Wood Innovation and Design Centre Dust Collection Unit Installation The following photographs have been assembled to provide additional information into the location of the ductwork currently concealed behind the ceiling tile. This is to be interpreted in conjunction with Site instruction #M-009 (SI-042) issued by MMM Group on Feb 20, 2014. Research Lab ceiling showing ventilation ducting, prior to installation of existing dust extraction ducting and ceiling grid.
Transcript
Page 1: Wood Innovation and Design Centre Dust Collection Unit ... · MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 q:\5012667 wood

Wood Innovation and Design Centre Dust Collection Unit Installation

The following photographs have been assembled to provide additional information into the location of the ductwork currently concealed behind the ceiling tile. This is to be interpreted in conjunction with Site instruction #M-009 (SI-042) issued by MMM Group on Feb 20, 2014.

Research Lab ceiling showing ventilation ducting, prior to installation of existing dust extraction ducting and ceiling grid.

Page 2: Wood Innovation and Design Centre Dust Collection Unit ... · MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 q:\5012667 wood

Partially installed ceiling grid on the west side of the research lab (for reference, and not the side where the dust extraction will be installed).

Page 3: Wood Innovation and Design Centre Dust Collection Unit ... · MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 q:\5012667 wood

Existing ductwork and ceiling grid installation.

Page 4: Wood Innovation and Design Centre Dust Collection Unit ... · MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 q:\5012667 wood

MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9t: 604.685.9381 | f: 604.683.8655 www.mmm.ca

q:\5012667 wood innov and des centre\mechanical\project site administration\site instructions\msi009 dust collector\5012667 si-042 - msi-009 dust collector.doc

SITE INSTRUCTION # M-009 (SI-042)

To:Michael Green Architecture Inc. 57 E. Cordova Street Vancouver, B.C. V6A 1K3

Date: 14.02.20 (YY.MM.DD)

Fax #: Tel #: 604-336-4770

File #: 5012667-002

Attn: Mingyuk Chen E-Mail: [email protected]

From: Peter Osuchowski Transmitted by: E-Mail Page 1 of 2

For Your Information Review Comments As Requested As Discussed Distribution

This Site Instruction is issued as a written clarification of the intent of the Contract Documents, or instructions to bring the work into conformity with the Plans and Specifications at no extra cost to the Owner. Any work involving a change to the Contract Price shall be carried out by an approved Change Order only. This shall not be construed as a complete list nor shall it relieve the Contractor from the responsibility for the proper performance of his work in accordance with the Contract Documents.

RE: WIDC – ROUGH-INS FOR DUST COLLECTOR SYSTEM

1. Revise supply and return ductwork distribution in UNBC Lab as indicated on the attached drawing to accommodate additional dust collector ductwork.

2. Provide dust collector ductwork distribution with rough-ins for future connections to woodworking machines inside UNBC Lab and to the future dust collector outside the building as per the attached drawing.

Rough-in connections for future woodworking machines shall be terminated at high level below the suspended ceiling. Rough-in connection for future dust collector shall be capped at high level on the outside wall.

3. The rough-in connections for future woodworking machines shall include the following:

.1 150 (6”) diameter rough-in for future planer (required exhaust: 378l/s or 800cfm) .2 125 (5”) diameter rough-in for future table saw (required exhaust: 260l/s or

550cfm) .3 125 (5”) diameter rough-in for future jointer (required exhaust: 260l/s or 550cfm) .4 100 (4”) diameter rough-in for future band saw (required exhaust: 165l/s or

350cfm) .5 125 (5”) diameter rough-in for future mitre saw (required exhaust: 260l/s or

550cfm) .6 100 (4”) diameter rough-in for future CNC router (required exhaust: 165l/s or

350cfm) .7 150 (6”) diameter rough-in for future floor sweep

Page 5: Wood Innovation and Design Centre Dust Collection Unit ... · MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 q:\5012667 wood

MMM Group Limited Page 2

q:\5012667 wood innov and des centre\mechanical\project site administration\site instructions\msi009 dust collector\5012667 si-042 - msi-009 dust collector.doc

4. Future dust collector shall be equal to Murphy model MKAW-400-2D with EA-1 13/C13 fan assembly (10hp, 208/3/60), air flow-1490l/s (3150cfm), TSP-2500Pa (10”), shaker motor (1/2hp, 208/3/60), filter area-37m² (400ft²), c/w pre-wired control panel (inside building), inlet blowback damper, top mounted explosion relief damper, inline discharge silencer and two 170l (45gal) drums with castors.

The future dust collector will be located outside the building as indicated on the attached drawing.

5. Dust collecting ductwork shall be round spiral lockseam duct fabricated from G60 galvanized steel to ASTM A653 and A924. Ducts up to 200 (8”) diameter shall be 22gauge and ducts 225 (9”) to 300 (12”) diameter shall be 20gauge.

Longitudinal seams shall be lapped 25 (1”) and riveted on 75 (3”) centres and then welded airtight. Girth joints shall be lapped 25 (1”) with the inner lap in the direction of airflow, riveted on 75 (3”) centres and welded airtight. High pressure gasketted flange connections are an acceptable alternative.

Elbows shall be minimum two gauges heavier than duct of equal diameter and shall have a minimum inside throat radius of two pipe diameters. Elbows 150 (6”) diameter and less shall be constructed of at least five sections. Elbows over 150 (6”) diameter shall be constructed of at least seven sections. All elbow sections shall be welded. Prefabricated smooth tube elbows are acceptable.

Ductwork shall be securely hung and anchored from the structure at maximum 2400 (8’) and at all elbows and drops. No two branches shall enter the main duct diametrically opposite.

Cleanouts shall be provided where indicated on the drawing. Cleanouts shall be fitted with gaskets, handles and locking devices.

Reason for change: As per UNBC request

CC:

Per:

MMM Group Limited

Page 6: Wood Innovation and Design Centre Dust Collection Unit ... · MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 q:\5012667 wood

KEYNOTES:

of

PROJECT NAME

DRAWING TITLE REF.

REF. No.

DATE

DWG. No. REF. REVISION

WOOD INNOVATIONDESIGN CENTRE

LEVEL 1 MEZZANINEWOODWORK SHOP PART PLAN

5012667

14.02.20

1 2 A

MEZZANINE PLAN WOODWORK SHOP - DUCTWORKSCALE 1:100

DUST COLLECTOR ORIENTATION:LENGTH ALONG G/L 1. ELBOWEXHAUST DUCT AND SILENCERAS NECESSARY.

1

Page 7: Wood Innovation and Design Centre Dust Collection Unit ... · MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 q:\5012667 wood

T

of

PROJECT NAME

DRAWING TITLE REF.

REF. No.

DATE

DWG. No. REF. REVISION

WOOD INNOVATIONDESIGN CENTRE

LEVEL 1 MEZZANINEWOODWORK SHOP PART PLAN

5012667

14.02.20

2 2 A

MEZZANINE PLAN - DUCTWORKSCALE 1:100

Page 8: Wood Innovation and Design Centre Dust Collection Unit ... · MMM Group Limited 1045 Howe Street, Suite 700 Vancouver, BC V6Z 2A9 t: 604.685.9381 | f: 604.683.8655 q:\5012667 wood