2003
02 Established SCT Co., Ltd.
2004
05 Venture Business Registration
05 Award official commendation as a distinguished company by the Business Incubator Center of the
SMBA
[Small and Medium Business Administration]
2005
06 Relocated main office / Occupancy Fabrication shop (South Korea, Chung-Cheong-do)
12 Award Superb Foundation Enterprise by Presidential Commission on Small and Medium Enterprise
2006
04 Certified INNO-BIZ (Innovative Small and Medium Business)
06 Awarded Grand prize Venture Enterprise
2007
04 Registration of Engineering Activities (Engineering and Design Chemical Plant division)
2008
10 Awarded Grand prize by Chung Cheong Book-do Small and Medium Enterprise
10 Awarded Superb business on South Korea Business Competition
2009
03 Awarded Great Model taxpayer on 43th Taxpayer day
09 Certified BEST Organization by HRD [Human Resources Development]
11 Awarded Excellent Talent Management by SMBA
2010
11 Awarded Superb Small and Medium Business by HRD
2011
03 Established Pa-Ju branch
2012
06 Selected as a Future Pioneer Enterprise
06 Certified Great Model Taxpayer by Seoul
2013
04 Established EPC Center
09 Selected as Hidden Champion by Ministry of Employment and
Labor
12 Awarded 10 million Export Tower
2014
03 Certified as Oversea Procurement Market Business
10 Registration of Special Equipment Fabrication
2015
04 Registered Energy Service Company (ESCO)
09 Established Dong-Tan Office
2016
02 Registered the Industrial & Environmental Plant Construction
11 Re-Certified Venture Business
2017
04 Established Yeo-su branch
SCT has been implementing various projects focused on Oil & Gas Plant and Industrial Plant in both domestic and overseas market including Middle Asia and South - East Asia.
•Oil Refinery Plant
•Gas Plant
•Petro-Chemical Plant
•Oil & Gas Plant
Wet Air Oxidation System
Flue Gas Desulfurization System
Tail Gas Catalytic Incinerator (TGCI)
SCT has supplied N2 Liquefaction Facility to the client in Thailand and participating in many other projects worldwide.
Air Separation System
Chemical Supply / Injection System
SCT has supplied more than 20 packages of Chemical Supply / Injection System to the clients for the last 10 years.
• Industrial Plant
• Fine-Chemical Plant
• Water Treatment
• Painting / Dust Collection
• Display
• Factory / Building
SCT has supplied MVR system in
order to reuse reflux vapor
through steam evaporator and
supply vaporized steam as hear
source then it leads energy
saving to operating plant .
MVR System
MVR(Mechanical Vapor Recompressor)
SCT has a commitment to be the front-runner based on developing new technologies through close cooperation with world-leading companies in Energy Saving & Industrial Plant field.
Incineration Power Plant
BIOMASS POWER PLANT
Biomass Power Plant is intended to generate designed Electricity and Process Steam by combusting as Biomass and Coal etc. as a fuel in Boiler system, and typically composed as Fuel storage and Handling system, Combustion, ash handling, Steam Turbine, Feed water system, Flue gas emission, Make up Water system, Control system and Power Transmission system etc.
SCT provides professional piping and hook-up service for the high-tech utility in the semiconductor and display facilities.
- LG Display / LG Innotek - Samsung Electronics - OCI Polysilicon - Woongjin KCC Polysilicon - ELK - Samsung C&T - Samsung Heavy Industries - Morning High-Tech - Serveone - Tokyo Electron Korea
Major Experience
We are also the most competitive player on the water concerned business as we have many experience for raw water treatment, demineralized water system, reverse osmosis system, ultra pure water system and waste water reuse system on EP or EPC turn-key basis.
Core Competence
1) Optimized Engineering Service We supply optimized engineering service to the client who
needs experienced engineering and wants to meet their various technical requirement.
2) Package & Skid Base To minimize work in site, we can provide our system with package & skid basis. It contributes to reduce project period and cost. 3) High Performance & Low Cost
For Laboratory equipment and Workshop Equipment, tools & materials in the field of Petrochemical, Power and Gas plant etc. industries, we’ve been providing total service from design, procurement, installation including technical support during installation and commissioning at site in world wide for a various range of customers in accordance with Client and Project Requirement.
We can provide practical solutions to our customers through a detailed analysis of their requirements
Advise Quotation Depending on client’s requirement we can provide competitive offer, ranging from budgetary and technical outline to fully detailed quotation
Qualified and professional engineer and staff is assigned to manage a project from bid to final acceptance for meeting client need
Project Management
We works with our customers, providing ongoing support for maintenance and servicing of our products
Service / Maintenance
Equipment for Laboratory supply consists of following items
• Mechanical Workshop
• Electrical Workshop
• I&C Workshop
• Others (Welding Workshop, Tools, Garage Workshop)
• Laboratory Equipment
• Standard Gas
• Laboratory Glassware
• Chemical Reagent
SCT has fabricated and supplied many Package System based on effective project management skill and abundant experiences for process plant. These packages will provide our client with benefits of cost, schedule and quality.
1) Value Engineering Service - Optimized Plot Plan & considering Constructability - Economic Engineering
2) Basic & Module(Skid) Design - Optimized engineering - Shorten schedule for minimizing site work
3) Fast Tracking Execution - Early design and Simultaneous fabrication in Shop
4) QA & HSE Control - More Systematic Quality control in Shop - Better HSE control in Shop and Field
SCT will provides
Benefits to Client
Minimizing project schedule
Overall Project Cost Saving
Best quality with high productivity
Wet Air Oxidation Unit (Lotte Chemical) Solution Pilot Unit (Korea Petro.Chem)
2004.05 Official commendation as distinguished company by the
Business Incubator Center of the SMBA
2006.06 Grand prize on Venture Enterprise
2008.10 Grand prize by Chung Cheong Book-do Small and Medium Enterprise
Superb business on South Korea Business Competition
2009.03 Great Model of Taxpayer on 43th Taxpayer day
2009.11 Excellent Talent Management by SMBA
2010.11 Superb Small and Medium Business by HRD
2012.06 Selected as a Future Pioneer Enterprise
Certified Great Model Taxpayer by Seoul
2013.12 Awarded 10 million Export Tower
Award 03
License No. Issued date
Industrial & Environmental Plant Construction
12-0021 2016.02.05
Mechanical Facility Works Cheong Ju - 03-12-03 2003.05.12
Engineering Business
(Chem./Mech.) 07-00042 2007.04.26
Gas Facilities Installation 1type Cheong Won 09-23-01 2009.10.26
Environmental Professional Construction (Atm./Water Treat)
2 2005.07.21
Specialties of Energy Saving 2015-0734-5 2015.04.30
Fabrication of Special Equipment 2014-5710030-16-5-00001 2014.10.17
KOSHA 18001 1613 2014.11.12
OHSMS 18001 SMC-0753 2015.11.07
ISO9001 8204164 2005.05.26
Licenses 04
Project Client Period Scope
1 MVR Plant Project
(Mechanical Vapor Recompression) Kolon Global
Feb.’17~ Dec.’18
E.P.C
2 WACKER L/7935 Site Extension Ulsan
Project Wacker Chemicals
Korea Inc Oct.’16~ Jan.’17
E
3 WAO Plant LOTTECHEMICAL June’16~ Apr.’17
E.P.C
4 Ulsan Line 9 Project KURARAY KOREA Feb.’16~ Aug.’17
E.P.C
5 Samsung P-Project Air Products Korea Feb.’16~ Mar.’17
C
6 MKAN Water Treatment HEC
(Owner : Lukoil Uzbekistan)
Apr.’15~ Jun.’16
E.P
⊙ Ulsan Line 9 Project ⊙ WAO Plant Project ⊙ Samsung P-P Project
Project 05
⊙ MVR Project ⊙ UGCC WAO Project ⊙ AEZIS PLANT REVAMPING PROJECT
Project Client Period Scope
7 Kirikkale Independent Power
Project WT & WWT System
SAMSUNG C&T
(Turkey)
Jan.’15~
Jan.’17 E
8 Karbala Drinking Package HDGSK JV Mar.’15~ Dec.16
E.P
9 Qatar UHP Project Samsung Fine Chemical Jan ‘15~
May ‘17 E
10 Asan DC Gas & PCW Samsung Fine Chemical Sep.’15~
June.’17 C
11
MVR Project
(Mechanical Vapor Recompression)
Samsung Fine Chemical Dec.’14~
May.’16 E.P.C
12 PMMA Solution Process LG MMA Aug.’15~
Dec.’15 E
13 L400 Nitrogen Liquefier Project BIG(Bangkok Industrial Gas)
Company, Thailand
Jun.’14~
Apr.’15 E.P.C
14 PTT RTI Infrastructure Project PTT Public Co.,Ltd. Thailand Nov.’14~
Nov.’15 E.P.C
15 UGCC UTILITIES & OFFSITES
PLANT PROJECT
HEC
(JV “Uz-Kor Gas Chemical LCC”)
Mar.’13~
Sep.’15 E.P
16 UGCC ETHYLENE PLANT
PROJECT
GS CONSTRUCTION
(JV “Uz-Kor Gas Chemical LCC”)
Mar.’13~
Sep.’15 E.P
17 AEZIS PLANT REVAMPING
PROJECT AEZIS
Jul.’14~
Jan.’15 E.P.C
18 #2 HOU Revamping
Detail Engineering Hyundai Oilbank
Jan.’14~
Jun.’15 E
⊙ PT. PATRA SK LBO Revamping Project
⊙ LOTTE CHEMICAL NCC Plant ⊙ BIG Nitrogen Liquefier Plant
Project Client Period Scope
19 LN2 Piping Project Samsung Electronic Sep.’14~
Oct.’15 C
20 SM Revamping Project LG Chem. Jan.’15~
Jun.’15 C
21 BD/BRU Project LG Chem. Jan.’15~
Jun.’15 C
22 #3 SRU TGCI S-Oil Apr.’14~
Dec.’14 E.P.C
23 KUMHO MITSUI CHEMICAL
PH Flaker system KUMHO MITSUI
Jul.’15~
Sep.’15 C
24 Annapruna Project PTT ME
(Mataput, Thailand)
Sep.’14~
Feb.’15 E & P
25 NCC Ethane Furnace (102-BN) LG Chem Jan.’14~
Feb.’15 E
26 PETROLEUM PRODUCTION
PROJECT Universal Adsorbents & Chemical
(Sukhothai, Thailand) Jul.’12 ~ Jun. ’13
E.P.C
27 HMC-3 NEW ONLINE MIXER
PROJECT
HMC Polymers
(Rayong, Thailand)
Apr.’11 ~ Sep. ‘12
E.P.C
28 NO.2 CA/EDC PROJECT LG CHEM
(Yeosu, Korea)
Mar.’11 ~
Nov.’12 E
29 NO.2 BTX PROJECT HHI May.’11 ~
Aug.’12 E
30 LUBE BASE OIL REVAMPING
PROJECT Patra SK
Oct.’11 ~ Dec. ‘11
E
⊙ THAI Gas Separation Plant ⊙ UAC PP Project ⊙ LOTTE CHEMICAL WAO Unit
Project Client Period Scope
31 NO.1 PX REVAMP PROJECT GS Caltex Sep.’10 ~ May. ‘11
E
32 LCD GLASS PROJECT LG Chemical Oct.’10~ Aug. ‘11
E.C
33 LG CHEM. NCC Revamp. Project
WAO UNIT GS E&C
Sep. ’09 ~ Apr ’10
E.P.C
LTSK
34 C1, C3 REVAMPING PROJECT LG CHEM Jun. ’09 ~
May. ‘10
E.P.C
LTSK
35 CAPRO #5 ESCO PROJECT CAPRO Apr. ’09 ~ Mar. ’10
E.P.C
LTSK
36 RAW C5 PROJECT LG CHEM Oct. ’ 09 ~
Dec. ‘09
E.P.C
LSTK
37 LED MOCVD PROJECT
(KWANGJU PLANT) LG INNOTEK
Oct. ‘09 ~ Dec. ‘09
C
38 UT& C/R ENGINEERING
(PAJU PLANT) LG INNOTEK
Apr. ‘09 ~ Sep. ‘09
E
39 UAE GASCO NGL PROJECT
DESIGN GS E&C
Mar. ’09 ~ May ‘09
E
40 LED PLANT PROJECT LG INNOTEK Aug. ’09 ~
Jun. ‘10
E.P.C
LTSK
41 HCR PROJECT
(HYDRO CARBON RESIN) KOLON Industry
Jun.’11 ~
Oct.’13 E
42 LG CHEM. NCC Revamp. Project
WAO UNIT GS E&C
Jun. ’06 ~ Mar ’07
E.P.C
LTSK
Project Client Period Scope
43 LPC NCC Revamp Project
WAO Unit LOTTE CHEMICAL
Jul. ’07 ~ Apr ’08
E.P.C
LTSK
44 CAA 1AA REVAMPING PROJECT LG CHEM Sep. ‘08 ~ May ‘09
E.P.C
45 3G CSP SYSTEM DuPont May. ‘08 ~
Dec. ‘09
E.P.C
LSTK
46 P2 POLY SILICON PROJECT KCC Jan. ‘08 ~ Dec. ‘09
E.P.C
47 NCC REVAMPING PROJECT HONAM PETROCHEMICAL Dec ‘07 ~
Jun ‘08 C
48 HPEO REVAMPING PJT. SAMSUNG TOTAL Aug.’07 ~
Feb.’08 P.C
49 OS-BOG UNIT PROJECT LG CHEM Jun. ‘07 ~
Apr.’08
E.P.C
LSTK
50 JETTY EXTENTION PROJECT SEETEC Jan. ‘07 ~ Mar. ’08
E.P.C
LSTK
51 UT & CLEAN ROOM PROJECT ELK Jan. ‘07 ~ Nov. ’07
E.P.C
LSTK
52 TANK TERMINAL PROJECT TAEYOUNG INDUSTRY Jul. ‘06 ~
Apr. ’07 E
53 FILM FILTER BLENDING SYSTEM LG MICRON Dec. ‘05 ~ Mar. ’06
E.P.C
LSTK
54 T.S CHEMICAL SUPPLY SYSTEM LG MICRON Dec. ‘05 ~ Mar. ’06
E.P.C
LSTK
55 P6/P7 D.I PROJECT LG DISPLAY Jan. ‘05 ~ Dec. ’05
E.P.C
LSTK
56 P-CHEM PROJCT LG CHEM Jan. ‘04 ~ Dec. ‘04
E.P.C
LSTK
57 PDP CHEMICAL SUPPLY SYSTEM
(#1~#3) LG MICRON
Apr. ‘03 ~ Sep. ’05
E.P.C
LSTK
58 C-PJT
D.I WATER SYSTEM
HEG
(HONAM, CHINA)
Sep. ‘03 ~ Apr. ‘04
E.P.C
LSTK
• SCT, as a Total Service Provider, provides comprehensive range
of services to cover any client’s requirements from business
planning to E.P.C. and commissioning.
• SCT provides professional engineering service through using
various engineering software and utilizing many of engineering
specialist.
• Based on the project management system, SCT always
concentrates on Quality, Cost and Schedule from the point of
client.
WHY SCT 06
Head Office
7-44, Cheoksan-gil, Cheoksan-ri, Nami-myeon, Seowon-gu, Cheongju-si, Chungbuk, Korea
Tel. +82-43-269-2900. Fax. +82-43-269-2950
EPC Center / Seoul
5 Floor, A-dong, BYC HIGHCITY Building, 131, Gasan digital 1-ro, Geumcheon-gu, Seoul,
Korea
Tel. +82-2-860-9600. Fax. +82-43-269-2950
Dong-Tan Office
303-ho, RoadPlaza, 26-21, Dongtanjungsimsangga 2-gil, Hwaseong-si, Gyeonggi-do, Korea
Tel. +82-70-4272-8890. Fax. +82-31-613-4309
Yeo-su branch
25, Seongsan-ro, Yeosu-si, Jeollanam-do, Korea