Waste management problems and planned solutions in the Gyula
microregion in Hungary
European Waste ManagementEuropean Waste ManagementInterreg IIIC projectInterreg IIIC project
Dr. Zoltán KarácsonyiCentre for Environmental Management and Policy
University of Debrecen
3-4 February 2005, Dundee, Scotland
Introduction of Gyula Introduction of Gyula MicroregionMicroregion
SettlementsSettlements in in the the micromicroregionregion number of inhabitantsnumber of inhabitants
GYULA 32647
ELEK 5517
KETEGYHAZA 4203
LOKOSHAZA 2043
UJKIGYOS 5795
SZABADKIGYOS 2938
0
10000
20000
30000
40000
2001 2002 2003
Waste produced 2001-2003 (tons)
Amounts of building wasteAmounts of produced industrial wasteAmounts of produced household/domestic waste
Disposal and costs
20012001 20022002 20032003
Costs landfill Costs landfill per yearper year (EUR)(EUR)
7734577345 9577095770 107411074111
Costs landfill Costs landfill per ton per per ton per yearyear (EUR)(EUR)
5,235,23 6,216,21 7,27,2
Costs landfill Costs landfill per person per per person per yearyear (EUR)(EUR)**
1,451,45 1,81,8 2,012,01
Costs landfill Costs landfill per entrance per entrance per yearper year (EUR)(EUR)**
3,643,64 4,54,5 5,025,02
*only costs of landfill excluding collection, manipulation, etc.
Methods used for disposal
29548 2869726359
1274 2109
0
5000
10000
15000
20000
25000
30000
35000
2001 2002 2003
ton
s
Amount of waste dumped Amount of waste recovered
Separate collection I.Separate collection I.
2001 2002 2003
Separate collected waste (%)
- 8 14
8
1244
22 18
2040
4011
0
500
1000
1500
2000
2500
tons
2001 2002 2003
Waste streams collected separately
- residual waste(plastic)
- bio degradablewaste (green waste)
- paper
- glass bottles
Separate collection II.Separate collection II.
• Aluminium containers (Bobr - 1100 l) with cover of different colours are located in living areas and parkings of commercial units
• Municipal competence
• Composting works since 2002 at the sewage farm of Gyula Public Supply Ltd. with project support
• Recipient works of organic waste with a capacity of 8800 m3 – can be improved to regional collecting works by enlargementin the future
Green Waste CollectionGreen Waste Collection2002 2003 2004. I-VIII
Container (pieces) 5000 6230 7300
Green waste (m3) 1244 2040 1200
Amount of compost made of green waste (m3)
720 2040 1200
2002.2003.
2004. I -VIII.
Amount of compost made...Green waste (m3)Container (pieces)
0
1000
2000
3000
4000
5000
6000
7000
8000 Amount of compost made ofgreen waste (m3)
Green waste (m3)
Container (pieces)
Listed problems (EWM project Listed problems (EWM project prop.)prop.)
• Landfill and reuse– Closure of landfills– Recultivation of landfills– Lack of effective reuse
• Separate collection– Implementation of separate collection
and its actors – Current level of reuse– Household hazardous waste– Animal waste– Office equipments– Tires– Medical waste– Their controllability
• Organisation structure– Different solutions and practice of
settlements– Lack of a common waste management– Household hazardous waste– Animal waste– Office equipments– Tires– Medical waste– Their controllability
Selected item for improvementSelected item for improvementSelected items/PrioritiesSelected items/Priorities• Landfill and reuse
– establishment of a waste transfer station supplying new microregional demands
• Separate collection– further development of
separate collection – feasibility of animal waste
collection
• Organisation structure– development of the operational
system of waste transfer station
– setting up the system of animal waste collection
Planned actionsPlanned actions• Landfill and reuse
– Assessment and qualification of current situation – Workshop with stakeholders (settlements, authority, companies, NGOs)– Getting and exchange knowledge– Possible establishment of a waste transfer station– Workshop 1. – March 2005– Workshop 2. – August 2005
• Separate collection– Assessment and qualification of current situation– Workshop with stakeholders (settlements, authority, companies, NGOs)– Getting and exchange knowledge– Common animal waste disposing concept– Workshop: March 2005
• Organisation structure– Assessment and qualification of current situation– Workshop with stakeholders (settlements, authority, companies, NGOs)– Getting and exchange knowledge– Workshop in the topic of establishment and operation of waste transfer
station– Co-operation agreement development– Workshop: August 2005
• Landfill and reuse– Development of microregional waste management
program
• Separate collection– Further development of separate collection
(Gyula) and its introduction in other settlements– Development of animal waste collection program,
fund raising
• Organisation structure– Establishment and operation of waste transfer
station – Co-operation agreement development
Expected resultsExpected results
Co-operation EWM partnersCo-operation EWM partners
• Landfill and reuse– Best methods and experience for
development of a microregional waste management program
• Separate collection– Ensuring methods and experience that
can be offered
• Organisation structure– How to...?
EWM project expert meeting EWM project expert meeting Gyula, 6-7th October 2005Gyula, 6-7th October 2005
Key factsKey facts – City of Gyula – City of Gyula
Population: ≈ 33 000
Annual budget: ≈ € 23 million
Local tax income: ≈ € 2.2 million
Unemployment: ≈ 6 %
Cultural HeritageCultural Heritage
„Szigeterőd” - Brick Fort and its vicinity (within that the Castle Theatre)- Almásy Castle and its park (within that the Castle Bath)
Historical Town Center (some example)
- Former County Hall (now City Hall)- Mogyoróssy Library- One Hundred-year Old Confectionery - Museums and Exhibitions
Rich intellectual heritage- Ferenc Erkel, Albrecht Dürer, Zoltán Bay, György Kohán, Mihály
Munkácsy, Benedek Göndöcs, Vilmos Apor, György Pomutz
Health RecoveryHealth Recovery
Bases:• Spa• County Hospital• Therapeutic services
Expectations:• Broader visitor cycle• International Health Insurance
Agencies• Investors to the Health Sector
Our plans:
Prosthesis manufacturing
Rehabilitation Center
Spa therapy, Spa tourism
Health PreservationHealth Preservation
Wellness, fitness tourism
New Recreation Center & Bath:− Adventure Bath− Wellness Center− Health Center− Fitness Unit
Connecting projects:− Wellness & Conference Hotel− Business Center− Entertainment Center
Healthy EnvironmentHealthy Environment
Environmental Protection, Environmental Management, Environment Safety• Drinking water arsenic removal• Canalization• Settling the environmental industry (Euro Wind – wind power plant engine-room
assembly )• Waste management
Health Minded Town Health Minded Town StructureStructure
Fort renovation and Castle Museum
Town Center rehabilitation of tourism purpose
Health Minded Eating and Health Minded Eating and Food ProductionFood Production
Production of guaranteed and organic foodsOrganic Foods: milk (Polimarketing Kft), honey (together with Rumania)
Brand name product: Gyulai kolbász (sausage), Mangalica products
Gastronomic programs
Hotel Erkel, Kisködmön Restaurant
Cross border Gastronomic Route
Healthy ThinkingHealthy Thinking
Festival City• Carnival• Gyula Days – Kisüsti Festival, Böllérs’ Day• Erkel Students’ Fest• ‘Végvári Esték (Border Castle Evenings)• All Hungarians’ Dance Festival• Erkel Ferenc Art Days
See you in Gyula on 6-7th October 2005 at the EWM meeting!
Dr. Klára Perjési Mayor of Gyula
Dr. Zoltán Karácsonyi
Project coordinator