EEWGROUP
WELCOME TO OUR WORLD
SEEING OPPORTUNITIES. SUSTAINING VALUES. TAKING RESPONSIBILITY.Our aspiration right from the beginning
‘Side by side by our partners – since more than 80 years’Jörg Schorge, Christoph Schorge and Christina Dietze, Associates Erndtebrücker Eisenwerk GmbH & Co. KG
2 – 3
Progress originates from the willingness to think big and to face challenges with farsigh-tedness. This attitude made EEW one of the global leaders offering solutions for large-diameter steel pipes. This is what counts and what our customers and partners can rely upon, now and in future.
We apply the highest standards, to ourselves and also to our products which are manufac- tured by our staff working in our affiliated plants around the globe. It is a question of responsibility to which we, at EEW, assign ourselves day by day. We move in complex markets where one thing counts more than anything else: customised solutions for chal-lenging tasks. This needs skills. This needs experience. Above all, it needs people who support you to achieve the best possible results.
Together we develop new dimensions.
Welcome to our world!
With power and passion
EEWGROUP
GOING FORWARD
1936Foundation
1982 Establishment of a second mill in Erndtebrück
13,651,493 €Turnover
140Employees
1995 Point-to-Point Construction
Service was born
1952Production of steel fuel-oil tanks
3,323,397 €Turnover
60Employees
1974Extended production programme
to include large DSAW pipes
1994Turning point in EEW’s history: Installation of a 13.2 press bending machine
24,542,010 €Turnover
199Employees
2001Becoming international:
Foundation of EEW Korea
75,167,144 €Turnover
510Employees 2008
EEW SPC – start of production
560,731,379 €Turnover
1,144Employees
2010Foundation of WELDEC (now AWS Schaefer).
EEW Pickhan joins the group. Start of EEW Malayisa.
375,360,643 €Turnover
1,488Employees
2017672,821,236 €
Turnover
2,125Employees
2012Foundation of Global Pipe Company
606,517,925 €Turnover
1,742Employees
2015EEW OSB and EEW KHPC – start of production
2014EEW Bergrohr joins the group.
4 – 5
Subsea PipelinesGathering LinesSubsea Manifolds & TreesFlow LinesExport LinesBuckle Arrestors
FPSOs & FPUsAnchor PilesRisers & Conductors
Tension Leg PlatformsTendon Systems
Fixed PlatformsJacket & Topside StructuresRisers & Conductors
Jack-Up RigsLeg Sections made ofChords & Racks
Offshore Wind TurbinesMonopile FoundationsJacket FoundationsTransition Pieces
AT HOME IN THE WORLD OF ENERGY
6 – 7
Petrochemical Plants
Compressor Stations
Substations & Converter PlatformsJacket Structures
Power Plants
Oil & Gas Storage
LNGJetty Pipelines & Construction
Gas Treatment Plantsincl. Slug Catchers
Civil Construction
Onshore Pipelines
Superlatives distinguish the markets of our clients – whether it is the intense heat in refi-neries and power plants, the strong pressure in the deep sea, the ice cold in the Arctic or the high wind offshore. Having a worldwide unique product portfolio of large diameter steel pipes, we able to provide complete solutions for the energy industry.
We work side-by-side with our customers to better understand their needs. Together we develop individual products and servi-ces required for each particular operation. Because unique projects need unique solutions.
Securing tomorrow’s energy supply with pipes from EEW
• Steel pipes and cones for legs, bracings,
piles and caissons
• Pre-fabricated legs and bracings, including profiling
• Pre-fabricated sleeves and conductor guides
• Conductor and riser pipes
• Monopiles and transition pieces
• Pin piles for jackets
• Suction piles
• Fully assembled legs for jack-up rigs
Structural Pipes
By diverse products and tailor-made solutions
PRECISION MEETS FLEXIBILITY ©
Sta
nisla
v Ko
mog
orov
– F
oto
lia.c
om
LSAW steel pipes of high quality for application in
• Power Plants
• Gas Treatment Plants
• Refineries
• Chemical Plants
• LNG Terminals
Line Pipes
Process Pipes
• Straight steel pipes
• Conductor pipes
• Strain-based design pipes
• Induction bends
• Buckle arrestors
• Pipes for finger-type slug catcher facilities
• Compressor station piping
• Pipes and eccentric reducers for pig receivers /
launchers
• Riser pipes / riser pipe systems incl. bends
• Pipes for gas storage
8 – 9
© S
tani
slav
Kom
ogor
ov –
Fo
tolia
.co
m
© okinawakasawa – Fotolia.com
CONVINCINGOnshore and offshore
ONGC NeelamYear: 2017 / 2018Customer: Larsen & ToubroDestination: IndiaMaterial: API 2H Gr. 50Z S355 J2 + N API 5L X52N PSL2Dimensions: 457.0 – 2,438.0 mm O. D. 9.53 – 95.0 mm W. T.Tonnage: 15,000
Zadco Upper ZakumYear: 2014 / 2015Customer: PetrofacDestination: UAEMaterial: API 5L Gr. X60 UNS N 08825 Clad MaterialDimensions: 487.0 – 1,067.0 mm O. D. 11.13 – 53.93 + 3.0 mm W. T.Tonnage: 5,400
Statoil Johan SverdrupYear: 2015 – 2017Customer: KvaernerDestination: NorwayMaterial: S355 G7 + M, S355 G8 + M Z35 S355 G10 + M Z35 S420 G2 + M, S420 G2 + M Z35Dimensions: 355.0 – 5,500.0 mm O. D. 10.0 – 100.0 mm W. T. 200 – 48,855 mm lengthTonnage: 37,500
Oil/Gas
© Courtesy of Dragados Offs
hore
Aramco JazanYear: 2015 / 2016Customer: various EPCsDestination: Saudi ArabiaMaterial: API & ASTM gradesDimensions: 660.4 – 2,428.4 mm O. D. 9.5 – 70.0 mm W. T.Tonnage: 70,000
Moho Nord TLP ProjectYear: 2013 – 2015Customer: Total E&P CongoDestination: Congo Water depth: approx. 800 m Material: API 5L Gr. X65 mod. S355KT-40 / KT-20Dimensions: Tendon segments: 610 mm O. D., 25.4 mm W. T., up to 80 m length Tendon piles: O. D. 2,133.6 mm, W. T. 50.0 – 100.0 mm FPU piles: O. D. 2,133.6 mm, W. T. 40.0 – 50.0 mmTonnage: 8,524
Hornsea Project 1Year: 2017 / 2018Customer: DONG Energy Destination: UKMaterial: S275 ML , S33 MLDimensions: 6,000.0 – 8,100.0 mm O. D. 58.0 – 92.7 mm W. T. 2,000 – 71,685 mm lengthTonnage: 142,260
© Ørsted
© T
Tstu
dio
– F
oto
li a.c
om
‘Why I rely on EEW? Because I can always count on personal service and perfect solutions.’Ricardo Carver, Tendon Lead Engineer, Total
Hornsea Project 1Year: 2017 / 2018Customer: DONG Energy Destination: UKMaterial: S275 ML , S33 MLDimensions: 6,000.0 – 8,100.0 mm O. D. 58.0 – 92.7 mm W. T. 2,000 – 71,685 mm lengthTonnage: 142,260
BeatriceYear: 2016 – 2017Customer: SHL, Bladt, Smulders, BiFab Destination: UKMaterial: S355 ML / ML , S355 ML Z35, S355 G8 + M Z35, S420 MLDimensions: 440.0 – 2,220.0 mm O. D. 12.7 – 70.0 mm W. T. 909 – 54,000 mm lengthTonnage: 78,457
Wind
© Ørsted
11 – 14
Burj KhalifaYear: 2007Customer: AMPDestination: UAEMaterial: ASTM A 572 Gr. 50Dimensions: 711.0 – 1,524.0 mm O. D. up to 55.0 mm W. T.Tonnage: 700
Civil Construction
Customer: EnBW Destination: GermanyTonnage: 83,950
© Ballast Nedam
Baltic I + II
Press and Roll bending – 12" to 96" OD
based on 355 MPa NYS
WT
OD
9.53(0.375)
12.70(0.500)
14.27(0.562)
15.88(0.625)
17.48(0.688)
19.05(0.750)
20.62(0.812)
22.23(0.875)
24.61(0.969)
25.40(1.000)
26.19(1.031)
28.58(1.125)
29.36(1.156)
30.96(1.219)
31.75(1.250)
32.54(1.281)
34.93(1.375)
38.10(1.500)
38.89(1.531)
39.67(1.562)
41.28(1.625)
44.45(1.750)
45.24(1.781)
46.02(1.812)
47.63(1.875)
50.80(2.000)
53.98(2.125)
59.54(2.344)
63.50(2.500)
101.60(4.000)
324 (12)
356 (14)
406 (16)
457 (18)
508 (20)
559 (22)
610 (24)
660 (26)
711 (28)
762 (30)
813 (32)
864 (34)
914 (36)
965 (38)
1016 (40)
1067 (42)
1118 (44)
1168 (46)
1219 (48)
1321 (52)
1422 (56)
1524 (60)
1575 (62)
1829 (72)
2134 (84)
2438 (96)
Roll bending – large diameter
WT
OD
35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 130 150 170
1016 (40)
1067 (42)
1118 (44)
1168 (46)
1219 (48)
1321 (52)
1422 (56)
1524 (60)
1829 (72)
2134 (84)
2438 (96)
2845 (112)
3500 (128)
5000 (197)
6000 (236)
7000 (236)
10000 (394)
DIVERSITY CREATES POSSIBILITIESExploring unique dimensions
* * * * *
*
* *
* *
* *
* *
* *
*
*
*
*
*
*
*
*
*
*
*
2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW
2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW
2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW
Pipe Length
4.8 + 4.2 m 6.1 + 4.2 m 4.2 m
OD mm (")
WT mm (")
based on 355 MPa NYS
WT
OD
9.53(0.375)
12.70(0.500)
14.27(0.562)
15.88(0.625)
17.48(0.688)
19.05(0.750)
20.62(0.812)
22.23(0.875)
24.61(0.969)
25.40(1.000)
26.19(1.031)
28.58(1.125)
29.36(1.156)
30.96(1.219)
31.75(1.250)
32.54(1.281)
34.93(1.375)
38.10(1.500)
38.89(1.531)
39.67(1.562)
41.28(1.625)
44.45(1.750)
45.24(1.781)
46.02(1.812)
47.63(1.875)
50.80(2.000)
53.98(2.125)
59.54(2.344)
63.50(2.500)
101.60(4.000)
324 (12)
356 (14)
406 (16)
457 (18)
508 (20)
559 (22)
610 (24)
660 (26)
711 (28)
762 (30)
813 (32)
864 (34)
914 (36)
965 (38)
1016 (40)
1067 (42)
1118 (44)
1168 (46)
1219 (48)
1321 (52)
1422 (56)
1524 (60)
1575 (62)
1829 (72)
2134 (84)
2438 (96)
Material grades• Carbon steels, incl. sour service • High strength carbon steels up to X120• Cr / Mo steel grades for high
temperature applications• Ni alloy steel grades for low
temperature applications• Stainless steels• Duplex, super duplex, 6 % Mo,
13 % Cr supermartensitic steels • High nickel alloys• Clad materials
DIVERSITY CREATES POSSIBILITIES
* * * * *
*
* *
* *
* *
* *
* *
*
*
*
*
*
*
*
*
*
*
*
2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW
2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW
2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW
Pipe Length
6.1* + 12.2 + 13.2 m 13.2 m 12.5 m
LW = longitudinal weldsWT = wall thicknessOD = outside diameter
16 – 17
ApprovalsISO 9001 EEW Group
ISO 14001 EEW Group
ISO 50001 EEW Erndtebrück, SPC, Pickhan, Bergrohr
OHSAS 18001 EEW Group
EN 1090 EEW Erndtebrück, SPC, Pickhan, OSB, KHPC, Bergrohr
API 2B EEW Erndtebrück, SPC, Malaysia, Korea, GPC, Bergrohr, KHPC, Pickhan
API 5L EEW Erndtebrück, Korea, Malaysia, GPC, Bergrohr, KHPC
API 5LC EEW Erndtebrück, Korea
API 5LD EEW Erndtebrück, Korea, Malaysia, Bergrohr
ASME U, S EEW Erndtebrück, SPC
PED 9723 EG EEW Erndtebrück, Malaysia, Korea, Pickhan, Bergrohr
ISO 3834-2 EEW Group
as well as numerous customer approvals
Sales Of�ce
HOUSTON
DUBAI
ABU DHABI
TEHERAN
MUMBAI
PERTH
TAIPEI
SEOUL
HO-CHI-MINH
RIO DE JANEIRO
GLASGOW
BREDA
VEJLEDÜSSELDORFMOSCOW
PARIS
MADRID
ISTANBUL
SINGAPORE
BEIJING TOKYO
Production & Administration
40,000 MTPAProduction Capacity
28,000 m2
Production Floor
75Employees
35,000 MTPAProduction Capacity
14,000 m2
Production Floor
150Employees
108,000 MTPAProduction Capacity
37,000 m2
Production Floor
500Employees
200,000 MTPAProduction Capacity
32,000 m2
Production Floor
550Employees
180,000 MTPAProduction Capacity
25,000 m2
Production Floor
200Employees
50,000 MTPAProduction Capacity
16,600 m2
Production Floor
50Employees
120,000 MTPAProduction Capacity
31,300 m2
Production Floor
200Employees
200,000 MTPAProduction Capacity
57,000 m2
Production Floor
400Employees
30,000 MTPAProduction Capacity
7,000 m2
Production Floor
90Employees
HEADQUARTERSERNDTEBRÜCK
OSBBERGROHR
SPC ROSTOCK KHPC
KOREA
MALAYSIA
PICKHAN
GPC SAUDI ARABIA
GLOBAL PRESENCESide by side
A list of local sales agencies in further countries is available on our website (www.eew-group.com). If your country is not listed there, please contact our headoffice ([email protected]).
Being close to our customers and their projects – for EEW this is more than only a promise. With our mills, representations and services, we are personally available for our customers worldwide. Our employees show complete commitment – for EEW, for our custo-mers and for bringing off something extraordinary.
Sales Of�ce
HOUSTON
DUBAI
ABU DHABI
TEHERAN
MUMBAI
PERTH
TAIPEI
SEOUL
HO-CHI-MINH
RIO DE JANEIRO
GLASGOW
BREDA
VEJLEDÜSSELDORFMOSCOW
PARIS
MADRID
ISTANBUL
SINGAPORE
BEIJING TOKYO
Production & Administration
40,000 MTPAProduction Capacity
28,000 m2
Production Floor
75Employees
35,000 MTPAProduction Capacity
14,000 m2
Production Floor
150Employees
108,000 MTPAProduction Capacity
37,000 m2
Production Floor
500Employees
200,000 MTPAProduction Capacity
32,000 m2
Production Floor
550Employees
180,000 MTPAProduction Capacity
25,000 m2
Production Floor
200Employees
50,000 MTPAProduction Capacity
16,600 m2
Production Floor
50Employees
120,000 MTPAProduction Capacity
31,300 m2
Production Floor
200Employees
200,000 MTPAProduction Capacity
57,000 m2
Production Floor
400Employees
30,000 MTPAProduction Capacity
7,000 m2
Production Floor
90Employees
HEADQUARTERSERNDTEBRÜCK
OSBBERGROHR
SPC ROSTOCK KHPC
KOREA
MALAYSIA
PICKHAN
GPC SAUDI ARABIA
EEWGROUP
18 – 19
We are aware of our responsibility for the community, the environment and the health and safety of our more than 2,200 employees worldwide. That‘s why we are convinced that HSE is an essential aspect of a successful project delivery as well as a necessary part of a strongly-integrated group management. Through regular self-evaluation, assessments of learning process and training programmes, we always improve our HSE performance.
As part of our HSE policy we are not only working together within the EEW Group in the field of HSE, but also with our customers, subcontractors and third parties. It is the combination of individual strengths and team spirit that brings us closer to our aim of ‘zero work-related injuries/illnesses’.
HSEWorking together for safety
‘No accident is accept-able and all injuries can be prevented.’Christoph Schorge,Managing Director, EEW Group
Working together for safety
All accidents are preventable
Zero work-related injuries / illnesses
OUR APPROACH
OUR GOAL
OUR BELIEF
20 – 21
CSRIt is our own approach to ensure that our in-ternational activities conform to the required laws and regulations as well as to the expecta-tions of our customers and community.
We have established an integrated manage-ment system within the EEW Group containing the internationally recognised certifications in accordance with ISO 9001, OHSAS 18001, ISO 14001 and ISO 50001.
As an ‘ethical compass’, our code of conduct defines guidelines for behaviour in the daily business life of our employees worldwide.
Taking responsibility
‘Great to see EEW took part in our safety incentive scheme during the Beatrice project and encouraged excellent safety suggestions from employees for charity – improving safety and supporting the community.’Douglas Blue, HSE Manager – BOWL EPCI Foundations and Inter-Array Cable Contract, Seaway Heavy Lifting
• ISO 9001
(Quality management)
• ISO 14001
(Environmental management)
• ISO 50001
(Energy management)
• OHSAS 18001
(Occupational health and
safety management)
QHSEcertifications
22 – 23
‘If you choose EEW, you are choosing a strong partner you can rely on – worldwide.’Dr.-Ing. Harald Stolten, Managing Director Erndtebrücker Eisenwerk GmbH & Co. KG
Im Grünewald 257339 ErndtebrückGermany
P.O. Box 10 01 0057335 ErndtebrückGermany
Phone +49 27 53 609-0Fax +49 27 53 609-190E-Mail [email protected]
www.eew-group.com © p
sv-m
arke
ting.
deEEW
GROUP
ERNDTEBRÜCKER EISENWERK GMBH & CO. KG