a complete unit of work to be done by the contractor.

vi The various items to be supplied/provided/erected should be as per the list of approved suppliers included in RVNL‘s Technica l Specifications/list followed by concerned zonal Railway. Items not appearing in the approved list shall be procured from good quality sources in line with best industries practices and shall be either ISI marked or conforming to latest IS (if any). Before procurement, vendor approval shall be obtained from the Employer.

vii Good workmanship and total compliance with safety and other statutory rules and regulations, shall invariably be observed by the Contractor.

viii All approvals from the relevant and appropriate government & statutory authorities shall be the total responsibility of the Contractor

unless specified otherwise.

Page 153: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 2 of 40

ix All quoted rates shall cover supply of materials, handling of materials, labour required, civil works, taxes and duties, fabrication,

installation, testing and commissioning, training and free maintenance till handing over to the Employer‘s representative.

x If any activity of work is essential for the satisfactory completion of the work but is not mentioned specifically in the Bill of Quantities

or elsewhere in the bidding documents, the same shall be deemed to be included In the scope of work and shall be executed by the

contractor within the accepted cost. The work shall be handed over in a functional manner complete in all respects.

xi

The inspection of various items shall be carried out by the agencies as specified in RVNL specifications. The prices quoted also

include RITES/RDSO representative inspection and testing charges unless otherwise specified in the bill of quantities or Technical

Specification. In case of change of inspection from RDSO/RITES to RVNL/CONSIGNEE, 1% of the cost of material will be

deducted by RVNL as inspection charges.

xii The inspection of above items will be done at the manufacture‘s works/place decided by the Employer based on item, its quantity,

Inspecting Authority etc.

2. DRAWINGS

2.1 The contractor shall prepare drawings in Auto Cad for all LT/HT installations, indicating proposed works and shall obtain approval of Engineer prior to taking up the work. Such drawings shall be prepared in coordination with all other agencies executing works at the same site and a maximum of 10(ten) copies as are required by RVNL with one tracing on RTF paper.

2.2 After commissioning, these drawings shall be duly updated as per erection work at site and submitted in six copies and one tracing in RTF paper, as Completion Drawings, along with a soft copy to the Employer.

2.3 Where the contractor proposes to use an item of equipment, other than that specified or detailed on the drawings, which requires any re-design of the structure, partitions, foundation, piping, wiring or any other part of the mechanical, electrical or architectural layouts, he shall inform the Engineer well in advance and obtain his approval. Delays resulting from such re-design shall be On Contractor’s account.

He shall also submit all related information as may be required for approval of such redesign, to the Engineer.

2.4 Where the work of the Contractor has to be executed in close proximity to or will interfere with work of other agencies, the Contractor shall work out space/time adjustments in coordination with other agencies. If the contractor installs his work before coordinating with other agencies, so as to cause any interference with their work, he shall make the necessary changes without extra cost to the owners of the installation.

Page 154: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 3 of 40

3. EXPLANATORY NOTES FOR BOQ ITEMS

The descriptions of all items are self explanatory. These Explanatory Notes are supplementary to the BOQ description. Further details are

available in latest booklet of RVNL‘s STANDARD SPECIFICATIONS FOR MATERIAL AND WORKS Volume-II(GENERAL

ELECTRIFICATION AND RAILWAY ELECTRIFICATION WORKS) as amended from time to time.

NOTE: Following particular requirements shall be followed for wiring works:

1 No conduit shall be of size less than 20 mm. 2 Occupancy of wiring cable in conduit shall not exceed 45% of the capacity of conduit. 3 Switch boxes shall be of galvanized sheet metal of suitable sizes from approved sources: 4. Separate conduit shall be laid for each circuit/sub main/main wiring. 5 Water cooler/AC Points and other such inductive loads shall be controlled with ―C‖ series MCBs. 6 Neutral cable shall be brought into each switch box. 7 Earth cable shall be brought into each switch box. 8 Fan point wiring shall include supply & fixing of fan box. 9 Approx.150 mm long wiring cable shall be kept loose in switch box/SDB/DB etc. 10 Conduits laid in sheds shall be clamped with the shed structure with clamps made from GI. strips of 25x1.6mm and spaced at

about 1000mm interval, fixed with 8mm dia bolts with nuts. 11 Brass screw and cup washers shall be used for fixing sheets on the front of switch box . 12 All the wiring work shall be in conformity with IS732/1989 (Latest Version) CODE OF PRACTICE FOR ELECTRICAL WIRING

INSTALLATIONS & IS 4648/1968 (Latest Version) Guide for Electrical Wiring in Residential Buildings. 13 The equipments which are available with ISI mark in Indian market, they shall be supplied having ISI mark only whether

specifically mentioned in BOQ & its explanatory notes or not. 14 All the energy consuming equipments which are available in Indian market with energy star rating issued by BEE, shall be

supplied with minimum 3 star energy rating only whether specifically mentioned in BOQ & its explanatory notes or not.

Page 155: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 4 of 40

ITEM NO 33001 (i) to (vi) ELECTRIFICATION OF STAFF QUARTERS

(a) The item price includes cost of labour & all materials required to electrify the quarter in all respect complete with ceiling and exhaust fans,

luminaries with lamps and other items indicated in the scale of fittings for each type of quarter. It also includes the cost of wiring cables

(sizes indicated for point wiring, circuit wiring and sub main wiring), PVC conduits with accessories, junction boxes, modular switches,

sockets, metal boxes, lamp holders and ceiling roses, modular plates, pre-wired sub distribution boards and meter boards with meters,

MCBs, earth electrodes etc.

The work of staircase wiring covers complete work of wiring and all the materials required including conduit, wiring cable of size for point wiring, two nos of two way switches etc. Payment for this item shall be in addition to the one point wiring covered under Item No-33003 (i).

(b) Scale of fittings, wiring points, fans, luminary etc. for each type of quarter, Cable sizes, no. of wires permissible in each circuit and sub main, meters, etc has been indicated here under.

SCALE OF ELECTRICAL FITTINGS FOR QUARTERS

Details of Points to be provided in each type of quarter

Type of

Qtr.

LP Tube Total FP PP 5A PP 15A Call Bell Ex. Fan Geyser AC (32A) Total

Points

I

No. of

Points

6 2 8 2 2 2 0 0 0 0 14

II

6 2 8 2 3 2 1 0 0 0 16

III

7 3 10 3 3 3 1 0 0 0 20

IV

11 5 16 3 4 4 1 1 1 1 31

V 15 6 21 5 6 5 1 1 2 2 43

Page 156: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 5 of 40

Sizes of single core (copper conductor) cable for point wiring, circuit wiring and sub main wiring, circuits, distribution board/s, etc. for Qrs.

Nos. of points and size of wiring cables Nos. of circuits and size of wiring

cables

Size of Sub main wiring

cable

Size of point wiring cable

(copper conductor)

Size of circuit wiring cable

(copper conductor) For L & F Load

For Power

load

LP TLP FP CBP EFP PP5A PP

15A

GP PP32A

(ACP)

For L&F For 5A

Plug

For

15A.

Plug

For

32A.

AC

For geyser

Phases

and

neutral

1.5 sq.mm 2.5s

q.

mm

4sq

mm

6sq

mm

6sq

mm

2.5 sq.

mm

4sq.

mm

4sq.

mm

6sq.

mm

6 sq.mm 4 sq mm 10 sq mm

Continuo

us earth

1.5 sq.mm 2.5s

q

mm

4

sq

mm

6

sq

mm

6sq

mm

2.5sq

mm

4sq

mm

4 sq

mm

6sq

mm

6 sq.mm 4 sq mm 10 sq mm

Page 157: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 6 of 40

Nos. of points

Nos. of circuits Single phase Double

Door Distribution board

(4 incomer +8 outgoing)

Earth Electrode Type of

Quarter

LP TL

P

FP CBP EFP PP5A PP

15A

GP PP32A

(ACP)

For

Lights

Fans &

call bell

For 5A

Plug

For 15A.

Plug

For 32A

AC

For

geyser

Total

Ckt. Qty Details

I 6 2 2 0 0 2 2 0 0 2 1 2 0 0 5 1 No.

Incoming MCB DP-20 Amp with RCCB 100 mA and O/G --- 6-16amps. MCB

SP -5 Nos.

(a) Single unit Quarter - 1 No (b) two units Quarter - 1 No,

(c)Three/four units quarter - 2 Nos. II 6 2 2 1 0 3 2 0 0 2 2 2 0 0 6 1 No.

Incoming MCB DP-20 Amp with RCCB 100 mA and O/G --- 6-16amps. MCB

SP -6 Nos

III 7 3 3 1 0 3 3 0 0 3 2 3 0 0 8 1 No.

I/C MCB DP-20 Amp with RCCB

100 mA and O/G --- 6-

16amps. MCB SP - 8 Nos.

Page 158: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 7 of 40

IV

11

5

3

1

1

4

4

1

1

4

2

4

1

1

12

1 No.

( for

L&F)

I/C MCB DP-32Amp with

RCCB 100 mA and Outgoing - (i) MCB SP 6-

16amps ---6 Nos,

One Number for

each quarter

1 No.

( for

power

circuit)

I/C MCB DP-32Amp with

RCCB 100 mA and Outgoing - (i) MCB SP 16amps ---4 Nos,(PP15A)

(ii) MCB SP 20 amps -- 1

No.(Geyser) (iii) MCB SP 32

amps -- 1 No(AC/WC)

V

15

6

5

1

1

6

5

2

2

6

3

5

2

2

18

1no.(for L&F)

I/C MCB SPN-32Amp with RCCB 100mA and Outgoing –(i) MCB SP 6-16 amps – 12 Nos,

Two Numbers

for each quarter 1.No. (for Power circuits)

I/C MCB TPN-40 Amp with RCCB 100 MA mA and Outgoing – (i) MCB SP

Page 159: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 8 of 40

16amps -6 nos, (PP15A) (ii) MCB SP 20 amps – 2 nos (Geyser) (iii) MCB SP 32 amps – 2 No (AC)

Abbreviations

LP Light point with 18 watt CFL PP5A Light plug point complete with socket and switch

TLP Tube light point with 1x28 watt T-5 Luminary and T-5 lamp PP15A Power plug point complete with socket and switch

FP Ceiling Fan point with 1200/1400 mm fan with 300 watts

electronic regulator

PP32A

(ACP)

Air Conditioner point with Industrial type iron clad plug

32 amps & 20A DP MCB in metal clad box

CBP Call bell point with ding dong type call bell GP Geyser point with 25 liters storage geyser

EFP Exhaust fan point with 300 mm Exhaust fan

Details of Meter board

(A) Electronic Energy Meter with LCD display and outgoing MCB for quarters

Type of Qtr Block of one unit Block of two units Block of three units Block of four units Capacity

Meter Outgoing DP MCB

Meter Outgoing DP MCB

Meter Outgoing DP MCB

Meter Outgoing DP MCB

Meter DP MCB

I 1 No. 1 No. 2 Nos. 2 Nos. 3 Nos. 3 Nos. 4 Nos. 4 Nos. 10-40 A 20 A

II 1 No. 1 No. 2 Nos. 2 Nos. 3 Nos. 3 Nos. 4 Nos. 4 Nos. 10-40 A 20 A

III 1 No. 1 No. 2 Nos. 2 Nos. 3 Nos. 3 Nos. 4 Nos. 4 Nos. 10-40 A 20 A

Page 160: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 9 of 40

Note: - Outgoing MCB and meter for individual unit shall be housed in separate chamber .Sealing arrangement for individual unit shall be made.

(B). Incoming MCBs in meter Boards (in separate chamber for each unit)

Qtr Block of one

unit

Block of two

units

Block of three

units

Block of four units Bus bar chamber

Type Rating MCB Rating MCB Rating MCB Rating DP MCB Copper Bus bars Type

I 32 A DP 40 A DP 63 A DP 63 A DP 100A Double door

II 32 A DP 40 A DP 63 A DP 63 A DP 100A Double door

III 32 A DP 40 A DP 63 A DP 63 A DP 100A Double door

IV 40 A DP 63 A DP 63 A TPN 63A TPN 100A Double door

V 40 A TPN 63 A TPN 100 A TPN 100A TPN 200A Double door

Note: - Bus bar chamber required only beyond two units quarter block.

IV 1 No. 1 No. 2 Nos. 2 Nos. 3 Nos. 3 Nos. 4 Nos. 4 Nos. 10-40 A 40 A

V 1 No. 1 No. 2 Nos. 2 Nos. 3 Nos. 3 Nos. 4 Nos. 4 Nos. 10-40 A single phase (for

L&F) 10-40 A, 3

Phase (for Power load)

40 A

40 A TPN

Page 161: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 10 of 40

ITEM NO: 33002: ELECTRIFICATION OF GATE MAN LODGE AT LEVEL CROSSING

(a) The item price includes cost of labour & all materials required to electrify the gate man lodge in all respect complete with ceiling fans, luminary with lamps and other items indicated in scale of fittings including cost of wiring cables (sizes indicated for point wiring, circuit wiring), PVC conduits with accessories, junction boxes, switches, metal boxes, lamp holders and ceiling roses, phenolic laminated sheet covers, pre wired sub distribution board, earth electrodes etc.

(b) Scale of fittings, wiring points, fans, luminary etc. and Cable sizes, no. of wires permissible in each circuit and sub main, etc has been indicated below.

(c) Payment for providing bracket on wall is included under item for GI pipe and shall be made on measurement of length basis. SCALE OF ELECTRICAL FITTINGS

Details of

Points

LP

TLP (T-5) F P STL PP5A Total Points D B EE

Quantity 2 No. 2 No. 1No. 1No. 1No. 7 Nos. 1No. 1No.

Abbreviations

LP Light point with 18 watt CFL STL light point with 1x28 watt street light (aluminium sheet) T-5 luminary with lamp and G.I.pipe bracket grouted on wall

FP Ceiling Fan point with 1200 mm

fan & 300watt stepped type

Electronic regulator

D B Pre wired Distribution board comprising of following:-

Incoming DP MCB32A with 100mA RCCB --- 1No.

Outgoing SP MCB 6-16A – 4Nos.

100A copper bus bars

TLP T-5 light point with 1x28 watt

surface type(metal sheet) T-5

luminary with lamp

EE G.I.pipe earth electrode

PP5A Light plug point complete with

socket and switch

Page 162: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 11 of 40

Sizes of single core (copper conductor) cable for point wiring, circuit wiring,

Size of point wiring cable

Size of

circuit

wiring

cable

Nos. of circuits

LP T-5 FP STL PP5A LP, FP & PP5A STL

Phases

and neutral 1.5 sq.mm 2.5 sq.mm

1 No. 1 No. Continuous

earth

1.5 sq.mm 2.5 sq.mm

ITEM NO.33003: ELECTRIFICATION OF SERVICE BUILDINGS &PASSENGER SHELTER AND SHEDS

a) The item price includes cost of labour & all materials required to electrify the buildings in all respects in surface/recess (excluding supply and erection of fans, luminaries, air conditioners, water coolers, geyser which are covered elsewhere under BOQ). The cost includes wiring cables (sizes indicated for point wiring, circuit wiring and sub main wirings), PVC conduits with accessories, junction boxes, modular switches, metal boxes, lamp holders and ceiling roses, modular plates sub distribution boards, distribution boards and earth electrodes etc.

b) Service buildings shall also include buildings at isolated locations such as relay huts at level crossings etc.

c) Wiring for essential and non essential load and their control shall be carried out separately at station buildings and other locations as

required.

Page 163: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 12 of 40

d) The payment for provision of industrial type iron clad plug socket with 32A DP MCB in M.S.Box [Item 33003(iii)] shall be paid in addition to

one power point work covered under 33003(ii).

NOTES: -

i) Earth Electrode shall be provided for each building as per IE rules.

ii) Single phase distribution system is permitted up to 10 KW load calculated on the basis of load of points as indicated here under.

iii) Three phase distribution system shall be carried out for the buildings having load above 10 KW calculated on the basis of load of

points as indicated here under.

iv) Separate SDB‘s shall be provided for L&F and Power loads as per site requirements.

v) Each SDB shall be provided with RCCB 100 mA with incoming DP MCB.

vi) Each Distribution Board and Sub Distribution board shall be designed based on the requirement of load as per site conditions and

considering 25% additional circuits (minimum- 1 No.) as spare (MCB) on outgoing and minimum 50% additional load on Incoming

(for future requirements)

vii) Approval for design shall be obtained from the Engineer, prior to ordering boards on the basis of sample calculation for assessment

of electrical load, circuits and wattage of points as indicated below.

Page 164: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 13 of 40

A) Sample Calculation for Assessment of Electrical load, Circuits and wattage of points

A-1) Wattage of points

Light Point /Call Bell

point

Ceiling

Fan Point

Exh. Fan

Point

Light Plug

point

5A

Power plug

point

15A

Geyser

Point

PP 32A Air Conditioner Point /Water Cooler

60 Watts. 100

Watts.

200 watts 100 Watts 500 Watts 1500 Watts 2000 Watts

Page 165: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 14 of 40

A-2) Sample Calculation for Assessment of Electrical load and Circuits:-

Building with load as detailed here under

LIGHT & FAN CIRCUIT POWER CIRCUIT

Light Point /Call Bell

point

Ceiling Fan Point

Exh. Fan Point

Light Plug point 5A

Power plug point

15A

Geyser Point

PP 32A Air Conditioner Point /Water Cooler

Wattage of points 60 Watts. 100 Watts 200 watts 100 Watts 500 Watts 1500 Watts 2000 Watts

No. of points 25 10 4 5 4 1 2

Total watts 1500 1000 800 500 2000 1500 4000

Total Load 3800 watts 7500 watts

Nos. of points permitted in a circuit

8 Nos 3 Nos 1 No 1 No 1 No

No. of circuits 5 Circuits 2 Circuits 4 Circuits 1 Circuit 2 Circuits

Total circuits 7 Circuits 7 Circuits

Sub Distribution

Board

Incoming 40 A DP MCB with RCCB --- 1 No Outgoing SP MCB 6--16amps—9 Nos (including spares)

Incoming 63 A DP MCB with RCCB—1 No, Outgoing (including spares) (i) SP MCB 32A -- 3 Nos for (AC/WC) (ii) SP MCB 20A – 2 Nos. For Geyser (iii) SP MCB 16A – 5 Nos. for 15A plugs

Distribution Board

Incoming 63 A TPN MCB --- 1 No Outgoing (including spares)

DP MCB 63 amps --2 Nos DP MCB 40 amps -- 2 Nos

Page 166: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 15 of 40

A-3) Size/s of single core (copper conductor) cable for point wiring, circuit wiring and sub main wiring, circuits, Sub Distribution Board/s,

etc.for buildings, offices etc.

Nos. of points and size of wiring cables

Nos. of circuits and size of wiring cables

Minimum size of Sub main wiring cable

Minimum size of main wiring cable

G.I.pipe Earth Electrode

Size of point wiring cables Size of circuit wiring cables

Light Point/Fan Point/Call Bell point/ PP5A etc.

Group point wiring/5A wiring

PP 15A

GP

PP32A (ACP/WC)

For L&F and 5A Plug

For 15A. Plug

For Geyser

For 32A. (AC/WC etc)

10 sq.mm

16 sq.mm

Phase/s and neutral

1.5 sq.mm

2.5 sq. mm

4 sq mm

6 sq. mm

6sq mm

2.5 sq.mm

4 sq. mm

4 sq. mm

6 sq. mm

10 sq. mm

16 sq. Mm (i) One No. for

Each single Phase SDB/DB (ii) two Nos. for each three phase SDB/DB

continuous earth

1.5 sq. mm

2.5 sq. mm

4 sq mm

6 sq. mm

6sq mm

2.5 sq. mm

4 sq. mm

4 sq. mm

6 sq. mm

10 sq. mm

16 sq. mm

Page 167: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 16 of 40

Nos. of points permitted in a circuit

No.of circuits permited in a Distribution Board

Light Point/Fan Point/Call Bell point/ PP5A etc.

PP5A PP 15A

GP PP32A (ACP/WC)

For L&F and 5A plug

For 15 A plug

For Geyeser

For 32A (AC/WC etc)

8 Nos. 4 Nos 1 No 1 No 1 No 12 Nos. 12 Nos 10 sq.mm

16 sq.mm

Abbreviations

LP Light point PP5A Light plug point complete with socket and switch

FP Ceiling Fan point. PP15A Power plug point complete with socket and switch

CBP Call bell point PP32A

(ACP/WC)

Air Conditioner/Water cooler point with Industrial type iron clad plug

32 amps & 20A DP MCB in metal clad box

EFP Exhaust fan point GP Geyser point

Page 168: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 17 of 40

ITEM NO 33004: DELETED

ITEM NO 33005: Supply, installation, testing and commissioning of prewired T-5, energy efficient luminaries.

The item price includes labour & cost of all materials including cost of luminary complete with accessories, T-5 tube, FR PVC insulated multistranded single core copper conductor cable, earthing etc. Requirements of this item shall be as per technical details furnished here under and as per instructions of Engineer.

Installation of luminary on wall/ceiling Luminary shall be fixed properly on ceiling or on the wall with wooden/ roll plugs and

screws. Installation of luminary on Passenger shelter/sheds -Luminary shall be fixed with structure of shed with 2 No clamps of GI.strips of 25x1.6mm and nut & bolts, 33005(i) Fitting & arrangement shall be similar to Havell's Cat. Ref. No.LHIT12128032 complete with electronic ballast, T-5 tube. & earthing etc. as required. 33005(ii) Fitting & arrangement shall be similar to Havell's Cat. Ref. No.LHIT11228033 complete with electronic ballast, T-5 tube & earthing etc. as required.

ITEM NO.33006: Supply, installation, testing and commissioning of street light luminary with prewired T-5 energy efficient tubes.

The item price includes labour & cost of all materials including cost of FR PVC insulated multistranded single core copper

conductor cable, earthing etc. Luminary shall be provided on the bracket of pole / on wall / as required. For provision of luminary

on wall, G.I.Pipe bracket is payable under G.I.Pipe item on measurement of length basis. It also includes

33006 (i): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT05228033, complete with T-5 tubes, electronic

ballast etc.

33006 (ii): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT05128032, complete with T-5 tubes, electronic

ballast etc.

33006 (iii): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT15214040, complete with T-5 tubes, electronic

ballast etc.

Page 169: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 18 of 40

33006 (iv): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT18414040, complete with T-5 tubes, electronic

ballast etc.

33006 (v): Fitting & arrangement shall be similar to Havell's Cat. Ref. No. LHRT18424034, complete with T-5 tubes, electronic

ballast etc. OR similar to Bajaj Cat Ref No BGEST 85 RF CFL FG E40 complete with 85W CFL as required by Railway.

CFL luminary shall be Integral, powder coated die-cast aluminium housing, pot optics reflector with full glass cover, accessories

complete.

ITEM NO.33007: Supply, installation, testing and commissioning of Metal Halide/HPSV Street light luminary with lamp.

The item price includes labour & cost of all materials including cost of Metal halide/HPSV street light luminary complete with

lamp, FR PVC insulated multistranded single core copper conductor cable earthing etc.

Luminary shall be provided on the bracket of pole / on wall / as required. For provision of luminary on wall, G.I.Pipe bracket is

payable under G.I.Pipe item on measurement of length basis.

33007(i) Fitting & arrangement shall be similar to Crompton cat. ref MHSGN1107IH.

33007(i) Fitting & arrangement shall be similar to Crompton cat. ref MHSG2115IH/FG.

ITEM NO 33008: Supply, installation, testing and commissioning of A.C. ceiling fan. (Without Regulator)

The item price includes supply & erection cost of all materials including cost of 230V A.C. ceiling fan having 3/4 blades, double ball bearing, copper wound motor, suitably sized down rod, canopies and capacitor etc complete with all accessories including fixing phenolic laminated sheet cover on the fan box, FR PVC insulated multistranded single/three core copper conductor cable wiring and connecting with earthing system etc. Fan should have ISI mark and as per IS-374/1979, min 3 star energy rating issued by BEE.

Fan point wiring is covered under item 33003.

Page 170: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 19 of 40

ITEM NO 33009: Supply, installation, testing and commissioning of stepped type, electronic fan regulator on

the existing phenolic laminated sheet.

The item price includes labour & cost of all materials including cost of stepped type, electronic regulator 300W and connecting cables etc.

ITEM NO 33010: Supplying, installation, testing and commissioning of 11-23 watts, compact fluorescent lamp

complete with electronic ballast

The item price includes labour & cost of all materials including cost of compact fluorescent lamp of suitable wattage complete with electronic ballast of approved make etc as advised by Engineer.

ITEM NO 33011: Supplying, installation, testing and commissioning of Exhaust fan

The item price includes labour & cost of all materials including cost of Exhaust fan (ISI marked, as per IS-2312), min 3 star

energy rating issued by BEE(if available in Indian market), grouting bolts & nuts, FR PVC insulated multistranded single core

copper conductor cable, connection to earthing system and making opening in the wall/modifications as required. The exhaust

fan should be preferably with louvers if available in Indian market.

ITEM NO 33012: Supply, installation, testing and commissioning of stationary vertical storage type drinking

water cooler complete with Supply and installation of Auto Voltage Corrector.

The item price includes labour & cost of self contained drinking water cooler 150 liters capacity (cooling capacity 150 Lts. per

hour) water cooler [conforming to IS-1475 (part-1)/2001, ISI marked, min 3 star rated], suitable for operation on 230 volts+/-10%,

50Hz, AC supply system complete with all connected standard fittings, accessories etc. and 5KVA , wall mounted, I.C. controlled

electronic auto-voltage corrector conforming to relevant IS (latest version), suitable for operation on single phase 180 to 260

volts, 50Hz incoming AC supply and output 200 to 230 volts A.C. supply, complete with time delay relay, voltmeter, instant start

provision with push button switch, connection to earthing system etc as required.

Page 171: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 20 of 40

ITEM NO 33013 (a), (b):Supplying, installation, testing and commissioning of LT Switch Boards different

capacities

The item price includes labour & cost of all materials including cost of LT switch board, connection of cables for incoming and

outgoing etc. LT switch board shall be cubical type, wall mounted, dust & vermin proof, conforming to IS:8623 (latest version). LT

switch board shall be suitable for operation on 3 phase, 4 wire, 415 volt, AC supply system, fabricated with 16 SWG M.S. sheet,

powder coated and complete with inter connections, instrument connections with copper conductor cable, copper bus bars

200/250 amps. (as per capacity of switch board 63/125A), CT's, voltmeter, ammeter, LED type indication lights, cable glands,

earthing studs etc.

ITEM NO.33014: DELETED

ITEM NO.33015 (i),(ii) & (iii):Supply, installation, testing and commissioning of L.T. Feeder pillars of different

capacities

The item price includes labour & cost of all materials including cost of L.T. Feeder pillar, construction of brick masonry platform

450 mm high, inter connections, connection of cables for incoming and outgoing etc. L.T. feeder pillar shall be weather proof

(degree of protection not less than IP54), fabricated with 2 mm thick CRCA sheet, conforming to IS:8623 (latest version), powder

coated, suitable for operation on 3 phase, 4 wire, 415 volt, AC supply system., copper bus bars of 200/250/400 amps (as per

capacity of feeder pillar 63/125/250A), LED type indication lights, cable glands, earthing studs etc.

ITEM NO.33016: DELETED

ITEM NO 33017 (i), (ii), (iii): Supply and erection of different length Tubular pole with Junction box etc.

The item price includes labour & cost of all materials including cost of swaged type steel Tubular pole 7/9 meters long conforming

to IS-2713 /Part I to III/1980 (latest version) (designation 410 SP – 3/ 410 SP - 30), canopy type with suitable length and diameter

brackets, Junction box, erection of pole, casting of foundation, muffing and painting of pole, connection to the earthing system

etc.

Entire Work shall be in conformity with IS 2713/Part 1-3 and specifications of RVNL.

Page 172: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 21 of 40

ITEM NO.33018: DELETED

ITEM NO.33019: Supply and erection of class‘B’ G.I.Pipe with bends, accessories etc.

The item price includes labour & cost of cost of G.I.Pipe class' B', ISI marked with bends, accessories etc.

ITEM NO.33020: Supply, installation, testing and commissioning of automatic changeover panel complete.

The item price includes labour & cost of all materials including cost of automatic changeover panel complete as per RDSO specification No.TI/SPC/PSI/CLS/0023 with amendment No.3 dated 21.03.07 or latest, connections as required. Note: Make of panel shall be on the approved list of manufacturers issued by RDSO/Lucknow.

ITEM NO.33021: ELECTRIFICATION OF FOB

The item price includes labour & cost of all materials required to electrify the FOB complete with G.I.pipe pole with bracket of

suitable length and diameter, luminary with lamp, suitable connection to the earth with GI wire M.S. junction box, connection with

1.5 sq.mm, FR PVC insulated, single core, copper conductor cable etc. Pole shall be clamped with FOB structure with clamps

manufactured with galvanized MS flat 50x50x6mm, Nut & bolts 16 mm dia at not less than two locations.

Junction box shall be Double door, weather proof (degree of protection not less than IP 54) complete with MCB 6 amps, copper

bus bars 100A for looping 4 core 3 nos. LT cables , as required. Payment for Earthing shall be covered under relevant BOQ Item.

The price includes following scale of fittings:

SCALE OF FITTINGS

Details ‗B‘class, ISI marked 50mm dia ,3.5

meters long G.I.pipe pole complete

with bracket

G.I.Flat clamp of

50x50x6mm with G.I.bolts &

nuts etc

STL Jn. box EE

Quantity

1No.

2 Nos. 1No. 1No. 1No.

Page 173: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 22 of 40

Abbreviations

STL 2X24W street light T5 luminary complete with T5 tube OR CFL fitting with CFL. Luminary shall be powder

coated die-cast aluminium housing, pot optics reflector with full glass cover, accessories for 85W CFL

similar to Bajaj Cat Ref No BGEST 85 RF CFL FG E40 as required by Railway.

Jn. Box M.S. junction box (1-phase 230 volts) complete with wiring including following:-

MCB SP 6 A

4 Nos. 100A copper bus bars for looping 3 cables

EE Connection to earthing system with GI wire

ITEM NO.33022: Supply, installation, testing and commissioning of 100/250/500 KVA Power Distribution

Transformer, fencing and foundation

The item price includes labour & cost of all materials including cost of Transformer, erection testing and commissioning as per

standard code of practice.

Extra payment shall be made for construction of foundation for transformer, providing fencing enclosure and Iron Gate (if

directed by the employer).

Requirements shall be as per details given here under:-

(i) Foundation

M10 grade cement concrete foundation shall be constructed with 20 mm coarse aggregate The size of foundation shall be as

per approved drawing based on size of transformer but shall not be less than 2 x1.5 mt (Length x breadth) and 600mm above

ground level duly plastered and finished surface. Curing shall be done as per code applicable. Excavation shall be done

complying with Code of Safety as per IS 3764/1992(Latest Version).

Page 174: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 23 of 40

(ii) Fencing

Fabrication of enclosure for housing transformer shall be made in rectangular formation as required with M.S. Angle iron

50x50x8mm spaced at about 2 meters and 12 SWG GI wire mesh GI wire shall be cut according to size and welded with the

angle frame. MS strip not less than 15x3mm size shall be provided and welded above GI wire along the angle frame to hold the

GI wire mesh. Height of enclosure shall be 2 meter above ground level. The portion of MS angle to be grouted in foundation

shall be 500mm.

The fencing panels shall be erected on foundation constructed of size 200mmx200mmx500mm deep with cement, & concrete of

M10 grade.

(iii ) Iron Gate

Iron gate shall be fabricated with 50mm x 50mm x 8mm MS angle iron frame with iron grill etc.as approved. The size of the gate shall be 2mt (height) x 3.5mt (width ) and fabricated in two parts of 1.75 mt each. Gate shall be provided with sliding Lockable bolt with Pad lock. Gate shall be fixed on channels of size not less than100x50mm, weighing 7.90 Kg per meter with bolts & Nuts and welded. Channels shall be erected on foundation constructed of size 300mmx300mmx500mm deep with cement, concrete M10 grade Complete enclosure including Gate and angles (except galvanized portion) shall be painted with approved shade enamel paint over two coats of red oxide primer. Installation shall be as per IS 10028 (Pt. II/1981) Latest Version.

Drawing of the enclosure with Iron Gate etc. shall be got approved from the Engineer.

ITEM NO.33023: Supply, installation, testing and commissioning of 3 pole 11 KV, 400 amps Gang Operated

Switch complete with drop out fuses etc.

The item price includes labour & cost of all materials including cost of 3 poles 11 KV, 400amps. Gang Operated Switch complete

with drop out fuses, operation system, clamps, connections with ACSR conductor, sleeves, etc. as required. All the materials

used for manufacturing Gang Operated Switch shall conform to IS-2544, IS-5340 (Part-III) and IS-9921 (Part-I to V).

ITEM NO.33024: Supply, installation, testing and commissioning of 11 KV 3 Panel HT Vacuum Circuit Breaker

board and end termination etc.

Page 175: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 24 of 40

The item price includes labour & cost of all material including cost of 11 KV 3 Panel (one incoming and two outgoings) HT

VCB board, conforming to IS:13118/1991 & IS:3427/97, erection, testing, commissioning as per RVNL specifications. VCB panel

shall be 11kV, 350MVA, 630 Amps, draw out type, manually operated, 3 panel HT VCB board comprising of 1 No. Incoming: 3

Pole, Vacuum Circuit Breaker complete with PT, relays, electronic metering devices including ammeter, voltmeter, frequency

meter, power factor meter and trivector meter (with 30 minutes integration) for maximum demand indicator of suitable range for

unbalanced loads, clustered LED type indication lights, double ratio copper wound current transformer (ratio 80/40/5A -- for

500KVA & 60/30/5A for 250 KVA) and 2 Nos. Outgoing: 3 Pole, Vacuum Circuit Breaker complete with relays, Digital Ammeter,

LED type Indication light, double ratio copper wound current transformer ( ratio 60/30/5A -- for 500KVA & 30/15/5A for 250 KVA)

complete.

ITEM NO.33025 & 33026: Supply, installation, testing and commissioning of LT Switch board.

The item price includes labour & cost of all material including cost of LT Switch board, erection, connections of cables, testing,

and commissioning etc. as per RVNL specifications. LT panel shall be cubical type, floor mounted, dust & vermin proof, multi-tier

construction, fabricated with 2mm thick CRCA sheet with base MS channel 100x50x7.5mm (nominal size), and powder coated.

The LT switchboard shall conform to IS:8623 (latest version) and shall be suitable for operation on 3 phase, 4 wire, 415 volt, AC

supply system. The switch board shall be complete with inter connections, instrument connections with copper conductor cable,

copper bus bars, front operated switchgears, selector switches, ammeter, voltmeter etc. on each incoming and ammeter on each

outgoing with LED type indication lights, cable glands, earthing studs etc. Each panel shall be in segregated compartment.

ITEM NO.33027 : DELETED

ITEM NO.33028 : DELETED

ITEM NO.33029: Supply, installation, testing and commissioning of safety items in the substation.

The item price shall cover cost of fire extinguishing equipments (ISI marked), Rubber mat (ISI marked), GI fire buckets filled with

dry sand held on free standing steel stand, First aid box with medicines (ISI marked) and associated materials, Shock treatment

chart suitably laminated on aluminium frame, schematic diagram of HT & LT installation & transformer data on white hylem sheet

with aluminium frame & fixing/providing in the sub-station area as directed by Engineer-in-charge of the work at site.

Page 176: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 25 of 40

Stand for holding of fire buckets shall be free standing, manufactured with MS angle frame 50x50x6mm with base angle frame,

shade and hanging arrangements for buckets as per approved drawing.

Details of items are as under:

i) Fire extinguisher, dry chemical powder type (ISI marked) suitable for electric fire,10kg capacity - 2 Nos

ii) Rubber mat (ISI marked) non-skid type suitable for 11kV AC supply of size 3600x1000x25mm - 2 nos

iii) 6 nos. GI fire buckets of 10 Ltrs. capacity (24 gauge) duly fitted on MS angle 50x50x6mm stand, shade and filled

with clean dry ordinary sand -1set

iv) First Aid Box (ISI marked) complete with medicines of approved make - 1 set

v) Electric shock treatment chart (large size) with aluminum frame and laminated as approved. - 2 Nos.

vi) 11kV/415 Volt danger plates conforming to relevant IS. - 8 Nos.

vii) Schematic diagram of HT/LT installation on white hylem sheet with aluminium frame of size 1200x600 mm. computer printed and suitably laminated - 1 No.

viii) Data of transformer on white hylum sheet with aluminum frame of size 900x600mm. - 2 Nos

ITEM NO. 33030: Supply, installation, testing & commissioning of DG set with acoustic enclosure with all

other accessories etc.

The item price includes labour & cost of all materials including cost of DG set with acoustic enclosure , AMF panel and all other

accessories, construction of plinth with materials as per OEM recommendations and approved drawing, first filling of lubricating

oil, supply of High speed Diesel oil required for testing, commissioning at site etc as per details given in RVNL specifications. DG

set shall be complete with diesel engine, copper wound alternator, battery set, anti-vibration pads, fuel tank and all other

Page 177: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 26 of 40

accessories/equipments/protective devices etc and AMF control panel conforming to relevant IS, fabricated with CRCA, 16 SWG

sheet, powder coated and comprising of incoming 4 pole, MCCB 50kA, copper bus-bars, 4 pole, heavy duty contactors,

multifunction panel meter for display of current and voltage on phases and lines, power factor, frequency, kWH, MD etc, LED

indications lights including connections with single core 1.1 kV grade LT XLPE insulated copper conductor control cable

between LT panel, AMF panel and alternator for auto and manual operation etc.

ITEM NO. 33031: Supply, installation, testing and commissioning of 125 KVAR APFC Panel. The item price includes Supply, erection, testing & commissioning of 125 kVAR (10x12.5) Automatic Power Factor Controller panel (capacitor bank) complete with low loss capacitors similar to MD-XL type of L&T make, 250 amp MCCB incomer (Ics=100%Icu), with auto and manual option, suitable for 3 phase, 415 Volt, 50 Hz AC supply & switching ratio1:2:3:4, conforming to relevant IS (latest version). APFC Panel shall be similar to L&T make cat.ref.A1256A10CMM. APFC panel shall be connected with the main panel as per site requirement. Cable for providing connections are payable under relevant BOQ item.

ITEM NO.33032: Earthing with 3 meter long, 50 mm dia G.I. Pipe class 'B' earthing electrode:

The item price includes labour & cost of all materials including cost of GI pipe, masonry enclosure, cover plate with lifting handle, charcoal/coke and salt, etc.

Earthing shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done

complying with Code of Safety as per IS 3764/1992(Latest Version). Earth resistance shall not be greater than 5 ohm in normal

soil and 8 ohm in rocky area.

ITEM NO. 33033 Earthing with 600mmx600mmx6mm thick G.I. earth plate

The item price includes labour & cost of all material including cost of supply of GI earth Plate, masonry enclosure, cover plate

with lifting handle, G. I. watering pipe, charcoal or coke and salt etc.The price shall also cover erection including digging of

earth pit in any kind of soil at the specified location. The work shall also cover the earth treated to obtain earth resistance of less

than 1 ohm. Connection of earth electrode should be made by providing GI clamps nuts, bolts.

Page 178: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 27 of 40

Work shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done complying with Code of Safety as per IS 3764/1992. Earth resistance shall not be greater than 1 ohm in normal soil and 2 ohm in rocky area. Payment of G.I.strips to be laid for connections are payable under relevant BOQ item

ITEM NO. 33034 : Earthing with 600mmx600mmx3mm thick copper plate earth plate

The item price includes labour & cost of all material including cost of supply of copper earth Plate, masonry enclosure, cover

plate with lifting handle, G. I. watering pipe, charcoal or coke and salt etc. The price shall also cover erection including digging

of earth pit in any kind of soil at the specified location. The work shall also cover the earth treated to obtain earth resistance of

less than 1 ohm. Connection of earth electrode should be made by providing cadmium plated brass bolts & nuts. Earth resistance

shall not be greater than 1 ohm in normal soil and 2 ohm in rocky area.

Work shall be in conformity to IS 3043/1987 (Latest Version) and as per approved drawing. Excavation shall be done complying

with Code of Safety as per IS 3764/1992

Payment of copper strips to be laid for connections are payable under relevant BOQ item.

ITEM NO. 33035 (i&ii): Supply and laying of G.I. strip below ground or surface/in recess.

The item price includes labour & cost of all materials including cost of G.I. strip on surface or recess or digging in ground/making

chase in wall/floor and making good the damages, connections including soldering/riveting etc as required.

ITEM NO. 33035 (iii): Supply and laying copper strip on surface or in recess or in 50 mm dia G.I. pipe

The item price includes labour & cost of all materials including cost of copper strip on surface or recess or digging in ground 0.50

meter below ground/ making suitable holding arrangements on transformer /D.G. Set end, making good the damages,

Connections of strip including soldering/riveting etc as required.

Rates for G.I.pipe are payable separately under relevant BOQ item.

Page 179: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 28 of 40

ITEM NO.33036: Supply, laying, testing and commissioning of LT cable.

The item price includes labour & cost of all material including cost of LT XLPE cable conforming to IS:7098/Pt I (latest version),

bricks, sand, cement, termination lugs/crimping socket, supply and erection of cable route markers of size not less than

200x150x5mm thick M.S.Plate and bolted to 40x40x6mm M.S angle iron of suitable length to hold the laid cable including fixing.

Inscription on the plate shall be as specified in RVNL tech. spec. Cable markers shall be provided as instructed by Engineer at

not more than 50 m interval and at locations where cable route is changing or cable joint provided.

In substation area, laying of cable includes construction of suitable trench. Trench shall be filled with dry sand up to 300 mm

above the cable after it is laid. ‗U‘ frame shall be manufactured with MS angle 50x50x6mm & grouted vertical in floor for holding

cable on transformer end. Cable shall be held vertical with clamps of MS flat 50x6mm at two places on frame on transformer and

panel side. Painting of U‘ frame and clamps shall be done with approved shade paint. Cables shall be terminated with LT panel &

on the transformer side with aluminium crimping sockets & tested and commissioned as required.

Rates for RCC/G.I/HDPE pipe are payable separately under relevant BOQ item.

ITEM NO.33037 (I & II) : Supply and erection of high mast system complete with accessories,

The item price includes labour & cost of Supply, erection, testing & commissioning of hot dipped galvanised (inside & outside),

16m high mast system (in two sections), complete with accessories, foundation bolts with nuts, washers, anchor plates &

templates etc. manufactured from special steel, head frame, 2-point suspension system with steel wire rope 6mm dia (7/19

construction), double drum winch, galvanised lantern carriage arrangement suitable for 9 luminaries symmetrically arranged &

control gear boxes and lighting finial etc. The mast shall have integral type power tool at the base compartment for its rais ing and

lowering operation, twin dome aviation obstruction lights with 100 watt lamp, control panel etc. High mast shall be supplied

complete with 2x400 watts MH luminaries (degree of protection IP-65) with control gear boxes, MH lamps, multi core flexible

copper conductor cable of suitable rating, connection with earthing system etc. as required.

Control panel shall consist of:

(a) 1X63 A TPN MCB for incoming supply

Page 180: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 29 of 40

(b) 3X32 A SPN MCB for outgoing (50% lighting, 100% lighting, motor)

(c) Automatic timer with contactor for controlling above lights of suitable capacity.

(d) 1 no multi plug socket 16A

High mast shall be provided with fencing panel of size 2Mx2Mx1.5M in square shape for protection of erected high mast tower wherever required as directed by Engineer. The cost shall also include construction of foundation as per recommendation of manufacturer and approved drawing and its fixing arrangements etc. Note: Pipe electrode earthing is payable extra under relevant SOR.

ITEM NO 33038 (i) to (iv): Supply, laying, testing and commissioning of 33 /11 KV XLPE (E) insulated, armoured aluminium conductor cable.

The item price includes the cost of supply of cable conforming to IS:7098/Pt.II/85 and all other materials including bricks, sand and cement. The item price also includes laying of cable, , miscellaneous works such as digging of trench, provision of suitable clamps as per site requirements and testing & commissioning. Laying of cable shall cover all type of pipes, horizontally or vertically, underground, on wall or in air or under the Railway track/road. It also includes coordination for arranging shut down from state Electricity authorities and returning/ transporting of released materials to state electricity authorities. In substation area, laying of cable includes construction of suitable trench. Trench shall be filled with dry sand up to 300 mm above cable after laying. ‗U‘ frame shall be manufactured with MS angle 50x50x6mm & grouted vertical in floor for holding cab le on transformer and HT panel end. Cable shall be held vertical with clamps of MS flat 50x6mm at two places on frame on transformer and panel side. Painting of U‘ frames and clamps shall be done with approved shade paint. The cable shall be laid as per RVNL‘s technical specifications. The cost of GI/RCC/HDPE pipe and cable route markers is payable under separate BOQ items.

ITEM NO.33039 : DELETED

ITEM NO. 33040 : Supply, termination, testing & commissioning of 33 KV/11KV outdoor types, heat shrinkable

end termination kit.

The item price includes labour & cost of all materials including cost of 33KV/11KV outdoor type, heat shrinkable end termination

kit, making termination and connecting to the overhead lines.

ITEM NO.33041 : DELETED

Page 181: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 30 of 40

ITEM NO 33042: Supplying and erection of pre-stressed, cement concrete (PSCC) double pole structure 9-11

meters long complete with galvanized stay set, anti climbing devices and fixing of Danger

plates on the erected pole.

The item price includes coordination with SEB/concerned authorities, labour & cost of all materials including cost of pre-

stressed, cement concrete (PSCC)/RSJ (As per site requirement) double pole structure(H-pole) 9-11 meters long, 4 nos. channel

cross arms & 2 nos cross bracing angles, clamps, bolts, nuts etc. including erection, casting of foundation , muffing etc. The item

price also includes supply and erection of galvanized stay set with 19/20 mm dia x1.8 meters long stay rod, anchor plate of size

45cm.x45cm x 7.5mm thick, thimble, stay clamp of galvanised MS flat 50 x 6 mm, turn buckle (20mmx600 mm), 7/4.00 mm dia G

I stay wire conforming to IS 2141-1968, 11KV strain insulators etc. including digging of pit, casting of foundation for poles & stays

with cement, concrete M10 grade and refilling, supply and erection of anti climbing devices, and danger plates on the erected

poles. Above items are for guidelines purpose. The entire work has to be done in coordination and as per standards of concerned

State Electricity Board.

ITEM NO. 33043:Supply and erection of 11 KV Porcelain Disc insulators complete with galvanized iron

hardware etc. including terminating with 11KV/ 33 KV overhead conductors as required.

The item price includes labour & cost of all materials including cost of 11 KV porcelain Disc insulators complete with galvanized

iron hardware, terminations with overhead with PG clamps, dismantling of materials transporting and handing over to concerned

authorities wherever required, etc.

ITEM NO. 33044: (i): Supply and laying of RCC Hume pipe under the Railway track /Road.

The item price includes labour & cost of all materials including cost of RCC Hume pipe, ISI marked, NP-4 class, digging of trench,

laying of pipe and back filling of trench with excavated earth etc.

Prior to start of excavation works under track/road, proper permission shall be obtained from the concerned authorities.

Page 182: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 31 of 40

ITEM NO. 33044 (ii): Supply and laying RCC Hume pipe under the Railway tracks with trench less method.

The item price includes labour & cost of all material including cost of RCC Hume pipe ISI marked, NP-4 class, making trench with

trenchless method with suitable machines etc and making good the damages..

Prior to start of works, proper permission shall be obtained from the concerned authorities.

Due care should be taken to avoid damage to tracks alignment, existing cables, pipes or other such installations during Drilling/Boring. Horizontal distance of the proposed trench from the existing and proposed electric mast shall not be less than

5.0 meters and shall be away from the track joints.

ITEM NO. 33045 (I & II):Supply, installation, testing & commissioning of Submersible pump set, control panel

etc

The item price includes labour & cost of all material including cost of Submersible pump set ISI marked and min 3 star energy

rating with control panel, cable etc suitable for supplying water at required head and discharge as per site conditions and as

directed by Engineer. The horse power of the motor is approximate. Suitable motor has to be installed keeping in view the site

conditions. However, all items required for the safe and efficient operation whether stated or not, shall be deemed to be included.

Control panel shall be wall mounted cubicle type, dust & vermin proof, suitable for operation on 415 volts AC supply system, with

degree of protection not less than IP 54, fabricated with 16SWG thick CRCA sheet steel, duly powder coated.

Details of accessories etc are as under:-

1 Flat, water submersible, 3 core cable of size as recommended by the manufacturer and of the required length.

2 Cable ties for clamping of flat cable to pipe at every 1 mtr interval through out the length.

Page 183: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 32 of 40

3 Two pairs of MS suspension clamps made of suitable size of MS flat - 1 set.

4 Full way valve of suitable size ISI mark - 1 No.

5 Pressure gauge of required capacity - 1 No.

6 Bore cover - 1 No.

7 GI bend of suitable size - as required

8 BCH/L&T make Cubicle type, weather proof control panel with degree of protection not less than IP54, complete with the following :-

i) TPN MCB 32A 10kA - 1 No.

ii) Direct On Line starter (DOL) suitable to the above - 1 No.

iii) Suitable pump set measurement and protection system as approved by engineer - 1 set

iv) MINILEC current based dry run protection - 1 No.

v) Suitable capacitors to improve PF to min 0.99.

ITEM NO. 33046:Co-ordination/ Liaisoning and chasing with State Electricity Board authorities for availing

New Electric Connection / augmentation of load/modification of crossings etc.

The item price includes cost for Co-ordination/Liasoning /chasing with State Electricity Board authorities for various activities

involved for availing new connections, augmentation of loads, including collection of estimates for New connections, additional

load & crossings modifications, arranging payment from RVNL, depositing payment to SEB's authority, release of load & other

connected works etc.as required.

Note: Payments made for application forms will be reimbursed by RVNL on proof of documents.

Page 184: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 33 of 40

ITEM NO. 33047: Design and preparation of working & completion drawings of the installations.

The item price includes cost for design of electrical works and preparation of working & completion drawings of the installat ions

covered under general electrical services work of the complete project including internal electrification of quarters, level

crossings, station buildings, offices, buildings, Power line crossings, Power supply distribution arrangements of stations with

platform lightings, sub stations, Electrification of Sub stations building, etc as required on Auto Cad & arranging approval from

competent authority.

On award of contract, survey of all the installations (Excluding Power line crossings which are covered under other BOQ item)

shall be carried out and drawings indicating existing & proposed works, schematic layout /arrangements etc. shall be prepared on

Auto Cad based on Zonal Railway‘s and SEB‘s norms & requirements and shall be got approved from the competent authorities

i.e. RVNL/Zonal Railways/SEB‘s etc. as required. All the drawings shall be speaking with conventional signs and symbols.

After completion of entire work, as executed drawings shall be prepared and supplied while handing over the completed works to

the Zonal Railways.

Design and Drawings will be the property of Railways.

Following drawings shall be prepared and submitted.

WORKING DRAWINGS

1 Soft Copy One set of each drawing prepared on Autocad.

2 Hard Copy Three set of each drawing of not less than A-3 size on RTF (Re-producible Tracing Film) and four

sets on paper

Page 185: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 34 of 40

COMPLETION DRAWINGS

1 Soft Copy One set of each drawing prepared on Autocad.

2 Hard Copy Three set of each drawing of not less than A-3 size on RTF (Re-producible Tracing Film) and four

sets on paper.

NOTES:

1) Drawing for all HT installations are to be got approved from the Chief Electrical Engineer of the zonal railway in his capacity as

Electrical Inspector to Govt.of India.

2) Drawings for LT/11kV/33kV crossings of State Utility Company, that are being modified, are to be got approved from the

concerned Utility Company, prior to taking up the work.

ITEM NO. 33048 : Conducting check survey for the existing LT, HT and EHT Power line Electrical crossings on

the section and measurements of clearances to identify modification required/not required

The item price includes cost for conducting check survey of complete section for all the existing LT, HT and EHT Power line Electrical crossings, power lines running parallel to track from the proposed track route and requiring modification keeping in view Regulations for Electrical crossing of Railway Track 1987 and IRSOD-2004 with latest amendments , measurements of horizontal distances of structures (up to next two structures on each side) from the existing & proposed tracks etc, vertical clearances of lowest conductors & guard wires from existing & proposed rail level, angle of crossings, height and type of towers/poles, preparation of ―list of crossings requiring modification‖ & ― list of crossings not requiring modifications‖ etc. (Height/ clearances shall be accurate with zero tolerances) Measurements shall be recorded on a format as approved and be submitted considering all aspects including details required as indicated above. Proposal for modification arrangement of infringing power line crossing shall also be submitted.

Page 186: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 35 of 40

ITEM NO. 33049 : Supply, erection, testing & commissioning of outdoor type, single side and double side

Glow sign board /Pictorial signage board with suspension/ mounting arrangement. The item price includes Supply, installation, testing & commissioning of outdoor type, single side, /Double side Glow sign

boards/Pictorial signage boards with suspension /side mounting/wall mounting type arrangements as required, complete

including internal wiring with 2x1.5sq mm FR PVC insulated, multistrand, copper conductor single core cable on surface PVC

conduit, earthing with 1.5 sq mm FR PVC insulated multi strand copper conductor single core cable conforming to IS 694(latest

version) etc, acrylic sheet of thickness not less than 4mm on front side, G.I /Aluminium Sheet of 24 SWG on all 5 / 4 sides with

louvers etc.as required. Depth of board shall not be less than 200mm. Erection arrangement shall be as approved by Railways.

Matter to be written / displayed on signboards shall be got approved before manufacturing of board. Glow sign board shall have

degree of protection not less than IP 54.

Prewired 1x28 watts T-5 surface type Luminary complete with electronic ballast etc. shall be provided. Provision of Nos. of

luminary shall be based on one No.28 watts T-5, surface type luminary per 8 Sq. ft area.

Note: 1. Boards of smaller dimensions/area which may not accommodate 28 watt luminary shall be provided with 1x14 watt luminary per 4 sq.feet area.

2. Payment for Double sided glow sign board shall be made @ 150% of the total rate of single sided glow sign boards.

Wiring shall conform to relevant IS and code of practice as applicable.

ITEM NO. 33050: Supply, installation, testing & commissioning of Silicon rectifier battery charging set 200

Amps capacity including connections.

The item price includes labour & cost of all materials including cost of battery charging set as per RVNL tech specifications.

Payment for L.T. cable shall be made under relevant BOQ item. .

ITEM NO. 33051: Supply, erection, testing and commissioning of weather proof, outdoor type, dust and

vermin, floor mounted, 110 volts battery charging point.

110 V DC battery charging points shall be manufactured as per RVNL technical specification OR as per approved Drawing of

Zonal Railway / RVNL.

Page 187: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 36 of 40

The item price includes labour & cost of all material including cost of Fabrication, supply, installation, testing and commissioning

of cubicle type, weather proof, outdoor type, dust & vermin proof, 110 volts Battery charging point conforming to IS 8623 (latest

version) with degree of protection not less than IP54. Battery Charging point shall be suitable for operation on 150 volts DC

supply system and fabricated with 14 SWG galvanised MS sheet, M.S. channel size 100x50mm (weight 7.914kg/metre)

1200mm long, powder coated, inter-connections with single core, PVC insulated, multi stranded, copper conductor cable of size

10 sqmm, 3 nos. aluminum bus bar of size 25x10mm, complete with one no. MCB DP 63 Amps (DC series) 10kA, including

vertical grouting of channel 300mm deep in ground for erection with cement concrete M10 grade as per standard drawing of

zonal railway/as approved by the Engineer. .

ITEM NO. 33052: Supply, erection, testing & commissioning of weather proof, dust & vermin proof, Pre- cooling point The item price includes labour & cost of all material including cost of Fabrication, supply, installation, testing and commissioning

of cubicle type, weather proof, outdoor type, dust & vermin proof, pre- cooling point conforming to IS 8623 (latest version) with

degree of protection not less than IP54. Pre-cooling point shall be manufactured with 3.15mm CRCA sheet with 4 pedestals (on

corners) of M.S. angle size 65x65x8mm (900mm long) with base frame of M.S. angle size 40x40x5mm, duly powder coated

including vertical grouting of MS. angles 300mm deep in ground for erection with cement concrete M10 grade as per standard

drawing of zonal railway/as approved by the Engineer. Pre-cooling point shall be complete including following:.

i) One no. 100 A, 4 pole, MCCB 35 kA (Fixed type ) ii) One no. 63A industrial type, iron clad 5 pin (3P +N+E) 415 V plug socket with spring locked cover. iii) One No. 32 A Industrial type iron clad 3 pin (P+N+E) 250 V plug socket with spring locked cover. iv) Batten Holder fixed on Bakelite sheet base plate with suitable lamp and controlled by 5 A piano type switch. v) 300 A Aluminium bus bar for Phases & 200 A for Neutral, with epoxy coating/ PVC colour coded sleeves. vi) Cable entry glands of suitable size vi) LED indication lights. The connections from bus bars to MCCB and from MCCB to the feeding terminal (Iron Clad Sockets) shall be done with single core, copper conductor cable of suitable rating with suitably sized galvanized MS bolts, nuts and washers.

Page 188: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 37 of 40

Fluorescent screen printed indication plates on the front shall be provided for clear indication of 415 Volts, AC pre-cooling point. Pre cooling points shall be manufactured as per RVNL technical specification OR as per approved Drawing of Zonal Railway /

RVNL.

ITEM NO. 33053: Dismantling of wiring installations

The item price includes cost of labour for dismantling of complete electrical/solar and wiring installations as per site conditions, stocking, accountal, transporting and handing over the released material to electrical department. Buildings, offices, sheds, gate lodges etc. infringing the new works may also require dismantling of Electrical installations. The item covers dismantling of wiring installation, lamp /tube fittings, street light fittings, fans, Distribution boards, mains, sub mains, L.T.Panel(s), solar panels and associated cables etc and other such accessories of Railway station building/service building/sheds/gate lodges etc, removal from site, transportation or shifting to new location and handing over of released materials to Electrical department as instructed and if required making temporary arrangements as per instructions of the engineer.

ITEM NO. 33054 (i): Dismantling of erected pole and its associated overhead conductor, GI wire, cross arms

brackets, insulators, Stay, luminary.

The item price includes cost of labour for dismantling of erected pole and its associated overhead conductor, GI wire, cross arms

brackets, insulators, Stay, luminary etc as are at site including stocking , transporting and handing over released material to

concerned official as instructed and if required making temporary arrangements as per instructions of the engineer.

ITEM NO. 33054 (ii): Dismantling of Sub Station Equipments.

Dismantling of Sub Station Equipments including Transformers, DG Sets, HT & LT Panels, cables, etc as are at site including

stocking , transporting and handing over to concerned official as instructed. Prior to dismantling of work, it shall be ensured that

the temporary power supply to the feeders shall be arranged to meet the requirements as per instructions of the engineer.

Page 189: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 38 of 40

ITEM NO. 33055 (i&II): Providing temporary wiring/cabling arrangements for lights & fans with stand by

D.G.Sets.

The item price includes labour & cost of all materials required for temporary arrangements in adequate quantity distributed over

entire station area as decided by the engineer including wiring, cabling, luminaries with lamps, Pedestal fans, cost of

consumables for replacement, deployment of staff for maintaining temporary arrangements during pre/post/during non -

interlocking period as required, arrangement of DG sets for Power supply to temporary installations including operation and

Supply of required Diesel oil, lube oil,, provision of earthing arrangement as required.

D.G. Sets including spare DG set should be of suitable capacity as decided by Engineer in charge to meet the load required

during non interlocking period.

Work of temporary wiring installation shall comply with latest code of practices and IE. Rules.

After completion of requirements of non interlocking work, installation shall be dismantled and material shall be taken away from

the site as directed by the Engineer.

NOTE: Normal power supply, if spare load is available, may be used up to sanctioned load with prior approval free of cost.

Item No.33056 (a): Supply, installation, testing and commissioning of 2.0Tonne window type A.C.unit (3 star

rating) complete with Supply and installation of Auto Voltage Corrector.

The item price includes labour & cost of Supply, installation, testing and commissioning of window type A.C.Unit ISI marked and

min 3 star energy rated conforming to IS-1391 Pt-I/1992 (amdt 1,2), complete with LCD display cordless remote (for control of

functions, on/off, timer, selecting fan speed (three speeds) and setting up of temperature), rotary compressor, 3/3 speed

cooling/fan, air ventilator, air bacteria filter, condensor (type - GOLD), suitable for 1-phase 230 ± 10% voltage AC supply including

supply & installation of 5 KVA, wall mounted, I.C. controlled electronic auto voltage corrector conforming to relevant IS (latest

version), suitable for operation on single phase 180 to 260 volts, 50 Hz incoming AC supply and output 200 to 230 volts A.C

supply, with time delay relay, voltmeter, instant start provision with push button switch, earthing etc as required.

Page 190: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 39 of 40

NOTE: AC unit shall be fixed in the space available and shall be provided with the frame in approved manner (polished hard

wood or other material as approved).

Item No. 33056 (b): Supply, installation, testing, & commissioning of Split type, 1.5 Tonne Cap. AC unit (5star

rating) complete with Supply and installation of Auto Voltage Corrector.

The item price includes of Supply, installation, testing and commissioning of split type A.C.Unit ISI marked and 5 star energy

rated conforming to IS-1391 Pt-II/1992 (amdt 1), complete with LCD display, cordless remote [for control of functions, on/off,

timer, selecting fan speed (three speeds) and setting up of temperature], rotary compressor, 3/3 speed cooling/fan, air ventilator,

air bacteria filter, condensor (type - GOLD), suitable for 1-phase 230 ± 10% voltage AC supply complete with stand (as approved)

for fixing outdoor unit, provision of rubber pads below the outdoor unit, heavy duty PVC flexible pipe (ISI marked) for drain,

interconnecting cable and refrigerant copper pipes with thermal insulation, including supply & installation of 5 KVA, wall mounted,

I.C. controlled electronic auto voltage corrector conforming to relevant IS (latest version), suitable for operation on single phase

180 to 260 volts, 50 Hz incoming AC supply and output 200 to 230 volts A.C supply, with time delay relay, voltmeter, instant start

provision with push button switch, earthing etc as required.

The item price also includes labour & cost of extra copper refrigerant pipes with insulation as required (in addition to standard

length supplied with the unit), electric cable for connection etc as required

Item No.33057: SUPPLY & ERECTION OF G.I. OCTAGONAL POLE

Item price includes labour & cost of all materials including cost of G.I. octagonal pole, single/Double arm bracket, foundation etc

as per details given in RVNL tech specifications.

Item No.33058:Supply, installation, testing & commissioning of cubical type, Mast mounted, dust & vermin

proof, L.T control switch board for AT.

Item price includes supply, installation, testing & commissioning of L.T control switch board for AT. Switch board shall be cubical

type mast mouted, dust & vermin proof, conforming to IS:8623 (latest version), suitable for operation on single phase, 2 wire, 415

Page 191: Volume 2 Package 1 03-03-2015

Railway Electrification & General Electrical Works (Explanatory Notes) for RANI-SRPJ/RE

Page 40 of 40

volt, AC supply system, fabricated with 16 SWG, CRCA sheet, powder coated and complete with inter connections with copper

conductor cable, copper bus bars in bus chamber, clustered LED type indication lights, cable glands for incoming and outgoing

clamping with mast with 50x50x6 mm MS flat clamps, earth studs etc., complete with TPN MCCB, copper busbars etc. as per

details given in RVNL tech specifications.

Item. NS -1: Supply, installation, testing & commissioning of control and distribution panel for colour light

signal.

Item price includes supply, installation, testing & commissioning of L.T control and distribution panel for colour light signalling

supply in 25 KV AC traction system as per RDSO tech. Specification No. TI/SPC/CLS/0023 ( latest amendment) for

5 KVA AT

Item NS- 2 : Supply, installation, testing & commissioning of fabricated double door distribution board for non

emergency load.

Item price includes supply, installation, testing & commissioning of fabricated double door distribution board confirming to IS

13031, IS 8623 with degree of protection not less than IP 42 aas per IS 13947/Pt. 1/1993 with power coated finish for non

emergency load with MCB‘s etc.

Item NS-3: Supply, installation, testing & commissioning of energy efficient 1x14 watt T-5 type light fitting.

Item price includes supply, installation, testing & commissioning of Lumanariry with lamp (Rod ) 1x14 watt T-5 type light

complete in all respect with clear Polycorbonate cover with high frequency warm start electronic ballast and wide input voltage

range with IP -65 protection to be fixed fitting including connection from light point with 3x1.5 sqmm FRP insulated copper

conductor single core cable etc.


Recommended