+ All Categories
Home > Documents >   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting:...

  · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting:...

Date post: 20-Mar-2020
Category:
Upload: others
View: 15 times
Download: 0 times
Share this document with a friend
186
Third Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96 Sophia Antipolis, France, 18/08/2014 to 22/08/2014 Note: Hyperlinks to tdocs will work only if the present report is in a subdirectory named "report" and the tdocs themselves are in a parallel subdirectory names "docs".
Transcript
Page 1:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Third Generation Partnership Project (3GPP™)

Meeting Reportfor

TSG SA WG5meeting: 96

Sophia Antipolis, France, 18/08/2014 to 22/08/2014

Note: Hyperlinks to tdocs will work only if the present report is in a subdirectory named "report" and the tdocs themselves are in a parallel subdirectory names "docs".

TABLE OF CONTENTS1 Opening of the meeting...............................................................................................................................4

Page 2:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

2 Approval of the agenda...............................................................................................................................43 IPR declaration............................................................................................................................................44 Meetings and activities reports....................................................................................................................54.1 Last SA5 meeting report........................................................................................................................54.2 Last SA meeting report..........................................................................................................................54.3 Inter-organizational reports...................................................................................................................55 Cross-SWG issues.......................................................................................................................................65.1 Administrative issues at SA5 level........................................................................................................65.2 Technical issues at SA5 level................................................................................................................75.3 Liaison statements at SA5 level............................................................................................................85.4 SA5 meeting calendar............................................................................................................................95.5 Review of the Work Plan....................................................................................................................106 OAM&P....................................................................................................................................................116.1 OAM&P Plenary.................................................................................................................................116.2 New Work Item proposals - OAM&P & Converged Management....................................................146.3 Maintenance and Rel-12 small Enhancements - OAM&P & Converged Management.....................146.3.1 UML diagram format & tools........................................................................................................326.4 OAM&P 12 Network Infrastructure Management..............................................................................326.4.1 Alarm quality improvements.........................................................................................................326.4.2 Radio Planning Tool interface.......................................................................................................346.5 OAM&P 12 Performance Management..............................................................................................376.5.1 Network Management for 3GPP Interworking WLAN - PM part................................................376.5.2 Energy Efficiency related Performance Measurements.................................................................386.6 OAM&P 12 WLAN Management.......................................................................................................386.6.1 TR on WLAN impacts to Type-2 management interface to the 3GPP Network Manager...........396.6.2 WLAN Network Resource Model for Type-2 interface................................................................406.6.3 WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on

Type-2 interface.............................................................................................................................406.7 OAM&P 12 Network Sharing.............................................................................................................406.7.1 OAM aspects of Network Sharing - Concepts and high-level requirements.................................416.7.2 OAM aspects of Network Sharing - Impacts on existing specifications.......................................426.8 OAM&P 13 Self-Organizing Networks (SON) - OAM aspects.........................................................456.8.1 Enhanced Network Management (NM) centralized Coverage and Capacity Optimization..........456.9 OAM&P Studies..................................................................................................................................456.9.1 Study on Enhanced Network Management (NM) centralized Coverage and Capacity

Optimization..................................................................................................................................456.9.2 Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON

function..........................................................................................................................................466.9.3 Study on Application and Partitioning of Itf-N.............................................................................496.9.4 Study on Network Management of Virtualized Networks............................................................507 Converged Management...........................................................................................................................547.1 Converged Management Plenary........................................................................................................547.2 OAM&P 12 Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations. 557.2.1 TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations......557.2.2 TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations577.3 OAM&P 12 Compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements..........577.3.1 Converged Management Model alignment Phase 2......................................................................577.3.2 Converged Management PM Interface definitions........................................................................587.4 Converged Management Studies.........................................................................................................587.4.1 TR on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements...............588 Charging....................................................................................................................................................598.1 Charging Plenary.................................................................................................................................598.2 New Charging Work Item proposals...................................................................................................648.3 Charging Maintenance and Rel-12 small Enhancements....................................................................668.4 BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO (Non

Seamless WLAN Offload) traffic from 3GPP UEs in fixed broadband access networks...................908.4.1 Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed

terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks.....................908.5 Charging Aspects of Proximity-based Services..................................................................................928.5.1 TR on Charging support for ProSe one-to-many Direct Communication for Public Safety use...928.5.2 Specification of Charging Aspects of Proximity-based Services..................................................95

Page 3:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

8.6 Inter-PLMN PS domain online charging.............................................................................................988.6.1 TR on Inter-PLMN PS domain online charging............................................................................988.6.2 Specification of Inter-PLMN PS domain online charging.............................................................998.7 Charging Studies.................................................................................................................................998.7.1 Study on Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and

interconnecting networks...............................................................................................................999 Any Other Business.................................................................................................................................10010 Closing of the meeting............................................................................................................................100Annex A: List of contribution documents................................................................................................................101Annex B: List of change requests............................................................................................................................120Annex C: Lists of liaisons........................................................................................................................................134C1: Incoming liaison statements..............................................................................................................................134C2: Outgoing liaison statements..............................................................................................................................134Annex D: List of agreed/approved new and revised Work Items............................................................................135Annex E: List of participants...................................................................................................................................136Annex H: List of future meetings.............................................................................................................................138

Page 4:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

1 Opening of the meeting

2 Approval of the agenda S5-144000 Agenda

Source: WG Chairman

Abstract:

-

Decision: The document was approved .

3 IPR declaration S5-144039 IPR declaration

Source: WG Chairman

Abstract:

-

Discussion:

The attention of the delegates to the meeting of this Technical Specification Group was drawn to the fact that 3GPP Individual Members have the obligation under the IPR Policies of their respective Organizational Partners to inform their respective Organizational Partners of Essential IPRs they become aware of.

The delegates were asked to take note that they were thereby invited:

to investigate whether their organization or any other organization owns IPRs which were, or were likely to become Essential in respect of the work of 3GPP.

to notify their respective Organizational Partners of all potential IPRs, e.g., for ETSI, by means of the IPR Information Statement and the Licensing declaration forms

Decision: The document was noted .

S5-144321 Legal announcementSource: WG Chairman

Abstract:

-

Discussion:

The attention of the delegates to the meeting was drawn to the fact that 3GPP activities were subject to antitrust and competition laws and that compliance with said laws was therefore required by any participant of the meeting, including the Chairman and Vice-Chairmen and were invited to seek any clarification needed with their legal counsel. The present meeting would be conducted with strict impartiality and in the interests of 3GPP. Delegates were reminded that timely submission of work items in advance of TSG/WG meetings was important to allow for full and fair consideration of such matters.

Decision: The document was noted .

Page 5:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

4 Meetings and activities reports

4.1 Last SA5 meeting report

S5-144001 Report from last SA5 meetingSource: ETSI Secretariat

Abstract:

-

Decision: The document was approved .

4.2 Last SA meeting report

S5-144002 SA5 status report at last SA meetingSource: WG Chairman

Abstract:

-

Decision: The document was noted .

S5-144003 SA5 results at last SA meetingSource: WG Chairman

Abstract:

-

Decision: The document was noted .

4.3 Inter-organizational reports

S5-144085 Meeting report from Industry Forum Workshop on Autonomic Management & Control (AMC) of Networks and Services, SDN, and NFV

Source: WG Chairman

Abstract:

-

Discussion:

NEC asked where there was intention on the White Paper to have SA5 input. The Chairman replied that there is no intention to do that, and it is up to the group to contribute if they wish.

The Chairman clarified that he would monitor what is being done in this group.

Decision: The document was noted .

Page 6:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144086 Presentations from Industry Forum Workshop on Autonomic Management & Control (AMC) of Networks and Services, SDN, and NFV

Source: WG Chairman

Abstract:

-

Decision: The document was noted .

5 Cross-SWG issues

5.1 Administrative issues at SA5 level

S5-144007 Leaders meeting agendaSource: WG Chairman

Abstract:

-

Decision: The document was approved .

S5-144008 Leaders meeting minutesSource: WG Chairman

Abstract:

-

Decision: The document was noted .

S5-144014 SA5 Working ProceduresSource: WG Chairman

Abstract:

-

Decision: The document was noted .

S5-144015 SA5 Meeting Facility RequirementsSource: WG Chairman

Abstract:

-

Decision: The document was noted .

S5-144016 Process for management of draft TSs/TRsSource: WG ViceChair

Page 7:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

-

Decision: The document was approved .

S5-144017 CR Quality CheckSource: ETSI Secretariat

Abstract:

-

Decision: The document was noted .

S5-144106 Process for quality improvement of SA5 TSsSource: WG Chairman

Abstract:

-

Decision: The document was noted .

S5-144379 Rapporteur list (resubmitted)Source: MCC

Decision: The document was noted .

S5-144528 Status of post SA5#96 email approvalsSource: WG Chairman

Decision: The document was left for email approval .

5.2 Technical issues at SA5 level

S5-144120 List of specifications that need upgradeSource: ETSI Secretariat

Abstract:

-

Decision: The document was revised to S5-144439 .

S5-144439 List of specifications that need upgradeSource: ETSI Secretariat

(Replaces S5-144120)

Page 8:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was revised to S5-144509 .

S5-144509 List of specifications that need upgradeSource: ETSI Secretariat

(Replaces S5-144439)

Decision: The document was noted .

5.3 Liaison statements at SA5 level

S5-144090 Reply to LS on Maintenance of I-WLAN Solution (SP-140089 /C6-140255)Source: C6-140294

Abstract:

-

Decision: The document was noted .

S5-144092 LS from CT cc SA5 on Maintenance of I-WLAN SolutionSource: CP-140457

Abstract:

-

Decision: The document was noted .

S5-144094 LS from OMA ARC to SA5 on OMA activities on NetAPIs and Service Exposure FrameworkSource: OMA-ARC

Abstract:

-

Discussion:

Ericsson: main work is in SA1,SA2. There may be charging implications in the future.

Decision: The document was noted .

S5-144101 LS from SA2 cc SA5 on Maintenance of I-WLAN specificationSource: S2-142202

Abstract:

-

Decision: The document was noted .

Page 9:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144102 LS from SA3 cc SA5 on Maintenance of I-WLAN SolutionSource: S3-140920

Abstract:

-

Decision: The document was noted .

S5-144103 LS from SA to SA5 on Maintenance of I-WLAN SolutionSource: SP-140397

Abstract:

-

Discussion:

Charging SWG has decided to discontinue their I-WLAN specification (more info in the exec report).

Ericsson commented that it was better to send an LS to the 3GPP products in order to let them know about this in case they reference this and other specs where SA5 decides to stop maintainance.

Decision: The document was replied to in S5-144380 .

S5-144380 Reply to: LS from SA to SA5 on Maintenance of I-WLAN SolutionSource: Chairman

Decision: The document was left for email approval and approved .

S5-144104 LS from SA cc SA5 on SDN standardization activity mapSource: SP-140399

Abstract:

-

Decision: The document was noted .

S5-144331 LS from ETSI NFV to SA5 on Availability of the NFV ISG Management and Orchestration GSSource: ETSI ISG NFV

Abstract:

-

Decision: The document was noted .

5.4 SA5 meeting calendar

S5-144013 SA5 Meeting CalendarSource: WG Chairman

Abstract:

Page 10:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Discussion:

SA5#101 will be moved one week later in order not to overlap with ETSI ISG NFV

Decision: The document was noted .

5.5 Review of the Work Plan

S5-144018 Deliverables due for the NEXT SA PlenarySource: ETSI Secretariat

Abstract:

-

Decision: The document was noted .

S5-144019 Rel-13 SA5 WIDsSource: WG Chairman

Abstract:

-

Decision: The document was noted .

S5-144020 SA5 3GPP Work PlanSource: ETSI Secretariat

Abstract:

-

Decision: The document was noted .

S5-144040 Work plan status after SA5#96Source: WG Chairman

Abstract:

-

Decision: The document was withdrawn .

S5-144053 Rel-12 SA5 WIDsSource: WG Chairman

Abstract:

-

Page 11:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was noted .

S5-144182 3GPP WID -Tutorial on how to prepare WIDs and how the whole Work Plan works, umbrella WIDs, etc.

Source: MCC (az)

Abstract:

-

Decision: The document was noted .

S5-144317 Work plan status after SA5#96Source: WG Chairman

Abstract:

-

Decision: The document was [not addressed] .

6 OAM&P

6.1 OAM&P Plenary

S5-144004 Time Plan for OAM&P and Converged Management SWGsSource: WG Chairman

Abstract:

-

Decision: The document was revised to S5-144366 .

S5-144366 Time Plan for OAM&P and Converged Management SWGsSource: WG Chairman

(Replaces S5-144004)

Decision: The document was approved .

S5-144005 OAM Executive Report from THIS MeetingSource: OAM SWG Chair

Abstract:

-

Decision: The document was revised to S5-144489 .

Page 12:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144021 Minutes of OAM&P PlenarySource: Rapporteur

Abstract:

-

Decision: The document was withdrawn .

S5-144095 LS from RAN1 cc SA5 on radio interface based synchronizationSource: R1-142762

Abstract:

-

Decision: The document was noted .

S5-144096 LS from RAN2 to SA5 on MBSFN MDTSource: R2-142873

Abstract:

-

Decision: The document was postponed .

S5-144174 OAM action list before the meetingSource: OAM Chair

Abstract:

-

Decision: The document was noted .

S5-144175 OAM action list after the meetingSource: OAM Chair

Abstract:

-

Decision: The document was noted .

S5-144176 OAM action list after the meetingSource: OAM Chair

Abstract:

-

Decision: The document was withdrawn .

Page 13:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144177 OAM Timing Matrix for SA5 #96Source: OAM Chair

Abstract:

-

Decision: The document was noted .

S5-144318 New WID on Heterogeneous Networks ManagementSource: Ericsson

Abstract:

-

Decision: The document was revised to S5-144487 .

S5-144423 History of LSs with BBF on HNB / HeNB counters and parametersSource: WG Chairman

Decision: The document was noted .

S5-144487 New WID on Heterogeneous Networks ManagementSource: Ericsson

(Replaces S5-144318)

Decision: The document was left for email approval and noted .

S5-144489 OAM Executive Report from THIS MeetingSource: OAM SWG Chair

(Replaces S5-144005)

Decision: The document was approved .

S5-144518 Revised WID on IWLAN managementSource: Rapporteur

Decision: The document was left for email approval and approved .

S5-144519 Updated draft TS 28.40228.402 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

S5-144520 Presentation sheet for TS 28.402Source: Rapporteur

Page 14:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was left for email approval and approved .

S5-144521 pCR 28.402 movement of counters from 28.401 and some correctionsSource: Rapporteur

Decision: The document was withdrawn .

6.2 New Work Item proposals - OAM&P & Converged Management

S5-144022 Minutes of New Work Item proposals - OAM&P & Converged ManagementSource: Rapporteur

Abstract:

-

Decision: The document was withdrawn .

6.3 Maintenance and Rel-12 small Enhancements - OAM&P & Converged Management

S5-144023 Minutes of Maintenance and Rel-12 small Enhancements - OAM&P & Converged Management

Source: MCC

Abstract:

-

Decision: The document was noted .

S5-144042 Rel-11 CR on 32153 b00 name space URI convention32.153 CR-0004 (Rel-11) v11.0.0Source: Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144043 Rel-11 CR on 28652-b30 Use standard template28.652 CR-0006 (Rel-11) v11.3.0Source: Ericsson

Abstract:

-

Decision: The document was noted .

Page 15:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144048 Rel-11 P-CR 28.671-b00Source: MCC (az/QC)

Abstract:

-

Decision: The document was noted .

S5-144049 Rel-11 P-CR 28.672-b00Source: MCC (az/QC)

Abstract:

-

Decision: The document was noted .

S5-144050 Rel-11 P-CR 28.673-b00Source: MCC (az/QC)

Abstract:

-

Decision: The document was noted .

S5-144084 Rel-11 CR 28.655 Geo-coordinates28.655 CR-0003 (Rel-11) v11.1.0Source: Orange

Abstract:

-

Decision: The document was noted .

S5-144112 Rel-11 CR 32.423 Adding abbreviation for Angle of Arrival32.423 CR-0085 (Rel-11) v11.8.0Source: CATT

Abstract:

-

Decision: The document was noted .

S5-144113 Rel-11 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT32.422 CR-0271 (Rel-11) v11.10.0Source: CATT

Abstract:

-

Page 16:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was revised to S5-144367 .

S5-144367 Rel-11 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT32.422 CR-0271 rev 1 (Rel-11) v11.10.0Source: CATT

(Replaces S5-144113)

Decision: The document was agreed .

S5-144114 Rel-12 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT32.422 CR-0272 (Rel-12) v12.2.0Source: CATT

Abstract:

-

Decision: The document was revised to S5-144368 .

S5-144368 Rel-12 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT32.422 CR-0272 rev 1 (Rel-12) v12.2.0Source: CATT

(Replaces S5-144114)

Decision: The document was agreed .

S5-144178 Discussion paper on real TA size KPISource: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144179 CR R12 32.451 Add real TA size monitoring KPI requirements32.451 CR-0004 (Rel-12) v11.0.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144180 CR R12 32.450 Add real TA size monitoring KPI32.450 CR-0016 (Rel-12) v11.0.0Source: Nokia Networks

Abstract:

Page 17:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was noted .

S5-144181 CR R9 32.405 Add the missing corresponding NRM spec32.405 CR-0072 (Rel-9) v9.2.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144424 .

S5-144424 CR CR R9 32.405 Correction of scope32.405 CR-0072 rev 1 (Rel-9) v9.2.0Source: Nokia Networks

(Replaces S5-144181)

Decision: The document was agreed .

S5-144183 CR R10 32.405 Add the missing corresponding NRM spec32.405 CR-0073 (Rel-10) v10.0.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144425 .

S5-144425 CR R10 32.405 Correction of scope32.405 CR-0073 rev 1 (Rel-10) v10.0.0Source: Nokia Networks

(Replaces S5-144183)

Decision: The document was agreed .

S5-144184 CR R11 32.405 Add the missing corresponding NRM spec32.405 CR-0074 (Rel-11) v11.1.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144426 .

S5-144426 CR R11 32.405 Correction of scope32.405 CR-0074 rev 1 (Rel-11) v11.1.1Source: Nokia Networks

Page 18:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

(Replaces S5-144184)

Decision: The document was agreed .

S5-144185 CR R9 32.406 Add the missing corresponding NRM spec32.406 CR-0011 (Rel-9) v9.0.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144429 .

S5-144429 CR R9 32.406 Correction of scope32.406 CR-0011 rev 1 (Rel-9) v9.0.0Source: Nokia Networks

(Replaces S5-144185)

Decision: The document was agreed .

S5-144186 CR R10 32.406 Add the missing corresponding NRM spec32.406 CR-0012 (Rel-10) v10.0.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144430 .

S5-144430 CR R10 32.406 Correction of scope32.406 CR-0012 rev 1 (Rel-10) v10.0.0Source: Nokia Networks

(Replaces S5-144186)

Decision: The document was agreed .

S5-144187 CR R11 32.406 Add the missing corresponding NRM spec32.406 CR-0013 (Rel-11) v11.3.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144431 .

S5-144431 CR R11 32.406 Correction of scope32.406 CR-0013 rev 1 (Rel-11) v11.3.0Source: Nokia Networks

Page 19:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

(Replaces S5-144187)

Decision: The document was agreed .

S5-144188 CR R9 32.407 Add the missing corresponding NRM spec32.407 CR-0021 (Rel-9) v9.3.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144189 CR R10 32.407 Add the missing corresponding NRM spec32.407 CR-0022 (Rel-10) v10.3.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144190 CR R11 32.407 Add the missing corresponding NRM spec32.407 CR-0023 (Rel-11) v11.2.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144191 CR R9 32.409 Add the missing corresponding NRM spec32.409 CR-0058 (Rel-9) v9.2.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144192 CR R10 32.409 Add the missing corresponding NRM spec32.409 CR-0059 (Rel-10) v10.4.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

Page 20:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144193 CR R11 32.409 Add the missing corresponding NRM spec32.409 CR-0060 (Rel-11) v11.4.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144194 CR R9 32.425 Add the missing corresponding NRM spec32.425 CR-0151 (Rel-9) v9.9.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144195 CR R10 32.425 Add the missing corresponding NRM spec32.425 CR-0152 (Rel-10) v10.7.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144196 CR R11 32.425 Add the missing corresponding NRM spec32.425 CR-0153 (Rel-11) v11.4.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144197 CR R12 32.425 Add the missing corresponding NRM spec32.425 CR-0154 (Rel-12) v12.0.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144198 CR R9 32.426 Add the missing corresponding NRM spec32.426 CR-0062 (Rel-9) v9.5.0Source: Nokia Networks

Abstract:

Page 21:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was noted .

S5-144199 CR R10 32.426 Add the missing corresponding NRM spec32.426 CR-0063 (Rel-10) v10.5.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144200 CR R11 32.426 Add the missing corresponding NRM spec32.426 CR-0064 (Rel-11) v11.4.0Source: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144202 Rel-11 CR on 28653-b30 re correction of data type28.653 CR-0006 (Rel-11) v11.3.0Source: Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144218 R12 CR 32.422 Update the value set of the Collection period for RRM measurements LTE to align with 36.413

32.422 CR-0273 (Rel-12) v12.2.0Source: ZTE

Abstract:

-

Decision: The document was noted .

S5-144219 R12 CR 32.446 Update the value set of the Collection period for RRM measurements LTE to align with 36.413

32.446 CR-0057 (Rel-12) v11.5.0Source: ZTE

Abstract:

-

Page 22:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was noted .

S5-144221 Rel-12 CR 32.422 Addition of missing configuration parameter for trace and MDT activation32.422 CR-0274 (Rel-12) v12.2.0Source: NEC

Abstract:

-

Decision: The document was noted .

S5-144223 Rel-11 CR 32.442 Addition of missing parameters relating to RCEF32.442 CR-0232 (Rel-11) v11.6.0Source: NEC

Abstract:

-

Decision: The document was agreed .

S5-144224 Rel-11 CR 32.442 Editorial corrections32.442 CR-0233 (Rel-11) v11.6.0Source: NEC

Abstract:

-

Decision: The document was noted .

S5-144225 Rel-10 CR 32.442 Editorial corrections32.442 CR-0234 (Rel-10) v10.7.0Source: NEC

Abstract:

-

Decision: The document was noted .

S5-144237 Rel-12 CR 28.612 Move IOCs from discontinued TS 28.602 - align with TSG SA decision to remove I-WLAN

28.612 CR-0001 (Rel-12) v12.0.0Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144506 .

Page 23:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144506 Rel-12 CR 28.612 Move IOCs from discontinued TS 28.602 - align with TSG SA decision to remove I-WLAN

28.612 CR-0001 rev 1 (Rel-12) v12.0.0Source: Ericsson

(Replaces S5-144237)

Decision: The document was agreed .

S5-144238 Rel-12 CR 28.616 Move IOCs/MOCs from discontinued TS 28.606 - align with TSG SA decision to remove I-WLAN

28.616 CR-0002 (Rel-12) v12.0.0Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144507 .

S5-144507 Rel-12 CR 28.616 Move IOCs/MOCs from discontinued TS 28.606 - align with TSG SA decision to remove I-WLAN

28.616 CR-0002 rev 1 (Rel-12) v12.0.0Source: Ericsson

(Replaces S5-144238)

Decision: The document was agreed .

S5-144239 Rel-11 CR 28.655 Correction of operationalState attribute definitions28.655 CR-0004 (Rel-11) v..Source: Ericsson

Abstract:

-

Decision: The document was withdrawn .

S5-144249 Rel-11 CR 32.442 Addition of missing input parameters list of TraceTarget attribute for EPC trace and MDT activation.

32.442 CR-0235 (Rel-11) v11.6.0Source: NEC

Abstract:

-

Decision: The document was noted .

S5-144255 Adapting Trace Reference to Core IMS32.422 CR-0275 (Rel-12) v12.2.0Source: Ericsson

Page 24:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

-

Decision: The document was noted .

S5-144370 Adapting Trace Reference to Core IMS32.422 CR-0275 rev 1 (Rel-12) v12.2.0Source: Ericsson

Decision: The document was withdrawn .

S5-144258 Adapting Trace Reference to Core IMS32.423 CR-0086 (Rel-12) v11.8.0Source: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144371 Adapting Trace Reference to Core IMS32.423 CR-0086 rev 1 (Rel-12) v11.8.0Source: Ericsson

Decision: The document was withdrawn .

S5-144260 Correct the File naming convention32.423 CR-0087 (Rel-6) v6.6.0Source: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144261 Correct the File naming convention32.423 CR-0088 (Rel-7) v7.4.0Source: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144262 Correct the File naming convention32.423 CR-0089 (Rel-8) v8.5.0Source: Ericsson

Abstract:

Page 25:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was noted .

S5-144263 Correct the File naming convention32.423 CR-0090 (Rel-9) v9.7.0Source: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144264 Correct the File naming convention32.423 CR-0091 (Rel-10) v10.9.0Source: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144265 Correct the File naming convention32.423 CR-0092 (Rel-11) v11.8.0Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144372 .

S5-144372 Rel-12 CR 32.423 Correct the File naming convention32.423 CR-0092 rev 1 (Rel-12) v11.8.0Source: Ericsson

(Replaces S5-144265)

Decision: The document was agreed .

S5-144301 Rel-11 CR on 28653-b30 re correction of data typeSource: Ericsson

Abstract:

-

Decision: The document was withdrawn .

Page 26:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144322 Rel-11 CR 28.655 Correction of operationalState attribute definitions (replaces S5-144239)28.655 CR-0004 (Rel-11) v11.1.0Source: Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144323 Rel-11 CR 28.702 Correction of proceduralStatus attribute definitions28.702 CR-0004 (Rel-11) v11.2.0Source: Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144324 Rel-11 CR 28.658 Align operationalState and other state attribute definitions28.658 CR-0009 (Rel-11) v11.4.0Source: Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144326 Rel-12 CR 32.102 Updates of entities of the mobile system32.102 CR-0051 (Rel-12) v11.2.0Source: TeliaSonera

Abstract:

The 3GPP Network Architecture (Release 12) has introduced new entities of the mobile system. The Telecom Management Architecture has to be updated accordingly.

Decision: The document was revised to S5-144505 .

S5-144505 Rel-12 CR 32.102 Updates of entities of the mobile system32.102 CR-0051 rev 1 (Rel-12) v11.2.0Source: TeliaSonera

(Replaces S5-144326)

Decision: The document was agreed .

S5-144329 Rel-11 CR 28.656 Geo-coordinates28.656 CR-0004 (Rel-11) v11.1.0Source: Orange

Abstract:

Page 27:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was noted .

S5-144427 CR R7 32.405 Correction of scope32.405 CR-0075 (Rel-7) v7.8.0Source: Nokia Networks

Decision: The document was agreed .

S5-144428 CR R8 32.405 Correction of scope32.405 CR-0076 (Rel-8) v8.5.0Source: Nokia Networks

Decision: The document was agreed .

S5-144436 CR R7 32.406 Correction of scope32.406 CR-0014 (Rel-7) v..Source: Nokia Networks

Decision: The document was agreed .

S5-144437 CR R8 32.406 Correction of scope32.406 CR-0015 (Rel-8) v..Source: Nokia Networks

Decision: The document was agreed .

S5-144490 Rel-12 CR 28.611 Remove unused reference28.611 CR-0004 (Rel-12) v..Source: Ericsson

Decision: The document was left for email approval and agreed .

S5-144529 Update the link from Solution Set to Information Service due to the end of Release 1228.623 CR-0005 (Rel-12) v11.2.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144530 Update the link from Solution Set to Information Service due to the end of Release 1228.626 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

Page 28:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144531 Update the link from Solution Set to Information Service due to the end of Release 1228.629 CR-0006 (Rel-12) v11.3.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144532 Update the link from Solution Set to Information Service due to the end of Release 1228.633 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144533 Update the link from Solution Set to Information Service due to the end of Release 1228.653 CR-0007 (Rel-12) v11.3.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144534 Update the link from Solution Set to Information Service due to the end of Release 1228.656 CR-0005 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144535 Update the link from Solution Set to Information Service due to the end of Release 1228.659 CR-0009 (Rel-12) v11.4.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144536 Update the link from Solution Set to Information Service due to the end of Release 1228.663 CR-0004 (Rel-12) v11.2.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144537 Update the link from Solution Set to Information Service due to the end of Release 1228.673 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144538 Update the link from Solution Set to Information Service due to the end of Release 1228.676 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

Page 29:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144539 Update the link from Solution Set to Information Service due to the end of Release 1228.703 CR-0004 (Rel-12) v11.2.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144540 Update the link from Solution Set to Information Service due to the end of Release 1228.706 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144541 Update the link from Solution Set to Information Service due to the end of Release 1228.709 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144542 Update the link from Solution Set to Information Service due to the end of Release 1228.733 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144543 Update the link from Solution Set to Information Service due to the end of Release 1228.736 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144544 Update the link from Solution Set to Information Service due to the end of Release 1228.753 CR-0003 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144545 Update the link from Solution Set to Information Service due to the end of Release 1232.111-6 CR-0006 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144546 Update the link from Solution Set to Information Service due to the end of Release 1232.126 CR-0002 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

Page 30:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144547 Update the link from Solution Set to Information Service due to the end of Release 1232.176 CR-0009 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was withdrawn. .

S5-144548 Update the link from Solution Set to Information Service due to the end of Release 1232.306 CR-0003 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144549 Update the link from Solution Set to Information Service due to the end of Release 1232.316 CR-0001 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144550 Update the link from Solution Set to Information Service due to the end of Release 1232.326 CR-0002 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144551 Update the link from Solution Set to Information Service due to the end of Release 1232.336 CR-0001 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144552 Update the link from Solution Set to Information Service due to the end of Release 1232.346 CR-0001 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144553 Update the link from Solution Set to Information Service due to the end of Release 1232.356 CR-0001 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144554 Update the link from Solution Set to Information Service due to the end of Release 1232.366 CR-0001 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

Page 31:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144555 Update the link from Solution Set to Information Service due to the end of Release 1232.376 CR-0002 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144556 Update the link from Solution Set to Information Service due to the end of Release 1232.386 CR-0002 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144557 Update the link from Solution Set to Information Service due to the end of Release 1232.396 CR-0003 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144558 Update the link from Solution Set to Information Service due to the end of Release 1232.416 CR-0004 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144559 Update the link from Solution Set to Information Service due to the end of Release 1232.446 CR-0058 (Rel-12) v11.5.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144560 Update the link from Solution Set to Information Service due to the end of Release 1232.506 CR-0001 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144561 Update the link from Solution Set to Information Service due to the end of Release 1232.536 CR-0010 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144562 Update the link from Solution Set to Information Service due to the end of Release 1232.606 CR-0003 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

Page 32:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144563 Update the link from Solution Set to Information Service due to the end of Release 1232.616 CR-0004 (Rel-12) v11.1.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

S5-144564 Update the link from Solution Set to Information Service due to the end of Release 1232.666 CR-0003 (Rel-12) v11.0.0Source: WG Chairman

Decision: The document was left for email approval and agreed .

6.3.1 UML diagram format & tools

S5-144325 Editable UML diagramSource: ETSI Secretariat

Abstract:

-

Discussion:

It was agreed to continue the Statu Quo, but a CR will be sent to SA plenary on the drafting rules to introduce the recommendation for using Papyrus as an UML tool.

Decision: The document was noted .

S5-144328 Editable UML diagramas in specs (MCC proposal)Source: ETSI Secretariat

Abstract:

-

Decision: The document was noted .

6.4 OAM&P 12 Network Infrastructure Management

6.4.1 Alarm quality improvements

S5-144037 Minutes for Alarm Quality ImprovementsSource: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144276 pCR 32.111-1 Add general principles of alarm generationSource: Huawei

Page 33:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

-

Decision: The document was revised to S5-144440 .

S5-144440 pCR 32.111-1 Add general principles of alarm generationSource: Huawei

(Replaces S5-144276)

Decision: The document was approved .

S5-144277 pCR 32.111-2 Add notification support for changed additionalTextSource: Huawei

Abstract:

-

Decision: The document was noted .

S5-144292 Introduction of Managed AlarmTS32.111-1 v..Source: TeliaSonera

Abstract:

The proposal includes introduction of the concept of Managed Alarms

Decision: The document was noted .

S5-144295 Correction of clearing of alarmsTS32.111-1 v..Source: TeliaSonera

Abstract:

Correction of faulty implementation of previous CR

Decision: The document was approved .

S5-144299 Quality of AlarmsTS32.111-1 v..Source: TeliaSonera

Abstract:

Proposal to add a clause enhancing the requirements for Quality of Alarms

Decision: The document was revised to S5-144499 .

Page 34:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144499 Quality of AlarmsTS32.111-1 v..Source: TeliaSonera

(Replaces S5-144299)

Decision: The document was approved .

S5-144469 Super CR for 32.111-1Source: Rapporteur

Decision: The document was left for email approval .

S5-144500 Exception sheet Alarm Quality ImprovementsSource: Rapporteur

Decision: The document was approved .

6.4.2 Radio Planning Tool interface

S5-144028 Minutes for Radio Planning Tool InterfaceSource: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144044 pCR on draft TS 28.667-020 RPT NRM IRP Req re Use CaseSource: Ericsson

Abstract:

-

Decision: The document was withdrawn .

S5-144087 Rel-12 CR 32.101 Include the Network Management Layer Service (NMLS) in the Management Reference Model

32.101 CR-0056 (Rel-12) v11.2.0Source: MCC

Abstract:

This is CR0055R2 that wasn't implemented in the correct Release of the spec

Decision: The document was agreed .

S5-144088 Rel-11 CR 32.101 Removal of the Network Management Layer Service (NMLS) in the Management Reference Model

Page 35:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

32.101 CR-0057 (Rel-11) v11.2.0Source: MCC

Abstract:

CR0055R2 was implemented in Rel-11 instead of Rel-12. This CR removes the incorrect text.

Decision: The document was agreed .

S5-144278 pCR 28.667 Add conceptual descriptions to RPT dataSource: Huawei

Abstract:

-

Decision: The document was revised to S5-144445 .

S5-144445 pCR 28.667 Add conceptual descriptions to RPT dataSource: Huawei

(Replaces S5-144278)

Decision: The document was noted .

S5-144287 Introduce the Radio Planning Tool (RPT) Access (RPTA) IRPSource: Nokia Networks

Abstract:

-

Decision: The document was noted .

S5-144288 pCR 28.668 - Implement the Radio Planning Tool (RPT) Access (RPTA) IRPSource: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144442 .

S5-144442 pCR 28.668 - Implement the Radio Planning Tool (RPT) Access (RPTA) IRPSource: Nokia Networks

(Replaces S5-144288)

Decision: The document was approved .

S5-144289 pCR 28.668 - Add attributes to the info modelSource: Nokia Networks

Page 36:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

-

Decision: The document was revised to S5-144382 .

S5-144382 pCR 28.668 - Add attributes to the info modelSource: Nokia Networks

(Replaces S5-144289)

Decision: The document was revised to S5-144510 .

S5-144510 pCR 28.668 - Add attributes to the info modelSource: Nokia Networks

(Replaces S5-144382)

Decision: The document was approved .

S5-144290 pCR 28.668 - Add the operation getAllPlannedData()Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144443 .

S5-144443 pCR 28.668 - Add the operation getAllPlannedData()Source: Nokia Networks

(Replaces S5-144290)

Decision: The document was noted .

S5-144300 pCR on draft TS 28.667-020 RPT NRM IRP: RequirementsSource: Ericsson, Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144444 .

S5-144444 pCR on draft TS 28.667-020 RPT NRM IRP: RequirementsSource: Ericsson, Nokia Networks

(Replaces S5-144300)

Decision: The document was approved .

Page 37:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144474 Presentation sheet 28.667Source: Rapporteur

Decision: The document was revised to S5-144511 .

S5-144511 Presentation sheet 28.667Source: Rapporteur

(Replaces S5-144474)

Decision: The document was left for email approval and approved .

S5-144475 Presentation sheet 28.668Source: Rapporteur

Decision: The document was revised to S5-144512 .

S5-144512 Presentation sheet 28.668Source: Rapporteur

(Replaces S5-144475)

Decision: The document was left for email approval and approved .

S5-144476 new draft spec TS 28.66728.667 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

S5-144477 new draft spec TS 28.66828.668 v..Source: Rapporteur

Decision: The document was left for email approval .

S5-144508 Exception sheet Radio Planning Tool InterfaceSource: Rapporteur

Decision: The document was approved .

6.5 OAM&P 12 Performance Management

6.5.1 Network Management for 3GPP Interworking WLAN - PM part

S5-144025 Minutes for Network Management for 3GPP Interworking WLAN - PM partSource: Rapporteur

Page 38:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

-

Decision: The document was withdrawn .

6.5.2 Energy Efficiency related Performance Measurements

S5-144026 Minutes for Energy Efficiency related Performance MeasurementsSource: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144093 Resubmitted LS from ETSI TC EE to SA5 on Update on the liaison to 3GPP on Cooperation for Energy Efficiency Measurements

Source: ETSI TC EE

Abstract:

-

Decision: The document was postponed .

S5-144247 Revised WID Energy Efficiency related Performance measurementsSource: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144446 .

S5-144446 Revised WID Energy Efficiency related Performance measurementsSource: Nokia Networks

(Replaces S5-144247)

Decision: The document was agreed .

6.6 OAM&P 12 WLAN Management

S5-144029 Minutes for OAM&P 12 WLAN ManagementSource: Rapporteur

Abstract:

-

Page 39:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was noted .

S5-144527 Rel 12 WLAN OAM SIDSource: Rapporteur

Decision: The document was left for email approval .

6.6.1 TR on WLAN impacts to Type-2 management interface to the 3GPP Network Manager

S5-144243 pCR Performance measurements handling SISource: Intel

Abstract:

-

Decision: The document was revised to S5-144432 .

S5-144432 pCR Performance measurements handling SISource: Intel

(Replaces S5-144243)

Decision: The document was approved .

S5-144284 pCR WLAN PM counter handlingSource: Ericsson, Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144432 .

S5-144433 Revised WID on WLAN ManagementSource: Intel

Decision: The document was revised to S5-144513 .

S5-144513 Revised WID on WLAN ManagementSource: Intel

(Replaces S5-144433)

Decision: The document was revised to S5-144488 .

S5-144434 Presentation sheet TR 32.841Source: Rapporteur

Page 40:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was left for email approval and approved.

S5-144435 new draft TR 32.84132.841 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

S5-144488 Revised WID on WLAN ManagementSource: Intel

(Replaces S5-144513)

Decision: The document was agreed .

6.6.2 WLAN Network Resource Model for Type-2 interface

6.6.3 WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface

S5-144244 pCR on 28.403 WLAN MAC protocol related MeasurementsSource: Intel

Abstract:

-

Decision: The document was noted .

S5-144245 pCR on 28.403 WLAN data volume MeasurementsSource: Intel

Abstract:

-

Decision: The document was noted .

6.7 OAM&P 12 Network Sharing

S5-144047 Rel-12 SA5 Work Item Exception for WI OAM aspects of network sharingSource: Rapporteur

Abstract:

-

Decision: The document was revised to S5-144378 .

Page 41:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144378 Rel-12 SA5 Work Item Exception for WI OAM aspects of network sharingSource: Rapporteur

(Replaces S5-144047)

Decision: The document was revised to S5-144515 .

S5-144515 Rel-12 SA5 Work Item Exception for WI OAM aspects of network sharingSource: Rapporteur

(Replaces S5-144378)

Decision: The document was revised to S5-144467 .

S5-144054 Minutes for OAM&P 12 Network SharingSource: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144467 Rel-12 SA5 Work Item Exception for WI OAM aspects of network sharingSource: Rapporteur

(Replaces S5-144515)

Decision: The document was left for email approval and approved .

6.7.1 OAM aspects of Network Sharing - Concepts and high-level requirements

S5-144046 Analysis of RAN3 and RAN2 answers to SA5 LS S5-143421Source: Orange, Deutsche Telekom

Abstract:

-

Decision: The document was noted .

S5-144056 pCR TR 32.130 Business-level and specification-level requirements, use casesSource: Orange, Deutsche Telekom

Abstract:

-

Decision: The document was revised to S5-144373 .

S5-144373 pCR TR 32.130 Business-level and specification-level requirements, use casesSource: Orange, Deutsche Telekom

Page 42:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

(Replaces S5-144056)

Decision: The document was approved .

S5-144057 pCR TR 32.130 Business-level requirements for Trace / MDTSource: Orange, Deutsche Telekom

Abstract:

-

Decision: The document was revised to S5-144374 .

S5-144374 pCR TR 32.130 Business-level requirements for Trace / MDTSource: Orange, Deutsche Telekom

(Replaces S5-144057)

Decision: The document was approved .

S5-144097 LS from RAN2 to SA5 on Clarifications about MOCN and GWCNSource: R2-142939

Abstract:

-

Decision: The document was noted .

S5-144098 LS from RAN3 to SA5 on on clarifications about MOCN and GWCNSource: R3-141523

Abstract:

-

Decision: The document was noted .

S5-144438 Presentation sheet 32.130 OAM for network sharing - Concepts and requirementsSource: Rapporteur

Decision: The document was approved .

S5-144450 new Draft TS 32.13032.130 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

Page 43:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

6.7.2 OAM aspects of Network Sharing - Impacts on existing specifications

S5-144058 Super CR 28657 - Add requirement for the management of shared E-UTRANSource: Orange

Abstract:

-

Decision: The document was approved .

S5-144059 Super CR 28658-b40 - Introduce new attributeSource: Orange

Abstract:

-

Decision: The document was noted .

S5-144060 Super CR 28659-b40 - Introduce new attributeSource: Orange

Abstract:

-

Decision: The document was noted .

S5-144077 Super CR 28621 Add support for network sharingSource: Orange

Abstract:

-

Decision: The document was noted .

S5-144078 Super CR 28623 Add new attribute for network sharingSource: Orange

Abstract:

-

Decision: The document was noted .

S5-144079 Super CR 28623 Add new attribute for network sharingSource: Orange

Abstract:

-

Page 44:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was noted .

S5-144081 Super CR 28651 Add support for network sharingSource: Orange

Abstract:

-

Decision: The document was approved .

S5-144082 Super CR 28652 Add new attribute for network sharingSource: Orange

Abstract:

-

Decision: The document was revised to S5-144375 .

S5-144375 Super CR 28652 Add new attribute for network sharingSource: Orange

(Replaces S5-144082)

Decision: The document was revised to S5-144441 .

S5-144441 Super CR 28652 Add new attribute for network sharingSource: Orange

(Replaces S5-144375)

Decision: The document was revised to S5-144514 .

S5-144514 Super CR 28652 Add new attribute for network sharingSource: Orange

(Replaces S5-144441)

Decision: The document was approved .

S5-144083 Super CR 28653 Add new attribute for network sharingSource: Orange

Abstract:

-

Decision: The document was revised to S5-144376 .

Page 45:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144376 Super CR 28653 Add new attribute for network sharingSource: Orange

(Replaces S5-144083)

Decision: The document was approved .

S5-144272 Super CR 32.422: Sharing network support32.422-c20 v..Source: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144274 Proposed Super CR 32.423-b80 Trace Reporting32.423-b80 v..Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144377 .

S5-144377 Proposed Super CR 32.423-b80 Trace Reporting32.423-b80 v..Source: Ericsson

(Replaces S5-144274)

Decision: The document was approved .

6.8 OAM&P 13 Self-Organizing Networks (SON) - OAM aspects

6.8.1 Enhanced Network Management (NM) centralized Coverage and Capacity Optimization

S5-144033 Minutes for Enhanced Network Management (NM) centralized Coverage and Capacity Optimization

Source: Rapporteur

Abstract:

-

Decision: The document was withdrawn .

Page 46:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

6.9 OAM&P Studies

6.9.1 Study on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization

S5-144027 Minutes for Study on Enhanced NM Centralised Coverage and Capacity OptimisationSource: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144246 pCR HO and RRC connection establishment distributionSource: Intel

Abstract:

-

Decision: The document was noted .

S5-144270 Presentation of Specification to TSGTR 32.836 v..Source: Ericsson

Abstract:

-

Decision: The document was approved .

6.9.2 Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function

S5-144031 Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function

Source: Rapporteur

Abstract:

-

Decision: The document was revised to S5-144516 .

S5-144516 Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function

Source: Rapporteur

(Replaces S5-144031)

Decision: The document was noted .

Page 47:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144045 pCR on draft TR 32.860-040 D-SON re long optimization cycleSource: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144259 pCR 32.860 Cell Capacity Class ValueSource: Cisco

Abstract:

-

Decision: The document was revised to S5-144478 .

S5-144478 pCR 32.860 Cell Capacity Class ValueSource: Cisco

(Replaces S5-144259)

Decision: The document was noted .

S5-144266 pCR to TR 32 860 MLB parameters alignmentSource: Cisco, Vodafone, Deutsche Telekom

Abstract:

-

Decision: The document was revised to S5-144473 .

S5-144473 pCR to TR 32 860 MLB parameters alignmentSource: Cisco, Vodafone, Deutsche Telekom

(Replaces S5-144266)

Decision: The document was noted .

S5-144267 pCR to TR 32.860 CAC Case for MLB Parameters alignmentSource: Cisco

Abstract:

-

Decision: The document was noted .

S5-144268 pCR to TR 32.860 MLB algorithms alignmentSource: Cisco, Vodafone, Deutsche Telekom

Page 48:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

-

Decision: The document was noted .

S5-144269 pCR to TR 32.860 Additional load information for MLBSource: Cisco, Vodafone, Deutsche Telekom

Abstract:

-

Decision: The document was revised to S5-144494 .

S5-144494 pCR to TR 32.860 Additional load information for MLBSource: Cisco, Vodafone, Deutsche Telekom

(Replaces S5-144269)

Decision: The document was noted .

S5-144271 pCR to TR 32.860 MLB TargetsSource: Cisco

Abstract:

-

Decision: The document was noted .

S5-144279 Way forward for OAM enhancements of D-MLB discussionSource: Huawei

Abstract:

-

Decision: The document was noted .

S5-144293 pCR on draft TR 32.860-040 Hybrid-SON re Alignment with WIDSource: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144471 pCR on draft TR 32.860-040 Hybrid-SON re Alignment with WIDSource: Ericsson

Page 49:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was withdrawn .

S5-144294 pCR on draft TR 32.860-040 Hybrid-SON re data transfer over itf-NSource: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144479 pCR on draft TR 32.860-040 Hybrid-SON re data transfer over itf-NSource: Ericsson

Decision: The document was withdrawn .

S5-144296 pCR on draft TR 32.860-040 Hybrid-SON re effectiveness of NM analysisSource: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144480 pCR on draft TR 32.860-040 Hybrid-SON re effectiveness of NM analysisSource: Ericsson

Decision: The document was withdrawn .

S5-144297 pCR on draft TR 32.860-040 Hybrid-SON re use of standard D-MLBSource: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144298 pCR on draft TR 32.860-040 Hybrid-SON re using statistic to predict future loadSource: Ericsson

Abstract:

-

Decision: The document was [not addressed] .

S5-144472 pCR on D-MLB algorithms misalignment IntroductionSource: Cisco

Page 50:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was withdrawn .

6.9.3 Study on Application and Partitioning of Itf-N

S5-144036 Minutes for Study on Application and Partitioning of Itf-NSource: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144134 pCR on introduction of TR32.861Source: China Mobile

Abstract:

-

Decision: The document was noted .

S5-144135 pCR on PM of TR32.861Source: China Mobile

Abstract:

-

Decision: The document was revised to S5-144448 .

S5-144448 pCR on PM of TR32.861Source: China Mobile

(Replaces S5-144135)

Decision: The document was revised to S5-144517 .

S5-144517 pCR on PM of TR32.861Source: China Mobile

(Replaces S5-144448)

Decision: The document was approved .

S5-144449 Draft TR on Study on Application and Partitioning of Itf-NSource: Rapporteur

Decision: The document was left for email approval and approved

Page 51:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

.

6.9.4 Study on Network Management of Virtualized Networks

S5-144030 Minutes for Study on Network Management of Virtualized NetworksSource: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144115 Discussion about the roll of network management blocksSource: KDDI

Abstract:

-

Decision: The document was withdrawn .

S5-144116 the Skeleton of Management of Virtualized NetworkTR 32.842 v..Source: Rapporteur

Abstract:

-

Decision: The document was revised to S5-144482 .

S5-144482 the Skeleton of Management of Virtualized NetworkTR 32.842 v..Source: Rapporteur

(Replaces S5-144116)

Decision: The document was approved .

S5-144118 The scope of TR 32.842TR 32.842 v..Source: Rapporteur

Abstract:

add the scope to TR 32.842

Decision: The document was revised to S5-144483 .

Page 52:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144483 The scope of TR 32.842TR 32.842 v..Source: Rapporteur

(Replaces S5-144118)

Decision: The document was approved .

S5-144119 Rel-13 pCR 32.842 Alarm correlation32.842 v..Source: KDDI

Abstract:

-

Decision: The document was withdrawn .

S5-144220 The Proposal of Management Scenarios and use cases of TR32.842TR 32.842 v..Source: Rapporteur

Abstract:

-

Decision: The document was revised to S5-144495 .

S5-144495 The Proposal of Management Scenarios and use cases of TR32.842TR 32.842 v..Source: Rapporteur

(Replaces S5-144220)

Decision: The document was noted .

S5-144222 Discussion on the Management Scenarios and Use Cases of TR 32.842TR32.842 v..Source: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144248 TR 32.842 rapporteur change proposalTR32.842 v..Source: Rapporteur

Abstract:

-

Page 53:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was agreed .

S5-144250 MME VNF instantiation and termination for mixed networkSource: Intel

Abstract:

-

Decision: The document was noted .

S5-144251 MME VNF instance scale in and outSource: Intel

Abstract:

-

Decision: The document was noted .

S5-144252 MME VNF instance scaling up and downSource: Intel

Abstract:

-

Decision: The document was noted .

S5-144280 pCR Add Introduction section to TR 32.842Source: Huawei, China Mobile

Abstract:

-

Decision: The document was revised to S5-144496 .

S5-144496 pCR Add Introduction section to TR 32.842Source: Huawei, China Mobile

(Replaces S5-144280)

Decision: The document was approved .

S5-144281 pCR Add Concept Introduction to TR 32.842Source: Huawei, China Mobile

Abstract:

-

Page 54:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was noted .

S5-144291 Management of mixed (virtualised and non virtualised) networkTR 32.842 v..Source: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144330 Event correlation points for Virtualized 3GPP netowork managementTR 32.842 v..Source: KDDI

Abstract:

The document of NFV management and orchestration has been put in public area of ETSI website. Based on the definition of the document, failure management of virtualized network functions is allowed to have too much flexibility for operation of virtualized

Decision: The document was noted .

S5-144497 Draft TR 32.84232.842 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

7 Converged Management

7.1 Converged Management Plenary

S5-144006 Converged Management Executive report from THIS meetingSource: Converged Management SWG Chair

Abstract:

-

Decision: The document was revised to S5-144491 .

S5-144024 Minutes of Converged Management PlenarySource: CMAN SWG Chair

Abstract:

-

Page 55:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was noted .

S5-144080 Alignment of titles and legal values between TR 32.837 and TR 32.838Source: Huawei

Abstract:

-

Decision: The document was approved .

S5-144319 Alignment of terms for TR 32.837 and TR 32.838Source: Huawei

Abstract:

-

Decision: The document was withdrawn .

S5-144369 Open Action Items for Converged Management SWGSource: Ericsson

Decision: The document was revised to S5-144498 .

S5-144498 Open Action Items for Converged Management SWGSource: Ericsson

(Replaces S5-144369)

Decision: The document was noted .

S5-144481 Update of S5-144120 for CMANSource: SWG Chair

Decision: The document was noted .

S5-144491 Converged Management Executive report from THIS meetingSource: Converged Management SWG Chair

(Replaces S5-144006)

Decision: The document was approved .

S5-144492 Update of TOP OPE WIDSource: WG Chairman

Decision: The document was left for email approval and approved .

Page 56:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

7.2 OAM&P 12 Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations

S5-144032 Minutes for compliance of 3GPP SA5 specifications to the NGMN Top OPE RecommendationsSource: Rapporteur

Abstract:

-

Decision: The document was noted .

7.2.1 TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations

S5-144216 pCR 32.838 Add analysis of automatic inventory requirementsSource: ZTE

Abstract:

-

Decision: The document was approved .

S5-144217 R12 CR 28.632 Add common notifications for inventory IOCs28.632 CR-0002 (Rel-12) v11.1.0Source: ZTE

Abstract:

-

Decision: The document was noted .

S5-144273 pCR to TR 32.838 OSS tool support, Optimization in NMS layerSource: Cisco

Abstract:

-

Decision: The document was approved .

S5-144275 pCR to TR 32.838 OSS tool support, FunctionalitiesSource: Cisco

Abstract:

-

Decision: The document was approved .

Page 57:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144320 Progress review of TR 32.838Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144501 draft TR 32.83832.838 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

7.2.2 TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations

7.3 OAM&P 12 Compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

7.3.1 Converged Management Model alignment Phase 2

S5-144034 Minutes for Converged Management Model alignment Phase 2Source: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144041 Rel-11 CR on 32156 b10 re MSDO deliverable32.156 CR-0002 (Rel-11) v11.1.0Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144504 .

S5-144504 Rel-11 CR on 32156 b10 re MSDO deliverable32.156 CR-0002 rev 1 (Rel-11) v11.1.0Source: Ericsson

(Replaces S5-144041)

Decision: The document was left for email approval and agreed .

Page 58:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144051 Multi-SDO Model Alignment JWG output: Model Repertoire V5.328.820 v..Source: WG Chairman

Abstract:

-

Decision: The document was noted .

S5-144052 Multi-SDO Model Alignment JWG output: Umbrella Operation Model (UOM) V5.2Source: WG Chairman

Abstract:

-

Decision: The document was noted .

S5-144240 Initial Draft TR for UOMSource: Ericsson

Abstract:

-

Decision: The document was revised to S5-144447 .

S5-144447 Initial Draft TR for UOMSource: Ericsson

(Replaces S5-144240)

Decision: The document was approved .

S5-144502 Presentation sheet TR 28.820Source: Rapporteur

Decision: The document was approved .

7.3.2 Converged Management PM Interface definitions

S5-144035 Minutes for Converged Management PM Interface definitionsSource: Rapporteur

Abstract:

-

Decision: The document was withdrawn .

Page 59:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144493 Revised WID Converged Management PM Interface definitionsSource: WG Chairman

Decision: The document was left for email approval and approved .

7.4 Converged Management Studies

7.4.1 TR on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

S5-144038 Minutes for TR on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

Source: Rapporteur

Abstract:

-

Decision: The document was noted .

S5-144055 Revised WID Study on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

Source: Huawei

Abstract:

-

Decision: The document was revised to S5-144381 .

S5-144381 Revised WID Study on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

Source: Huawei

(Replaces S5-144055)

Decision: The document was agreed .

S5-144282 pCR TR 32.837 Editorial Change of Compliance quailiferSource: Huawei

Abstract:

-

Decision: The document was approved .

S5-144283 pCR TR 32.837 Reformat of section - Requirements for NGCOR Modelling and Tooling (MT)Source: Huawei

Abstract:

-

Page 60:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was approved .

S5-144503 new draft TR 32.83732.837 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

8 Charging

8.1 Charging Plenary

S5-144009 CH Agenda and Time PlanSource: CH SWG Chair

Abstract:

-

Decision: The document was approved .

S5-144010 CH Detailed Report from LAST MeetingSource: CH SWG Chair

Abstract:

-

Decision: The document was approved .

S5-144011 CH Executive Report from THIS MeetingSource: CH SWG Chair

Abstract:

-

Decision: The document was revised to S5-144486 .

S5-144012 CH Detailed Report from THIS MeetingSource: CH SWG Chair

Abstract:

-

Decision: The document was [not addressed] .

S5-144089 LS from CT4 to SA5 on Renaming of TWAN-SSID and TWAN-BSSID Diameter AVPsSource: C4-141030

Page 61:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

-

Decision: The document was noted .

S5-144091 Ls from CT6 to SA5 on ProSe Lawful InterceptionSource: C6-140315

Abstract:

-

Decision: The document was replied to in S5-144353 .

S5-144099 LS from SA1 to SA5 on Removal of option to subscribe for a notification of diversion occurrence

Source: S1-141382

Abstract:

-

Decision: The document was noted .

S5-144100 Resubmitted LS from SA2 to SA5 on Charging aspects for Network Sharing (MOCN GWCN)Source: S2-141509

Abstract:

-

Decision: The document was postponed .

S5-144105 LS from CT4 to SA5 on Discontinuance of 29.234Source: C4-141672

Abstract:

-

Decision: The document was noted .

S5-144107 DP Keywords in Charging TSTS 32.2xx v..Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144342 .

Page 62:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144117 DP Presence Reporting Areas for ChargingSource: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144201 LSout from SA5 to CT4 on Completion of AVP code definitions32.299 (SA5) 29.230 (CT4) v..Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144336 .

S5-144210 DP Maintenance of I-WLAN solution in charging specificationsSource: Ericsson

Abstract:

-

Decision: The document was noted .

S5-144211 Rel-12 CR 32.240 Removal of I-WLAN solution32.240 CR-0377 (Rel-12) v12.4.1Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144522 .

S5-144522 Rel-12 CR 32.240 Removal of I-WLAN solution32.240 CR-0377 rev 1 (Rel-12) v12.4.1Source: Ericsson

(Replaces S5-144211)

Decision: The document was left for email approval and agreed .

S5-144212 Rel-12 CR 32.296 Removal of I-WLAN solution32.296 CR-0038 (Rel-12) v12.1.1Source: Ericsson

Abstract:

-

Page 63:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was revised to S5-144337 .

S5-144213 Rel-12 CR 32.297 Removal of I-WLAN solution32.297 CR-0016 (Rel-12) v12.0.1Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144523 .

S5-144523 Rel-12 CR 32.297 Removal of I-WLAN solution32.297 CR-0016 rev 1 (Rel-12) v12.0.1Source: Ericsson

(Replaces S5-144213)

Decision: The document was left for email approval and agreed .

S5-144214 Rel-12 CR 32.298 Removal of I-WLAN solution32.298 CR-0492 (Rel-12) v12.4.1Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144524 .

S5-144524 Rel-12 CR 32.298 Removal of I-WLAN solution32.298 CR-0492 rev 1 (Rel-12) v12.4.1Source: Ericsson

(Replaces S5-144214)

Decision: The document was left for email approval and agreed .

S5-144215 Rel-12 CR 32.299 Removal of I-WLAN solution32.299 CR-0609 (Rel-12) v12.5.1Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144338 .

S5-144336 LSout from SA5 to CT4 on Completion of AVP code definitionsSource: Nokia Networks

(Replaces S5-144201)

Page 64:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was approved .

S5-144337 Removal of I-WLAN solution32.296 CR-0038 rev 1 (Rel-12) v12.1.1Source: Ericsson

(Replaces S5-144212)

Decision: The document was revised to S5-144525 .

S5-144525 Removal of I-WLAN solution32.296 CR-0038 rev 2 (Rel-12) v12.1.1Source: Ericsson

(Replaces S5-144337)

Decision: The document was left for email approval and agreed .

S5-144338 Rel-12 CR 32.299 Removal of I-WLAN solution32.299 CR-0609 rev 1 (Rel-12) v12.5.1Source: Ericsson

(Replaces S5-144215)

Decision: The document was revised to S5-144526 .

S5-144526 Rel-12 CR 32.299 Removal of I-WLAN solution32.299 CR-0609 rev 2 (Rel-12) v12.5.1Source: Ericsson

(Replaces S5-144338)

Decision: The document was left for email approvaland agreed .

S5-144340 LS on Removal of I-WLAN-specific AVPsSource: Ericsson

Decision: The document was approved .

S5-144342 DP Keywords in Charging TSSource: Nokia Networks

(Replaces S5-144107)

Decision: The document was noted .

S5-144486 CH Executive Report from THIS MeetingSource: CH SWG Chair

(Replaces S5-144011)

Page 65:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was approved .

8.2 New Charging Work Item proposals

S5-144108 New WID Charging aspects of Core Network Overload - User Location Information reporting improvements

Source: Alcatel-Lucent, Ericsson

Abstract:

-

Decision: The document was revised to S5-144352 .

S5-144109 Rel-12 CR 32.251 Introduction of Presence Reporting Areas for Charging32.251 CR-0378 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

Abstract:

-

Decision: The document was revised to S5-144341 .

S5-144110 Rel-12 CR 32.299 Introduction of Presence Reporting Areas for Charging32.299 CR-0596 (Rel-12) v12.5.1Source: Ericsson, Alcatel-Lucent

Abstract:

-

Decision: The document was revised to S5-144343 .

S5-144111 Rel-12 CR 32.298 Introduction of Presence Reporting Areas for Charging32.298 CR-0470 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

Abstract:

-

Decision: The document was revised to S5-144344 .

S5-144253 Discussion on service continuity charging in GCSE_LTESource: ZTE

Abstract:

-

Decision: The document was noted .

Page 66:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144254 Draft New WID on GCSE Service Continuity ChargingSource: ZTE

Abstract:

-

Decision: The document was noted .

S5-144341 Rel-12 CR 32.251 Introduction of Presence Reporting Areas for Charging32.251 CR-0378 rev 1 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

(Replaces S5-144109)

Decision: The document was agreed .

S5-144343 Rel-12 CR 32.299 Introduction of Presence Reporting Areas for Charging32.299 CR-0596 rev 1 (Rel-12) v12.5.1Source: Ericsson, Alcatel-Lucent,Allot

(Replaces S5-144110)

Decision: The document was agreed .

S5-144344 Rel-12 CR 32.298 Introduction of Presence Reporting Areas for Charging32.298 CR-0470 rev 1 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

(Replaces S5-144111)

Decision: The document was agreed .

S5-144352 New WID on Charging aspects of Core Network Overload - User Location Information reporting improvements

Source: Alcatel-Lucent, Ericsson

(Replaces S5-144108)

Decision: The document was agreed .

8.3 Charging Maintenance and Rel-12 small Enhancements

S5-144061 R8 CR 32.275 Removal of CDIVN service32.275 CR-0053 (Rel-8) v8.5.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144362 .

Page 67:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144062 R8 CR 32.298 Removal of CDIVN service32.298 CR-0471 (Rel-8) v8.19.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144363 .

S5-144063 R8 CR 32.299 Removal of CDIVN service32.299 CR-0597 (Rel-8) v8.22.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144364 .

S5-144064 R9 CR 32.275 Removal of CDIVN service32.275 CR-0054 (Rel-9) v9.6.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144365 .

S5-144065 R9 CR 32.298 Removal of CDIVN service32.298 CR-0472 (Rel-9) v9.18.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144383 .

S5-144066 R9 CR 32.299 Removal of CDIVN service32.299 CR-0598 (Rel-9) v9.17.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144384 .

S5-144067 R10 CR 32.275 Removal of CDIVN service32.275 CR-0055 (Rel-10) v10.1.0Source: Nokia Networks

Abstract:

Page 68:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was revised to S5-144385 .

S5-144068 R10 CR 32.298 Removal of CDIVN service32.298 CR-0473 (Rel-10) v10.15.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144386 .

S5-144069 R10 CR 32.299 Removal of CDIVN service32.299 CR-0599 (Rel-10) v10.12.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144387 .

S5-144070 R11 CR 32.275 Removal of CDIVN service32.275 CR-0056 (Rel-11) v11.3.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144388 .

S5-144071 R11 CR 32.298 Removal of CDIVN service32.298 CR-0474 (Rel-11) v11.10.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144389 .

S5-144072 R11 CR 32.299 Removal of CDIVN service32.299 CR-0600 (Rel-11) v11.12.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144391 .

Page 69:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144073 R12 CR 32.298 Removal of CDIVN service32.298 CR-0475 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144392 .

S5-144074 R12 CR 32.299 Removal of CDIVN service32.299 CR-0601 (Rel-12) v11.12.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144393 .

S5-144075 R12 CR 32.298 Correction for expanded ASN.1 sources code generation32.298 CR-0476 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144414 .

S5-144076 R12 CR 32.298 Introduction of ASN.1 Cross-reference listing32.298 CR-0477 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144412 .

S5-144121 Rel-12 CR 32.251 Introduction of report the most up to date User Location Information32.251 CR-0380 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

-

Decision: The document was revised to S5-144415 .

S5-144122 Rel-12 CR 32.298 Introduction of report the most up to date User Location Information32.298 CR-0479 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

Page 70:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was revised to S5-144416 .

S5-144123 Rel-12 CR 32.299 Introduction of report the most up to date User Location Information32.299 v..Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

-

Decision: The document was withdrawn .

S5-144124 Rel-8 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs32.298 CR-0480 (Rel-8) v8.20.0Source: Alcatel-Lucent, Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144394 .

S5-144125 Rel-9 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs32.298 CR-0481 (Rel-9) v9.18.0Source: Alcatel-Lucent, Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144395 .

S5-144126 Rel-10 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

32.298 CR-0482 (Rel-10) v10.15.0Source: Alcatel-Lucent, Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144396 .

S5-144127 Rel-11 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

32.298 CR-0483 (Rel-11) v11.10.0Source: Alcatel-Lucent, Nokia Networks

Abstract:

-

Page 71:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was revised to S5-144397 .

S5-144136 Rel-12 CR 32.240 Editorial corrections on references and definitions32.240 CR-0376 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144417 .

S5-144137 Rel-12 CR 32.250 Editorial corrections on references and definitions32.250 CR-0040 (Rel-12) v12.1.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144418 .

S5-144138 Rel-12 CR 32.251 Editorial corrections on references and definitions32.251 CR-0379 (Rel-12) v12.6.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144419 .

S5-144139 Rel-12 CR 32.260 Editorial corrections on references and definitions32.260 CR-0271 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144420 .

S5-144140 Rel-12 CR 32.270 Editorial corrections on references and definitions32.270 CR-0027 (Rel-12) v11.0.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144421 .

Page 72:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144141 Rel-12 CR 32.271 Editorial corrections on references and definitions32.271 CR-0014 (Rel-12) v11.1.2Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144422 .

S5-144142 Rel-12 CR 32.272 Editorial corrections on references and definitions32.272 CR-0034 (Rel-12) v11.1.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144451 .

S5-144143 Rel-12 CR 32.273 Editorial corrections on references and definitions32.273 CR-0027 (Rel-12) v11.1.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144452 .

S5-144144 Rel-12 CR 32.274 Editorial corrections on references and definitions32.274 CR-0029 (Rel-12) v12.3.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144453 .

S5-144145 Rel-12 CR 32.275 Editorial corrections on references and definitions32.275 CR-0057 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144454 .

S5-144146 Rel-12 CR 32.280 Editorial corrections on references and definitions32.280 CR-0028 (Rel-12) v11.1.1Source: Nokia Networks

Abstract:

Page 73:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was revised to S5-144455 .

S5-144147 Rel-12 CR 32.295 Editorial corrections on references and definitions32.295 CR-0008 (Rel-12) v12.0.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144456 .

S5-144148 Rel-12 CR 32.296 Editorial corrections on references and definitions32.296 CR-0037 (Rel-12) v12.1.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144457 .

S5-144149 Rel-12 CR 32.297 Editorial corrections on references and definitions32.297 CR-0015 (Rel-12) v12.0.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144458 .

S5-144150 Rel-12 CR 32.298 Editorial corrections on references and definitions32.298 CR-0478 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144459 .

S5-144151 Rel-12 CR 32.299 Editorial corrections on references and definitions32.299 CR-0602 (Rel-12) v12.5.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144460 .

Page 74:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144152 R12 CR 32.275 Removal of CDIVN service32.275 CR-0058 (Rel-12) v12.0.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144390 .

S5-144153 Re-8 CR 32.260 Removal of duplicate Requested Action in IMS online charging32.260 CR-0272 (Rel-8) v8.17.0Source: Nokia Networks, Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144154 Re-9 CR 32.260 Removal of duplicate Requested Action in IMS online charging32.260 CR-0273 (Rel-9) v9.15.0Source: Nokia Networks, Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144155 Re-10 CR 32.260 Removal of duplicate Requested Action in IMS online charging32.260 CR-0274 (Rel-10) v10.12.0Source: Nokia Networks, Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144156 Re-11 CR 32.260 Removal of duplicate Requested Action in IMS online charging32.260 CR-0275 (Rel-11) v11.12.0Source: Nokia Networks, Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144157 Re-12 CR 32.260 Removal of duplicate Requested Action in IMS online charging32.260 CR-0276 (Rel-12) v12.4.1Source: Nokia Networks, Ericsson

Abstract:

Page 75:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was agreed .

S5-144158 Rel-11 CR 32.260 Correction on inconsistent defined parameter for NetLoc32.260 CR-0277 (Rel-11) v11.12.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144408 .

S5-144159 Rel-11 CR 32.298 Correction on inconsistent defined parameter for NetLoc32.298 CR-0487 (Rel-11) v11.10.0Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144409 .

S5-144160 Rel-12 CR 32.260 Correction on inconsistent defined parameter for NetLoc32.260 CR-0278 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144410 .

S5-144161 Rel-12 CR 32.298 Correction on inconsistent defined parameter for NetLoc32.298 CR-0488 (Rel-12) v12.4.1Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144411 .

S5-144162 DP Problems with MBMS offline charging specificationSource: Ericsson

Abstract:

-

Decision: The document was noted .

Page 76:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144163 Rel-9 CR 32.273 Corrections for MBMS offline charging using Diameter32.273 CR-0028 (Rel-9) v9.3.0Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144401 .

S5-144164 Rel-10 CR 32.273 Corrections for MBMS offline charging using Diameter32.273 CR-0029 (Rel-10) v10.1.0Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144402 .

S5-144165 Rel-11 CR 32.273 Corrections for MBMS offline charging using Diameter32.273 CR-0030 (Rel-11) v11.1.1Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144403 .

S5-144166 Rel-9 CR 32.299 Correction to define missing AVP for MBMS offline charging32.299 CR-0605 (Rel-9) v9.3.0Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144404 .

S5-144167 Rel-10 CR 32.299 Correction to define missing AVP for MBMS offline charging32.299 CR-0606 (Rel-10) v10.12.0Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144405 .

S5-144168 Rel-11 CR 32.299 Correction to define missing AVP for MBMS offline charging32.299 CR-0607 (Rel-11) v11.12.0Source: Ericsson

Abstract:

Page 77:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was revised to S5-144406 .

S5-144169 Rel-12 CR 32.299 Correction to define missing AVP for MBMS offline charging32.299 CR-0608 (Rel-12) v12.5.1Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144407 .

S5-144171 CR Rel-12 32.251 Complete ePDG offline charging description32.251 CR-0382 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

-

Decision: The document was revised to S5-144461 .

S5-144172 CR Rel-12 32.298 Complete ePDG offline charging description32.298 CR-0486 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

-

Decision: The document was revised to S5-144462 .

S5-144173 CR Rel-12 32.299 Complete ePDG offline charging description32.299 CR-0603 (Rel-12) v12.5.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

-

Decision: The document was revised to S5-144463 .

S5-144206 Rel-12 CR 32.260 Correction of Subscriber Equipment Number and Instance Id for privacy concerns

32.260 CR-0279 (Rel-12) v12.4.1Source: Ericsson

Abstract:

-

Page 78:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was agreed .

S5-144207 Rel-12 CR 32.298 Correction of Subscriber Equipment Number and Instance Id for privacy concerns

32.298 CR-0490 (Rel-12) v12.4.1Source: Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144208 Rel-12 CR 32.251 Minor corrections to CHIPS for clarification32.251 CR-0384 (Rel-12) v12.6.1Source: Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144209 Rel-8 CR 32.298 Correction of ASN.1 tag value for 3GPP2UserLocation - align with Release 932.298 CR-0491 (Rel-8) v8.20.0Source: Ericsson, Alcatel-Lucent

Abstract:

-

Decision: The document was revised to S5-144398 .

S5-144226 Rel-12 CR 32.251 Introduction of Network Release cause to include RAN-NAS Release cause in offline charging

32.251 CR-0385 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

Abstract:

-

Decision: The document was noted .

S5-144227 Rel-12 CR 32.298 Introduction of Network Release cause to include RAN-NAS Release cause in offline charging

32.298 CR-0493 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

Abstract:

-

Page 79:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was noted .

S5-144228 Rel-12 CR 32.299 Introduction of Network Release cause to include RAN-NAS Release cause in offline charging

32.299 CR-0610 (Rel-12) v12.5.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

Abstract:

-

Decision: The document was noted .

S5-144303 Rel-8 CR 32.260 SDP general handling clarification32.260 CR-0280 (Rel-8) v8.17.0Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144304 Rel-9 CR 32.260 SDP general handling clarification32.260 CR-0281 (Rel-9) v9.15.0Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144305 Rel-10 CR 32.260 SDP general handling clarification32.260 CR-0282 (Rel-10) v10.12.0Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144306 Rel-11 CR 32.260 SDP general handling clarification32.260 CR-0283 (Rel-11) v11.12.0Source: Huawei

Abstract:

-

Decision: The document was revised to S5-144399 .

Page 80:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144307 Rel-12 CR 32.260 SDP general handling clarification32.260 CR-0284 (Rel-12) v12.4.1Source: Huawei

Abstract:

-

Decision: The document was revised to S5-144400 .

S5-144308 Rel-8 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR32.260 CR-0285 (Rel-8) v8.17.0Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144309 Rel-9 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR32.260 CR-0286 (Rel-9) v12.4.1Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144310 Rel-10 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR32.260 CR-0287 (Rel-10) v10.12.0Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144311 Rel-11 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR32.260 CR-0288 (Rel-11) v11.12.0Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144312 Rel-12 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR32.260 CR-0289 (Rel-12) v12.4.1Source: Huawei

Abstract:

Page 81:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

-

Decision: The document was noted .

S5-144313 Discussion paper on charging support for PCC rules with application identifierSource: Huawei

Abstract:

-

Decision: The document was noted .

S5-144314 Rel-11 CR 32.251 clarification of charging support for PCC rules with application identifier32.251 CR-0386 (Rel-11) v11.10.0Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144315 Rel-12 CR 32.251 clarification of charging support for PCC rules with application identifier32.251 CR-0387 (Rel-12) v12.6.1Source: Huawei

Abstract:

-

Decision: The document was noted .

S5-144316 Discussion paper on QoS information description in GyGz per IP-CAN sessionSource: Huawei

Abstract:

-

Decision: The document was noted .

S5-144362 R8 CR 32.275 Removal of CDIVN service32.275 CR-0053 rev 1 (Rel-8) v8.5.0Source: Nokia Networks

(Replaces S5-144061)

Decision: The document was agreed .

S5-144363 R8 CR 32.298 Removal of CDIVN service32.298 CR-0471 rev 1 (Rel-8) v8.19.1Source: Nokia Networks

Page 82:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

(Replaces S5-144062)

Decision: The document was agreed .

S5-144364 R8 CR 32.299 Removal of CDIVN service32.299 CR-0597 rev 1 (Rel-8) v8.22.0Source: Nokia Networks

(Replaces S5-144063)

Decision: The document was agreed .

S5-144365 R9 CR 32.275 Removal of CDIVN service32.275 CR-0054 rev 1 (Rel-9) v9.6.0Source: Nokia Networks

(Replaces S5-144064)

Decision: The document was agreed .

S5-144383 R9 CR 32.298 Removal of CDIVN service32.298 CR-0472 rev 1 (Rel-9) v9.18.0Source: Nokia Networks

(Replaces S5-144065)

Decision: The document was agreed .

S5-144384 R9 CR 32.299 Removal of CDIVN service32.299 CR-0598 rev 1 (Rel-9) v9.17.0Source: Nokia Networks

(Replaces S5-144066)

Decision: The document was agreed .

S5-144385 R10 CR 32.275 Removal of CDIVN service32.275 CR-0055 rev 1 (Rel-10) v10.1.0Source: Nokia Networks

(Replaces S5-144067)

Decision: The document was agreed .

S5-144386 R10 CR 32.298 Removal of CDIVN service32.298 CR-0473 rev 1 (Rel-10) v10.15.0Source: Nokia Networks

(Replaces S5-144068)

Page 83:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was agreed .

S5-144387 R10 CR 32.299 Removal of CDIVN service32.299 CR-0599 rev 1 (Rel-10) v10.12.0Source: Nokia Networks

(Replaces S5-144069)

Decision: The document was agreed .

S5-144388 R11 CR 32.275 Removal of CDIVN service32.275 CR-0056 rev 1 (Rel-11) v11.3.0Source: Nokia Networks

(Replaces S5-144070)

Decision: The document was agreed .

S5-144389 R11 CR 32.298 Removal of CDIVN service32.298 CR-0474 rev 1 (Rel-11) v11.10.0Source: Nokia Networks

(Replaces S5-144071)

Decision: The document was agreed .

S5-144390 R12 CR 32.275 Removal of CDIVN service32.275 CR-0058 rev 1 (Rel-12) v12.0.1Source: Nokia Networks

(Replaces S5-144152)

Decision: The document was agreed .

S5-144391 R11 CR 32.299 Removal of CDIVN service32.299 CR-0600 rev 1 (Rel-11) v11.12.0Source: Nokia Networks

(Replaces S5-144072)

Decision: The document was agreed .

S5-144392 R12 CR 32.298 Removal of CDIVN service32.298 CR-0475 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144073)

Decision: The document was agreed .

Page 84:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144393 R12 CR 32.299 Removal of CDIVN service32.299 CR-0601 rev 1 (Rel-12) v11.12.0Source: Nokia Networks

(Replaces S5-144074)

Decision: The document was agreed .

S5-144394 Rel-8 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs32.298 CR-0480 rev 1 (Rel-8) v8.20.0Source: Alcatel-Lucent, Nokia Networks

(Replaces S5-144124)

Decision: The document was agreed .

S5-144395 Rel-9 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs32.298 CR-0481 rev 1 (Rel-9) v9.18.0Source: Alcatel-Lucent, Nokia Networks

(Replaces S5-144125)

Decision: The document was agreed .

S5-144396 Rel-10 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

32.298 CR-0482 rev 1 (Rel-10) v10.15.0Source: Alcatel-Lucent, Nokia Networks

(Replaces S5-144126)

Decision: The document was agreed .

S5-144397 Rel-11 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

32.298 CR-0483 rev 1 (Rel-11) v11.10.0Source: Alcatel-Lucent, Nokia Networks

(Replaces S5-144127)

Decision: The document was agreed .

S5-144398 Rel-8 CR 32.298 Correction of ASN.1 tag value for 3GPP2UserLocation - align with Release 932.298 CR-0491 rev 1 (Rel-8) v8.20.0Source: Ericsson, Alcatel-Lucent

(Replaces S5-144209)

Decision: The document was agreed .

Page 85:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144399 Rel-11 CR 32.260 SDP general handling clarification32.260 CR-0283 rev 1 (Rel-11) v11.12.0Source: Huawei

(Replaces S5-144306)

Decision: The document was agreed .

S5-144400 Rel-12 CR 32.260 SDP general handling clarification32.260 CR-0284 rev 1 (Rel-12) v12.4.1Source: Huawei

(Replaces S5-144307)

Decision: The document was agreed .

S5-144401 Rel-9 CR 32.273 Corrections for MBMS offline charging using Diameter32.273 CR-0028 rev 1 (Rel-9) v9.3.0Source: Ericsson

(Replaces S5-144163)

Decision: The document was agreed .

S5-144402 Rel-10 CR 32.273 Corrections for MBMS offline charging using Diameter32.273 CR-0029 rev 1 (Rel-10) v10.1.0Source: Ericsson

(Replaces S5-144164)

Decision: The document was agreed .

S5-144403 Rel-11 CR 32.273 Corrections for MBMS offline charging using Diameter32.273 CR-0030 rev 1 (Rel-11) v11.1.1Source: Ericsson

(Replaces S5-144165)

Decision: The document was agreed .

S5-144404 Rel-9 CR 32.299 Correction to define missing AVP for MBMS offline charging32.299 CR-0605 rev 1 (Rel-9) v9.3.0Source: Ericsson

(Replaces S5-144166)

Decision: The document was agreed .

S5-144405 Rel-10 CR 32.299 Correction to define missing AVP for MBMS offline charging32.299 CR-0606 rev 1 (Rel-10) v10.12.0Source: Ericsson

Page 86:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

(Replaces S5-144167)

Decision: The document was agreed .

S5-144406 Rel-11 CR 32.299 Correction to define missing AVP for MBMS offline charging32.299 CR-0607 rev 1 (Rel-11) v11.12.0Source: Ericsson

(Replaces S5-144168)

Decision: The document was agreed .

S5-144407 Rel-12 CR 32.299 Correction to define missing AVP for MBMS offline charging32.299 CR-0608 rev 1 (Rel-12) v12.5.1Source: Ericsson

(Replaces S5-144169)

Decision: The document was agreed .

S5-144408 Rel-11 CR 32.260 Correction on inconsistent defined parameter for NetLoc32.260 CR-0277 rev 1 (Rel-11) v11.12.0Source: Nokia Networks

(Replaces S5-144158)

Decision: The document was agreed .

S5-144409 Rel-11 CR 32.298 Correction on inconsistent defined parameter for NetLoc32.298 CR-0487 rev 1 (Rel-11) v11.10.0Source: Nokia Networks

(Replaces S5-144159)

Decision: The document was agreed .

S5-144410 Rel-12 CR 32.260 Correction on inconsistent defined parameter for NetLoc32.260 CR-0278 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144160)

Decision: The document was agreed .

S5-144411 Rel-12 CR 32.298 Correction on inconsistent defined parameter for NetLoc32.298 CR-0488 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144161)

Page 87:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was agreed .

S5-144412 R12 CR 32.298 Introduction of ASN.1 Cross-reference listing32.298 CR-0477 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144076)

Decision: The document was agreed .

S5-144413 Rel-11 CR 32.298 Correction for expanded ASN.1 sources code generation32.298 CR-0494 (Rel-11) v11.10.0Source: Nokia Networks

Decision: The document was agreed .

S5-144414 R12 CR 32.298 Correction for expanded ASN.1 sources code generation32.298 CR-0476 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144075)

Decision: The document was agreed .

S5-144415 Rel-12 CR 32.251 Introduction of report the most up to date User Location Information32.251 CR-0380 rev 1 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

(Replaces S5-144121)

Decision: The document was agreed .

S5-144416 Rel-12 CR 32.298 Introduction of report the most up to date User Location Information32.298 CR-0479 rev 1 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

(Replaces S5-144122)

Decision: The document was agreed .

S5-144417 Rel-12 CR 32.240 Corrections for alignment between charging specifications32.240 CR-0376 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144136)

Decision: The document was agreed .

Page 88:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144418 Rel-12 CR 32.250 Corrections for alignment between charging specifications32.250 CR-0040 rev 1 (Rel-12) v12.1.1Source: Nokia Networks

(Replaces S5-144137)

Decision: The document was agreed .

S5-144419 Rel-12 CR 32.251 Corrections for alignment between charging specifications32.251 CR-0379 rev 1 (Rel-12) v12.6.1Source: Nokia Networks

(Replaces S5-144138)

Decision: The document was agreed .

S5-144420 Rel-12 CR 32.260 ECorrections for alignment between charging specifications32.260 CR-0271 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144139)

Decision: The document was agreed .

S5-144421 Rel-12 CR 32.270 Corrections for alignment between charging specifications32.270 CR-0027 rev 1 (Rel-12) v11.0.1Source: Nokia Networks

(Replaces S5-144140)

Decision: The document was agreed .

S5-144422 Rel-12 CR 32.271 Corrections for alignment between charging specifications32.271 CR-0014 rev 1 (Rel-12) v11.1.2Source: Nokia Networks

(Replaces S5-144141)

Decision: The document was agreed .

S5-144451 Rel-12 CR 32.272 Corrections for alignment between charging specifications32.272 CR-0034 rev 1 (Rel-12) v11.1.1Source: Nokia Networks

(Replaces S5-144142)

Decision: The document was agreed .

S5-144452 Rel-12 CR 32.273 Corrections for alignment between charging specifications32.273 CR-0027 rev 1 (Rel-12) v11.1.1Source: Nokia Networks

Page 89:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

(Replaces S5-144143)

Decision: The document was agreed .

S5-144453 Rel-12 CR 32.274 Corrections for alignment between charging specifications32.274 CR-0029 rev 1 (Rel-12) v12.3.1Source: Nokia Networks

(Replaces S5-144144)

Decision: The document was agreed .

S5-144454 Rel-12 CR 32.275 Corrections for alignment between charging specifications32.275 CR-0057 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144145)

Decision: The document was agreed .

S5-144455 Rel-12 CR 32.280 Corrections for alignment between charging specifications32.280 CR-0028 rev 1 (Rel-12) v11.1.1Source: Nokia Networks

(Replaces S5-144146)

Decision: The document was agreed .

S5-144456 Rel-12 CR 32.295 Corrections for alignment between charging specifications32.295 CR-0008 rev 1 (Rel-12) v12.0.1Source: Nokia Networks

(Replaces S5-144147)

Decision: The document was agreed .

S5-144457 Rel-12 CR 32.296 Corrections for alignment between charging specifications32.296 CR-0037 rev 1 (Rel-12) v12.1.1Source: Nokia Networks

(Replaces S5-144148)

Decision: The document was agreed .

S5-144458 Rel-12 CR 32.297 Corrections for alignment between charging specifications32.297 CR-0015 rev 1 (Rel-12) v12.0.1Source: Nokia Networks

(Replaces S5-144149)

Page 90:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was agreed .

S5-144459 Rel-12 CR 32.298 Corrections for alignment between charging specifications32.298 CR-0478 rev 1 (Rel-12) v12.4.1Source: Nokia Networks

(Replaces S5-144150)

Decision: The document was agreed .

S5-144460 Rel-12 CR 32.299 Corrections for alignment between charging specifications32.299 CR-0602 rev 1 (Rel-12) v12.5.1Source: Nokia Networks

(Replaces S5-144151)

Decision: The document was agreed .

S5-144461 CR Rel-12 32.251 Complete ePDG offline charging description32.251 CR-0382 rev 1 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

(Replaces S5-144171)

Decision: The document was agreed .

S5-144462 CR Rel-12 32.298 Complete ePDG offline charging description32.298 CR-0486 rev 1 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

(Replaces S5-144172)

Decision: The document was agreed .

S5-144463 CR Rel-12 32.299 Complete ePDG offline charging description32.299 CR-0603 rev 1 (Rel-12) v12.5.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

(Replaces S5-144173)

Decision: The document was agreed .

Page 91:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

8.4 BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO (Non Seamless WLAN Offload) traffic from 3GPP UEs in fixed broadband access networks

8.4.1 Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks

S5-144128 Rel-12 CR 32.251 Introduce Charging Characteristics in Convergent scenario32.251 CR-0381 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

-

Decision: The document was revised to S5-144345 .

S5-144129 Rel-12 CR 32.298 Introduce Charging Characteristics in Convergent scenario32.298 CR-0484 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

-

Decision: The document was revised to S5-144346 .

S5-144170 Rel-12 CR 32.298 Introduce Traffic Data Volumes in IPE-CDR32.298 CR-0485 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

Abstract:

-

Decision: The document was agreed .

S5-144203 Rel-12 CR 32.251 Corrections to include missing fixed user location information for NSWO32.251 CR-0383 (Rel-12) v12.6.1Source: Ericsson

Abstract:

-

Decision: The document was revised to S5-144347 .

S5-144204 Rel-12 CR 32.298 Corrections to include missing fixed user location information for NSWO32.298 CR-0489 (Rel-12) v..Source: Ericsson

Abstract:

-

Page 92:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was revised to S5-144327 .

S5-144205 Rel-12 CR 32.299 Corrections to include missing fixed user location information for NSWO32.299 CR-0604 (Rel-12) v12.5.1Source: Ericsson

Abstract:

-

Decision: The document was agreed .

S5-144327 Rel-12 CR 32.298 Corrections to include missing fixed user location information for NSWO32.298 CR-0489 rev 1 (Rel-12) v12.4.1Source: Ericsson

(Replaces S5-144327)

Abstract:

-

Decision: The document was revised to S5-144348 .

S5-144345 Rel-12 CR 32.251 Introduce Charging Characteristics in Convergent scenario32.251 CR-0381 rev 1 (Rel-12) v12.6.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

(Replaces S5-144128)

Decision: The document was agreed .

S5-144346 Rel-12 CR 32.298 Introduce Charging Characteristics in Convergent scenario32.298 CR-0484 rev 1 (Rel-12) v12.4.1Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

(Replaces S5-144129)

Decision: The document was agreed .

S5-144347 Rel-12 CR 32.251 Corrections to include missing fixed user location information for NSWO32.251 CR-0383 rev 1 (Rel-12) v12.6.1Source: Ericsson,Allot

(Replaces S5-144203)

Decision: The document was agreed .

S5-144348 Rel-12 CR 32.298 Corrections to include missing fixed user location information for NSWO32.298 CR-0489 rev 1 (Rel-12) v12.4.1Source: Ericsson,Allot

(Replaces S5-144327)

Page 93:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was agreed .

8.5 Charging Aspects of Proximity-based Services

8.5.1 TR on Charging support for ProSe one-to-many Direct Communication for Public Safety use

S5-144233 Reply LS on ProSe Lawful InterceptionTR 32.844 v..Source: Qualcomm Incorporated

Abstract:

This is the LS response to CT6 LS S5-144091/C6-140315 on ProSe Lawful Interception.

Decision: The document was revised to S5-144353 .

S5-144234 pCR to TR 32.844 on Charing Architecture for ProSe Direct Communication - Revision output of SA#95bis

TR 32.844 v..Source: Qualcomm Incorporated

Abstract:

Capture the text for the charging architecture for ProSe Direct Communication into the TR 32.844 on ProSe Direct Communication Charging support.

Decision: The document was withdrawn .

S5-144235 pCR to TR 32.844 on Charing Architecture for ProSe Direct Communication - Revision output of SA#95bis

TR 32.844 v..Source: Qualcomm Incorporated

Abstract:

Capture the text for the charging architecture for ProSe Direct Communication into the TR 32.844 on ProSe Direct Communication Charging support.

Decision: The document was revised to S5-144354 .

S5-144236 pCR to TR 32.844 on Scenarios for ProSe Direct Communication - Revision output of SA5#95bis

TR 32.844 v..Source: Qualcomm Incorporated

Abstract:

Capture the text for the charging operation and scenarios for ProSe Direct Communication into the TR 32.844 on ProSe Direct Communication Charging support.

Decision: The document was approved .

Page 94:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144302 pCR to TR 32.844 on usage information for reportingTR 32.844 v..Source: Qualcomm Incorporated

Abstract:

This contribution presented the information that should be included in the usage information reporting, and addressed a few issues that is related to the usage information reporting.

Decision: The document was withdrawn .

S5-144332 pCR to TR 32.844 on ReferencesTR 32.844 v..Source: Nokia Networks

Abstract:

-

Decision: The document was revised to S5-144356 .

S5-144333 pCR to TR 32.844 on usage information for reporting - revision output from SA5#95bisTR 32.844 v..Source: Qualcomm Incorporated

Abstract:

This is the revision of SA5#95bis output S5c-140058.

Decision: The document was revised to S5-144355 .

S5-144334 Presentation of Specification to TSG for TR 32.844TR 32.844 v..Source: Rapporteur

Abstract:

Cover sheet for presenting TR 32.844 to TSG SA for information.

Decision: The document was revised to S5-144357 .

S5-144351 LS to CT1 on ProSe Direct Communication charging supportSource: Qualcomm Incorporated

Decision: The document was revised to S5-144466 .

S5-144353 Reply to Ls from CT6 to SA5 on ProSe Lawful InterceptionSource: Qualcomm Incorporated

(Replaces S5-144233)

Decision: The document was approved .

Page 95:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144354 pCR to TR 32.844 on Charing Architecture for ProSe Direct Communication - Revision output of SA#95bis

Source: Qualcomm Incorporated

(Replaces S5-144235)

Decision: The document was approved .

S5-144355 pCR to TR 32.844 on usage information for reporting - revision output from SA5#95bisSource: Qualcomm Incorporated

(Replaces S5-144333)

Decision: The document was approved .

S5-144356 pCR to TR 32.844 on ReferencesSource: Nokia Networks

(Replaces S5-144332)

Decision: The document was approved .

S5-144357 Presentation of Specification to TSG for TR 32.844Source: Rapporteur

(Replaces S5-144334)

Decision: The document was approved .

S5-144358 TR 32.844Source: Rapporteur

Decision: The document was left for email approval and approved .

S5-144466 LS to CT1 on ProSe Direct Communication charging supportSource: Qualcomm Incorporated

(Replaces S5-144351)

Decision: The document was left for email approval and approved .

8.5.2 Specification of Charging Aspects of Proximity-based Services

S5-144130 Rel-12 PCR 32.277 Correction of architecture figures - align with TS 23.30332.277 v..Source: Ericsson

Abstract:

-

Page 96:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was approved .

S5-144131 Rel-12 pCR TS 32.277 Refinement on requirements - revision from SA5#95bisSource: Alcatel-Lucent

Abstract:

-

Decision: The document was approved .

S5-144132 Rel-12 pCR TS 32.277 Online Charging Architecture for ProSe Discovery - revision from SA5#95bis

Source: Alcatel-Lucent

Abstract:

-

Decision: The document was approved .

S5-144133 Rel-12 pCR TS 32.277 Online Charging Monitor request scenario - revision from SA5#95bisSource: Alcatel-Lucent

Abstract:

-

Decision: The document was approved .

S5-144230 Rel-12 pCR 32277 Proposed Rf message content and CDR field of discovery- revision from SA5#95bis

Source: Huawei

Abstract:

-

Decision: The document was revised to S5-144359 .

S5-144232 Rel-12 SA5 Work Item Exception for WI ProSe-CHSource: Rapporteur

Abstract:

This is the exception sheet for the Rel-12 WI ProSe-CH.

Decision: The document was revised to S5-144361 .

S5-144241 pCR to TS 32.277 on ProSe EPC-level discovery offline charging principle and message flows - Revision output of SA5#95bis

TS 32.277 v..Source: Qualcomm Incorporated

Page 97:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

This contribution proposed the text for the ProSe EPC-level Discovery offline charging principle and message flows to the TS 32.277.

Decision: The document was approved .

S5-144242 pCR to TS 32.277 on ProSe online charging principle and message flows - Revision output of SA5#95bis

TS 32.277 v..Source: Qualcomm Incorporated

Abstract:

This contribution proposed the text for the ProSe online charging scenarios to the TS 32.277 on ProSe Charging.

Decision: The document was withdrawn .

S5-144256 pCR to TS32.277 on ProSe Direct Discovery Offline Charging principle and message flows - Revision output of SA5#95bis

Source: ZTE

Abstract:

-

Decision: The document was approved .

S5-144257 pCR to TS32.277 on Prose Direct Discovery Online Charging IEC Message flow - Revision output of SA5#95bis

Source: ZTE

Abstract:

-

Decision: The document was approved .

S5-144335 Presentation of Specification to TSG for TS 32.277TS 32.277 v..Source: Rapporteur

Abstract:

Coversheet for presentation of TS 32.277 to TSG SA for information.

Decision: The document was revised to S5-144360 .

S5-144339 pCR to TR 32.277 on ReferencesSource: Nokia Networks

Decision: The document was agreed .

Page 98:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144359 Rel-12 pCR 32277 Proposed Rf message content and CDR field of discovery- revision from SA5#95bis

Source: Huawei

(Replaces S5-144230)

Decision: The document was approved .

S5-144360 Presentation of Specification to TSG for TS 32.277Source: Rapporteur

(Replaces S5-144335)

Decision: The document was approved .

S5-144361 Rel-12 SA5 Work Item Exception for WI ProSe-CHSource: Rapporteur

(Replaces S5-144232)

Decision: The document was revised to S5-144468 .

S5-144468 Rel-12 SA5 Work Item Exception for WI ProSe-CHSource: Rapporteur

(Replaces S5-144361)

Decision: The document was left for email approval and approved .

S5-144470 draft TS 32.27732.277 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

8.6 Inter-PLMN PS domain online charging

8.6.1 TR on Inter-PLMN PS domain online charging

S5-144229 Rel-12 pCR TR 32.843 scenario A: IMS conversational video service over LTESource: Alcatel-Lucent

Abstract:

-

Decision: The document was revised to S5-144465 .

S5-144231 Rel-13 pCR TR 32.843 Study on Inter-PLMN PS domain online charging - ArchitecturesSource: Alcatel-Lucent

Page 99:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Abstract:

-

Decision: The document was revised to S5-144464 .

S5-144464 Rel-13 pCR TR 32.843 Study on Inter-PLMN PS domain online charging - ArchitecturesSource: Alcatel-Lucent

(Replaces S5-144231)

Decision: The document was approved .

S5-144465 Rel-12 pCR TR 32.843 scenario A: IMS conversational video service over LTESource: Alcatel-Lucent

(Replaces S5-144229)

Decision: The document was approved .

S5-144485 draft TR 32.843Source: Rapporteur

Decision: The document was left for email approval and approved .

8.6.2 Specification of Inter-PLMN PS domain online charging

8.7 Charging Studies

8.7.1 Study on Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks

S5-144285 Rel-12 PCR 32.849 Key issue: Unnecessary correlation of CDRs when loopback is not active32.849 v..Source: Deutsche Telekom, Ericsson

Abstract:

-

Decision: The document was revised to S5-144349 .

S5-144286 Rel-12 PCR 32.849 Key issue: Identification of home network32.849 v..Source: Deutsche Telekom, Ericsson

Abstract:

-

Page 100:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Decision: The document was revised to S5-144350 .

S5-144349 Rel-12 PCR 32.849 Key issue: Unnecessary correlation of CDRs when loopback is not activeSource: Deutsche Telekom, Ericsson

(Replaces S5-144285)

Decision: The document was agreed .

S5-144350 Rel-12 PCR 32.849 Key issue: Identification of home networkSource: Deutsche Telekom, Ericsson

(Replaces S5-144286)

Decision: The document was approved .

S5-144484 draft TR 32.84932.849 v..Source: Rapporteur

Decision: The document was left for email approval and approved .

9 Any Other Business

10 Closing of the meeting

Report prepared by: Mirko Cano Soveri

Page 101:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Annex A: List of contribution documents

Page 102:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Document Title Source Decision Replaces Replaced by

S5-144000

Agenda WG Chairman approved - -

S5-144001

Report from last SA5 meeting ETSI Secretariat approved - -

S5-144002

SA5 status report at last SA meeting WG Chairman noted - -

S5-144003

SA5 results at last SA meeting WG Chairman noted - -

S5-144004

Time Plan for OAM&P and Converged Management SWGs

WG Chairman revised - S5-144366

S5-144005

OAM Executive Report from THIS Meeting

OAM SWG Chair revised - S5-144489

S5-144006

Converged Management Executive report from THIS meeting

Converged Management SWG Chair

revised - S5-144491

S5-144007

Leaders meeting agenda WG Chairman approved - -

S5-144008

Leaders meeting minutes WG Chairman noted - -

S5-144009

CH Agenda and Time Plan CH SWG Chair approved - -

S5-144010

CH Detailed Report from LAST Meeting CH SWG Chair approved - -

S5-144011

CH Executive Report from THIS Meeting

CH SWG Chair revised - S5-144486

S5-144012

CH Detailed Report from THIS Meeting CH SWG Chair [not addressed]

- -

S5-144013

SA5 Meeting Calendar WG Chairman noted - -

S5-144014

SA5 Working Procedures WG Chairman noted - -

S5-144015

SA5 Meeting Facility Requirements WG Chairman noted - -

S5-144016

Process for management of draft TSs/TRs

WG ViceChair approved - -

S5-144017

CR Quality Check ETSI Secretariat noted - -

S5-144018

Deliverables due for the NEXT SA Plenary

ETSI Secretariat noted - -

S5-144019

Rel-13 SA5 WIDs WG Chairman noted - -

S5-144020

SA5 3GPP Work Plan ETSI Secretariat noted - -

S5-144021

Minutes of OAM&P Plenary Rapporteur withdrawn - -

S5-144022

Minutes of New Work Item proposals - OAM&P & Converged Management

Rapporteur withdrawn - -

S5-144023

Minutes of Maintenance and Rel-12 small Enhancements - OAM&P & Converged Management

MCC noted - -

S5-144024

Minutes of Converged Management Plenary

CMAN SWG Chair noted - -

S5-144025

Minutes for Network Management for 3GPP Interworking WLAN - PM part

Rapporteur withdrawn - -

S5-144026

Minutes for Energy Efficiency related Performance Measurements

Rapporteur noted - -

S5-144027

Minutes for Study on Enhanced NM Centralised Coverage and Capacity Optimisation

Rapporteur noted - -

S5-144028

Minutes for Radio Planning Tool Interface

Rapporteur noted - -

S5-144029

Minutes for OAM&P 12 WLAN Management

Rapporteur noted - -

S5-144030

Minutes for Study on Network Management of Virtualized Networks

Rapporteur noted - -

Page 103:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144031

Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function

Rapporteur revised - S5-144516

S5-144032

Minutes for compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations

Rapporteur noted - -

S5-144033

Minutes for Enhanced Network Management (NM) centralized Coverage and Capacity Optimization

Rapporteur withdrawn - -

S5-144034

Minutes for Converged Management Model alignment Phase 2

Rapporteur noted - -

S5-144035

Minutes for Converged Management PM Interface definitions

Rapporteur withdrawn - -

S5-144036

Minutes for Study on Application and Partitioning of Itf-N

Rapporteur noted - -

S5-144037

Minutes for Alarm Quality Improvements

Rapporteur noted - -

S5-144038

Minutes for TR on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

Rapporteur noted - -

S5-144039

IPR declaration WG Chairman noted - -

S5-144040

Work plan status after SA5#96 WG Chairman withdrawn - -

S5-144041

Rel-11 CR on 32156 b10 re MSDO deliverable

Ericsson revised - S5-144504

S5-144042

Rel-11 CR on 32153 b00 name space URI convention

Ericsson agreed - -

S5-144043

Rel-11 CR on 28652-b30 Use standard template

Ericsson noted - -

S5-144044

pCR on draft TS 28.667-020 RPT NRM IRP Req re Use Case

Ericsson withdrawn - -

S5-144045

pCR on draft TR 32.860-040 D-SON re long optimization cycle

Ericsson noted - -

S5-144046

Analysis of RAN3 and RAN2 answers to SA5 LS S5-143421

Orange, Deutsche Telekom

noted - -

S5-144047

Rel-12 SA5 Work Item Exception for WI OAM aspects of network sharing

Rapporteur revised - S5-144378

S5-144048

Rel-11 P-CR 28.671-b00 MCC (az/QC) noted - -

S5-144049

Rel-11 P-CR 28.672-b00 MCC (az/QC) noted - -

S5-144050

Rel-11 P-CR 28.673-b00 MCC (az/QC) noted - -

S5-144051

Multi-SDO Model Alignment JWG output: Model Repertoire V5.3

WG Chairman noted - -

S5-144052

Multi-SDO Model Alignment JWG output: Umbrella Operation Model (UOM) V5.2

WG Chairman noted - -

S5-144053

Rel-12 SA5 WIDs WG Chairman noted - -

S5-144054

Minutes for OAM&P 12 Network Sharing

Rapporteur noted - -

S5-144055

Revised WID Study on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

Huawei revised - S5-144381

S5-144056

pCR TR 32.130 Business-level and specification-level requirements, use cases

Orange, Deutsche Telekom

revised - S5-144373

S5-144057

pCR TR 32.130 Business-level requirements for Trace / MDT

Orange, Deutsche Telekom

revised - S5-144374

S5-144058

Super CR 28657 - Add requirement for the management of shared E-UTRAN

Orange approved - -

S5-144059

Super CR 28658-b40 - Introduce new attribute

Orange noted - -

S5-144060

Super CR 28659-b40 - Introduce new attribute

Orange noted - -

Page 104:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144061

R8 CR 32.275 Removal of CDIVN service

Nokia Networks revised - S5-144362

S5-144062

R8 CR 32.298 Removal of CDIVN service

Nokia Networks revised - S5-144363

S5-144063

R8 CR 32.299 Removal of CDIVN service

Nokia Networks revised - S5-144364

S5-144064

R9 CR 32.275 Removal of CDIVN service

Nokia Networks revised - S5-144365

S5-144065

R9 CR 32.298 Removal of CDIVN service

Nokia Networks revised - S5-144383

S5-144066

R9 CR 32.299 Removal of CDIVN service

Nokia Networks revised - S5-144384

S5-144067

R10 CR 32.275 Removal of CDIVN service

Nokia Networks revised - S5-144385

S5-144068

R10 CR 32.298 Removal of CDIVN service

Nokia Networks revised - S5-144386

S5-144069

R10 CR 32.299 Removal of CDIVN service

Nokia Networks revised - S5-144387

S5-144070

R11 CR 32.275 Removal of CDIVN service

Nokia Networks revised - S5-144388

S5-144071

R11 CR 32.298 Removal of CDIVN service

Nokia Networks revised - S5-144389

S5-144072

R11 CR 32.299 Removal of CDIVN service

Nokia Networks revised - S5-144391

S5-144073

R12 CR 32.298 Removal of CDIVN service

Nokia Networks revised - S5-144392

S5-144074

R12 CR 32.299 Removal of CDIVN service

Nokia Networks revised - S5-144393

S5-144075

R12 CR 32.298 Correction for expanded ASN.1 sources code generation

Nokia Networks revised - S5-144414

S5-144076

R12 CR 32.298 Introduction of ASN.1 Cross-reference listing

Nokia Networks revised - S5-144412

S5-144077

Super CR 28621 Add support for network sharing

Orange noted - -

S5-144078

Super CR 28623 Add new attribute for network sharing

Orange noted - -

S5-144079

Super CR 28623 Add new attribute for network sharing

Orange noted - -

S5-144080

Alignment of titles and legal values between TR 32.837 and TR 32.838

Huawei approved - -

S5-144081

Super CR 28651 Add support for network sharing

Orange approved - -

S5-144082

Super CR 28652 Add new attribute for network sharing

Orange revised - S5-144375

S5-144083

Super CR 28653 Add new attribute for network sharing

Orange revised - S5-144376

S5-144084

Rel-11 CR 28.655 Geo-coordinates Orange noted - -

S5-144085

Meeting report from Industry Forum Workshop on Autonomic Management & Control (AMC) of Networks and Services, SDN, and NFV

WG Chairman noted - -

S5-144086

Presentations from Industry Forum Workshop on Autonomic Management & Control (AMC) of Networks and Services, SDN, and NFV

WG Chairman noted - -

S5-144087

Rel-12 CR 32.101 Include the Network Management Layer Service (NMLS) in the Management Reference Model

MCC agreed - -

S5-144088

Rel-11 CR 32.101 Removal of the Network Management Layer Service (NMLS) in the Management Reference Model

MCC agreed - -

S5-144089

LS from CT4 to SA5 on Renaming of TWAN-SSID and TWAN-BSSID Diameter AVPs

C4-141030 noted - -

Page 105:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144090

Reply to LS on Maintenance of I-WLAN Solution (SP-140089 /C6-140255)

C6-140294 noted - -

S5-144091

Ls from CT6 to SA5 on ProSe Lawful Interception

C6-140315 replied to - -

S5-144092

LS from CT cc SA5 on Maintenance of I-WLAN Solution

CP-140457 noted - -

S5-144093

Resubmitted LS from ETSI TC EE to SA5 on Update on the liaison to 3GPP on Cooperation for Energy Efficiency Measurements

ETSI TC EE postponed - -

S5-144094

LS from OMA ARC to SA5 on OMA activities on NetAPIs and Service Exposure Framework

OMA-ARC noted - -

S5-144095

LS from RAN1 cc SA5 on radio interface based synchronization

R1-142762 noted - -

S5-144096

LS from RAN2 to SA5 on MBSFN MDT R2-142873 postponed - -

S5-144097

LS from RAN2 to SA5 on Clarifications about MOCN and GWCN

R2-142939 noted - -

S5-144098

LS from RAN3 to SA5 on on clarifications about MOCN and GWCN

R3-141523 noted - -

S5-144099

LS from SA1 to SA5 on Removal of option to subscribe for a notification of diversion occurrence

S1-141382 noted - -

S5-144100

Resubmitted LS from SA2 to SA5 on Charging aspects for Network Sharing (MOCN GWCN)

S2-141509 postponed - -

S5-144101

LS from SA2 cc SA5 on Maintenance of I-WLAN specification

S2-142202 noted - -

S5-144102

LS from SA3 cc SA5 on Maintenance of I-WLAN Solution

S3-140920 noted - -

S5-144103

LS from SA to SA5 on Maintenance of I-WLAN Solution

SP-140397 replied to - -

S5-144104

LS from SA cc SA5 on SDN standardization activity map

SP-140399 noted - -

S5-144105

LS from CT4 to SA5 on Discontinuance of 29.234

C4-141672 noted - -

S5-144106

Process for quality improvement of SA5 TSs

WG Chairman noted - -

S5-144107

DP Keywords in Charging TS Nokia Networks revised - S5-144342

S5-144108

New WID Charging aspects of Core Network Overload - User Location Information reporting improvements

Alcatel-Lucent, Ericsson

revised - S5-144352

S5-144109

Rel-12 CR 32.251 Introduction of Presence Reporting Areas for Charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

revised - S5-144341

S5-144110

Rel-12 CR 32.299 Introduction of Presence Reporting Areas for Charging

Ericsson, Alcatel-Lucent

revised - S5-144343

S5-144111

Rel-12 CR 32.298 Introduction of Presence Reporting Areas for Charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

revised - S5-144344

S5-144112

Rel-11 CR 32.423 Adding abbreviation for Angle of Arrival

CATT noted - -

S5-144113

Rel-11 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT

CATT revised - S5-144367

S5-144114

Rel-12 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT

CATT revised - S5-144368

S5-144115

Discussion about the roll of network management blocks

KDDI withdrawn - -

S5-144116

the Skeleton of Management of Virtualized Network

Rapporteur revised - S5-144482

S5- DP Presence Reporting Areas for Ericsson noted - -

Page 106:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144117 ChargingS5-144118

The scope of TR 32.842 Rapporteur revised - S5-144483

S5-144119

Rel-13 pCR 32.842 Alarm correlation KDDI withdrawn - -

S5-144120

List of specifications that need upgrade ETSI Secretariat revised - S5-144439

S5-144121

Rel-12 CR 32.251 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

revised - S5-144415

S5-144122

Rel-12 CR 32.298 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

revised - S5-144416

S5-144123

Rel-12 CR 32.299 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

withdrawn - -

S5-144124

Rel-8 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

revised - S5-144394

S5-144125

Rel-9 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

revised - S5-144395

S5-144126

Rel-10 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

revised - S5-144396

S5-144127

Rel-11 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

revised - S5-144397

S5-144128

Rel-12 CR 32.251 Introduce Charging Characteristics in Convergent scenario

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

revised - S5-144345

S5-144129

Rel-12 CR 32.298 Introduce Charging Characteristics in Convergent scenario

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

revised - S5-144346

S5-144130

Rel-12 PCR 32.277 Correction of architecture figures - align with TS 23.303

Ericsson approved - -

S5-144131

Rel-12 pCR TS 32.277 Refinement on requirements - revision from SA5#95bis

Alcatel-Lucent approved - -

S5-144132

Rel-12 pCR TS 32.277 Online Charging Architecture for ProSe Discovery - revision from SA5#95bis

Alcatel-Lucent approved - -

S5-144133

Rel-12 pCR TS 32.277 Online Charging Monitor request scenario - revision from SA5#95bis

Alcatel-Lucent approved - -

S5-144134

pCR on introduction of TR32.861 China Mobile noted - -

S5-144135

pCR on PM of TR32.861 China Mobile revised - S5-144448

S5-144136

Rel-12 CR 32.240 Editorial corrections on references and definitions

Nokia Networks revised - S5-144417

S5-144137

Rel-12 CR 32.250 Editorial corrections on references and definitions

Nokia Networks revised - S5-144418

S5-144138

Rel-12 CR 32.251 Editorial corrections on references and definitions

Nokia Networks revised - S5-144419

S5-144139

Rel-12 CR 32.260 Editorial corrections on references and definitions

Nokia Networks revised - S5-144420

S5-144140

Rel-12 CR 32.270 Editorial corrections on references and definitions

Nokia Networks revised - S5-144421

S5-144141

Rel-12 CR 32.271 Editorial corrections on references and definitions

Nokia Networks revised - S5-144422

S5-144142

Rel-12 CR 32.272 Editorial corrections on references and definitions

Nokia Networks revised - S5-144451

S5-144143

Rel-12 CR 32.273 Editorial corrections on references and definitions

Nokia Networks revised - S5-144452

Page 107:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144144

Rel-12 CR 32.274 Editorial corrections on references and definitions

Nokia Networks revised - S5-144453

S5-144145

Rel-12 CR 32.275 Editorial corrections on references and definitions

Nokia Networks revised - S5-144454

S5-144146

Rel-12 CR 32.280 Editorial corrections on references and definitions

Nokia Networks revised - S5-144455

S5-144147

Rel-12 CR 32.295 Editorial corrections on references and definitions

Nokia Networks revised - S5-144456

S5-144148

Rel-12 CR 32.296 Editorial corrections on references and definitions

Nokia Networks revised - S5-144457

S5-144149

Rel-12 CR 32.297 Editorial corrections on references and definitions

Nokia Networks revised - S5-144458

S5-144150

Rel-12 CR 32.298 Editorial corrections on references and definitions

Nokia Networks revised - S5-144459

S5-144151

Rel-12 CR 32.299 Editorial corrections on references and definitions

Nokia Networks revised - S5-144460

S5-144152

R12 CR 32.275 Removal of CDIVN service

Nokia Networks revised - S5-144390

S5-144153

Re-8 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

agreed - -

S5-144154

Re-9 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

agreed - -

S5-144155

Re-10 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

agreed - -

S5-144156

Re-11 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

agreed - -

S5-144157

Re-12 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

agreed - -

S5-144158

Rel-11 CR 32.260 Correction on inconsistent defined parameter for NetLoc

Nokia Networks revised - S5-144408

S5-144159

Rel-11 CR 32.298 Correction on inconsistent defined parameter for NetLoc

Nokia Networks revised - S5-144409

S5-144160

Rel-12 CR 32.260 Correction on inconsistent defined parameter for NetLoc

Nokia Networks revised - S5-144410

S5-144161

Rel-12 CR 32.298 Correction on inconsistent defined parameter for NetLoc

Nokia Networks revised - S5-144411

S5-144162

DP Problems with MBMS offline charging specification

Ericsson noted - -

S5-144163

Rel-9 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson revised - S5-144401

S5-144164

Rel-10 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson revised - S5-144402

S5-144165

Rel-11 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson revised - S5-144403

S5-144166

Rel-9 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson revised - S5-144404

S5-144167

Rel-10 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson revised - S5-144405

S5-144168

Rel-11 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson revised - S5-144406

S5-144169

Rel-12 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson revised - S5-144407

S5-144170

Rel-12 CR 32.298 Introduce Traffic Data Volumes in IPE-CDR

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

agreed - -

S5-144171

CR Rel-12 32.251 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

revised - S5-144461

S5-144172

CR Rel-12 32.298 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

revised - S5-144462

Page 108:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144173

CR Rel-12 32.299 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

revised - S5-144463

S5-144174

OAM action list before the meeting OAM Chair noted - -

S5-144175

OAM action list after the meeting OAM Chair noted - -

S5-144176

OAM action list after the meeting OAM Chair withdrawn - -

S5-144177

OAM Timing Matrix for SA5 #96 OAM Chair noted - -

S5-144178

Discussion paper on real TA size KPI Nokia Networks noted - -

S5-144179

CR R12 32.451 Add real TA size monitoring KPI requirements

Nokia Networks noted - -

S5-144180

CR R12 32.450 Add real TA size monitoring KPI

Nokia Networks noted - -

S5-144181

CR R9 32.405 Add the missing corresponding NRM spec

Nokia Networks revised - S5-144424

S5-144182

3GPP WID -Tutorial on how to prepare WIDs and how the whole Work Plan works, umbrella WIDs, etc.

MCC (az) noted - -

S5-144183

CR R10 32.405 Add the missing corresponding NRM spec

Nokia Networks revised - S5-144425

S5-144184

CR R11 32.405 Add the missing corresponding NRM spec

Nokia Networks revised - S5-144426

S5-144185

CR R9 32.406 Add the missing corresponding NRM spec

Nokia Networks revised - S5-144429

S5-144186

CR R10 32.406 Add the missing corresponding NRM spec

Nokia Networks revised - S5-144430

S5-144187

CR R11 32.406 Add the missing corresponding NRM spec

Nokia Networks revised - S5-144431

S5-144188

CR R9 32.407 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144189

CR R10 32.407 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144190

CR R11 32.407 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144191

CR R9 32.409 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144192

CR R10 32.409 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144193

CR R11 32.409 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144194

CR R9 32.425 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144195

CR R10 32.425 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144196

CR R11 32.425 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144197

CR R12 32.425 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144198

CR R9 32.426 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144199

CR R10 32.426 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144200

CR R11 32.426 Add the missing corresponding NRM spec

Nokia Networks noted - -

S5-144201

LSout from SA5 to CT4 on Completion of AVP code definitions

Nokia Networks revised - S5-144336

S5-144202

Rel-11 CR on 28653-b30 re correction of data type

Ericsson agreed - -

S5-144203

Rel-12 CR 32.251 Corrections to include missing fixed user location information for NSWO

Ericsson revised - S5-144347

S5-144204

Rel-12 CR 32.298 Corrections to include missing fixed user location

Ericsson revised - S5-144327

Page 109:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

information for NSWO

Page 110:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144205

Rel-12 CR 32.299 Corrections to include missing fixed user location information for NSWO

Ericsson agreed - -

S5-144206

Rel-12 CR 32.260 Correction of Subscriber Equipment Number and Instance Id for privacy concerns

Ericsson agreed - -

S5-144207

Rel-12 CR 32.298 Correction of Subscriber Equipment Number and Instance Id for privacy concerns

Ericsson agreed - -

S5-144208

Rel-12 CR 32.251 Minor corrections to CHIPS for clarification

Ericsson agreed - -

S5-144209

Rel-8 CR 32.298 Correction of ASN.1 tag value for 3GPP2UserLocation - align with Release 9

Ericsson, Alcatel-Lucent

revised - S5-144398

S5-144210

DP Maintenance of I-WLAN solution in charging specifications

Ericsson noted - -

S5-144211

Rel-12 CR 32.240 Removal of I-WLAN solution

Ericsson revised - S5-144522

S5-144212

Rel-12 CR 32.296 Removal of I-WLAN solution

Ericsson revised - S5-144337

S5-144213

Rel-12 CR 32.297 Removal of I-WLAN solution

Ericsson revised - S5-144523

S5-144214

Rel-12 CR 32.298 Removal of I-WLAN solution

Ericsson revised - S5-144524

S5-144215

Rel-12 CR 32.299 Removal of I-WLAN solution

Ericsson revised - S5-144338

S5-144216

pCR 32.838 Add analysis of automatic inventory requirements

ZTE approved - -

S5-144217

R12 CR 28.632 Add common notifications for inventory IOCs

ZTE noted - -

S5-144218

R12 CR 32.422 Update the value set of the Collection period for RRM measurements LTE to align with 36.413

ZTE noted - -

S5-144219

R12 CR 32.446 Update the value set of the Collection period for RRM measurements LTE to align with 36.413

ZTE noted - -

S5-144220

The Proposal of Management Scenarios and use cases of TR32.842

Rapporteur revised - S5-144495

S5-144221

Rel-12 CR 32.422 Addition of missing configuration parameter for trace and MDT activation

NEC noted - -

S5-144222

Discussion on the Management Scenarios and Use Cases of TR 32.842

Rapporteur noted - -

S5-144223

Rel-11 CR 32.442 Addition of missing parameters relating to RCEF

NEC agreed - -

S5-144224

Rel-11 CR 32.442 Editorial corrections NEC noted - -

S5-144225

Rel-10 CR 32.442 Editorial corrections NEC noted - -

S5-144226

Rel-12 CR 32.251 Introduction of Network Release cause to include RAN-NAS Release cause in offline charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

noted - -

S5-144227

Rel-12 CR 32.298 Introduction of Network Release cause to include RAN-NAS Release cause in offline charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

noted - -

S5-144228

Rel-12 CR 32.299 Introduction of Network Release cause to include RAN-NAS Release cause in offline charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

noted - -

S5-144229

Rel-12 pCR TR 32.843 scenario A: IMS conversational video service over LTE

Alcatel-Lucent revised - S5-144465

S5-144230

Rel-12 pCR 32277 Proposed Rf message content and CDR field of discovery- revision from SA5#95bis

Huawei revised - S5-144359

S5- Rel-13 pCR TR 32.843 Study on Inter- Alcatel-Lucent revised - S5-

Page 111:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144231 PLMN PS domain online charging - Architectures

144464

S5-144232

Rel-12 SA5 Work Item Exception for WI ProSe-CH

Rapporteur revised - S5-144361

S5-144233

Reply LS on ProSe Lawful Interception Qualcomm Incorporated

revised - S5-144353

S5-144234

pCR to TR 32.844 on Charing Architecture for ProSe Direct Communication - Revision output of SA#95bis

Qualcomm Incorporated

withdrawn - -

S5-144235

pCR to TR 32.844 on Charing Architecture for ProSe Direct Communication - Revision output of SA#95bis

Qualcomm Incorporated

revised - S5-144354

S5-144236

pCR to TR 32.844 on Scenarios for ProSe Direct Communication - Revision output of SA5#95bis

Qualcomm Incorporated

approved - -

S5-144237

Rel-12 CR 28.612 Move IOCs from discontinued TS 28.602 - align with TSG SA decision to remove I-WLAN

Ericsson revised - S5-144506

S5-144238

Rel-12 CR 28.616 Move IOCs/MOCs from discontinued TS 28.606 - align with TSG SA decision to remove I-WLAN

Ericsson revised - S5-144507

S5-144239

Rel-11 CR 28.655 Correction of operationalState attribute definitions

Ericsson withdrawn - -

S5-144240

Initial Draft TR for UOM Ericsson revised - S5-144447

S5-144241

pCR to TS 32.277 on ProSe EPC-level discovery offline charging principle and message flows - Revision output of SA5#95bis

Qualcomm Incorporated

approved - -

S5-144242

pCR to TS 32.277 on ProSe online charging principle and message flows - Revision output of SA5#95bis

Qualcomm Incorporated

withdrawn - -

S5-144243

pCR Performance measurements handling SI

Intel revised - S5-144432

S5-144244

pCR on 28.403 WLAN MAC protocol related Measurements

Intel noted - -

S5-144245

pCR on 28.403 WLAN data volume Measurements

Intel noted - -

S5-144246

pCR HO and RRC connection establishment distribution

Intel noted - -

S5-144247

Revised WID Energy Efficiency related Performance measurements

Nokia Networks revised - S5-144446

S5-144248

TR 32.842 rapporteur change proposal Rapporteur agreed - -

S5-144249

Rel-11 CR 32.442 Addition of missing input parameters list of TraceTarget attribute for EPC trace and MDT activation.

NEC noted - -

S5-144250

MME VNF instantiation and termination for mixed network

Intel noted - -

S5-144251

MME VNF instance scale in and out Intel noted - -

S5-144252

MME VNF instance scaling up and down

Intel noted - -

S5-144253

Discussion on service continuity charging in GCSE_LTE

ZTE noted - -

S5-144254

Draft New WID on GCSE Service Continuity Charging

ZTE noted - -

S5-144255

Adapting Trace Reference to Core IMS Ericsson noted - -

S5-144256

pCR to TS32.277 on ProSe Direct Discovery Offline Charging principle and message flows - Revision output of SA5#95bis

ZTE approved - -

Page 112:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144257

pCR to TS32.277 on Prose Direct Discovery Online Charging IEC Message flow - Revision output of SA5#95bis

ZTE approved - -

S5-144258

Adapting Trace Reference to Core IMS Ericsson noted - -

S5-144259

pCR 32.860 Cell Capacity Class Value Cisco revised - S5-144478

S5-144260

Correct the File naming convention Ericsson noted - -

S5-144261

Correct the File naming convention Ericsson noted - -

S5-144262

Correct the File naming convention Ericsson noted - -

S5-144263

Correct the File naming convention Ericsson noted - -

S5-144264

Correct the File naming convention Ericsson noted - -

S5-144265

Correct the File naming convention Ericsson revised - S5-144372

S5-144266

pCR to TR 32 860 MLB parameters alignment

Cisco, Vodafone, Deutsche Telekom

revised - S5-144473

S5-144267

pCR to TR 32.860 CAC Case for MLB Parameters alignment

Cisco noted - -

S5-144268

pCR to TR 32.860 MLB algorithms alignment

Cisco, Vodafone, Deutsche Telekom

noted - -

S5-144269

pCR to TR 32.860 Additional load information for MLB

Cisco, Vodafone, Deutsche Telekom

revised - S5-144494

S5-144270

Presentation of Specification to TSG Ericsson approved - -

S5-144271

pCR to TR 32.860 MLB Targets Cisco noted - -

S5-144272

Super CR 32.422: Sharing network support

Ericsson noted - -

S5-144273

pCR to TR 32.838 OSS tool support, Optimization in NMS layer

Cisco approved - -

S5-144274

Proposed Super CR 32.423-b80 Trace Reporting

Ericsson revised - S5-144377

S5-144275

pCR to TR 32.838 OSS tool support, Functionalities

Cisco approved - -

S5-144276

pCR 32.111-1 Add general principles of alarm generation

Huawei revised - S5-144440

S5-144277

pCR 32.111-2 Add notification support for changed additionalText

Huawei noted - -

S5-144278

pCR 28.667 Add conceptual descriptions to RPT data

Huawei revised - S5-144445

S5-144279

Way forward for OAM enhancements of D-MLB discussion

Huawei noted - -

S5-144280

pCR Add Introduction section to TR 32.842

Huawei, China Mobile revised - S5-144496

S5-144281

pCR Add Concept Introduction to TR 32.842

Huawei, China Mobile noted - -

S5-144282

pCR TR 32.837 Editorial Change of Compliance quailifer

Huawei approved - -

S5-144283

pCR TR 32.837 Reformat of section - Requirements for NGCOR Modelling and Tooling (MT)

Huawei approved - -

S5-144284

pCR WLAN PM counter handling Ericsson, Nokia Networks

revised - S5-144432

S5-144285

Rel-12 PCR 32.849 Key issue: Unnecessary correlation of CDRs when loopback is not active

Deutsche Telekom, Ericsson

revised - S5-144349

S5-144286

Rel-12 PCR 32.849 Key issue: Identification of home network

Deutsche Telekom, Ericsson

revised - S5-144350

S5-144287

Introduce the Radio Planning Tool (RPT) Access (RPTA) IRP

Nokia Networks noted - -

S5- pCR 28.668 - Implement the Radio Nokia Networks revised - S5-

Page 113:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144288 Planning Tool (RPT) Access (RPTA) IRP

144442

S5-144289

pCR 28.668 - Add attributes to the info model

Nokia Networks revised - S5-144382

S5-144290

pCR 28.668 - Add the operation getAllPlannedData()

Nokia Networks revised - S5-144443

S5-144291

Management of mixed (virtualised and non virtualised) network

Ericsson noted - -

S5-144292

Introduction of Managed Alarm TeliaSonera noted - -

S5-144293

pCR on draft TR 32.860-040 Hybrid-SON re Alignment with WID

Ericsson noted - -

S5-144294

pCR on draft TR 32.860-040 Hybrid-SON re data transfer over itf-N

Ericsson noted - -

S5-144295

Correction of clearing of alarms TeliaSonera approved - -

S5-144296

pCR on draft TR 32.860-040 Hybrid-SON re effectiveness of NM analysis

Ericsson noted - -

S5-144297

pCR on draft TR 32.860-040 Hybrid-SON re use of standard D-MLB

Ericsson noted - -

S5-144298

pCR on draft TR 32.860-040 Hybrid-SON re using statistic to predict future load

Ericsson [not addressed]

- -

S5-144299

Quality of Alarms TeliaSonera revised - S5-144499

S5-144300

pCR on draft TS 28.667-020 RPT NRM IRP: Requirements

Ericsson, Nokia Networks

revised - S5-144444

S5-144301

Rel-11 CR on 28653-b30 re correction of data type

Ericsson withdrawn - -

S5-144302

pCR to TR 32.844 on usage information for reporting

Qualcomm Incorporated

withdrawn - -

S5-144303

Rel-8 CR 32.260 SDP general handling clarification

Huawei noted - -

S5-144304

Rel-9 CR 32.260 SDP general handling clarification

Huawei noted - -

S5-144305

Rel-10 CR 32.260 SDP general handling clarification

Huawei noted - -

S5-144306

Rel-11 CR 32.260 SDP general handling clarification

Huawei revised - S5-144399

S5-144307

Rel-12 CR 32.260 SDP general handling clarification

Huawei revised - S5-144400

S5-144308

Rel-8 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei noted - -

S5-144309

Rel-9 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei noted - -

S5-144310

Rel-10 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei noted - -

S5-144311

Rel-11 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei noted - -

S5-144312

Rel-12 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei noted - -

S5-144313

Discussion paper on charging support for PCC rules with application identifier

Huawei noted - -

S5-144314

Rel-11 CR 32.251 clarification of charging support for PCC rules with application identifier

Huawei noted - -

S5-144315

Rel-12 CR 32.251 clarification of charging support for PCC rules with application identifier

Huawei noted - -

S5-144316

Discussion paper on QoS information description in GyGz per IP-CAN session

Huawei noted - -

S5- Work plan status after SA5#96 WG Chairman [not - -

Page 114:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144317 addressed]S5-144318

New WID on Heterogeneous Networks Management

Ericsson revised - S5-144487

S5-144319

Alignment of terms for TR 32.837 and TR 32.838

Huawei withdrawn - -

S5-144320

Progress review of TR 32.838 Huawei noted - -

S5-144321

Legal announcement WG Chairman noted - -

S5-144322

Rel-11 CR 28.655 Correction of operationalState attribute definitions (replaces S5-144239)

Ericsson agreed - -

S5-144323

Rel-11 CR 28.702 Correction of proceduralStatus attribute definitions

Ericsson agreed - -

S5-144324

Rel-11 CR 28.658 Align operationalState and other state attribute definitions

Ericsson agreed - -

S5-144325

Editable UML diagram ETSI Secretariat noted - -

S5-144326

Rel-12 CR 32.102 Updates of entities of the mobile system

TeliaSonera revised - S5-144505

S5-144327

Rel-12 CR 32.298 Corrections to include missing fixed user location information for NSWO

Ericsson revised S5-144327

S5-144348

S5-144328

Editable UML diagramas in specs (MCC proposal)

ETSI Secretariat noted - -

S5-144329

Rel-11 CR 28.656 Geo-coordinates Orange noted - -

S5-144330

Event correlation points for Virtualized 3GPP netowork management

KDDI noted - -

S5-144331

LS from ETSI NFV to SA5 on Availability of the NFV ISG Management and Orchestration GS

ETSI ISG NFV noted - -

S5-144332

pCR to TR 32.844 on References Nokia Networks revised - S5-144356

S5-144333

pCR to TR 32.844 on usage information for reporting - revision output from SA5#95bis

Qualcomm Incorporated

revised - S5-144355

S5-144334

Presentation of Specification to TSG for TR 32.844

Rapporteur revised - S5-144357

S5-144335

Presentation of Specification to TSG for TS 32.277

Rapporteur revised - S5-144360

S5-144336

LSout from SA5 to CT4 on Completion of AVP code definitions

Nokia Networks approved S5-144201

-

S5-144337

Removal of I-WLAN solution Ericsson revised S5-144212

S5-144525

S5-144338

Rel-12 CR 32.299 Removal of I-WLAN solution

Ericsson revised S5-144215

S5-144526

S5-144339

pCR to TR 32.277 on References Nokia Networks agreed - -

S5-144340

LS on Removal of I-WLAN-specific AVPs

Ericsson approved - -

S5-144341

Rel-12 CR 32.251 Introduction of Presence Reporting Areas for Charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

agreed S5-144109

-

S5-144342

DP Keywords in Charging TS Nokia Networks noted S5-144107

-

S5-144343

Rel-12 CR 32.299 Introduction of Presence Reporting Areas for Charging

Ericsson, Alcatel-Lucent,Allot

agreed S5-144110

-

S5-144344

Rel-12 CR 32.298 Introduction of Presence Reporting Areas for Charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

agreed S5-144111

-

S5-144345

Rel-12 CR 32.251 Introduce Charging Characteristics in Convergent scenario

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

agreed S5-144128

-

S5- Rel-12 CR 32.298 Introduce Charging Alcatel-Lucent, Alcatel- agreed S5- -

Page 115:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144346 Characteristics in Convergent scenario Lucent Shanghai Bell 144129S5-144347

Rel-12 CR 32.251 Corrections to include missing fixed user location information for NSWO

Ericsson,Allot agreed S5-144203

-

S5-144348

Rel-12 CR 32.298 Corrections to include missing fixed user location information for NSWO

Ericsson,Allot agreed S5-144327

-

S5-144349

Rel-12 PCR 32.849 Key issue: Unnecessary correlation of CDRs when loopback is not active

Deutsche Telekom, Ericsson

agreed S5-144285

-

S5-144350

Rel-12 PCR 32.849 Key issue: Identification of home network

Deutsche Telekom, Ericsson

approved S5-144286

-

S5-144351

LS to CT1 on ProSe Direct Communication charging support

Qualcomm Incorporated

revised - S5-144466

S5-144352

New WID on Charging aspects of Core Network Overload - User Location Information reporting improvements

Alcatel-Lucent, Ericsson

agreed S5-144108

-

S5-144353

Reply to Ls from CT6 to SA5 on ProSe Lawful Interception

Qualcomm Incorporated

approved S5-144233

-

S5-144354

pCR to TR 32.844 on Charing Architecture for ProSe Direct Communication - Revision output of SA#95bis

Qualcomm Incorporated

approved S5-144235

-

S5-144355

pCR to TR 32.844 on usage information for reporting - revision output from SA5#95bis

Qualcomm Incorporated

approved S5-144333

-

S5-144356

pCR to TR 32.844 on References Nokia Networks approved S5-144332

-

S5-144357

Presentation of Specification to TSG for TR 32.844

Rapporteur approved S5-144334

-

S5-144358

TR 32.844 Rapporteur approved - -

S5-144359

Rel-12 pCR 32277 Proposed Rf message content and CDR field of discovery- revision from SA5#95bis

Huawei approved S5-144230

-

S5-144360

Presentation of Specification to TSG for TS 32.277

Rapporteur approved S5-144335

-

S5-144361

Rel-12 SA5 Work Item Exception for WI ProSe-CH

Rapporteur revised S5-144232

S5-144468

S5-144362

R8 CR 32.275 Removal of CDIVN service

Nokia Networks agreed S5-144061

-

S5-144363

R8 CR 32.298 Removal of CDIVN service

Nokia Networks agreed S5-144062

-

S5-144364

R8 CR 32.299 Removal of CDIVN service

Nokia Networks agreed S5-144063

-

S5-144365

R9 CR 32.275 Removal of CDIVN service

Nokia Networks agreed S5-144064

-

S5-144366

Time Plan for OAM&P and Converged Management SWGs

WG Chairman approved S5-144004

-

S5-144367

Rel-11 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT

CATT agreed S5-144113

-

S5-144368

Rel-12 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT

CATT agreed S5-144114

-

S5-144369

Open Action Items for Converged Management SWG

Ericsson revised - S5-144498

S5-144370

Adapting Trace Reference to Core IMS Ericsson withdrawn - -

S5-144371

Adapting Trace Reference to Core IMS Ericsson withdrawn - -

S5-144372

Rel-12 CR 32.423 Correct the File naming convention

Ericsson agreed S5-144265

-

S5-144373

pCR TR 32.130 Business-level and specification-level requirements, use cases

Orange, Deutsche Telekom

approved S5-144056

-

S5- pCR TR 32.130 Business-level Orange, Deutsche approved S5- -

Page 116:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144374 requirements for Trace / MDT Telekom 144057S5-144375

Super CR 28652 Add new attribute for network sharing

Orange revised S5-144082

S5-144441

S5-144376

Super CR 28653 Add new attribute for network sharing

Orange approved S5-144083

-

S5-144377

Proposed Super CR 32.423-b80 Trace Reporting

Ericsson approved S5-144274

-

S5-144378

Rel-12 SA5 Work Item Exception for WI OAM aspects of network sharing

Rapporteur revised S5-144047

S5-144515

S5-144379

Rapporteur list (resubmitted) MCC noted - -

S5-144380

Reply to: LS from SA to SA5 on Maintenance of I-WLAN Solution

Chairman approved - -

S5-144381

Revised WID Study on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

Huawei agreed S5-144055

-

S5-144382

pCR 28.668 - Add attributes to the info model

Nokia Networks revised S5-144289

S5-144510

S5-144383

R9 CR 32.298 Removal of CDIVN service

Nokia Networks agreed S5-144065

-

S5-144384

R9 CR 32.299 Removal of CDIVN service

Nokia Networks agreed S5-144066

-

S5-144385

R10 CR 32.275 Removal of CDIVN service

Nokia Networks agreed S5-144067

-

S5-144386

R10 CR 32.298 Removal of CDIVN service

Nokia Networks agreed S5-144068

-

S5-144387

R10 CR 32.299 Removal of CDIVN service

Nokia Networks agreed S5-144069

-

S5-144388

R11 CR 32.275 Removal of CDIVN service

Nokia Networks agreed S5-144070

-

S5-144389

R11 CR 32.298 Removal of CDIVN service

Nokia Networks agreed S5-144071

-

S5-144390

R12 CR 32.275 Removal of CDIVN service

Nokia Networks agreed S5-144152

-

S5-144391

R11 CR 32.299 Removal of CDIVN service

Nokia Networks agreed S5-144072

-

S5-144392

R12 CR 32.298 Removal of CDIVN service

Nokia Networks agreed S5-144073

-

S5-144393

R12 CR 32.299 Removal of CDIVN service

Nokia Networks agreed S5-144074

-

S5-144394

Rel-8 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

agreed S5-144124

-

S5-144395

Rel-9 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

agreed S5-144125

-

S5-144396

Rel-10 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

agreed S5-144126

-

S5-144397

Rel-11 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

agreed S5-144127

-

S5-144398

Rel-8 CR 32.298 Correction of ASN.1 tag value for 3GPP2UserLocation - align with Release 9

Ericsson, Alcatel-Lucent

agreed S5-144209

-

S5-144399

Rel-11 CR 32.260 SDP general handling clarification

Huawei agreed S5-144306

-

S5-144400

Rel-12 CR 32.260 SDP general handling clarification

Huawei agreed S5-144307

-

S5-144401

Rel-9 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson agreed S5-144163

-

S5-144402

Rel-10 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson agreed S5-144164

-

Page 117:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144403

Rel-11 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson agreed S5-144165

-

S5-144404

Rel-9 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson agreed S5-144166

-

S5-144405

Rel-10 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson agreed S5-144167

-

S5-144406

Rel-11 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson agreed S5-144168

-

S5-144407

Rel-12 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson agreed S5-144169

-

S5-144408

Rel-11 CR 32.260 Correction on inconsistent defined parameter for NetLoc

Nokia Networks agreed S5-144158

-

S5-144409

Rel-11 CR 32.298 Correction on inconsistent defined parameter for NetLoc

Nokia Networks agreed S5-144159

-

S5-144410

Rel-12 CR 32.260 Correction on inconsistent defined parameter for NetLoc

Nokia Networks agreed S5-144160

-

S5-144411

Rel-12 CR 32.298 Correction on inconsistent defined parameter for NetLoc

Nokia Networks agreed S5-144161

-

S5-144412

R12 CR 32.298 Introduction of ASN.1 Cross-reference listing

Nokia Networks agreed S5-144076

-

S5-144413

Rel-11 CR 32.298 Correction for expanded ASN.1 sources code generation

Nokia Networks agreed - -

S5-144414

R12 CR 32.298 Correction for expanded ASN.1 sources code generation

Nokia Networks agreed S5-144075

-

S5-144415

Rel-12 CR 32.251 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

agreed S5-144121

-

S5-144416

Rel-12 CR 32.298 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

agreed S5-144122

-

S5-144417

Rel-12 CR 32.240 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144136

-

S5-144418

Rel-12 CR 32.250 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144137

-

S5-144419

Rel-12 CR 32.251 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144138

-

S5-144420

Rel-12 CR 32.260 ECorrections for alignment between charging specifications

Nokia Networks agreed S5-144139

-

S5-144421

Rel-12 CR 32.270 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144140

-

S5-144422

Rel-12 CR 32.271 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144141

-

S5-144423

History of LSs with BBF on HNB / HeNB counters and parameters

WG Chairman noted - -

S5-144424

CR CR R9 32.405 Correction of scope Nokia Networks agreed S5-144181

-

S5-144425

CR R10 32.405 Correction of scope Nokia Networks agreed S5-144183

-

S5-144426

CR R11 32.405 Correction of scope Nokia Networks agreed S5-144184

-

S5-144427

CR R7 32.405 Correction of scope Nokia Networks agreed - -

S5-144428

CR R8 32.405 Correction of scope Nokia Networks agreed - -

S5- CR R9 32.406 Correction of scope Nokia Networks agreed S5- -

Page 118:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144429 144185S5-144430

CR R10 32.406 Correction of scope Nokia Networks agreed S5-144186

-

S5-144431

CR R11 32.406 Correction of scope Nokia Networks agreed S5-144187

-

S5-144432

pCR Performance measurements handling SI

Intel approved S5-144243

-

S5-144433

Revised WID on WLAN Management Intel revised - S5-144513

S5-144434

Presentation sheet TR 32.841 Rapporteur approved - -

S5-144435

new draft TR 32.841 Rapporteur approved - -

S5-144436

CR R7 32.406 Correction of scope Nokia Networks agreed - -

S5-144437

CR R8 32.406 Correction of scope Nokia Networks agreed - -

S5-144438

Presentation sheet 32.130 OAM for network sharing - Concepts and requirements

Rapporteur approved - -

S5-144439

List of specifications that need upgrade ETSI Secretariat revised S5-144120

S5-144509

S5-144440

pCR 32.111-1 Add general principles of alarm generation

Huawei approved S5-144276

-

S5-144441

Super CR 28652 Add new attribute for network sharing

Orange revised S5-144375

S5-144514

S5-144442

pCR 28.668 - Implement the Radio Planning Tool (RPT) Access (RPTA) IRP

Nokia Networks approved S5-144288

-

S5-144443

pCR 28.668 - Add the operation getAllPlannedData()

Nokia Networks noted S5-144290

-

S5-144444

pCR on draft TS 28.667-020 RPT NRM IRP: Requirements

Ericsson, Nokia Networks

approved S5-144300

-

S5-144445

pCR 28.667 Add conceptual descriptions to RPT data

Huawei noted S5-144278

-

S5-144446

Revised WID Energy Efficiency related Performance measurements

Nokia Networks agreed S5-144247

-

S5-144447

Initial Draft TR for UOM Ericsson approved S5-144240

-

S5-144448

pCR on PM of TR32.861 China Mobile revised S5-144135

S5-144517

S5-144449

Draft TR on Study on Application and Partitioning of Itf-N

Rapporteur approved - -

S5-144450

new Draft TS 32.130 Rapporteur approved - -

S5-144451

Rel-12 CR 32.272 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144142

-

S5-144452

Rel-12 CR 32.273 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144143

-

S5-144453

Rel-12 CR 32.274 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144144

-

S5-144454

Rel-12 CR 32.275 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144145

-

S5-144455

Rel-12 CR 32.280 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144146

-

S5-144456

Rel-12 CR 32.295 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144147

-

S5-144457

Rel-12 CR 32.296 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144148

-

S5- Rel-12 CR 32.297 Corrections for Nokia Networks agreed S5- -

Page 119:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144458 alignment between charging specifications

144149

S5-144459

Rel-12 CR 32.298 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144150

-

S5-144460

Rel-12 CR 32.299 Corrections for alignment between charging specifications

Nokia Networks agreed S5-144151

-

S5-144461

CR Rel-12 32.251 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

agreed S5-144171

-

S5-144462

CR Rel-12 32.298 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

agreed S5-144172

-

S5-144463

CR Rel-12 32.299 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

agreed S5-144173

-

S5-144464

Rel-13 pCR TR 32.843 Study on Inter-PLMN PS domain online charging - Architectures

Alcatel-Lucent approved S5-144231

-

S5-144465

Rel-12 pCR TR 32.843 scenario A: IMS conversational video service over LTE

Alcatel-Lucent approved S5-144229

-

S5-144466

LS to CT1 on ProSe Direct Communication charging support

Qualcomm Incorporated

approved S5-144351

-

S5-144467

Rel-12 SA5 Work Item Exception for WI OAM aspects of network sharing

Rapporteur approved S5-144515

-

S5-144468

Rel-12 SA5 Work Item Exception for WI ProSe-CH

Rapporteur approved S5-144361

-

S5-144469

Super CR for 32.111-1 Rapporteur approved - -

S5-144470

draft TS 32.277 Rapporteur approved - -

S5-144471

pCR on draft TR 32.860-040 Hybrid-SON re Alignment with WID

Ericsson withdrawn - -

S5-144472

pCR on D-MLB algorithms misalignment Introduction

Cisco withdrawn - -

S5-144473

pCR to TR 32 860 MLB parameters alignment

Cisco, Vodafone, Deutsche Telekom

noted S5-144266

-

S5-144474

Presentation sheet 28.667 Rapporteur revised - S5-144511

S5-144475

Presentation sheet 28.668 Rapporteur revised - S5-144512

S5-144476

new draft spec TS 28.667 Rapporteur approved - -

S5-144477

new draft spec TS 28.668 Rapporteur approved - -

S5-144478

pCR 32.860 Cell Capacity Class Value Cisco noted S5-144259

-

S5-144479

pCR on draft TR 32.860-040 Hybrid-SON re data transfer over itf-N

Ericsson withdrawn - -

S5-144480

pCR on draft TR 32.860-040 Hybrid-SON re effectiveness of NM analysis

Ericsson withdrawn - -

S5-144481

Update of S5-144120 for CMAN SWG Chair noted - -

S5-144482

the Skeleton of Management of Virtualized Network

Rapporteur approved S5-144116

-

S5-144483

The scope of TR 32.842 Rapporteur approved S5-144118

-

S5-144484

draft TR 32.849 Rapporteur approved - -

S5-144485

draft TR 32.843 Rapporteur approved - -

S5-144486

CH Executive Report from THIS Meeting

CH SWG Chair approved S5-144011

-

S5-144487

New WID on Heterogeneous Networks Management

Ericsson Noted S5-144318

-

S5-144488

Revised WID on WLAN Management Intel agreed S5-144513

-

S5-144489

OAM Executive Report from THIS Meeting

OAM SWG Chair approved S5-144005

-

Page 120:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144490

Rel-12 CR 28.611 Remove unused reference

Ericsson agreed - -

S5-144491

Converged Management Executive report from THIS meeting

Converged Management SWG Chair

approved S5-144006

-

S5-144492

Update of TOP OPE WID WG Chairman approved - -

S5-144493

Revised WID Converged Management PM Interface definitions

WG Chairman approved - -

S5-144494

pCR to TR 32.860 Additional load information for MLB

Cisco, Vodafone, Deutsche Telekom

noted S5-144269

-

S5-144495

The Proposal of Management Scenarios and use cases of TR32.842

Rapporteur noted S5-144220

-

S5-144496

pCR Add Introduction section to TR 32.842

Huawei, China Mobile approved S5-144280

-

S5-144497

Draft TR 32.842 Rapporteur approved - -

S5-144498

Open Action Items for Converged Management SWG

Ericsson noted S5-144369

-

S5-144499

Quality of Alarms TeliaSonera approved S5-144299

-

S5-144500

Exception sheet Alarm Quality Improvements

Rapporteur approved - -

S5-144501

draft TR 32.838 Rapporteur approved - -

S5-144502

Presentation sheet TR 28.820 Rapporteur approved - -

S5-144503

new draft TR 32.837 Rapporteur approved - -

S5-144504

Rel-11 CR on 32156 b10 re MSDO deliverable

Ericsson agreed S5-144041

-

S5-144505

Rel-12 CR 32.102 Updates of entities of the mobile system

TeliaSonera agreed S5-144326

-

S5-144506

Rel-12 CR 28.612 Move IOCs from discontinued TS 28.602 - align with TSG SA decision to remove I-WLAN

Ericsson agreed S5-144237

-

S5-144507

Rel-12 CR 28.616 Move IOCs/MOCs from discontinued TS 28.606 - align with TSG SA decision to remove I-WLAN

Ericsson agreed S5-144238

-

S5-144508

Exception sheet Radio Planning Tool Interface

Rapporteur approved - -

S5-144509

List of specifications that need upgrade ETSI Secretariat noted S5-144439

-

S5-144510

pCR 28.668 - Add attributes to the info model

Nokia Networks approved S5-144382

-

S5-144511

Presentation sheet 28.667 Rapporteur approved S5-144474

-

S5-144512

Presentation sheet 28.668 Rapporteur approved S5-144475

-

S5-144513

Revised WID on WLAN Management Intel revised S5-144433

S5-144488

S5-144514

Super CR 28652 Add new attribute for network sharing

Orange approved S5-144441

-

S5-144515

Rel-12 SA5 Work Item Exception for WI OAM aspects of network sharing

Rapporteur revised S5-144378

S5-144467

S5-144516

Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function

Rapporteur noted S5-144031

-

S5-144517

pCR on PM of TR32.861 China Mobile approved S5-144448

-

S5-144518

Revised WID on IWLAN management

Rapporteur approved - -

S5-144519

Updated draft TS 28.402 Rapporteur approved - -

S5-144520

Presentation sheet for TS 28.402 Rapporteur approved - -

Page 121:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144521

pCR 28.402 movement of counters from 28.401 and some corrections

Rapporteur withdrawn - -

S5-144522

Rel-12 CR 32.240 Removal of I-WLAN solution

Ericsson agreed S5-144211

-

S5-144523

Rel-12 CR 32.297 Removal of I-WLAN solution

Ericsson agreed S5-144213

-

S5-144524

Rel-12 CR 32.298 Removal of I-WLAN solution

Ericsson agreed S5-144214

-

S5-144525

Removal of I-WLAN solution Ericsson agreed S5-144337

-

S5-144526

Rel-12 CR 32.299 Removal of I-WLAN solution

Ericsson agreed S5-144338

-

S5-144527

Rel 12 WLAN OAM SID Rapporteur agreed - -

S5-144528

Status of post SA5#96 email approvals WG Chairman agreed - -

S5-144529

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144530

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144531

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144532

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144533

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144534

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144535

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144536

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144537

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144538

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144539

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144540

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144541

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144542

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144543

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144544

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144545

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

Page 122:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144546

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144547

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144548

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144549

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144550

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144551

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144552

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144553

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144554

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144555

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144556

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144557

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144558

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144559

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144560

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144561

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144562

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144563

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

S5-144564

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman agreed - -

Page 123:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Annex B: List of change requests

Page 124:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Document Title Source Spec CR Rev Rel Cat WI DecisionS5-144301

Rel-11 CR on 28653-b30 re correction of data type

Ericsson - - - - - - withdrawn

S5-144490

Rel-12 CR 28.611 Remove unused reference

Ericsson 28.611 0004 - Rel-12

D - agreed

S5-144237

Rel-12 CR 28.612 Move IOCs from discontinued TS 28.602 - align with TSG SA decision to remove I-WLAN

Ericsson 28.612 0001 - Rel-12

C OAM12 revised

S5-144506

Rel-12 CR 28.612 Move IOCs from discontinued TS 28.602 - align with TSG SA decision to remove I-WLAN

Ericsson 28.612 0001 1 Rel-12

C OAM12 agreed

S5-144238

Rel-12 CR 28.616 Move IOCs/MOCs from discontinued TS 28.606 - align with TSG SA decision to remove I-WLAN

Ericsson 28.616 0002 - Rel-12

C OAM12 revised

S5-144507

Rel-12 CR 28.616 Move IOCs/MOCs from discontinued TS 28.606 - align with TSG SA decision to remove I-WLAN

Ericsson 28.616 0002 1 Rel-12

C OAM12 agreed

S5-144529

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.623 0005 - Rel-12

C OAM12 agreed

S5-144530

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.626 0003 - Rel-12

C OAM12 agreed

S5-144531

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.629 0006 - Rel-12

C OAM12 agreed

S5-144217

R12 CR 28.632 Add common notifications for inventory IOCs

ZTE 28.632 0002 - Rel-12

F OAM12 noted

S5-144532

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.633 0003 - Rel-12

C OAM12 agreed

S5-144043

Rel-11 CR on 28652-b30 Use standard template

Ericsson 28.652 0006 - Rel-11

D OAM11 agreed

S5-144202

Rel-11 CR on 28653-b30 re correction of data type

Ericsson 28.653 0006 - Rel-11

F OAM11 agreed

S5-144533

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.653 0007 - Rel-12

C OAM12 agreed

S5-144084

Rel-11 CR 28.655 Geo-coordinates

Orange 28.655 0003 - Rel-11

F OAM11 agreed

S5-144239

Rel-11 CR 28.655 Correction of operationalState attribute definitions

Ericsson 28.655 0004 - Rel-11

- - withdrawn

S5-144322

Rel-11 CR 28.655 Correction of operationalState attribute definitions (replaces S5-144239)

Ericsson 28.655 0004 - Rel-11

F OAM11 agreed

S5-144329

Rel-11 CR 28.656 Geo-coordinates

Orange 28.656 0004 - Rel-11

F OAM11 noted

S5-144534

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.656 0005 - Rel-12

C OAM12 agreed

Page 125:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144324

Rel-11 CR 28.658 Align operationalState and other state attribute definitions

Ericsson 28.658 0009 - Rel-11

F OAM11 agreed

S5-144535

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.659 0009 - Rel-12

C OAM12 agreed

S5-144536

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.663 0004 - Rel-12

C OAM12 agreed

S5-144537

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.673 0003 - Rel-12

C OAM12 agreed

S5-144538

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.676 0003 - Rel-12

C OAM12 agreed

S5-144323

Rel-11 CR 28.702 Correction of proceduralStatus attribute definitions

Ericsson 28.702 0004 - Rel-11

F OAM11 agreed

S5-144539

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.703 0004 - Rel-12

C OAM12 agreed

S5-144540

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.706 0003 - Rel-12

C OAM12 agreed

S5-144541

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.709 0003 - Rel-12

C OAM12 agreed

S5-144542

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.733 0003 - Rel-12

C OAM12 agreed

S5-144543

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.736 0003 - Rel-12

C OAM12 agreed

S5-144544

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 28.753 0003 - Rel-12

C OAM12 agreed

S5-144087

Rel-12 CR 32.101 Include the Network Management Layer Service (NMLS) in the Management Reference Model

MCC 32.101 0056 - Rel-12

B OAM-RPTi

agreed

S5-144088

Rel-11 CR 32.101 Removal of the Network Management Layer Service (NMLS) in the Management Reference Model

MCC 32.101 0057 - Rel-11

F OAM-RPTi

agreed

S5-144326

Rel-12 CR 32.102 Updates of entities of the mobile system

TeliaSonera 32.102 0051 - Rel-12

F OAM11 revised

S5-144505

Rel-12 CR 32.102 Updates of entities of the mobile system

TeliaSonera 32.102 0051 1 Rel-12

F OAM12 agreed

S5-144545

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.111-6

0006 - Rel-12

C OAM12 agreed

Page 126:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144546

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.126 0002 - Rel-12

C OAM12 agreed

S5-144042

Rel-11 CR on 32153 b00 name space URI convention

Ericsson 32.153 0004 - Rel-11

F OAM11 agreed

S5-144041

Rel-11 CR on 32156 b10 re MSDO deliverable

Ericsson 32.156 0002 - Rel-11

B OAM11 revised

S5-144504

Rel-11 CR on 32156 b10 re MSDO deliverable

Ericsson 32.156 0002 1 Rel-11

B OAM11 agreed

S5-144547

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.176 0009 - Rel-12

C OAM12 withdrawn

S5-144136

Rel-12 CR 32.240 Editorial corrections on references and definitions

Nokia Networks 32.240 0376 - Rel-12

F CH12 revised

S5-144417

Rel-12 CR 32.240 Corrections for alignment between charging specifications

Nokia Networks 32.240 0376 1 Rel-12

F CH12 agreed

S5-144211

Rel-12 CR 32.240 Removal of I-WLAN solution

Ericsson 32.240 0377 - Rel-12

F CH12 revised

S5-144522

Rel-12 CR 32.240 Removal of I-WLAN solution

Ericsson 32.240 0377 1 Rel-12

F CH12 agreed

S5-144137

Rel-12 CR 32.250 Editorial corrections on references and definitions

Nokia Networks 32.250 0040 - Rel-12

F CH12 revised

S5-144418

Rel-12 CR 32.250 Corrections for alignment between charging specifications

Nokia Networks 32.250 0040 1 Rel-12

F CH12 agreed

S5-144109

Rel-12 CR 32.251 Introduction of Presence Reporting Areas for Charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

32.251 0378 - Rel-12

B CNO_ULI-CH

revised

S5-144341

Rel-12 CR 32.251 Introduction of Presence Reporting Areas for Charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

32.251 0378 1 Rel-12

B CNO_ULI-CH

agreed

S5-144138

Rel-12 CR 32.251 Editorial corrections on references and definitions

Nokia Networks 32.251 0379 - Rel-12

F CH12 revised

S5-144419

Rel-12 CR 32.251 Corrections for alignment between charging specifications

Nokia Networks 32.251 0379 1 Rel-12

F CH12 agreed

S5-144121

Rel-12 CR 32.251 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.251 0380 - Rel-12

B CH12 revised

S5-144415

Rel-12 CR 32.251 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.251 0380 1 Rel-12

B CH12 agreed

S5-144128

Rel-12 CR 32.251 Introduce Charging Characteristics in Convergent scenario

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.251 0381 - Rel-12

B P4C-F-CH_P

revised

S5-144345

Rel-12 CR 32.251 Introduce Charging Characteristics in Convergent scenario

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.251 0381 1 Rel-12

B P4C-F-CH_P

agreed

Page 127:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144171

CR Rel-12 32.251 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.251 0382 - Rel-12

B CH12 revised

S5-144461

CR Rel-12 32.251 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.251 0382 1 Rel-12

B CH12 agreed

S5-144203

Rel-12 CR 32.251 Corrections to include missing fixed user location information for NSWO

Ericsson 32.251 0383 - Rel-12

F P4C-F-CH_P, P4C-F-CH_T

revised

S5-144347

Rel-12 CR 32.251 Corrections to include missing fixed user location information for NSWO

Ericsson,Allot 32.251 0383 1 Rel-12

F P4C-F-CH_P, P4C-F-CH_T

agreed

S5-144208

Rel-12 CR 32.251 Minor corrections to CHIPS for clarification

Ericsson 32.251 0384 - Rel-12

F CHIPS agreed

S5-144226

Rel-12 CR 32.251 Introduction of Network Release cause to include RAN-NAS Release cause in offline charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

32.251 0385 - Rel-12

B CH12 noted

S5-144314

Rel-11 CR 32.251 clarification of charging support for PCC rules with application identifier

Huawei 32.251 0386 - Rel-11

F ABC noted

S5-144315

Rel-12 CR 32.251 clarification of charging support for PCC rules with application identifier

Huawei 32.251 0387 - Rel-12

A ABC noted

S5-144139

Rel-12 CR 32.260 Editorial corrections on references and definitions

Nokia Networks 32.260 0271 - Rel-12

F CH12 revised

S5-144420

Rel-12 CR 32.260 ECorrections for alignment between charging specifications

Nokia Networks 32.260 0271 1 Rel-12

F CH12 agreed

S5-144153

Re-8 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

32.260 0272 - Rel-8

F CH8 agreed

S5-144154

Re-9 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

32.260 0273 - Rel-9

A CH8 agreed

S5-144155

Re-10 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

32.260 0274 - Rel-10

A CH8 agreed

S5-144156

Re-11 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

32.260 0275 - Rel-11

A CH8 agreed

S5-144157

Re-12 CR 32.260 Removal of duplicate Requested Action in IMS online charging

Nokia Networks, Ericsson

32.260 0276 - Rel-12

A CH8 agreed

S5-144158

Rel-11 CR 32.260 Correction on inconsistent defined parameter for NetLoc

Nokia Networks 32.260 0277 - Rel-11

F NWK-PL2IMS_CH

revised

S5-144408

Rel-11 CR 32.260 Correction on inconsistent defined parameter for NetLoc

Nokia Networks 32.260 0277 1 Rel-11

F NWK-PL2IMS_CH

agreed

S5-144160

Rel-12 CR 32.260 Correction on inconsistent defined parameter for

Nokia Networks 32.260 0278 - Rel-12

A NWK-PL2IMS_CH

revised

Page 128:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

NetLoc

Page 129:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144410

Rel-12 CR 32.260 Correction on inconsistent defined parameter for NetLoc

Nokia Networks 32.260 0278 1 Rel-12

A NWK-PL2IMS_CH

agreed

S5-144206

Rel-12 CR 32.260 Correction of Subscriber Equipment Number and Instance Id for privacy concerns

Ericsson 32.260 0279 - Rel-12

F CH12 agreed

S5-144303

Rel-8 CR 32.260 SDP general handling clarification

Huawei 32.260 0280 - Rel-8

F CH8 noted

S5-144304

Rel-9 CR 32.260 SDP general handling clarification

Huawei 32.260 0281 - Rel-9

A CH8 noted

S5-144305

Rel-10 CR 32.260 SDP general handling clarification

Huawei 32.260 0282 - Rel-10

A CH8 noted

S5-144306

Rel-11 CR 32.260 SDP general handling clarification

Huawei 32.260 0283 - Rel-11

A CH8 revised

S5-144399

Rel-11 CR 32.260 SDP general handling clarification

Huawei 32.260 0283 1 Rel-11

A CH8 agreed

S5-144307

Rel-12 CR 32.260 SDP general handling clarification

Huawei 32.260 0284 - Rel-12

A CH8 revised

S5-144400

Rel-12 CR 32.260 SDP general handling clarification

Huawei 32.260 0284 1 Rel-12

A CH8 agreed

S5-144308

Rel-8 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei 32.260 0285 - Rel-8

F CH8 noted

S5-144309

Rel-9 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei 32.260 0286 - Rel-9

A CH8 noted

S5-144310

Rel-10 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei 32.260 0287 - Rel-10

A CH8 noted

S5-144311

Rel-11 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei 32.260 0288 - Rel-11

A CH8 noted

S5-144312

Rel-12 CR 32.260 Consistency correction of SDP information occurrence in BGCF CDR

Huawei 32.260 0289 - Rel-12

A CH8 noted

S5-144140

Rel-12 CR 32.270 Editorial corrections on references and definitions

Nokia Networks 32.270 0027 - Rel-12

F CH12 revised

S5-144421

Rel-12 CR 32.270 Corrections for alignment between charging specifications

Nokia Networks 32.270 0027 1 Rel-12

F CH12 agreed

S5-144141

Rel-12 CR 32.271 Editorial corrections on references and definitions

Nokia Networks 32.271 0014 - Rel-12

F CH12 revised

S5-144422

Rel-12 CR 32.271 Corrections for alignment between charging specifications

Nokia Networks 32.271 0014 1 Rel-12

F CH12 agreed

S5-144142

Rel-12 CR 32.272 Editorial corrections on references and definitions

Nokia Networks 32.272 0034 - Rel-12

F CH12 revised

S5- Rel-12 CR 32.272 Nokia Networks 32.272 0034 1 Rel- F CH12 agreed

Page 130:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144451 Corrections for alignment between charging specifications

12

S5-144143

Rel-12 CR 32.273 Editorial corrections on references and definitions

Nokia Networks 32.273 0027 - Rel-12

F CH12 revised

S5-144452

Rel-12 CR 32.273 Corrections for alignment between charging specifications

Nokia Networks 32.273 0027 1 Rel-12

F CH12 agreed

S5-144163

Rel-9 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson 32.273 0028 - Rel-9

F MBMS_EPS

revised

S5-144401

Rel-9 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson 32.273 0028 1 Rel-9

F MBMS_EPS

agreed

S5-144164

Rel-10 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson 32.273 0029 - Rel-10

A MBMS_EPS

revised

S5-144402

Rel-10 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson 32.273 0029 1 Rel-10

A MBMS_EPS

agreed

S5-144165

Rel-11 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson 32.273 0030 - Rel-11

A MBMS_EPS

revised

S5-144403

Rel-11 CR 32.273 Corrections for MBMS offline charging using Diameter

Ericsson 32.273 0030 1 Rel-11

A MBMS_EPS

agreed

S5-144144

Rel-12 CR 32.274 Editorial corrections on references and definitions

Nokia Networks 32.274 0029 - Rel-12

F CH12 revised

S5-144453

Rel-12 CR 32.274 Corrections for alignment between charging specifications

Nokia Networks 32.274 0029 1 Rel-12

F CH12 agreed

S5-144061

R8 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0053 - Rel-8

F CH8 revised

S5-144362

R8 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0053 1 Rel-8

F CH8 agreed

S5-144064

R9 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0054 - Rel-9

A CH8 revised

S5-144365

R9 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0054 1 Rel-9

A CH8 agreed

S5-144067

R10 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0055 - Rel-10

A CH8 revised

S5-144385

R10 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0055 1 Rel-10

A CH8 agreed

S5-144070

R11 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0056 - Rel-11

A CH8 revised

S5-144388

R11 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0056 1 Rel-11

A CH8 agreed

S5-144145

Rel-12 CR 32.275 Editorial corrections on references and definitions

Nokia Networks 32.275 0057 - Rel-12

F CH12 revised

S5-144454

Rel-12 CR 32.275 Corrections for alignment between charging specifications

Nokia Networks 32.275 0057 1 Rel-12

F CH12 agreed

S5-144152

R12 CR 32.275 Removal of CDIVN service

Nokia Networks 32.275 0058 - Rel-12

A CH8 revised

S5- R12 CR 32.275 Removal of Nokia Networks 32.275 0058 1 Rel- A CH8 agreed

Page 131:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144390 CDIVN service 12S5-144146

Rel-12 CR 32.280 Editorial corrections on references and definitions

Nokia Networks 32.280 0028 - Rel-12

F CH12 revised

S5-144455

Rel-12 CR 32.280 Corrections for alignment between charging specifications

Nokia Networks 32.280 0028 1 Rel-12

F CH12 agreed

S5-144147

Rel-12 CR 32.295 Editorial corrections on references and definitions

Nokia Networks 32.295 0008 - Rel-12

F CH12 revised

S5-144456

Rel-12 CR 32.295 Corrections for alignment between charging specifications

Nokia Networks 32.295 0008 1 Rel-12

F CH12 agreed

S5-144148

Rel-12 CR 32.296 Editorial corrections on references and definitions

Nokia Networks 32.296 0037 - Rel-12

F CH12 revised

S5-144457

Rel-12 CR 32.296 Corrections for alignment between charging specifications

Nokia Networks 32.296 0037 1 Rel-12

F CH12 agreed

S5-144212

Rel-12 CR 32.296 Removal of I-WLAN solution

Ericsson 32.296 0038 - Rel-12

F CH12 revised

S5-144337

Removal of I-WLAN solution

Ericsson 32.296 0038 1 Rel-12

F CH12 revised

S5-144525

Removal of I-WLAN solution

Ericsson 32.296 0038 2 Rel-12

F CH12 agreed

S5-144149

Rel-12 CR 32.297 Editorial corrections on references and definitions

Nokia Networks 32.297 0015 - Rel-12

F CH12 revised

S5-144458

Rel-12 CR 32.297 Corrections for alignment between charging specifications

Nokia Networks 32.297 0015 1 Rel-12

F CH12 agreed

S5-144213

Rel-12 CR 32.297 Removal of I-WLAN solution

Ericsson 32.297 0016 - Rel-12

F CH12 revised

S5-144523

Rel-12 CR 32.297 Removal of I-WLAN solution

Ericsson 32.297 0016 1 Rel-12

F CH12 agreed

S5-144111

Rel-12 CR 32.298 Introduction of Presence Reporting Areas for Charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

32.298 0470 - Rel-12

B CNO_ULI-CH

revised

S5-144344

Rel-12 CR 32.298 Introduction of Presence Reporting Areas for Charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,Ericsson, Allot Communications

32.298 0470 1 Rel-12

B CNO_ULI-CH

agreed

S5-144062

R8 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0471 - Rel-8

F CH8 revised

S5-144363

R8 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0471 1 Rel-8

F CH8 agreed

S5-144065

R9 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0472 - Rel-9

A CH8 revised

S5-144383

R9 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0472 1 Rel-9

A CH8 agreed

S5-144068

R10 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0473 - Rel-10

A CH8 revised

S5-144386

R10 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0473 1 Rel-10

A CH8 agreed

S5-144071

R11 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0474 - Rel-11

A CH8 revised

S5-144389

R11 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0474 1 Rel-11

A CH8 agreed

Page 132:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144073

R12 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0475 - Rel-12

A CH8 revised

S5-144392

R12 CR 32.298 Removal of CDIVN service

Nokia Networks 32.298 0475 1 Rel-12

A CH8 agreed

S5-144075

R12 CR 32.298 Correction for expanded ASN.1 sources code generation

Nokia Networks 32.298 0476 - Rel-12

F CH12 revised

S5-144414

R12 CR 32.298 Correction for expanded ASN.1 sources code generation

Nokia Networks 32.298 0476 1 Rel-12

A CH11 agreed

S5-144076

R12 CR 32.298 Introduction of ASN.1 Cross-reference listing

Nokia Networks 32.298 0477 - Rel-12

B CH12 revised

S5-144412

R12 CR 32.298 Introduction of ASN.1 Cross-reference listing

Nokia Networks 32.298 0477 1 Rel-12

B CH12 agreed

S5-144150

Rel-12 CR 32.298 Editorial corrections on references and definitions

Nokia Networks 32.298 0478 - Rel-12

F CH12 revised

S5-144459

Rel-12 CR 32.298 Corrections for alignment between charging specifications

Nokia Networks 32.298 0478 1 Rel-12

F CH12 agreed

S5-144122

Rel-12 CR 32.298 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.298 0479 - Rel-12

- CH12 revised

S5-144416

Rel-12 CR 32.298 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.298 0479 1 Rel-12

B CH12 agreed

S5-144124

Rel-8 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

32.298 0480 - Rel-8

F CH8 revised

S5-144394

Rel-8 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

32.298 0480 1 Rel-8

F CH8 agreed

S5-144125

Rel-9 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

32.298 0481 - Rel-9

A CH8 revised

S5-144395

Rel-9 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

32.298 0481 1 Rel-9

A CH8 agreed

S5-144126

Rel-10 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

32.298 0482 - Rel-10

A CH8 revised

S5-144396

Rel-10 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

32.298 0482 1 Rel-10

A CH8 agreed

S5-144127

Rel-11 CR 32.298 Correction of ASN.1 tag value for servingNodePLMNIdentifier in SGSN CDRs

Alcatel-Lucent, Nokia Networks

32.298 0483 - Rel-11

A CH8 revised

S5-144397

Rel-11 CR 32.298 Correction of ASN.1 tag

Alcatel-Lucent, Nokia Networks

32.298 0483 1 Rel-11

A CH8 agreed

Page 133:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

value for servingNodePLMNIdentifier in SGSN CDRs

Page 134:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144129

Rel-12 CR 32.298 Introduce Charging Characteristics in Convergent scenario

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.298 0484 - Rel-12

B P4C-F-CH_P

revised

S5-144346

Rel-12 CR 32.298 Introduce Charging Characteristics in Convergent scenario

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.298 0484 1 Rel-12

B P4C-F-CH_P

agreed

S5-144170

Rel-12 CR 32.298 Introduce Traffic Data Volumes in IPE-CDR

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.298 0485 - Rel-12

B P4C-F-CH_P

agreed

S5-144172

CR Rel-12 32.298 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.298 0486 - Rel-12

B CH12 revised

S5-144462

CR Rel-12 32.298 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.298 0486 1 Rel-12

B CH12 agreed

S5-144159

Rel-11 CR 32.298 Correction on inconsistent defined parameter for NetLoc

Nokia Networks 32.298 0487 - Rel-11

F NWK-PL2IMS_CH

revised

S5-144409

Rel-11 CR 32.298 Correction on inconsistent defined parameter for NetLoc

Nokia Networks 32.298 0487 1 Rel-11

F NWK-PL2IMS_CH

agreed

S5-144161

Rel-12 CR 32.298 Correction on inconsistent defined parameter for NetLoc

Nokia Networks 32.298 0488 - Rel-12

A NWK-PL2IMS_CH

revised

S5-144411

Rel-12 CR 32.298 Correction on inconsistent defined parameter for NetLoc

Nokia Networks 32.298 0488 1 Rel-12

A NWK-PL2IMS_CH

agreed

S5-144204

Rel-12 CR 32.298 Corrections to include missing fixed user location information for NSWO

Ericsson 32.298 0489 - Rel-12

F P4C-F-CH_P, P4C-F-CH_T

revised

S5-144327

Rel-12 CR 32.298 Corrections to include missing fixed user location information for NSWO

Ericsson 32.298 0489 1 Rel-12

F P4C-F-CH_P, P4C-F-CH_T

revised

S5-144348

Rel-12 CR 32.298 Corrections to include missing fixed user location information for NSWO

Ericsson,Allot 32.298 0489 1 Rel-12

F P4C-F-CH_P, P4C-F-CH_T

agreed

S5-144207

Rel-12 CR 32.298 Correction of Subscriber Equipment Number and Instance Id for privacy concerns

Ericsson 32.298 0490 - Rel-12

F CH12 agreed

S5-144209

Rel-8 CR 32.298 Correction of ASN.1 tag value for 3GPP2UserLocation - align with Release 9

Ericsson, Alcatel-Lucent

32.298 0491 - Rel-8

F CH8 revised

S5-144398

Rel-8 CR 32.298 Correction of ASN.1 tag value for 3GPP2UserLocation - align with Release 9

Ericsson, Alcatel-Lucent

32.298 0491 1 Rel-8

F CH8 agreed

S5-144214

Rel-12 CR 32.298 Removal of I-WLAN solution

Ericsson 32.298 0492 - Rel-12

F CH12 revised

S5-144524

Rel-12 CR 32.298 Removal of I-WLAN solution

Ericsson 32.298 0492 1 Rel-12

F CH12 agreed

S5-144227

Rel-12 CR 32.298 Introduction of Network Release cause to include RAN-NAS Release cause

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

32.298 0493 - Rel-12

B CH12 noted

Page 135:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

in offline charging

Page 136:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144413

Rel-11 CR 32.298 Correction for expanded ASN.1 sources code generation

Nokia Networks 32.298 0494 - Rel-11

F CH11 agreed

S5-144123

Rel-12 CR 32.299 Introduction of report the most up to date User Location Information

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.299 - - Rel-12

- - withdrawn

S5-144110

Rel-12 CR 32.299 Introduction of Presence Reporting Areas for Charging

Ericsson, Alcatel-Lucent

32.299 0596 - Rel-12

B CNO_ULI-CH

revised

S5-144343

Rel-12 CR 32.299 Introduction of Presence Reporting Areas for Charging

Ericsson, Alcatel-Lucent,Allot

32.299 0596 1 Rel-12

B CNO_ULI-CH

agreed

S5-144063

R8 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0597 - Rel-8

F CH8 revised

S5-144364

R8 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0597 1 Rel-8

F CH8 agreed

S5-144066

R9 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0598 - Rel-9

A CH8 revised

S5-144384

R9 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0598 1 Rel-9

A CH8 agreed

S5-144069

R10 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0599 - Rel-10

A CH8 revised

S5-144387

R10 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0599 1 Rel-10

A CH8 agreed

S5-144072

R11 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0600 - Rel-11

A CH8 revised

S5-144391

R11 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0600 1 Rel-11

A CH8 agreed

S5-144074

R12 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0601 - Rel-12

A CH8 revised

S5-144393

R12 CR 32.299 Removal of CDIVN service

Nokia Networks 32.299 0601 1 Rel-12

A CH8 agreed

S5-144151

Rel-12 CR 32.299 Editorial corrections on references and definitions

Nokia Networks 32.299 0602 - Rel-12

F CH12 revised

S5-144460

Rel-12 CR 32.299 Corrections for alignment between charging specifications

Nokia Networks 32.299 0602 1 Rel-12

F CH12 agreed

S5-144173

CR Rel-12 32.299 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.299 0603 - Rel-12

B CH12 revised

S5-144463

CR Rel-12 32.299 Complete ePDG offline charging description

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell

32.299 0603 1 Rel-12

B CH12 agreed

S5-144205

Rel-12 CR 32.299 Corrections to include missing fixed user location information for NSWO

Ericsson 32.299 0604 - Rel-12

F P4C-F-CH_P, P4C-F-CH_T

agreed

S5-144166

Rel-9 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson 32.299 0605 - Rel-9

F MBMS_EPS

revised

S5-144404

Rel-9 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson 32.299 0605 1 Rel-9

F MBMS_EPS

agreed

S5-144167

Rel-10 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson 32.299 0606 - Rel-10

A MBMS_EPS

revised

S5-144405

Rel-10 CR 32.299 Correction to define

Ericsson 32.299 0606 1 Rel-10

A MBMS_EPS

agreed

Page 137:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

missing AVP for MBMS offline charging

Page 138:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144168

Rel-11 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson 32.299 0607 - Rel-11

A MBMS_EPS

revised

S5-144406

Rel-11 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson 32.299 0607 1 Rel-11

A MBMS_EPS

agreed

S5-144169

Rel-12 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson 32.299 0608 - Rel-12

A MBMS_EPS

revised

S5-144407

Rel-12 CR 32.299 Correction to define missing AVP for MBMS offline charging

Ericsson 32.299 0608 1 Rel-12

A MBMS_EPS

agreed

S5-144215

Rel-12 CR 32.299 Removal of I-WLAN solution

Ericsson 32.299 0609 - Rel-12

F CH12 revised

S5-144338

Rel-12 CR 32.299 Removal of I-WLAN solution

Ericsson 32.299 0609 1 Rel-12

F CH12 revised

S5-144526

Rel-12 CR 32.299 Removal of I-WLAN solution

Ericsson 32.299 0609 2 Rel-12

F CH12 agreed

S5-144228

Rel-12 CR 32.299 Introduction of Network Release cause to include RAN-NAS Release cause in offline charging

Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T

32.299 0610 - Rel-12

B CH12 noted

S5-144548

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.306 0003 - Rel-12

C OAM12 agreed

S5-144549

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.316 0001 - Rel-12

C OAM12 agreed

S5-144550

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.326 0002 - Rel-12

C OAM12 agreed

S5-144551

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.336 0001 - Rel-12

C OAM12 agreed

S5-144552

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.346 0001 - Rel-12

C OAM12 agreed

S5-144553

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.356 0001 - Rel-12

C OAM12 agreed

S5-144554

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.366 0001 - Rel-12

C OAM12 agreed

S5-144555

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.376 0002 - Rel-12

C OAM12 agreed

S5-144556

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.386 0002 - Rel-12

C OAM12 agreed

S5-144557

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.396 0003 - Rel-12

C OAM12 agreed

S5- CR R9 32.405 Add the Nokia Networks 32.405 0072 - Rel- F OAM9 revised

Page 139:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144181 missing corresponding NRM spec

9

S5-144424

CR CR R9 32.405 Correction of scope

Nokia Networks 32.405 0072 1 Rel-9

A OAM7 agreed

S5-144183

CR R10 32.405 Add the missing corresponding NRM spec

Nokia Networks 32.405 0073 - Rel-10

A OAM9 revised

S5-144425

CR R10 32.405 Correction of scope

Nokia Networks 32.405 0073 1 Rel-10

A OAM7 agreed

S5-144184

CR R11 32.405 Add the missing corresponding NRM spec

Nokia Networks 32.405 0074 - Rel-11

A OAM9 revised

S5-144426

CR R11 32.405 Correction of scope

Nokia Networks 32.405 0074 1 Rel-11

A OAM9 agreed

S5-144427

CR R7 32.405 Correction of scope

Nokia Networks 32.405 0075 - Rel-7

F OAM7 agreed

S5-144428

CR R8 32.405 Correction of scope

Nokia Networks 32.405 0076 - Rel-8

A OAM7 agreed

S5-144185

CR R9 32.406 Add the missing corresponding NRM spec

Nokia Networks 32.406 0011 - Rel-9

F OAM9 revised

S5-144429

CR R9 32.406 Correction of scope

Nokia Networks 32.406 0011 1 Rel-9

A OAM7 agreed

S5-144186

CR R10 32.406 Add the missing corresponding NRM spec

Nokia Networks 32.406 0012 - Rel-10

A OAM9 revised

S5-144430

CR R10 32.406 Correction of scope

Nokia Networks 32.406 0012 1 Rel-10

A OAM7 agreed

S5-144187

CR R11 32.406 Add the missing corresponding NRM spec

Nokia Networks 32.406 0013 - Rel-11

A OAM9 revised

S5-144431

CR R11 32.406 Correction of scope

Nokia Networks 32.406 0013 1 Rel-11

A OAM7 agreed

S5-144436

CR R7 32.406 Correction of scope

Nokia Networks 32.406 0014 - Rel-7

F OAM7 agreed

S5-144437

CR R8 32.406 Correction of scope

Nokia Networks 32.406 0015 - Rel-8

A OAM7 agreed

S5-144188

CR R9 32.407 Add the missing corresponding NRM spec

Nokia Networks 32.407 0021 - Rel-9

F OAM9 noted

S5-144189

CR R10 32.407 Add the missing corresponding NRM spec

Nokia Networks 32.407 0022 - Rel-10

A OAM9 noted

S5-144190

CR R11 32.407 Add the missing corresponding NRM spec

Nokia Networks 32.407 0023 - Rel-11

A OAM9 noted

S5-144191

CR R9 32.409 Add the missing corresponding NRM spec

Nokia Networks 32.409 0058 - Rel-9

F OAM9 noted

S5-144192

CR R10 32.409 Add the missing corresponding NRM spec

Nokia Networks 32.409 0059 - Rel-10

A OAM9 noted

S5-144193

CR R11 32.409 Add the missing corresponding NRM spec

Nokia Networks 32.409 0060 - Rel-11

A OAM9 noted

S5-144558

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.416 0004 - Rel-12

C OAM12 agreed

S5-144113

Rel-11 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT

CATT 32.422 0271 - Rel-11

F OAM-ePM-UE

revised

S5-144367

Rel-11 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT

CATT 32.422 0271 1 Rel-11

F OAM-ePM-UE

agreed

Page 140:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

S5-144114

Rel-12 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT

CATT 32.422 0272 - Rel-12

F OAM-ePM-UE

revised

S5-144368

Rel-12 CR 32.422 Adding reference for location measurement Angle of Arrival for MDT

CATT 32.422 0272 1 Rel-12

F OAM-ePM-UE

agreed

S5-144218

R12 CR 32.422 Update the value set of the Collection period for RRM measurements LTE to align with 36.413

ZTE 32.422 0273 - Rel-12

F OAM12 noted

S5-144221

Rel-12 CR 32.422 Addition of missing configuration parameter for trace and MDT activation

NEC 32.422 0274 - Rel-12

F OAM12 noted

S5-144255

Adapting Trace Reference to Core IMS

Ericsson 32.422 0275 - Rel-12

F OAM12 noted

S5-144370

Adapting Trace Reference to Core IMS

Ericsson 32.422 0275 1 Rel-12

F OAM12 withdrawn

S5-144112

Rel-11 CR 32.423 Adding abbreviation for Angle of Arrival

CATT 32.423 0085 - Rel-11

F OAM-ePM-UE

noted

S5-144258

Adapting Trace Reference to Core IMS

Ericsson 32.423 0086 - Rel-12

F OAM12 noted

S5-144371

Adapting Trace Reference to Core IMS

Ericsson 32.423 0086 1 Rel-12

F OAM12 withdrawn

S5-144260

Correct the File naming convention

Ericsson 32.423 0087 - Rel-6

F OAM6 noted

S5-144261

Correct the File naming convention

Ericsson 32.423 0088 - Rel-7

A OAM6 noted

S5-144262

Correct the File naming convention

Ericsson 32.423 0089 - Rel-8

A OAM6 noted

S5-144263

Correct the File naming convention

Ericsson 32.423 0090 - Rel-9

A OAM6 noted

S5-144264

Correct the File naming convention

Ericsson 32.423 0091 - Rel-10

A OAM6 noted

S5-144265

Correct the File naming convention

Ericsson 32.423 0092 - Rel-11

A OAM6 revised

S5-144372

Rel-12 CR 32.423 Correct the File naming convention

Ericsson 32.423 0092 1 Rel-12

F OAM12 agreed

S5-144194

CR R9 32.425 Add the missing corresponding NRM spec

Nokia Networks 32.425 0151 - Rel-9

F OAM9 noted

S5-144195

CR R10 32.425 Add the missing corresponding NRM spec

Nokia Networks 32.425 0152 - Rel-10

A OAM9 noted

S5-144196

CR R11 32.425 Add the missing corresponding NRM spec

Nokia Networks 32.425 0153 - Rel-11

A OAM9 noted

S5-144197

CR R12 32.425 Add the missing corresponding NRM spec

Nokia Networks 32.425 0154 - Rel-12

A OAM9 noted

S5-144198

CR R9 32.426 Add the missing corresponding NRM spec

Nokia Networks 32.426 0062 - Rel-9

F OAM9 noted

S5-144199

CR R10 32.426 Add the missing corresponding NRM spec

Nokia Networks 32.426 0063 - Rel-10

A OAM9 noted

S5-144200

CR R11 32.426 Add the missing corresponding NRM spec

Nokia Networks 32.426 0064 - Rel-11

A OAM9 noted

S5-144223

Rel-11 CR 32.442 Addition of missing parameters relating to RCEF

NEC 32.442 0232 - Rel-11

F OAM11 agreed

S5- Rel-11 CR 32.442 Editorial NEC 32.442 0233 - Rel- D OAM11 noted

Page 141:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

144224 corrections 11S5-144225

Rel-10 CR 32.442 Editorial corrections

NEC 32.442 0234 - Rel-10

D OAM10 noted

S5-144249

Rel-11 CR 32.442 Addition of missing input parameters list of TraceTarget attribute for EPC trace and MDT activation.

NEC 32.442 0235 - Rel-11

F OAM11 noted

S5-144219

R12 CR 32.446 Update the value set of the Collection period for RRM measurements LTE to align with 36.413

ZTE 32.446 0057 - Rel-12

F OAM12 noted

S5-144559

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.446 0058 - Rel-12

C OAM12 agreed

S5-144180

CR R12 32.450 Add real TA size monitoring KPI

Nokia Networks 32.450 0016 - Rel-12

B OAM12 noted

S5-144179

CR R12 32.451 Add real TA size monitoring KPI requirements

Nokia Networks 32.451 0004 - Rel-12

B OAM12 noted

S5-144560

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.506 0001 - Rel-12

C OAM12 agreed

S5-144561

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.536 0010 - Rel-12

C OAM12 agreed

S5-144562

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.606 0003 - Rel-12

C OAM12 agreed

S5-144563

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.616 0004 - Rel-12

C OAM12 agreed

S5-144564

Update the link from Solution Set to Information Service due to the end of Release 12

WG Chairman 32.666 0003 - Rel-12

C OAM12 agreed

Page 142:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Annex C: Lists of liaisons

C1: Incoming liaison statements

Document Original Title From Decision Reply inS5-144089

LS from CT4 to SA5 on Renaming of TWAN-SSID and TWAN-BSSID Diameter AVPs

C4-141030

noted

S5-144090

Reply to LS on Maintenance of I-WLAN Solution (SP-140089 /C6-140255)

C6-140294

noted

S5-144091

Ls from CT6 to SA5 on ProSe Lawful Interception C6-140315

replied to S5-144353

S5-144092

LS from CT cc SA5 on Maintenance of I-WLAN Solution CP-140457

noted

S5-144093

Resubmitted LS from ETSI TC EE to SA5 on Update on the liaison to 3GPP on Cooperation for Energy Efficiency Measurements

ETSI TC EE

postponed

S5-144094

LS from OMA ARC to SA5 on OMA activities on NetAPIs and Service Exposure Framework

OMA-ARC

noted

S5-144095

LS from RAN1 cc SA5 on radio interface based synchronization

R1-142762

noted

S5-144096

LS from RAN2 to SA5 on MBSFN MDT R2-142873

postponed

S5-144097

LS from RAN2 to SA5 on Clarifications about MOCN and GWCN

R2-142939

noted

S5-144098

LS from RAN3 to SA5 on on clarifications about MOCN and GWCN

R3-141523

noted

S5-144099

LS from SA1 to SA5 on Removal of option to subscribe for a notification of diversion occurrence

S1-141382

noted

S5-144100

Resubmitted LS from SA2 to SA5 on Charging aspects for Network Sharing (MOCN GWCN)

S2-141509

postponed

S5-144101

LS from SA2 cc SA5 on Maintenance of I-WLAN specification

S2-142202

noted

S5-144102

LS from SA3 cc SA5 on Maintenance of I-WLAN Solution S3-140920

noted

S5-144103

LS from SA to SA5 on Maintenance of I-WLAN Solution SP-140397

replied to S5-144380

S5-144104

LS from SA cc SA5 on SDN standardization activity map SP-140399

noted

S5-144105

LS from CT4 to SA5 on Discontinuance of 29.234 C4-141672

noted

S5-144331

LS from ETSI NFV to SA5 on Availability of the NFV ISG Management and Orchestration GS

ETSI ISG NFV

noted

C2: Outgoing liaison statements

Document Title To Cc reply to i/c LS

S5-144336

LSout from SA5 to CT4 on Completion of AVP code definitions

CT4 -

S5-144340

LS on Removal of I-WLAN-specific AVPs CT3,CT4 -

S5-144353

Reply to Ls from CT6 to SA5 on ProSe Lawful Interception

CT6, SA3, SA1

SA2, CT, CT1, CT4

S5-144091

S5-144380

Reply to: LS from SA to SA5 on Maintenance of I-WLAN Solution

SA

S5-144466

LS to CT1 on ProSe Direct Communication charging support

CT1

Page 143:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Annex D: List of agreed/approved new and revised Work Items

Document Title Source new/revisedS5-144352

New WID on Charging aspects of Core Network Overload - User Location Information reporting improvements

Alcatel-Lucent, Ericsson

new WID

S5-144248

TR 32.842 rapporteur change proposal Rapporteur revised WID

S5-144381

Revised WID Study on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements

Huawei revised WID

S5-144446

Revised WID Energy Efficiency related Performance measurements Nokia Networks revised WID

S5-144488

Revised WID on WLAN Management Intel revised WID

S5-144493

Revised WID Converged Management PM Interface definitions WG Chairman Revised WID

S5-144518

Revised WID on IWLAN management Rapporteur Revised WID

S5-144492

Update of TOP OPE WID Rapporteur Revised WID

S5-144487

New WID on Heterogeneous Networks Management Rapporteur New WID

S5-144527

Rel 12 WLAN OAM SID Rapporteur New WID

Page 144:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Annex E: List of participantsName Representing Status-Partner Ctry

Al-kanani, Hassan (Dr.) NEC EUROPE LTD3GPPMEMBER (ETSI) GB

Andrianov, Anatoly (Mr.) Nokia Networks3GPPMEMBER (ETSI) US

Berggren, Tommy (Mr.) TeliaSonera AB3GPPMEMBER (ETSI) SE

Bizzarri, Simone (Mr.) TELECOM ITALIA S.p.A.3GPPMEMBER (ETSI) IT

Cailliere, David (Mr.) ORANGE3GPPMEMBER (ETSI) FR

Cheng, Hong (Mr.) Qualcomm Incorporated3GPPMEMBER (ATIS) US

Chou, Joey (Mr.) Intel Corporation (UK) Ltd3GPPMEMBER (ETSI) US

Cornily, Jean Michel (Mr.) Orange Spain3GPPMEMBER (ETSI) FR

Gardella, Maryse (Mrs.) Alcatel-Lucent Telecom Ltd3GPPMEMBER (ETSI) FR

Goermer, Gerald (Mr.) Nokia Networks Oy3GPPMEMBER (ETSI) DE

Guo, Wenjie (Miss) ZTE Corporation3GPPMEMBER (ETSI) CN

Hédé, Patrice (Mr.)HUAWEI Technologies Japan K.K.

3GPPMEMBER (ARIB) FR

Heskin, Eamon (Mr.) T-Mobile Austria GmbH3GPPMEMBER (ETSI) NL

Hu, Di (Mr.) CATR3GPPMEMBER (CCSA)  

Hubinette, Ulf (Mr.) Ericsson3GPPMEMBER (ETSI) SE

Huo, Xiaoning (Mr.)China Mobile Com. Corporation

3GPPMEMBER (CCSA)  

Lagha, Naceur (Dr.)Amdocs Software Systems Ltd

3GPPMEMBER (ETSI) FR

Li, Jian (Mr.)China Mobile Com. Corporation

3GPPMEMBER (CCSA) CN

Li, Li (Miss)HiSilicon Technologies Co. Ltd

3GPPMEMBER (CCSA) CN

Liping, Chen (Miss) ZTE Corporation3GPPMEMBER (CCSA) CN

Liu, Jinglei (Mr.)China Mobile Com. Corporation

3GPPMEMBER (CCSA) CN

Marchetto, Luisa (Miss) AT&T GNS Belgium SPRL3GPPMEMBER (ETSI) US

McNamee, Alan (Mr.) Openet Telecom3GPPMEMBER (ETSI) IE

Mustapha, Mona (Ms.) VODAFONE Group Plc3GPPMEMBER (ETSI) GB

Nakamura, Shin-ichi (Mr.) Hitachi Ltd.3GPPMEMBER (ARIB) JP

Nakano, Yusuke (Mr.) KDDI Corporation3GPPMEMBER (ARIB) JP

Neal, Adrian (Dr.) Vodafone Romania S.A.3GPPMEMBER (ETSI) GB

Olvera, Ulises (Mr.)INTERDIGITAL COMMUNICATIONS

3GPPMEMBER (ETSI) CA

Petersen, Robert (Mr.) Ericsson Japan K.K.3GPPMEMBER (ARIB) SE

Pollakowski, Olaf (Dr.) Nokia Networks3GPPMEMBER (ETSI) DE

Sakae, Kozo (Mr.) NTT DOCOMO INC. 3GPPMEMBER (TTC)  

Schnell, Christof (Ing.) Vodafone GmbH3GPPMEMBER (ETSI) DE

Shrader, David (Mr.) Ericsson Inc.3GPPMEMBER (ATIS) US

Stanek, George (Mr.) AT&T3GPPMEMBER (ATIS) US

Sudarsan, Padma (Ms.)Alcatel-Lucent Deutschland AG

3GPPMEMBER (ETSI) US

Swetina, Joerg (Dr.) NEC Corporation 3GPPMEMBER DE

Page 145:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

(ETSI)Tamura, Toshiyuki (Mr.) NEC Corporation 3GPPMEMBER (TTC) JP

Toche, Christian (Mr.)HuaWei Technologies Co., Ltd

3GPPMEMBER (CCSA) FR

Tovinger, Thomas (Mr.) Ericsson3GPPMEMBER (ETSI) SE

Tse, Edwin (Mr.) Ericsson Inc.3GPPMEMBER (ATIS) CA

Yanover, Vladimir (Dr.) Cisco Systems Belgium3GPPMEMBER (ETSI) IL

Yao, Yizhi (Mr.) Nokia Networks3GPPMEMBER (ETSI) CN

Yokota, Daisuke (Mr.) SOFTBANK MOBILE Corp.3GPPMEMBER (ARIB) JP

Zhang, Kai (Mr.)HUAWEI TECHNOLOGIES Co. Ltd.

3GPPMEMBER (ETSI) CN

Zoicas, Adrian (Mr.) ETSI3GPPORG_REP (ETSI) FR

Zou, Lan (Miss)Huawei Technologies France

3GPPMEMBER (ETSI) CN

Page 146:   · Web viewThird Generation Partnership Project (3GPP™) Meeting Report for TSG SA WG5 meeting: 96. Sophia Antipolis, France, 18/08/2014 to 22/08/2014. Note: Hyperlinks to tdocs

Annex H: List of future meetings

Title Start date End date (OP) Town Country

Reference

3GPPSA5#97 20/10/2014 09:00:00

24/10/2014 17:30:00

Venice IT S5-97

3GPPSA5#98 17/11/2014 09:00:00

21/11/2014 17:30:00

San Francisco US S5-98

3GPPSA5#99 02/02/2015 09:00:00

06/02/2015 17:30:00

Taipei TW S5-99

3GPPSA5#100 13/04/2015 09:00:00

17/04/2015 17:30:00

Dubrovnik HR S5-100

3GPPSA5#101 18/05/2015 09:00:00

22/05/2015 17:30:00

Istanbul TR S5-101

3GPPSA5#102 24/08/2015 09:00:00

28/08/2015 17:30:00

China CN S5-102

3GPPSA5#103 12/10/2015 09:00:00

16/10/2015 17:30:00

US US S5-103

3GPPSA5#104 16/11/2015 09:00:00

20/11/2015 17:30:00

US US S5-104

Annexes to report prepared by: Mirko Cano Soveri


Recommended