+ All Categories
Home > Documents > Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified...

Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified...

Date post: 03-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
7
Wilson Street Reconstruction Upgrading Wilson Street from Gordon / Norfolk Street to Macdonell Street will generally include: · Streetscape upgrades outlined in the Downtown Streetscape Manual · Replacement of asphalt · Sidewalk upgrades · Cycling facilities · On-Street parking · Streetlighting · Watermain, Sanitary, and Storm Sewer replacement · Pedestrian refuge island at MacDonell · Review of grading at building entrances The City of Guelph has reviewed feedback from the previous public meeting and has conducted a number of background studies in order to develop a Preferred Design Concept for Wilson Street. The City of Guelph is now looking for feedback from the public on the Preferred Design Concept before proceeding with final design. Please provide your written feedback using the comment sheet provided. July 20th Public Meeting
Transcript
Page 1: Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified contractors July 15, 2016 Design-Build RFP Bid Period Bid submission Aug 22, 2016 Proposals

Wilson Street Reconstruction

Upgrading Wilson Street from Gordon / Norfolk Street to Macdonell Street

will generally include:

· Streetscape upgrades outlined in the Downtown

Streetscape Manual

· Replacement of asphalt

· Sidewalk upgrades

· Cycling facilities

· On-Street parking

· Streetlighting

· Watermain, Sanitary, and Storm Sewer replacement

· Pedestrian refuge island at MacDonell

· Review of grading at building entrances

The City of Guelph has reviewed feedback from the previous public

meeting and has conducted a number of background studies in order to

develop a Preferred Design Concept for Wilson Street.

The City of Guelph is now looking for feedback from the public on the

Preferred Design Concept before proceeding with final design.

Please provide your written feedback using the comment sheet provided.

July 20th Public Meeting

Page 2: Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified contractors July 15, 2016 Design-Build RFP Bid Period Bid submission Aug 22, 2016 Proposals

Wilson Street Reconstruction Macdonell Street to Gordon/Norfol k Stree t

Evaluation Matrix

Evaluation Criteria

Alternative 1

Existing Traffic Flow Two-Way

(Macdonell to Northumberland) One-Way Northbound

(Gordon / Norfolk to Northumberland)

Alternative 2

Reverse One-Way Section Two-Way

(Macdonell to Northumberland) One-Way Southbound

(Gordon / Norfolk to Northumberland)

One-Way Northbound

(Gordon / Norfolk to Macdonell)

Alternative 4

One-Way Southbound

(Macdonell to Gordon / Norfolk)

Alternative 5

Tec

hn

ical

Traffic Performance (based on forecast 2031 traffic conditions)

Lower Level of Service (LOS) during peak hours for: -Norfolk and Paisley -Macdonell and Wilson -Macdonell and Wyndham

Lower Level of Service (LOS) during peak hours for: -Norfolk and Paisley

Lower Level of Service (LOS) during peak hours for: -Norfolk and Paisley -Macdonell and Wilson -Macdonell and Wyndham

Lower Level of Service (LOS) during peak hours for: -Norfolk and Paisley

Road network continuity

-Maintains current access to downtown through Wilson Street -Maintains two-way section for access to businesses and residences

-Removes access to downtown via Wilson -Maintains two-way section for access to businesses and residences

-Maintains current access to downtown through Wilson Street -Only one-way access to businesses between Carden and Macdonell

-Removes access to downtown via Wilson -Only one-way access to businesses between Carden and Macdonell -One-way connection at Carden forces movement out of downtown

Cycling/Walking Impacts Provides for two-way cycling and sidewalks along full length of Wilson

Provides for two-way cycling and sidewalks along full length of Wilson

Provides for two-way cycling and sidewalks along full length of Wilson

Provides for two-way cycling and sidewalks along full length of Wilson

Summary

Nat

ura

l En

viro

nm

ent Natural Area Impact Minimal impacts to natural environment Minimal impacts to natural environment Minimal impacts to natural environment Minimal impacts to natural environment

Air Quality Impact Minimal impacts to air quality Minimal impacts to air quality Minimal impacts to air quality Minimal impacts to air quality

Stormwater Impact Improvements to be made to stormwater collection Improvements to be made to stormwater collection Improvements to be made to stormwater collection Improvements to be made to stormwater collection

Summary

So

cial

/ Cu

ltu

ral

Heritage/Cultural Landscape Impacts No anticipated impacts No anticipated impacts No anticipated impacts No anticipated impacts

Neighbourhood/Community Impacts -Maintains movement toward downtown -Minimal additional streetscaping opportunities

-Reverses movement from downtown -Provides streetscape & parking opportunity at Gordon / Wilson intersection

-Maintains movement toward downtown -Provides additional streetscaping opportunities

-Reverses movement from downtown -Provides additional streetscaping opportunities -Provides streetscape & parking opportunity at Gordon / Wilson intersection

Noise Impacts No change in noise levels No change in noise levels No change in noise levels No change in noise levels

Summary

Eco

no

mic

/Fin

anci

al

Capital Cost Minimal change in capital costs Some additional costs at Gordon / Norfolk intersection

Minimal change in capital costs Some additional costs at Gordon / Norfolk intersection

Operating & Maintenance Cost Minimal change in maintenance costs Minimal change in maintenance costs Minimal change in maintenance costs Minimal change in maintenance costs

Economic Impacts for Downtown Businesses and Residents

-Maintains movement toward downtown -Lower traffic performance reduces access to business and parking

-Reverses movement from downtown -Maintains traffic performance for access to business and parking

-Maintains movement toward downtown -Lower traffic performance reduces access to business and parking

-Reverses movement from downtown -Maintains traffic performance for access to business and parking

Property Acquisition None Required None Required None Required None Required

Summary

Preferred Overall Evaluation

Note: Alternative 3 (Two-Way traffic along the full length of Wilson Street from Macdonell to Gordon / Norfolk) was screened out based input received during the first public meeting as well as input from City staff which noted that a number of project objectives would not be satisfied by the alternative.

Page 3: Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified contractors July 15, 2016 Design-Build RFP Bid Period Bid submission Aug 22, 2016 Proposals

Date March January

7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 6 13 20 27 6 13 20 27 3 10 17 24

Consultant Appointment

Phase 1 - Design Build RFP

Project Initiation

Preparation of RFP Package and Performance Specs

Class D cost estimate

Update cost estimate

Design-Build Prequalification Process

Issue Pre-qualification request to design build contractors May 20, 2016

Pre-qualification tender period

Pre-qualification Evaluation period

Selection of pre-qualified Design Build Contractor

Issue Design-Build RFP to pre-qualified contractors July 15, 2016

Design-Build RFP Bid Period

Bid submission Aug 22, 2016

Proposals evaluation period

Presentation and Recommendation to Council Sept 19, 2016

Wilson Street - Design Phase

Public Consultation #1 (Options)

Stage 1 Archaeology Study

Heritage Impact Assessment

Socio-Economic Impact Assessment

Traffic Study

Geotechnical Investigation

Wilson Street - Develop Design Alternatives

Public Consultation #2 (Preferred Alternative)

Wilson Street - Final Design

Class EA Report Preparations

City Staff - Internal Review of EA Report

Council Approval to File Class EA Report

30-day Notice Period for Class EA Filing

Wilson Street Construction Tender Period (Surface Works Provisional)

Wilson Street Tender Analysis and Recommendation

Council Award of Wilson Street Tender

Wilson Street - Construction Phase

Wilson Street - Underground Infrastructure Construction

Wilson Street - Surface Works Construction May 2017

Phase 2A - Design Compliance Review

Design Build Team design phase

Design Compliance Review at 50%

Design Compliance Review at 100%

Phase 2B Construction Compliance Review TO WINTER 2017

Parking Garage Construction Phase

Project ScheduleWilson Street Reconstruction

(Macdonell Street to Gordon/Norfolk Street)

Wilson Street Parkade

WE

AR

E H

ER

E

DecemberMay June July August September

2017

Activity AprilMarchOctober FebruaryApril

2016

November

Legend

Parkade Task

Milestone

Street Task

Page 4: Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified contractors July 15, 2016 Design-Build RFP Bid Period Bid submission Aug 22, 2016 Proposals

~1.8m

Conc. S/W

~0.2m Barrier Curb

~2.0m Conc. S/W

~5.6m

Lane

~1.7m Conc. S/W

~2.6m

Conc. S/W

~2.9m

Parallel Parking

~3.9m

Lane

~3.5m

Lane

~5.7m

Angled Parking

~2.8m

Conc. S/W

~0.2m Barrier Curb

~

2

.

4

m

C

o

n

c

.

S

/

W

~

5

.

9

m

L

a

n

e

~

1

.

7

m

C

o

n

c

.

S

/

W

~0.5m Curb & Gutter

~0.5m Curb & Gutter

~1.3m Bike Lane

~

1

.

3

m

B

i

k

e

L

a

n

e

LegendProperty Line

Mac

done

ll

Str

eet

Car

den

Str

eet

C.N

. R

ailw

ay

Norfolk Street

Wilson Street

Gordon Street

City Hall

Wilson Street Reconstruction

Existing Conditions

July 20th Public Meeting

Nor

thum

berl

and

Str

eet

F

a

r

m

e

r

s

M

a

r

k

e

t

Existing Tree

Existing Concrete

Existing Interlocking Brick

Existing Asphalt

Existing Grass Boulevard

Existing Parking

East - 5 Parallel

West - 13 Angled

- 1 Barrier Free

Total - 19 Spaces

Page 5: Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified contractors July 15, 2016 Design-Build RFP Bid Period Bid submission Aug 22, 2016 Proposals

Approx. 21.8m

TrenchDrain

EastProperty Line

WestProperty Line

2.3mParallelParking

~2.8mConcreteSidewalk

3.35mShared Lane

3.35mShared Lane

TrenchDrain

~4.0mConcreteSidewalk

0.3mEdge Zone

0.3mEdge Zone

2.3mParallelParking

2.5mPlanting &Furnishing

Zone

LS

Wilson StreetTypical Section - Northumberland to Gordon / Norfolk

Approx. 13.4m

EastProperty Line

WestProperty Line

3.2mOne-Way

Lane

1.5mContraFlowBikeLane

~1.8mConcreteSidewalk

Curb &Gutter

1.5mBikeLane

~1.8mConcreteSidewalk

ExistingRetaining

Wall

ExistingRetaining

Wall

0.3mBufferStrip

0.5mBufferStrip

Curb &Gutter

0.5mBufferStrip

R

6

.

0

m

R

3

7

.4

m

R

1

2

.

2

m

R

6

.

0

m

R

6

.

0

m

Stop Sign

Stop Sign

Stop Sign

Do Not Enter

Bicycles Excepted

R

1

.

7

m

0.3m Trench Drain

0.3m Trench Drain

0.3m Edge Zone

0.3m Edge Zone

Match Existing

Match Existing

Match Existing

2.8m

Conc. S/W

2.3m Parallel Parking (x4)

3.35m

Shared Lane

3.35m

Shared Lane

2.3m Parallel Parking (x7)

~4.0m

Conc. S/W

2.5m Planting &

Furnishing Zone

End Protection Sign

Do Not Enter

R

6

.

0

m

R

9

.

0

m

~1.8m Conc. S/W

1.5m Bike Lane

0.3m Painted

Buffer Strip

~1.8m Conc. S/W

1.5m Bike Lane

Taper 0.5m Buffer

Pedestrian

Crossing Sign

~1.8m

Conc. S/W

0.5m Curb & Gutter

~

1

.

8

m

C

o

n

c

.

S

/

W

3.2m

One Way

0.5m Buffer

~

1

.

8

m

C

o

n

c

.

S

/

W

0.5m Curb & Gutter

R

6

.

0

m

Pedestrian

Crossing Sign

0.5m Buffer

R

5

.

0

m

R

2

.

0

m

Northumberland Street Design

& Construction By Parking

Garage Design Build Team

Proposed Parking

East - 4 Parallel

West - 7 Parallel

Total - 11 Spaces

Wilson StreetTypical Section - Macdonell to Northumberland

Legend

Proposed Concrete

Proposed Asphalt

Property Line

Proposed Trench Drain

Proposed Bike Box

Mac

done

ll

Str

eet

Car

den

Str

eet

C.N

. R

ailw

ay

Norfolk Street

Wilson Street

Gordon Street

City Hall

Wilson Street Reconstruction

Preferred Design Concept

July 20th Public Meeting

Nor

thum

berl

and

Str

eet

For Gordon St & Waterloo Ave Works

See Gordon/Waterloo Panel

Norfolk Street

F

a

r

m

e

r

s

M

a

r

k

e

t

Future

Parking Garage

Entry/Exit

Future

Parking Garage

Entry/Exit

Match Existing

Match Existing

Existing Tree

Proposed Tree

Proposed LandscapedBoulevard

Proposed Paver Brick

Page 6: Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified contractors July 15, 2016 Design-Build RFP Bid Period Bid submission Aug 22, 2016 Proposals

~

1

.

7

m

C

o

n

c

.

S

/

W

Proposed Parking

4 Parallel

C.N

. R

ailw

ay

Waterloo AvenueRealignment

Wilson Street Reconstruction

Gordon Street & Waterloo Avenue Road Works

July 20th Public Meeting

Norfolk Street

Farmers Market

Wils

on

Stre

et

Farmers Market

Wils

onSt

reet

Nor

folk

Str

eetC.N. Railway

Gordon StreetRight Turn Lane Replacement

and Streetscaping Concept

Esse

x S

tree

t

Do Not Enter

Do Not Enter

Bicycles Excepted

Existing Lane Markings On

Waterloo Avenue To Be Adjusted

Existing Right Turn Lane On

Gordon Street To Be Removed and

Replaced With Parallel Parking

Gor

don

Str

eet

Do Not Enter

Do Not Enter

Bicycles Excepted

Legend

Proposed Concrete

Proposed Asphalt

Property Line

Proposed Trench Drain

Proposed Bike Box

Existing Tree

Proposed Tree

Proposed LandscapedBoulevard

Proposed Paver Brick

Page 7: Wilson Street Reconstruction - City of Guelph · Issue Design-Build RFP to pre-qualified contractors July 15, 2016 Design-Build RFP Bid Period Bid submission Aug 22, 2016 Proposals

Approx. 21.8m

TrenchDrain

EastProperty Line

WestProperty Line

2.3mParallelParking

~2.8mConcreteSidewalk

3.35mShared Lane

3.35mShared Lane

TrenchDrain

~4.0mConcreteSidewalk

0.3mEdge Zone

0.3mEdge Zone

2.3mParallelParking

2.5mPlanting &Furnishing

Zone

Wilson Street - Preferred Design ConceptTypical Section - Macdonell to Northumberland

2.0mPedestrianClearway

~4.0mMarketing Zone

LS

Wilson Street - Flexible Streetscape OptionTypical Section - Macdonell to Northumberland

Approx. 21.8m

TrenchDrain

EastProperty Line

WestProperty Line

2.3mParallelParking

~2.8mConcreteSidewalk

3.35mShared Lane

3.35mShared Lane

TrenchDrain

~3.6mConcreteSidewalk

0.3mEdge Zone

Layout 15.2m Angled Parking

0.3mEdge Zone

MovableBollards

Layout 2Parallel Parking

MovableBollards

~3.0m SeasonalMarketing Zone

2.0mPedestrianClearway

LS

Wilson StreetExisting Conditions - Macdonell to Northumberland

Approx. 21.8m

BarrierCurb

EastProperty Line

WestProperty Line

~2.9mParallelParking

~2.6mConcreteSidewalk

~3.9m Lane ~3.5m Lane~2.8m

ConcreteSidewalk

~5.7mAngled Parking

BarrierCurb

Wilson Street Reconstruction

Macdonell to Northumberland

Streetscape Alternative

July 20th Public Meeting

Proposed Parking

East - 4 Parallel

West - 7 Parallel

Total - 11 Spaces

Proposed Parking

(Angled Layout)

East - 4 Parallel

West - 12 Angled

- 1 Barrier Free

Total - 17 Spaces

Existing Parking

East - 5 Parallel

West - 13 Angled

- 1 Barrier Free

Total - 19 Spaces


Recommended