+ All Categories
Home > Documents > XYZ Port Facility Maritime Security Drill

XYZ Port Facility Maritime Security Drill

Date post: 10-Feb-2016
Category:
Upload: vin
View: 22 times
Download: 0 times
Share this document with a friend
Description:
XYZ Port Facility Maritime Security Drill. Briefing for Players. date. Material Handling – Personal Effects, Parcels and Mail. Materials Handling – Unauthorized Loading of Personal Items in Restricted Area. Drill D314. Scope Review of the previous drill Date, time, location Aim - PowerPoint PPT Presentation
19
Unauthorized Unloading of Items in Restricted Area XYZ Port Facility Maritime Security Drill Briefing for Players dat e
Transcript
Page 1: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

XYZ Port FacilityMaritime Security Drill

Briefing for Players date

Page 2: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Materials Handling –Unauthorized Loading of Personal

Items in Restricted Area

Drill D314

Material Handling –Personal Effects, Parcels and Mail

Page 3: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Scope• Review of the previous drill• Date, time, location• Aim• Objectives• Desired outcomes• Controllers• Players• Scenario• Port Facility security instructions• Communications• Safety• Debrief• Update on the ISPS Code/local regulations• Developments in maritime security

Page 4: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Review of Previous Port Facility Drill no. X/XX

Date conducted:

Objectives:

Lessons Learnt:

• • •

Page 5: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Drill number: X/XX

Date:

Start Time:

Location:

Estimated End Time:

Page 6: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

AimTo enhance the proficiency of port facility security staff in monitoring Restricted Areas in the port facility.

Page 7: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Objectives

• Security staff to detect suspicious activities in the Restricted Areas within the time limit as specified in the PFSP

•Security staff to respond to suspicious activities in the Restricted Areas according to procedures in the PFSP.

Page 8: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Desired Outcomes

Security staff will be able to:• Effectively monitor the Restricted Areas • Recognize suspicious activities taking place in the Restricted Areas

• Take the necessary actions to deal with suspicious activities in Restricted Areas

Page 9: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Control Team

• Chief Controller: PFSO, Mr. AAA

Page 10: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Players

• Security staff

Page 11: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Scenario

The local police have warned that they have received intelligence information that crime syndicates are using port facilities to export their contrabands. As such, they have asked all port facilities to step up their vigilance especially when dealing with baggage, cargoes or stores being delivered to ships.

Page 12: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Port Facility Security Instructions

• •

Page 13: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Communications

• Telephone • Walkie-Talkie

Players – Ch YY

Page 14: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Drill Start The drill is to commence

Drill Suspend The drill is temporarily suspended

Drill Go The drill is to resume from where it was suspended

Drill Stop The drill is to be terminated (prematurely)

Drill End The drill is completed

Drill, Drill, Drill The message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity

Code words

Page 15: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Safety

• Physical safety of personnel is paramount• There is to be no physical contact between

players and controllers acting as intruders, etc.• Security staff are not to use abusive language when talking to controllers acting

as “intruders”• Do not neglect the safety of equipment

Page 16: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Debrief

• Location:

• Secretary:

• Attendance

Page 17: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Updates on the ISPS Code andlocal Regulations

• • •

Page 18: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Developments in Maritime Security

• • •

Page 19: XYZ Port Facility Maritime Security Drill

Unauthorized Unloading of Items in Restricted Area

Any questions ?


Recommended