ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)
Transcript
Page 1: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

ppt on Ash Management

By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)

Page 2: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly
Page 3: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Salient Features of Lignite Project Panandhro

Village Panandhro, Fulra & Khanot

Taluka Lakhpat

District Kutch

State Gujarat

Lease Area 1719 Hectare

Lease coordinate

Latitude : 22°42'13" to 23°39'56" Longitude 64°45'00" to 68°44'55"

Commencement Period

1973-74

Mineral Mined Lignite and Limestone

Lignite excavated 115.00 million tones

Mineable Reserves 1.00 million tones

Overall Ratio 1 : 3.64 {Lignite(T) : Overburden (M3)}

Total Meter age of Exploration

10,757 m

Total Exploration area 11.33 km2

No. of Exploration Boreholes

362 within lease area

Page 4: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Constitute Received Base analysis (Average (%))

Total Moisture 36.34 %

Ash 16.49 %

Volatile Matter 32.54 %

Fixed Carbon 14.63 %

Calorific Value (Kcal/kg)

3053.0

Plantation on Backfilled Area at Panandhro Lignite Mine

Total area on which plantation carried out is : App. 300 hector.

Page 5: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Modalities adopted for plantation . On excavated area , ash evacuated from power plant is

being utilized to fill up the area.

After filling the by ash , area is being covered by top soil having layer of 2.5 to 3.0 feet. Here the soil utilised is the same which has excavated to get approach to lignite.

On this area plantation is carried out .

Growth of plantation is found same as it is on normal soil.

Trees generally grows on this land. A). Pilu B). Goras Ambli. C). Desi Baboon. D). Ram Baboon.

Page 6: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Akrimota Power Project

GMDC has implemented 2 X 125 MW Akrimota Thermal Power Project at village Nani

Chher, Taluka Lakhapat, Dist. Kutchh, Gujarat State.

Both the units have been in commercial operation since March, 2007. It is a pit head lignite based thermal power plant getting lignite from its own mines at Panandhro.

The water requirement for the power plant is taken from the nearest Kori Creek through a 1.4k.m.long sea water intake channel. The CFBC boiler is used here as it is environment friendly and controls sulfur in the flue gas emission. A 100 metre green belt surrounds the entire site.

Ash production remains around 12-14 % of total lignite feeding , same is being transported to mines , now we are planning to sale it to near by cement industries .

Milestones

1st unit Synchronized

31st Mar. 2005

1st unit CoD 12th March 2007

2nd unit Synchronized

19thDecember 2005

2nd unit CoD 1st May 2006

Page 7: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

COLONY

ATPS PLANT

ATPS PLANT AND COLONY

Page 8: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Bed Ash Handling System

Fly Ash Handling System

Page 9: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

First chamber Empty

chamber

Second chamber

Toward boiler particle size between 90 to 300 micron

Page 10: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

2nd chamber

Overflow

ash

1st chamber Empty chamber

Page 11: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Ash cooler for cooling of bed Ash coming out from Boiler . 1.Generally bed ash coming out from boiler contains higher temperature hence it is essential to cool it down to atmospheric temperature before it gets discharged to atmosphere. 2.Each boilers having two ash coolers which is equipped with cooling coils in which desal water gets circulated . Which carries heat of ash and it goes to second stage for further cooling . Water remains in closed circuit . 3.Also fluidizing nozzle are provided inside the Ash cooler so that whatever the ash comes inside the ash cooler gets fluidized and hot ash gets cooled within short period.

Page 12: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

PURPOSE

◦ Conveying Bed Ash collected in intermediate Ash Bin to Bed & FLY Ash Silo.

HANDLING SYSTEM

◦ DPAC (Dense Phase Ash Conveying ) through compressed air.

CONVEYING CAPACITY

◦ 110 Tons/hr

CONVEYING DISTANCE

◦ 550 m

CAPACITY OF FLY ASH SILO

◦ 4x650 M Tons( 03 are for fly ash and one is for bed ash filling purpose.)

Ash Detail :

QUANTITY 300Tons/Day

UNBURNT MATTERS

Less than 1%

STICKNESS VERY LOW

FLOWABILITY GOOD

ABRASIVITY VERY HIGH

Page 13: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

PURPOSE

Conveying Fly Ash From ESP and Boiler Hoppers to Fly Ash Silo.

HANDLING SYSTEM

Pneumatic Dense Phase Conveying Through Compressed Air.

CONVEYING CAPACITY

220 Tons/Hr.

CONVEYING DISTANCE 550 m

CAPACITY OF FLY ASH SILO

650 MT

Properties of Fly Ash

QUANTITY 900 Tons / Day

UNBURNT MATTER Less than 1%

STICKNESS Low

FLOWABILITY Good

ACIDITY Low

ABRASIVITY High

GYPSUM CONTENT Good

Page 14: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Fly Ash :- Flyash generated from ESP ,We have Installed 14 field 02 pass ESP for Each unit which have the Pneumatic Ash conveying system

Electrostatic precipitator

Page 15: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Intermediate system for optimum utilisation of ash to boiler having size of -2 mm as for bed charging.

Page 16: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Ash can be gainfully utilized as :

Stowing material in Underground

Mines.

Filling material for reclamation of

abandoned mines.

Filler material along-with

overburden of an operating mines.

Page 17: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Photo graph manifests transpiration of ash and lignite with covering of dumper.

Transportation of Ash in covered dumper.

Page 18: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Monthly Abstract of Ash Generation and Utilization

(For the period from 1st April, 2016 to 31st March, 2017)

NAME OF POWER UTILITY:- GMDC LTD

INSTALLED CAPACITY (Total): 250 MW

PERIOD OF REPORT: April, 2016 to March,2017

(All Quantities in Metric Tonne)

Sl.

No

.

Mo

nth

Co

al C

on

su

me

d (

MT

)

As

h C

on

ten

t o

f c

oa

l

(%)

As

h G

en

era

tio

n (

MT

)

As

h U

tili

ze

d (

MT

)

As

h U

tili

za

tio

n in

Pe

rce

nta

ge

In M

ine

fil

lin

g

1 2 3 4 5 6 7 15

1 April 114021.0 14.90 16989.1 14547.9 85.63 14547.85

2 May 93972.0 14.75 13860.9 13604.1 98.15 13604.08

3 June 97219.0 15.35 14923.1 15327.6 102.71 15327.64

4 July 108693.0 14.33 15575.7 17003.0 109.16 17003.02

5 August 85736.0 15.16 12997.6 7392.1 56.87 7392.11

6 September 116955.0 16.79 19636.7 25177.8 128.22 25177.79

7 October 130320.0 15.89 20704.1 22176.4 107.11 22176.40

8 November 87883.0 14.73 12942.2 19038.8 147.11 19038.80

9 December 127436.0 14.20 18095.9 33206.2 183.50 33206.17

10 January 118761.0 14.41 17116.9 37564.7 219.46 37564.67

11 February 79551.0 13.93 11082.3 23703.6 213.89 23703.62

12 March 123230.0 14.34 17669.6 33390.6 188.97 33390.58

TOTAL 1283777.0 14.92 191594.1 262132.7 136.82 262132.73

Fly Ash utilisation last FY : 16-17.

Note :More Ash utilization comes attributed to shifting of ash accumulated in earlier years, also water gets

mixed up before weighment and shifting to mines for fugitive dust control.

Page 19: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Monthly Abstract of Ash Generation and Utilization

(For the period from 1st April, 2017 to 30th Sep, 2017)

NAME OF POWER UTILITY:- GMDC LTD

INSTALLED CAPACITY (Total): 250 MW

PERIOD OF REPORT: April, 2017 to September,2017

(All Quantities in Metric Tonne)

Sl.

No

.

Mo

nth

Co

al C

on

su

med

(MT

)

Ash

Co

nte

nt

of

co

al

(%)

Ash

Gen

era

tio

n

(MT

)

Ash

Uti

lized

(M

T)

Ash

Uti

lizati

on

in

Perc

en

tag

e

In M

ine

fil

lin

g

1 2 3 4 5 6 7 15

1 April 114451.0 15.68 17945.9 26108.4 145.48 26108.43

2 May 107989.0 17.14 18504.7 29701.6 160.51 29701.62

3 June 95971.0 17.97 17246.0 25586.6 148.36 25586.56

4 July 89926.0 16.33 14684.9 14403.0 98.08 14402.99

5 August 117078.0 17.31 20262.0 25840.4 127.53 25840.44

6 September 50690.0 17.19 8713.6 20137.7 231.11 20137.70

TOTAL 576105.0 16.90 97357.2 141777.7 145.63 141777.74

Fly Ash utilisation data from Half Yearly

Note: More Ash utilization comes attributed to shifting of ash accumulated in earlier years, also water gets mixed up before weighment and shifting to mines for fugitive dust control.

Page 20: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly
Page 21: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly
Page 22: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly
Page 23: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly
Page 24: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Migratory birds coming during winter season i.e. Famingo , Pelicon.

Page 25: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Migratory birds during winter season

Page 26: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Matanamadh mines

Page 27: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly
Page 28: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

It is proposed to convert this filled mine to a visiting place for Mining Engg students of not only from Gujarat but also from all across the India.

Preparation of a training gallery.

To built a model room where machinery/ equipment/mining processes involved during mining will be displayed.

Sequence wise mining operation process will be displayed with pictorial representation.

Page 29: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

A 10KM long driving lane starting from the mouth of the pit up to the external dump covering the entire backfilled areas surrounded by dense forest (plantation)

A beautiful garden in front of the ADM building with proof of fossils & the rock mass handled during the mining process.

A kitchen garden where vegetables for the self consumption of the staff will be available.

Page 30: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Will encourage entrepreneur for public

partnership business.

To develop paver block.

To develop ventilation block.

And for bricks manufacturing.

Page 31: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Indian coal presents high ash content generally

which tends to be inconsistent.

Design of the system has to adequately cover

anticipated variations and be capable of handling

the worst scenario.

Handling required great care to avoid spillage to

protect environment.

No bricks manufacturing unit in nearby area.

Plant situated at remote place.

Page 32: Workshop on Ash managementflyash2018.missionenergy.org/presentations/GMDC.pdf · lignite based thermal power plant getting lignite from its own mines at Panandhro. ... Conveying Fly

Central government and state government policy

can help for increasing ash utilization,

For development of reclaimed area can be used

as tourism place.