Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
1
ANNEX 1
Subprojects List and Location Maps
This annex presents a list of the proposed subprojects to be implemented under Component 4 for
the first phase and second phase and their locations maps in the following river basins: Ma, Ca, Ha Vang –
Rac, Gianh – Nhat Le, Thach Han, Vu Gia – Thu Bon, Tra Khuc – Ve, Kone – Ha Thanh, and Dinh.
Table A1.1: List of the first phase subprojects under Component 4 (5 provinces, 5 basins)
No. Provinces Subprojects
1 Thanh Hoa Maintaining, upgrading and treating the key parts of the left dyke of Cau
Chay river (section from K0-K42)
2 Nghe An Upgrading dike site of Luong Yen Khai, Thanh Chuong
3 Nghe An Bridge combining with overflow connecting rescued roads, Nghi Loc and
Vinh city
4 Ha Tinh Upgrading dike site Phuc Long Nhuong, Cam Xuyen district
5 Binh Dinh Upgrading anti-erosion embankment of Kone river for safety, An Nhon
and Tuy Phuoc district
6 Quang Nam Repairing and upgrading Thach Ban Reservoir, Duy Xuyen district
Table A1.2: List of potential subprojects under Component 4 for the second phase by provinces
Total 9 provinces
Nghe An
1 Repair, Upgrade, ensure safety for reservoirs Ban Muong, Cho Quan, Xop Thap, Khe Lau, Khe
Lang and Lach Buoi
2 Rescued road of Hung Nguyen district (including Hung Lam, Hung Nhan, Hung Xuan, Hung
Chau)
3 Embankment protecting Ca River, acrossing Đinh Son, district Anh Son.
4 Embankment protecting Ca River, acrossing Linh Son, district Anh Son.
5 Rescued road of Do Luong district (including Thai Son, Minh Son communes)
6 Upgrade dike Vach Bac, district Yen Thanh
7 Rescued road connecting national road 46 to Thanh Luong - Nam Hung.
Ha Tinh
E2993 v1 P
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
ed
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
2
8 Dredging, treating jet to Cua Sot shelter, Loc Ha district
Quang Binh
9 Fishing boat habours in Nhat Le river basin
Quang Tri
10 Upgrade of Trieu Thuong reservoirs 1,2
11 Repair & Upgrade of Hydraulic Structures: Viet Yen – Vinh Phuoc
12 Upgrade of Phuoc Mon reservoir, Hai Le commune
13 Emergency anti- erosion embankment for Nai Cuu – Trieu Dong commune – Trieu Phong district
14 Embankment for Trieu Do commune – Trieu Phong district
15 Emergency anti-erosion embankment for Trieu Tai commune – Trieu Phong district
Da Nang
16 Upgrade ensure safety for Hoa Trung reservoir
17 Upgrade, widen flood drain for An Trach weir
18 Upgrade ensure safety for 4 reservoirs: Truoc Dong, Truong Loan, Hoc Khe, Ho Cau
19 Upgrade ensure safety for 2 small reservoirs: Dong Treo và Ho Thung
Quang Nam
20 Repair, upgrade Khe Tan reservoir, Đại Loc district
21 Build anti-erosion embankment for Thu Bon river, Phu Đa area, Duy Xuyen district
22 Repair, upgrade Chan Son reservoir, Đai Loc district
23 Build river embankment for Tan Binh village, Đien Trung commune, Đien Ban district
24 Build anti-landslide embankment for Bau Sau river, in the down-stream of Bau Nit weir, Đien Ban
district
Quang Ngai
25 Đuc Loi dam
26 Fishing boat habours and My A sea gates (phase 2)
Binh Dinh
27 Upgrade, repair overflow bridges of rescued road Đong Tuy Phuoc – An Nhon – Phu cat
Ninh Thuan
28 Upgrade dyke at the north of Dinh river
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
3
A1.1.
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
4
A1.2.
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
5
A1.3.
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
6
A1.4.
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
7
A1.5.
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
8
A1.6.
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
9
A1.7.
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
10
A1.8. WB 5 Sub-Projects and Environmental Background in the Kone river basin
Environmental Assessment (EA)
Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)
11
A1.9. WB 5 Sub-Projects and Environmental Background in the Dinh river basin