What is the definition of a “Community” Drainfield System A drainfield that services more than 1 owner A drainfield that services more than 1 owner is considered a “Community” system.
Transcript

What is the definition of a “Community” Drainfield System

A drainfield that services more than 1 owner A drainfield that services more than 1 owner is considered a “Community” system.

Why is it a viable alternative to holding tanks and alternative treatment system?y Community systems are often the lowest cost

per homeownerper homeowner. Systems are inexpensive to maintain.

Overview of a typical system

Wastewater from the Larger pump stationWastewater from the house enters the septic tank.

Larger pump station collects effluent and doses the drainfield.

Effluent leaves the septic tank and enters a pump chambera pump chamber.

Pump forces the effluent to a remoteeffluent to a remote location where the drainfield is located.

Overview of a typical system

Septic TankSeptic Tank

Pump Chamber

Common Forcemain

Overview of a typical system

Main Pump Station

Community Drainfield

Septic Tank & Pump Chamber

Holding Tank Conversion

Drainfield Construction

Typically a low Typically a low pressure system.

Bed type Bed type. Zoned System similar

to your lawn irrigationto your lawn irrigation system.

Drainfield Location Requirements

Proximity to nearby wells Proximity to nearby wells Wetlands and other waterbodies

Property lines Property lines Depth to high ground water Soil Conditions Distance from the “Community” = Higher $$$

How many homes can be on one system? Systems are designed by the gallons per day they Systems are designed by the gallons per day they

treat.

Under 6000 gallons per day (approx 15 homes) Under 6000 gallons per day (approx. 15 homes)

Under 10,000 gallons per day (approx. 25 homes)

Under 20,000 gallons per day (approx. 50 homes)

DEQ Requirements

6000 gallons per day or less 6000 gallons per day or less Straight forward permitting requirements Setbacks to water and wetlands = 100 feet Setbacks to water and wetlands 100 feet Isolation from wells = 75 feet to 300 feet No required reporting No required reporting Examples

LWTA, Platte Lake, Benzonia Twp. BWR, Glen Lake, Glen Arbor Twp.

DEQ Requirements

6000 to 10,000 gallons per dayS b k i d Setbacks are increased

Hydrogeologic study is required to establish groundwater flow direction and other analysis ofgroundwater flow direction and other analysis of the soil in and around the drainfield.

Groundwater Discharge Permit required. Weekly inspection and Yearly reporting is

required. Cost for permitting is more Cost for permitting is more. Examples

Miami Beach, Elk Lake, Whitewater Townshipp

DEQ Requirements

10 000 to 20 000 gallons per day 10,000 to 20,000 gallons per day Setbacks are further increased Pre-treatment of the effluent is required to obtain Pre treatment of the effluent is required to obtain

qualities that meet DEQ standards. Small treatment plant is necessary.y Expensive; budget estimates difficult to establish

until land is identified. Examples

Northport Point AssociationLeland Leland

Drainfield Site Ownership Options

Use existing parcel Use existing parcel Acquire parcel

Acquire easement Acquire easement Not acceptable forms of property ownership

L Lease Land Contract

Costs

Land Land Design

Legal Legal Permitting Installation Operation & Maintenance

Land

No set parameters here No set parameters here Consider market value

Often the most difficult part of the whole Often the most difficult part of the whole project

Design

Based on scope and size of project Based on scope and size of project, complexity and hurdles.

Last two 6000 gallon/day systems were in the Last two 6000 gallon/day systems were in the range of $20,000-$25,000 per home

Other Considerations

How will the cost of the system be dispersed How will the cost of the system be dispersed over the membership?

By the number of bedrooms they currently have?

By size of their property?

By front footage along the road or water?

Other Considerations

If system is over 10,000 gal/day, a carefulIf system is over 10,000 gal/day, a careful study needs to occur to insure that the right treatment system is selected to match the property.

Often, wetlands need to be crossed requiring dditi l itadditional permits.

Road Commission requires permits and approvals from abutting property ownersapprovals from abutting property owners where forcemain or other equipment may be in the right-of-way.g y

Possible Constraints

Lack of available suitable property for the Lack of available, suitable property for the drainfield

Easement for pipeline…..getting from point A to point B legallyto point B legally

P t i ht f ti i t Property rights of non-participants

Construction Process

Directional Drilling Method Directional Drilling Method

Trenchless pipe i t ll tiinstallation

Minimum disturbancedisturbance

Inexpensive

Construction Process

Dewatering Dewatering Temporarily, artificially lowers the water table in

proximity to the excavation.p y

Construction Process

Vacuum Excavation Vacuum Excavation

Homeowner’s Perspective The Players

Homeowners Homeowners Engineering firm Construction team Legal resources Local Government Health Department Health Department DEQ Road Commission Electric Provider Maintenance Provider

Homeowner’s Perspective Why consider this….?

Environmental Environmental Many homes along lakes have septic systems that do

not meet current codes and are introducing mostly untreated effluent into lakes.

Property value – holding tanks vs. septic systemP b k i d i i t t h id th Payback period is instantaneous when you consider the value of a home on holding tanks versus a home that has a functioning septic system.

Future costs Future costs of pumping holding tanks is uncertain and

likely to be higher every few yearslikely to be higher every few years.

Homeowner’s Perspective

Organization requirements Organization requirements Corporation

Officers Duties Job descriptions

How to get the Ball Rolling

Assessment of homes needing service Assessment of homes needing service

Find nucleus of leadership Find nucleus of leadership

Become informed about options

Establish relationship with service providers

Step by Step Process

Gather interest from neighbors Gather interest from neighbors Establish service district

Identify potential properties for the field Identify potential properties for the field Have consultant provide suitability

t d id tif t i tassessment and identify constraints. Form an Association Negotiate land acquisition Seek funding

Step by Step Process (cont)

Prepare design plans Prepare design plans Complete permitting process Part 41 DEQ Permit Part 41 DEQ Permit Establish Financial and Managerial Capacity for

ongoing maintenance and operationongoing maintenance and operation Construct the system Plan for operation routine Plan for operation routine Establish responsibilities Regular communication Regular communication

More Information

Leland Sewer Options Task Force Report Leland Sewer Options Task Force Report Report on the viability of community drainfield systems along the east

shore of north Lake Leelanau http://www leelanau cc/downloads/leland sewer 1 1 jozwiak final pdf http://www.leelanau.cc/downloads/leland_sewer_1_1_jozwiak_final.pdf

Orenco Systems On-site wastewater equipment provider Lots of literature about on-site wastewater systems www.orenco.com

Contact Us

Scott Jozwiak, P.E.PO Box 5342, Traverse City, MI 49696, y,

[email protected]@j g


Recommended