Complete one cover sheet per proposal. Complete all sections. All parts marked in yellow should be replaced with your text. All parts marked in blue should be removed in your final version to be submitted. All colour markings should be removed, too. Any part not marked should be left unaltered. If a field is not applicable to you, enter N/A. The information contained in this sheet must be unclassified, notwithstanding any privacy marking you wish to apply. Combat Equipment for Dismounted Soldier Feasibility Study Programme Template for Proposers (Identifier to be filled by EDA) TITLE (ACRONYM) Submitted under the Call B-1143-RT-GP Attached are: Annex A 1 Proposal Summary of [insert number] – should be 2 pages, and | 1 CEDS-FSP EVALUATION ONLY (when completed) European Defence Agency Rue des Drapiers 17-23 B-1050 Brussels www.eda.europa.eu
Transcript
Page 1:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Complete one cover sheet per proposal. Complete all sections. All parts marked in yellow should be

replaced with your text. All parts marked in blue should be removed in your final version to be

submitted. All colour markings should be removed, too. Any part not marked should be left

unaltered. If a field is not applicable to you, enter N/A. The information contained in this sheet must

be unclassified, notwithstanding any privacy marking you wish to apply.

Combat Equipment for Dismounted Soldier

Feasibility Study Programme

Template for Proposers

(Identifier to be filled by EDA)

TITLE

(ACRONYM)

Submitted under the Call

B-1143-RT-GP

Attached are:

Annex A 1 Proposal Summary of [insert number] – should be 2 pages, and

Annex B [insert number] Participant Details sheets, totalling [insert number] pages, and

Annex C 1 Proposal Description totalling [insert number] pages, and

Annex D [insert number] Work Package Descriptions, totalling [insert number] pages, and

Annex E [insert number] attachment(s) totalling [insert number documents and /or insert

number insert number pages], including their cover sheet(s), and

Annex F 1 signed Proposal Control Sheet of [insert number] pages.

| 1CEDS-FSP EVALUATION ONLY (when completed)

European Defence Agency

Rue des Drapiers 17-23 B-1050 Brussels

www.eda.europa.eu

Page 2:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Erro

r! M

ain

Docu

men

t Onl

y. 4.

24.3

371.

3371

10/

12/2

012

13:2

7:00

.10/

12/2

012

16:4

2:00

.10/

12/2

012

15:2

8:00

Draft Version 1.06Done on behalf of the consortium at [enter town], [enter country], the [enter date as dd/mm/yyyy]

by [enter title and full name of the Person in Charge at the Lead entity - and sign below]

JIP-FP EVALUATION ONLY WHEN COMPLETED

JIP-FP Proposal Cover Sheet 2/2

Page 3:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Complete all sections. All parts marked in yellow should be replaced with your text. All parts marked in blue should be removed in your final version to be submitted. All colour markings should be removed, too. Any part not marked should be left unaltered. If a field is not applicable to you, enter N/A. The information contained in this summary must be unclassified, notwithstanding any privacy marking you wish to apply. All financial figures must be expressed in EURO and be inclusive of VAT. A 1 to A 13 will fit on one page once all sections are duly completed and all parts marked in blue have been removed. The first page is marked “CEDS-FSP EVALUATION ONLY” when completed whereas the second page with A 14 is not marked. A 1 will be automatically repeated on all pages.

Combat Equipment for the Dismounted Soldier

Feasibility Study Programme (CEDS-FSP)

Annex A – Proposal Summary

A 1. Identifier A 2. Acronym and Title

(filled by EDA) (Specify - Repeat from the cover sheet like e.g. ACRONYM – Title)

A 3. Call A 4. Duration A 5. Objective(s) A 6. Taxonomy

(Specify Call ID) (Specify in months)

(refer to the objectives in the call)

(Specify – use the EDA technology taxonomy; refer to EDA website)

A 7. Classification A 8. TRL A 9. Free Keywords

(Specify maximum level of classification used or generated when implementing the proposal – classification should be harmonized with the EU Council Decision of 31March 2011 on the security rules for protecting EU classified information (2011/292/EU available on EDA website)

(Specify TRL level the proposal is aiming at – use the TRL description available on EDA website)

(Specify)

A 10. Linked to

(Specify if linked to another proposal, programme or proposal and describe the link – include previously submitted similar proposals or signed contracts, as well under other European public funding organisations)

A1/3CEDS-FSP Proposal Annex A

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 4:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

A 11. Overall Proposal Cost A 12. Co-Funding A 13. CEDS-FSP Contribution

(Specify total cost as sum of section A 14 column v.

below.)

(Specify co-funding total as sum of section A 14 column

vi. below.)

(Specify requested CEDS-FSP contribution total as sum of

section A 14 column vii. below.)

A2/3CEDS-FSP Proposal Annex A

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 5:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

A 14. Participants

(Specify:

i. Participant number as in Annex B. The Lead is always participant no. 1.

ii. Refer to Annex B, section B 5; state if academic institution [ACA], research laboratory [RL], small and medium sized enterprise [SME], or any other type [OTH], i.e. none of the three types ACA, RL, or SME before.)

iii. Report short name as in Annex B, section B 4.

iv. Use two letter codes: DE, ES, FI, FR, PT, or SE

v. Report each consortium members’ individual proposal costs as in Annexes B, section B 11.

vi. State each consortium members’ individual co-funding amount, if any, as the difference between the total cost, column v., and the requested CEDS-FSP Contribution, column vii.

vii. State the requested CEDS-FSP contribution, including VAT or other readily identifiable taxes, customs duties and similar charges or quantitative restrictions on imports and exports to be paid, that are directly linked to the work under the proposal, amounts that will be incurred by the respective consortium member)

(Add rows as necessary)

i. No. ii. Type iii. Short Name

iv. cM v. Individual Proposal Cost

vi. Co-Funding vii. CEDS-FSP Contribution

1 (Specify)

(Specify)

(Specify)

(Copy the total cost

from Annex B, section

B11)

(Specify in EURO)

(Specify in EURO)

2 (Specify)

(Specify)

(Specify)

(Copy the total cost

from Annex B, section

B11)

(Specify in EURO)

(Specify in EURO)

A 15. Releasable Abstract

(Describe – Recommended length: ½ to 1 page. The information in this abstract should not allow for the identification of any consortium member by whatever means, e.g. names, acronyms, phone numbers, patent and publication references etc.)

A3/3CEDS-FSP Proposal Annex A

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 6:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

A4/3CEDS-FSP Proposal Annex A

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 7:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Complete one sheet per participant. Complete all sections. All parts marked in yellow should be replaced with your text. All parts marked in blue should be removed in your final version to be submitted. All colour markings should be removed, too. Any part not marked should be left unaltered. If a field is not applicable to you, enter N/A. The information contained in this Annex must be unclassified. All financial figures must be expressed in EURO inclusive VAT exempt for B11, cost items (a) to (f). All work effort figures must be expressed in person days. This document is marked with “CEDS-FSP EVALUATION ONLY” when completed. B 1 and B 3will be automatically repeated on all pages.

Combat Equipment for Dismounted SoldierFeasibility Study Programme (CEDS-FSP)

Annex B – Participant Details

B 1. Identifier B 2. Acronym and Title

(filled by EDA) (Specify - Repeat from the cover sheet like e.g. ACRONYM – Title)

B 3. Participant B 4. Short Name B 5. Type

Double click the text below. The “text form field options window opens. Change the default text as necessary.

(Specify the participant number as in Annex A, section A 14, column i.)

(Specify) (Specify – state if academic institution [ACA], Research laboratory [RL], small and medium sized enterprise [SME], or any other type [OTH], i.e. non of the three types ACA, RL, or SME before.)

B 6. Activity Outline

(Specify –Recommended maximum length: ½ page)

B1/5CEDS FSP Proposal Annex B

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 8:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Participant (Specify the participant number as in Annex A, section A 14, column i.) (filled by EDA)

B 7. Contact Address

(Specify – for the LEAD, this is the address where any communication is send to)

B 8. Legal Address

(Specify if different from contact address)

a) Name of the Entity

(Specify)

a) Legal Name of the Entity

(Specify)

b) Department, Faculty, Institute, Laboratory etc. in Charge

(Specify if different from a)

b) Department, Faculty, Institute, Laboratory etc. in Charge

(Specify if different from a)

c) Street name and Number, PO Box

(Specify)

c) Street name and Number, PO Box

(Specify)

d) Other Address Details

(Specify where required – e.g. Building, Office, other)

d) Other Address Details

(Specify where required – e.g. Building, Office, other)

e) Postal Code

(Specify)

e) Postal Code

(Specify)

f) Town

(Specify)

f) Town

(Specify)

g) Country

(Specify)

g) Country

(Specify)

h) Internet Homepage

(Specify)

h) Internet Homepage

(Specify)

B2/5CEDS-FSP Proposal Annex B

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 9:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Participant (Specify the participant number as in Annex A, section A 14, column i.) (filled by EDA)

B 9. Primary Contact Person

(Specify – for the LEAD, this is the person where any communication is send to)

B 10. Secondary Contact Person

(Specify if necessary)

a) Last Name

(Specify)

a) Last Name

(Specify)

b) First Name

(Specify)

b) First Name

(Specify)

c) Title

(Specify)

c) Title

(Specify)

d) Phone

(Specify)

d) Phone

(Specify)

e) Mobile Phone

(Specify)

e) Mobile Phone

(Specify)

f) Fax

(Specify)

f) Fax

(Specify)

g) Email

(Specify)

g) Email

(Specify)

B3/5CEDS-FSP Proposal Annex B

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 10:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Participant (Specify the participant number as in Annex A, section A 14, column i.) (filled by EDA)

B 11. Consortium Member’s Individual Proposal Cost Breakdown

(Specify – The consortium members’ individual proposal cost must be repeated in Annex A, section A 14, column v. If not otherwise stated below, for this paragraph “cost” means any direct and indirect cost necessary to implement the proposal excluding VAT and other taxes. The Management Committee of the CEDS-FSP may require you to explain this cost breakdown in more detail, including a separation between direct and indirect costs, before letting a contract.)

Consortium Member’s Individual Proposal Cost

(specify – sum of the cost items (a) to (g) below)(Specify in EURO)

(Specify in person days)

Cost Item i. Cost ii. Work

(a) Management

(specify cost and work effort of Management work under the proposal directly carried out by your organisation)

(Specify in EURO without VAT)

(Specify in person days)

(b) R&T Work

(specify cost and work effort of R&T work under the proposal directly carried out by your organisation)

(Specify in EURO without VAT)

(Specify in person days)

(c) Contracting of Management or R&T Work

(specify cost of all contracts that would be let by your organisation for management work or R&T work under the proposal, directly placed by your organisation to entities outside the consortium)

(Specify in EURO without VAT)

(d) R&T Consumables

(specify cost of all consumables directly linked to R&T work under the proposal, including costs for demonstrators, cost that will be incurred by your organisation)

(Specify in EURO without VAT)

(e) R&T Investments

(specify cost of all investments directly linked to R&T work under the proposal, cost that will be incurred by your organisation)

(Specify in EURO without VAT)

(f) Other costs not covered elsewhere

(specify any other cost not covered elsewhere that is directly linked to R&T work under the proposal, cost that will be incurred by your organisation)

(Specify in EURO without VAT)

B4/5CEDS-FSP Proposal Annex B

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 11:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Participant (Specify the participant number as in Annex A, section A 14, column i.) (filled by EDA)

B 11. Consortium Member’s Individual Proposal Cost Breakdown

(Specify – The consortium members’ individual proposal cost must be repeated in Annex A, section A 14, column v. If not otherwise stated below, for this paragraph “cost” means any direct and indirect cost necessary to implement the proposal excluding VAT and other taxes. The Management Committee of the CEDS-FSP may require you to explain this cost breakdown in more detail, including a separation between direct and indirect costs, before letting a contract.)

Consortium Member’s Individual Proposal Cost

(specify – sum of the cost items (a) to (g) below)(Specify in EURO)

(Specify in person days)

Cost Item i. Cost ii. Work

(g) VAT and other taxes

(specify the expected total amount of VAT or other readily identifiable taxes, customs duties and similar charges or quantitative restrictions on imports and exports to be paid, that are directly linked to the work under the proposal, amounts that will be incurred by your organisation)

(Specify in EURO)

B5/5CEDS-FSP Proposal Annex B

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 12:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Complete all sections. All parts marked in yellow should be replaced with your text. All parts marked in blue should be removed in your final version to be submitted. All colour markings should be removed, too. Any part not marked should be left unaltered. If a field is not applicable to you, enter N/A. The information contained in this Annex must be unclassified. All financial figures must be expressed in EURO inclusive VAT. All work effort figures must be expressed in person days. This document is marked with “CEDS FSP EVALUATION ONLY” when completed.

Combat Equipment for Dismounted SoldierFeasibility Study Programme (CEDS-FSP)

Annex C – Proposal Details

C 1. Identifier Acronym and Title

(filled by EDA) (Specify - Repeat from the cover sheet like e.g. ACRONYM – Title)

C1/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 13:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

C 2. Criterion 1: R&T Innovation

Description of the proposal Scientific and/or technological innovative value, consistency and credibility (describe – Recommended maximum length: 1 page; for the criterion details refer to the call, section 4.2. Please note that this criterion deals with the current proposal , not the past achievements of the consortium members)

C2/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 14:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

C 3. Criterion 2: Management

Ability of the consortium to carry out the project successfully and to ensure the efficient management of the work, including clear plans for the management of intellectual property and the ability to protect classified information if necessary.

(Describe – Recommended maximum length: 1 page; for the criterion details refer to the call, section 4.2)

C3/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 15:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

C 4. Criterion 3: Value for MoneyPrice of the proposal in relation to the deliverables.

(Specify – Recommended maximum length: ½ page; for the criterion details refer to the call, section 4.2)

C4/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 16:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

C 5. Criterion 4: Cooperation

Encouraging cooperation and building of effective partnerships.

(Specify – Recommended maximum length: ½ page; for the criterion details refer to the call, section 4.2)

C5/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 17:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

C 6. Work Plan

(Describe – Recommended maximum length: ten pages.)

This section describes in detail the work planned to achieve the objectives for the full duration of the proposal. An introduction should explain the structure of this work plan and how the plan will lead the participants to achieve the objectives. The work plan should distinguish between R&T, management and dissemination activities, as appropriate.

It should identify most significant risks, and contingency plans for these. The plan must be broken down into work packages (WPs), which should follow the logical phases of the proposal Typical elements of the plan are:

(a) Introduction – explaining the structure of this plan

b) Work planning, showing the timing of the different WPs and their components (Gantt chart or similar)

Note: The number of work packages used must be appropriate to the complexity of the work and the overall value of the proposal. Each work package should be a major sub-division of the proposal and should also have a verifiable end-point (normally a milestone). The planning should be sufficiently detailed to justify the proposed effort and allow progress monitoring by the Executive Management Group. The day-to-day management of the activity by the consortium may require a more detailed plan.

C6/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 18:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

C 7. Work Packages

(Specify:

i. WP No, refer to the WP numbers as in Annex D.

ii. Participants, refer to the participant numbers as in Annex B. Provide a comma separated list of all participants with the WP Lead in the first position and in bold letters, e.g.: 5, 1, 2, 3, 4.

iii. Work effort in person days.

iv. and v. Start / End months from the start of the project, or Start / End events/milestones.

vi. Related deliverable(s), refer to the deliverables section C 8 below.)

(Add rows as necessary.)

i. No ii. Participant(s) iii. Work iv. Start v. End vi. Deliverable(s)

1 (Specify) (Specify) (Specify) (Specify) (Specify)

C7/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 19:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

C 8. Deliverables

(Specify:

i. Deliverable number.

ii. Title or other denomination of the deliverable

iii. Nature of the deliverable, e.g. Report, Demonstrator, Presentation, Workshop etc.

iv. Lead organisation responsible for the deliverable. Refer to the participant number as in Annex A, section A 13, column i.

v. Dissemination information and / or restriction

vi. Payment milestone associated with the deliverable, refer to section C 9 below. The related milestone payment will only be made after approval of the deliverable.)

(Add rows as necessary.)

i. No ii. Title iii. Nature iv. Lead v. Dissemination Info

vi. Milestone

1 (Specify) (Specify) (Specify) (Specify) (Specify)

C8/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 20:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

C 9. Requested Milestone Payments

(Specify – there should be one milestone for payments every four months, with a first milestone four months after the actual start of the contract. For practical reasons, the current table is limited to a maximum project duration of 12 months. If you intend to propose a longer project, you may add rows as necessary. Check if the call allows longer project duration.)

i. Milestone ii. Project Month iii. Amount

PM 01 04 (Specify in EURO)

PM 02 08 (Specify in EURO)

PM 03 12 (Specify in EURO)

C9/9CEDS-FSP Proposal Annex C

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 21:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Complete all sections. All parts marked in yellow should be replaced with your text. All parts marked in blue should be removed in your final version to be submitted. All colour markings should be removed, too. Any part not marked should be left unaltered. If a field is not applicable to you, enter N/A. The information contained in this Annex must be unclassified. This document is marked with “CEDS-FSP EVALUATION ONLY” when completed. Attach one work package description sheet for each work package.

Combat Equipment for Dismounted SoldierFeasibility Study Programme (CEDS-FSP)

Annex D – Work Package Details

D 1. Identifier D 2. Acronym and Title

(filled by EDA) (Specify - Repeat from the cover sheet like e.g. ACRONYM – Title)

D 3. List of Work PackagesWP 1. (Specify WP Title)......................................................................................................2

D1/2CEDS-FSP Proposal Annex D

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 22:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

(filled by EDA)

WP 1. (Specify WP Title)

(1 page per work package – copy this entire table on each page.)

(a) Objectives

(Specify – recommended maximum length ¼ page)

(b) Description of Work

(Specify – recommended maximum length rest of the page)

D2/2CEDS-FSP Proposal Annex D

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 23:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Complete one sheet per attachment, or per set of attachments belonging together and serving the same purpose. Complete all sections. All parts marked in yellow should be replaced with your text. All parts marked in blue should be removed in your final version to be submitted. All colour markings should be removed, too. Any part not marked should be left unaltered. If a field is not applicable to you, enter N/A. The information contained in this Annex must be unclassified. This document is marked with “CEDS FSP Evaluation Only” when completed.

Special provision – refer to the call, paragraph 2.1, and paragraph 2.1.3 in particular: A consortium member that has been included as such in a particular proposal, that was not on the list of potential contractors when that call for proposals was issued, will have to provide confirmation from the cM of the territory in which that consortium member is registered that it is allowed to remain in the consortium. All confirmation(s) must be attached to the same attachment cover.

Combat Equipment for Dismounted Soldier

Feasibility Study Programme (CEDS-FSP)

Annex E – Attachment Cover

E 1. Identifier E 2. Acronym and Title

(filled by EDA) (Specify - Repeat from the cover sheet like e.g. ACRONYM – Title)

E 3. Attachment(s) Title(s)

(Specify – e.g. cM confirmation that consortium members are allowed to remain in the consortium as provided for in the call section 2.3)

E 4. Number of Pages

(Specify)

E 5. Attachment Purpose

(Specify – refer to the section of the proposal this attachment belongs to; state: “[Two letter country code] cM confirmation of participant(s) number [list of participants]”)

E1/1CEDS FSP Proposal Annex E

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 24:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

Complete one control sheet per proposal. The consortium’s quality controller in charge should complete all sections and sign the sheet. All parts marked in yellow should be replaced with your text. All parts marked in blue should be removed in your final version to be submitted. All colour markings should be removed, too. Any part not marked should be left unaltered. The information contained in this sheet must be unclassified, notwithstanding any privacy marking you wish to apply.

Combat Equipment for Dismounted SoldierFeasibility Study Programme (CEDS-FSP)

Annex F – Control Sheet

F 1. Identifier F 2. Acronym and Title

(filled by EDA) (Specify - Repeat from the cover sheet like e.g. ACRONYM – Title)

F1/3CEDS FSP Proposal Annex E

CEDS-FSP EVALUATION ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 25:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

F 3. Proposers Quality Control

(Specify – Before sending your proposal check the following; numbers refer to the respective paragraph in the Call)

Formal Criteria

(Paragraph numbers in square brackets refer to the call)

F 4. Initial Sift

(Filled by EDA)

(specify OK or not OK)

(a) The minimum consortium composition requirement has been respected [2.1].

(specify OK or not OK)

(b) Each consortium has been designated by a cM, either prior to the call publication [2.2], or by confirmation [2.3].

(specify OK or not OK)

(c) The correct proposal template has been used [3.1.1].

(specify OK or not OK)

(d) The proposal is typed and is in English [3.1.3].

(specify OK or not OK)

(e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format.

(specify OK or not OK)

(f) The requested CEDS-FSP contribution does not exceed the Ad Hoc Budget allocation [3.2.1, 3.2.5].

(specify OK or not OK)

(g) The proposed co-funding complies with [3.2.4].

(specify OK or not OK)

(h) The requested CEDS-FSP contribution is expressed in Euro (€) and inclusive VAT [3.2.6].

(specify OK or not OK)

(i) The proposal validity requirement is fulfilled [3.2.7].

(specify OK or not OK)

(j) The proposal classification requirement is fulfilled [3.2.9].

(specify OK or not OK)

(k) A contact point is designated [3.2.10].

F2/3CEDS FSP Proposal Annex F

CEDS-FSP MC ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 26:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

F 3. Proposers Quality Control

(Specify – Before sending your proposal check the following; numbers refer to the respective paragraph in the Call)

Formal Criteria

(Paragraph numbers in square brackets refer to the call)

F 4. Initial Sift

(Filled by EDA)

Done on behalf of the consortium at [enter town], [enter country], the [enter date as dd/mm/yyyy] by [enter title and full name of the consortium quality controller in charge - and sign below]

(Signature )

(l) The proposal submission deadline was respected (3.3.1, 3.3.2).

m) The other proposal submission requirements were respected (3.3.1, 3.3.3).

Initial Sift done at Brussels the __/__/____ by the opening committee charge:

F 5. Rejection Decision Ground(s)

(a) Initial Sift

The proposal did not pass the Initial Sift, refer to section F 3 (a) to (m) above.

(b) Evaluation Outcome

The proposal failed to achieve one or more of the threshold scores.

The total score of the proposal obtained in the evaluation was below the score of the proposals

F3/3CEDS FSP Proposal Annex F

CEDS-FSP MC ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu

Page 27:  · Web view(specify OK or not OK) (e) One original and one CD-ROM copy are included with the same content [3.1.4] using Word format. (specify OK or not OK) (f) The requested CEDS-FSP

F 3. Proposers Quality Control

(Specify – Before sending your proposal check the following; numbers refer to the respective paragraph in the Call)

Formal Criteria

(Paragraph numbers in square brackets refer to the call)

F 4. Initial Sift

(Filled by EDA)

selected.

(c) MC Decision

The Management Committee rejected the proposal on other grounds.

Done at Brussels the __/__/____ by the co-Chairperson of the CEDS-FSP Management Committee

F4/3CEDS FSP Proposal Annex F

CEDS-FSP MC ONLY (when completed)European Defence

AgencyRue des Drapiers 17-23 B-1050

Brusselswww.eda.europa.eu


Recommended