Welcome to the Ice-O-Matic ® on-line training modules. Diagnosing Slow Production. This module will cover the possible causes of slow production issues on the ICE Series™ Undercounter, 22” and 30” wide modular units. - PowerPoint PPT Presentation
Popular Tags:
12
Ice. Pure and SimpleWelcome to the Ice-O-Matic® on-line training modules.
Transcript

Diagnosing Slow Production

Welcome to the Ice-O-Matic on-line training modules.

Ice. Pure and Simple1Diagnosing Slow ProductionThis module will cover the possible causes of slow production issues on the ICE Series Undercounter, 22 and 30 wide modular units. This module defines slow production as making less than 90% of rated capacity.

Ice. Pure and Simple2Ambient Operating Temperatureat CondenserMinimum: 50 F (10 C)Maximum: 110 F (43 C)Minimum : -20 F (-29 C)Maximum : 120 F (49 C)

Need 6 inches Minimum on inlet and outlet of Self Contained UnitsInstallationSelf-Contained

Remote

One of the causes of low production is improper installation location. IOM Cubers are not to be installed outside or in a location that can exceed designed limits.

Ice. Pure and Simple3Incoming Water Supply Minimum: 20 PSIG Maximum: 60 PSIG Minimum : 40 F (4.5 C) Maximum : 100 F (38 C)

InstallationWater Pressure

Water TemperatureExcessive water temperature can also cause a unit to produce ice slower than designed. It is a myth that hot water freezes faster than cold.

Ice. Pure and Simple430 Modular Units

The major cause of under production is lack of maintenance. A dirty system will cause less than expected ice production. Always verify the cleanliness of the ice maker prior to making adjustments. An indication of a dirty Evaporator is a normal freeze time, but an extended defrost. Mineral accumulation on the plate can make it difficult for the Harvest Assist Assembly to clear the slab from the plate.

Ice. Pure and Simple5Several shots of with curtain on, curtain off, control box cover offTo verify actual production, use this simple formula. Time a cycle from drop to drop. Catch and weigh an ice slab, then do the math as shown above. This example uses ICE0400 Air Cooled units in two different install locations. The one on the left is in a 70 degree room and being fed 50 degree water, the one on the right is in a 90 degree room and being fed 70 degree water. Production charts can be found on each units spec sheets. Which unit is under producing? ICE0400HA4 70/50

20 Minute cycle time

1440 minutes in a day

1440 divided by 20 = 72 cycles/day

Batch weight of 5.5#

72 times 5.5 = 396 # per day.ICE0400HA4 90/70

23 Minute cycle time

1440 minutes in a day

1440 divided by 23 = 62.6 cycles/day

Batch weight of 5.5#

62.6 times 5.5 = 344 # per day.1440 divided by Cycle Time times Batch Weight = Production

Ice. Pure and Simple6The unit on the left is rated for approximately 500 pounds of production while the one on the right is rated for 368 pounds in their given locations. It is the one on the left that is under producing. This unit would need to be checked for cleanliness first, then diagnosed for possible issues. It is imperative that the units be cleaned AT LEAST every six months for proper operation.ICE0400HA4 70/50

20 Minute cycle time

1440 minutes in a day

1440 divided by 20 = 72 cycles/day

Batch weight of 5.5#

72 times 5.5 = 396 # per day.ICE0400HA4 90/70

23 Minute cycle time

1440 minutes in a day

1440 divided by 23 = 62.6 cycles/day

Batch weight of 5.5#

62.6 times 5.5 = 344 # per day.

Ice. Pure and Simple7

Water Leaking from Purge ValveAnother possible cause of slow production is a leaking Purge Valve. During the freeze cycle, no water should be leaving the unit through the valve. Any water leaking out will be replaced by the float, keeping the water temperature in the trough up and therefore extending the freeze cycle. A visual sign of this would be little to no ice on the top rows of the Evaporator. A leaking Purge Valve should be replaced.

Ice. Pure and Simple8Current drawing showing layout

Compressor inefficiency can also cause prolonged production times. The more inefficient the Compressor becomes, the more likely it is to lead to a freeze-up. Compressor RLA should be within 10% of the rating on the data tag 5 minutes into the freeze cycle.

Ice. Pure and Simple9

Miss-feeding Thermostatic Expansion Valves can also cause slow production if they do not meter down properly.

Ice. Pure and Simple10

Should the Hot Gas Valve be slightly leaking by, this too could cause extended cycle times by keeping the suction pressure elevated, slowing production. There should always be a marked temperature difference between the inlet and outlet of the Hot Gas Valve.

Ice. Pure and Simple11Diagnosing Slow Production QuizIce. Pure and Simple12