+ All Categories
Home > Documents > YOUR FAITHFUL PARTNER - · PDF fileAir Separation System ... Superb business on South Korea...

YOUR FAITHFUL PARTNER - · PDF fileAir Separation System ... Superb business on South Korea...

Date post: 16-Mar-2018
Category:
Upload: votruc
View: 216 times
Download: 1 times
Share this document with a friend
24
YOUR FAITHFUL PARTNER
Transcript

YOUR

FAITHFUL

PARTNER

COMPANY INFO

01

2003

02 Established SCT Co., Ltd.

2004

05 Venture Business Registration

05 Award official commendation as a distinguished company by the Business Incubator Center of the

SMBA

[Small and Medium Business Administration]

2005

06 Relocated main office / Occupancy Fabrication shop (South Korea, Chung-Cheong-do)

12 Award Superb Foundation Enterprise by Presidential Commission on Small and Medium Enterprise

2006

04 Certified INNO-BIZ (Innovative Small and Medium Business)

06 Awarded Grand prize Venture Enterprise

2007

04 Registration of Engineering Activities (Engineering and Design Chemical Plant division)

2008

10 Awarded Grand prize by Chung Cheong Book-do Small and Medium Enterprise

10 Awarded Superb business on South Korea Business Competition

2009

03 Awarded Great Model taxpayer on 43th Taxpayer day

09 Certified BEST Organization by HRD [Human Resources Development]

11 Awarded Excellent Talent Management by SMBA

2010

11 Awarded Superb Small and Medium Business by HRD

2011

03 Established Pa-Ju branch

2012

06 Selected as a Future Pioneer Enterprise

06 Certified Great Model Taxpayer by Seoul

2013

04 Established EPC Center

09 Selected as Hidden Champion by Ministry of Employment and

Labor

12 Awarded 10 million Export Tower

2014

03 Certified as Oversea Procurement Market Business

10 Registration of Special Equipment Fabrication

2015

04 Registered Energy Service Company (ESCO)

09 Established Dong-Tan Office

2016

02 Registered the Industrial & Environmental Plant Construction

11 Re-Certified Venture Business

2017

04 Established Yeo-su branch

PLANT

BUSINESS AREA

02

Hi-Tech

Energy

SCT has been implementing various projects focused on Oil & Gas Plant and Industrial Plant in both domestic and overseas market including Middle Asia and South - East Asia.

•Oil Refinery Plant

•Gas Plant

•Petro-Chemical Plant

•Oil & Gas Plant

Wet Air Oxidation System

Flue Gas Desulfurization System

Tail Gas Catalytic Incinerator (TGCI)

SCT has supplied N2 Liquefaction Facility to the client in Thailand and participating in many other projects worldwide.

Air Separation System

Chemical Supply / Injection System

SCT has supplied more than 20 packages of Chemical Supply / Injection System to the clients for the last 10 years.

• Industrial Plant

• Fine-Chemical Plant

• Water Treatment

• Painting / Dust Collection

• Display

• Factory / Building

SCT has supplied MVR system in

order to reuse reflux vapor

through steam evaporator and

supply vaporized steam as hear

source then it leads energy

saving to operating plant .

MVR System

MVR(Mechanical Vapor Recompressor)

SCT has a commitment to be the front-runner based on developing new technologies through close cooperation with world-leading companies in Energy Saving & Industrial Plant field.

Incineration Power Plant

BIOMASS POWER PLANT

Biomass Power Plant is intended to generate designed Electricity and Process Steam by combusting as Biomass and Coal etc. as a fuel in Boiler system, and typically composed as Fuel storage and Handling system, Combustion, ash handling, Steam Turbine, Feed water system, Flue gas emission, Make up Water system, Control system and Power Transmission system etc.

SCT provides professional piping and hook-up service for the high-tech utility in the semiconductor and display facilities.

- LG Display / LG Innotek - Samsung Electronics - OCI Polysilicon - Woongjin KCC Polysilicon - ELK - Samsung C&T - Samsung Heavy Industries - Morning High-Tech - Serveone - Tokyo Electron Korea

Major Experience

We are also the most competitive player on the water concerned business as we have many experience for raw water treatment, demineralized water system, reverse osmosis system, ultra pure water system and waste water reuse system on EP or EPC turn-key basis.

Core Competence

1) Optimized Engineering Service We supply optimized engineering service to the client who

needs experienced engineering and wants to meet their various technical requirement.

2) Package & Skid Base To minimize work in site, we can provide our system with package & skid basis. It contributes to reduce project period and cost. 3) High Performance & Low Cost

For Laboratory equipment and Workshop Equipment, tools & materials in the field of Petrochemical, Power and Gas plant etc. industries, we’ve been providing total service from design, procurement, installation including technical support during installation and commissioning at site in world wide for a various range of customers in accordance with Client and Project Requirement.

We can provide practical solutions to our customers through a detailed analysis of their requirements

Advise Quotation Depending on client’s requirement we can provide competitive offer, ranging from budgetary and technical outline to fully detailed quotation

Qualified and professional engineer and staff is assigned to manage a project from bid to final acceptance for meeting client need

Project Management

We works with our customers, providing ongoing support for maintenance and servicing of our products

Service / Maintenance

Equipment for Laboratory supply consists of following items

• Mechanical Workshop

• Electrical Workshop

• I&C Workshop

• Others (Welding Workshop, Tools, Garage Workshop)

• Laboratory Equipment

• Standard Gas

• Laboratory Glassware

• Chemical Reagent

SCT has fabricated and supplied many Package System based on effective project management skill and abundant experiences for process plant. These packages will provide our client with benefits of cost, schedule and quality.

1) Value Engineering Service - Optimized Plot Plan & considering Constructability - Economic Engineering

2) Basic & Module(Skid) Design - Optimized engineering - Shorten schedule for minimizing site work

3) Fast Tracking Execution - Early design and Simultaneous fabrication in Shop

4) QA & HSE Control - More Systematic Quality control in Shop - Better HSE control in Shop and Field

SCT will provides

Benefits to Client

Minimizing project schedule

Overall Project Cost Saving

Best quality with high productivity

Wet Air Oxidation Unit (Lotte Chemical) Solution Pilot Unit (Korea Petro.Chem)

2004.05 Official commendation as distinguished company by the

Business Incubator Center of the SMBA

2006.06 Grand prize on Venture Enterprise

2008.10 Grand prize by Chung Cheong Book-do Small and Medium Enterprise

Superb business on South Korea Business Competition

2009.03 Great Model of Taxpayer on 43th Taxpayer day

2009.11 Excellent Talent Management by SMBA

2010.11 Superb Small and Medium Business by HRD

2012.06 Selected as a Future Pioneer Enterprise

Certified Great Model Taxpayer by Seoul

2013.12 Awarded 10 million Export Tower

Award 03

License No. Issued date

Industrial & Environmental Plant Construction

12-0021 2016.02.05

Mechanical Facility Works Cheong Ju - 03-12-03 2003.05.12

Engineering Business

(Chem./Mech.) 07-00042 2007.04.26

Gas Facilities Installation 1type Cheong Won 09-23-01 2009.10.26

Environmental Professional Construction (Atm./Water Treat)

2 2005.07.21

Specialties of Energy Saving 2015-0734-5 2015.04.30

Fabrication of Special Equipment 2014-5710030-16-5-00001 2014.10.17

KOSHA 18001 1613 2014.11.12

OHSMS 18001 SMC-0753 2015.11.07

ISO9001 8204164 2005.05.26

Licenses 04

Project Client Period Scope

1 MVR Plant Project

(Mechanical Vapor Recompression) Kolon Global

Feb.’17~ Dec.’18

E.P.C

2 WACKER L/7935 Site Extension Ulsan

Project Wacker Chemicals

Korea Inc Oct.’16~ Jan.’17

E

3 WAO Plant LOTTECHEMICAL June’16~ Apr.’17

E.P.C

4 Ulsan Line 9 Project KURARAY KOREA Feb.’16~ Aug.’17

E.P.C

5 Samsung P-Project Air Products Korea Feb.’16~ Mar.’17

C

6 MKAN Water Treatment HEC

(Owner : Lukoil Uzbekistan)

Apr.’15~ Jun.’16

E.P

⊙ Ulsan Line 9 Project ⊙ WAO Plant Project ⊙ Samsung P-P Project

Project 05

⊙ MVR Project ⊙ UGCC WAO Project ⊙ AEZIS PLANT REVAMPING PROJECT

Project Client Period Scope

7 Kirikkale Independent Power

Project WT & WWT System

SAMSUNG C&T

(Turkey)

Jan.’15~

Jan.’17 E

8 Karbala Drinking Package HDGSK JV Mar.’15~ Dec.16

E.P

9 Qatar UHP Project Samsung Fine Chemical Jan ‘15~

May ‘17 E

10 Asan DC Gas & PCW Samsung Fine Chemical Sep.’15~

June.’17 C

11

MVR Project

(Mechanical Vapor Recompression)

Samsung Fine Chemical Dec.’14~

May.’16 E.P.C

12 PMMA Solution Process LG MMA Aug.’15~

Dec.’15 E

13 L400 Nitrogen Liquefier Project BIG(Bangkok Industrial Gas)

Company, Thailand

Jun.’14~

Apr.’15 E.P.C

14 PTT RTI Infrastructure Project PTT Public Co.,Ltd. Thailand Nov.’14~

Nov.’15 E.P.C

15 UGCC UTILITIES & OFFSITES

PLANT PROJECT

HEC

(JV “Uz-Kor Gas Chemical LCC”)

Mar.’13~

Sep.’15 E.P

16 UGCC ETHYLENE PLANT

PROJECT

GS CONSTRUCTION

(JV “Uz-Kor Gas Chemical LCC”)

Mar.’13~

Sep.’15 E.P

17 AEZIS PLANT REVAMPING

PROJECT AEZIS

Jul.’14~

Jan.’15 E.P.C

18 #2 HOU Revamping

Detail Engineering Hyundai Oilbank

Jan.’14~

Jun.’15 E

⊙ PT. PATRA SK LBO Revamping Project

⊙ LOTTE CHEMICAL NCC Plant ⊙ BIG Nitrogen Liquefier Plant

Project Client Period Scope

19 LN2 Piping Project Samsung Electronic Sep.’14~

Oct.’15 C

20 SM Revamping Project LG Chem. Jan.’15~

Jun.’15 C

21 BD/BRU Project LG Chem. Jan.’15~

Jun.’15 C

22 #3 SRU TGCI S-Oil Apr.’14~

Dec.’14 E.P.C

23 KUMHO MITSUI CHEMICAL

PH Flaker system KUMHO MITSUI

Jul.’15~

Sep.’15 C

24 Annapruna Project PTT ME

(Mataput, Thailand)

Sep.’14~

Feb.’15 E & P

25 NCC Ethane Furnace (102-BN) LG Chem Jan.’14~

Feb.’15 E

26 PETROLEUM PRODUCTION

PROJECT Universal Adsorbents & Chemical

(Sukhothai, Thailand) Jul.’12 ~ Jun. ’13

E.P.C

27 HMC-3 NEW ONLINE MIXER

PROJECT

HMC Polymers

(Rayong, Thailand)

Apr.’11 ~ Sep. ‘12

E.P.C

28 NO.2 CA/EDC PROJECT LG CHEM

(Yeosu, Korea)

Mar.’11 ~

Nov.’12 E

29 NO.2 BTX PROJECT HHI May.’11 ~

Aug.’12 E

30 LUBE BASE OIL REVAMPING

PROJECT Patra SK

Oct.’11 ~ Dec. ‘11

E

⊙ THAI Gas Separation Plant ⊙ UAC PP Project ⊙ LOTTE CHEMICAL WAO Unit

Project Client Period Scope

31 NO.1 PX REVAMP PROJECT GS Caltex Sep.’10 ~ May. ‘11

E

32 LCD GLASS PROJECT LG Chemical Oct.’10~ Aug. ‘11

E.C

33 LG CHEM. NCC Revamp. Project

WAO UNIT GS E&C

Sep. ’09 ~ Apr ’10

E.P.C

LTSK

34 C1, C3 REVAMPING PROJECT LG CHEM Jun. ’09 ~

May. ‘10

E.P.C

LTSK

35 CAPRO #5 ESCO PROJECT CAPRO Apr. ’09 ~ Mar. ’10

E.P.C

LTSK

36 RAW C5 PROJECT LG CHEM Oct. ’ 09 ~

Dec. ‘09

E.P.C

LSTK

37 LED MOCVD PROJECT

(KWANGJU PLANT) LG INNOTEK

Oct. ‘09 ~ Dec. ‘09

C

38 UT& C/R ENGINEERING

(PAJU PLANT) LG INNOTEK

Apr. ‘09 ~ Sep. ‘09

E

39 UAE GASCO NGL PROJECT

DESIGN GS E&C

Mar. ’09 ~ May ‘09

E

40 LED PLANT PROJECT LG INNOTEK Aug. ’09 ~

Jun. ‘10

E.P.C

LTSK

41 HCR PROJECT

(HYDRO CARBON RESIN) KOLON Industry

Jun.’11 ~

Oct.’13 E

42 LG CHEM. NCC Revamp. Project

WAO UNIT GS E&C

Jun. ’06 ~ Mar ’07

E.P.C

LTSK

Project Client Period Scope

43 LPC NCC Revamp Project

WAO Unit LOTTE CHEMICAL

Jul. ’07 ~ Apr ’08

E.P.C

LTSK

44 CAA 1AA REVAMPING PROJECT LG CHEM Sep. ‘08 ~ May ‘09

E.P.C

45 3G CSP SYSTEM DuPont May. ‘08 ~

Dec. ‘09

E.P.C

LSTK

46 P2 POLY SILICON PROJECT KCC Jan. ‘08 ~ Dec. ‘09

E.P.C

47 NCC REVAMPING PROJECT HONAM PETROCHEMICAL Dec ‘07 ~

Jun ‘08 C

48 HPEO REVAMPING PJT. SAMSUNG TOTAL Aug.’07 ~

Feb.’08 P.C

49 OS-BOG UNIT PROJECT LG CHEM Jun. ‘07 ~

Apr.’08

E.P.C

LSTK

50 JETTY EXTENTION PROJECT SEETEC Jan. ‘07 ~ Mar. ’08

E.P.C

LSTK

51 UT & CLEAN ROOM PROJECT ELK Jan. ‘07 ~ Nov. ’07

E.P.C

LSTK

52 TANK TERMINAL PROJECT TAEYOUNG INDUSTRY Jul. ‘06 ~

Apr. ’07 E

53 FILM FILTER BLENDING SYSTEM LG MICRON Dec. ‘05 ~ Mar. ’06

E.P.C

LSTK

54 T.S CHEMICAL SUPPLY SYSTEM LG MICRON Dec. ‘05 ~ Mar. ’06

E.P.C

LSTK

55 P6/P7 D.I PROJECT LG DISPLAY Jan. ‘05 ~ Dec. ’05

E.P.C

LSTK

56 P-CHEM PROJCT LG CHEM Jan. ‘04 ~ Dec. ‘04

E.P.C

LSTK

57 PDP CHEMICAL SUPPLY SYSTEM

(#1~#3) LG MICRON

Apr. ‘03 ~ Sep. ’05

E.P.C

LSTK

58 C-PJT

D.I WATER SYSTEM

HEG

(HONAM, CHINA)

Sep. ‘03 ~ Apr. ‘04

E.P.C

LSTK

• SCT, as a Total Service Provider, provides comprehensive range

of services to cover any client’s requirements from business

planning to E.P.C. and commissioning.

• SCT provides professional engineering service through using

various engineering software and utilizing many of engineering

specialist.

• Based on the project management system, SCT always

concentrates on Quality, Cost and Schedule from the point of

client.

WHY SCT 06

Head Office

7-44, Cheoksan-gil, Cheoksan-ri, Nami-myeon, Seowon-gu, Cheongju-si, Chungbuk, Korea

Tel. +82-43-269-2900. Fax. +82-43-269-2950

EPC Center / Seoul

5 Floor, A-dong, BYC HIGHCITY Building, 131, Gasan digital 1-ro, Geumcheon-gu, Seoul,

Korea

Tel. +82-2-860-9600. Fax. +82-43-269-2950

Dong-Tan Office

303-ho, RoadPlaza, 26-21, Dongtanjungsimsangga 2-gil, Hwaseong-si, Gyeonggi-do, Korea

Tel. +82-70-4272-8890. Fax. +82-31-613-4309

Yeo-su branch

25, Seongsan-ro, Yeosu-si, Jeollanam-do, Korea


Recommended