ZELOSKI MARSH PROJECT

Date post: 30-Dec-2015
Category:
Upload: hammett-hurst
View: 43 times
Download: 4 times
Share this document with a friend
Description:
ZELOSKI MARSH PROJECT. EVALUATING OUR SUCCESS by ROCK RIVER COALITION ed grunden .. presenter. Wow! What made the change ?. 1937 this 1500 acre area is a “worthless” marsh ~ wetlands area known as the ‘London Marsh’ - PowerPoint PPT Presentation
Popular Tags:
48
ZELOSKI MARSH PROJECT EVALUATING OUR SUCCESS by ROCK RIVER COALITION ed grunden .. presenter
Transcript
Page 1: ZELOSKI MARSH PROJECT

ZELOSKI MARSH PROJECT

EVALUATING OUR SUCCESS

by

ROCK RIVER COALITIONed grunden .. presenter

Page 2: ZELOSKI MARSH PROJECT
Page 3: ZELOSKI MARSH PROJECT
Page 4: ZELOSKI MARSH PROJECT

Wow! What made the change ?

• 1937 this 1500 acre area is a “worthless” marsh ~ wetlands area known as the ‘London Marsh’

• 1945 Mr. Felix Zeloski began the purchase of this wetland area realizing its potential for growing food crops with rich soil, available water, and the Great Northern Railroad crossing the territory

• 1946 draining of the wetlands began• 1947 – 2003 root crops (potatoes – onions –

carrots) were grown in this drained and then irrigated area

Page 5: ZELOSKI MARSH PROJECT
Page 6: ZELOSKI MARSH PROJECT
Page 7: ZELOSKI MARSH PROJECT
Page 8: ZELOSKI MARSH PROJECT
Page 9: ZELOSKI MARSH PROJECT

Woa! What happened..is this the same area ?• In the mid 1990’s Mr. Dennis Zeloski (son of Felix) was

approached regarding the sale of the farm to the Department of Natural Resources. Dennis was not interested in selling

• Having reached retirement age and experiencing an increase in the flooding of his farm fields Dennis was receptive to the potential sale of his farm when again approached in the early 2000’s

• The sale would entail nearly 1500 contiguous acres of highly organic soil which had for 60 years been the main area of the farm, located two miles west of Rock Lake at Lake Mills, Wi.

• A sale agreement was reached between Mr. Zeloski and the NRCS (Natural Resources Conservation Service), with the help of funding by the Madison Audubon Society and completed in 2004

• This sale agreement would require the restoration of the former wetlands, a monitoring of the restoration area, and the transfer of the property to the Wisconsin Department of Natural Resources (DNR). This occurred this fall (2006)

Page 10: ZELOSKI MARSH PROJECT

Brief review of the history of the Zeloski Marsh Project

• 1944 the 1500 a. area located 2 miles west of Lake Mills, Wisconsin is a wetlands and marsh

• 1945 area is purchased by the Zeloski family• 1946 natural area is drained• 1947-2003 area is being cropped• 2003 area is sold by Zeloski family for restoration• 2004 – 2005 area is cash cropped (corn and

soybeans)• 2006 area restoration work begins with

monitoring entering the second year of “pre-restoration phase”

Page 11: ZELOSKI MARSH PROJECT

Restoration Monitoring Research Project• Under the requirements of the Natural

Resources Conservation Service (NRCS) the area being purchased and restored must be monitored for flora and fauna changes.

• Rock River Coalition (not for profit organization - utilizing volunteer citizen scientists to monitor conditions within the Rock River Basin) is awarded the responsibility and challenge of monitoring the marsh

• Bryan Huberty is hired to begin the monitoring study. Bryan will establish protocols, recruit volunteers, and begin monitoring activities

Page 12: ZELOSKI MARSH PROJECT

The Challenge of beginning a monitoring project: questions need to be answered

what monitoring should be done what protocols should be used what areas should be studied when should monitoring occur who should be in charge who should do the actual work what should become of the data

Page 13: ZELOSKI MARSH PROJECT

Monitoring Studies are Implemented

• Floristic• Large mammal• Small mammal• Aves • Anuran [frog and toad]• Odonata [damselfly and dragonfly]• Lepidoptera [butterfly and moth]

Page 14: ZELOSKI MARSH PROJECT

Floristic

Page 15: ZELOSKI MARSH PROJECT

Large Mammal : snow tracking

Page 16: ZELOSKI MARSH PROJECT

Small Mammal – trap line count

Page 17: ZELOSKI MARSH PROJECT

Aves : Christmas Bird Count

Page 18: ZELOSKI MARSH PROJECT

Anuran : frogs & toads

Page 19: ZELOSKI MARSH PROJECT

Odonata

Page 20: ZELOSKI MARSH PROJECT

Lepidoptera

Page 21: ZELOSKI MARSH PROJECT

Water Quality

Page 22: ZELOSKI MARSH PROJECT

Thanks to our many Volunteer Citizen Scientists

Page 23: ZELOSKI MARSH PROJECT
Page 24: ZELOSKI MARSH PROJECT
Page 25: ZELOSKI MARSH PROJECT
Page 26: ZELOSKI MARSH PROJECT

2006 Restoration in progress

Page 27: ZELOSKI MARSH PROJECT
Page 28: ZELOSKI MARSH PROJECT
Page 29: ZELOSKI MARSH PROJECT

Zeloski Marsh 2006Zeloski Marsh 2006

Page 30: ZELOSKI MARSH PROJECT
Page 31: ZELOSKI MARSH PROJECT
Page 32: ZELOSKI MARSH PROJECT
Page 33: ZELOSKI MARSH PROJECT
Page 34: ZELOSKI MARSH PROJECT
Page 35: ZELOSKI MARSH PROJECT
Page 36: ZELOSKI MARSH PROJECT
Page 37: ZELOSKI MARSH PROJECT
Page 38: ZELOSKI MARSH PROJECT
Page 39: ZELOSKI MARSH PROJECT
Page 40: ZELOSKI MARSH PROJECT
Page 41: ZELOSKI MARSH PROJECT

Remnant Tamarack Swamp discovered

Page 42: ZELOSKI MARSH PROJECT

BIKE TRAIL TRANSECTS AREA

Page 43: ZELOSKI MARSH PROJECT
Page 44: ZELOSKI MARSH PROJECT

New usage of wetlands begins ~

• hunting • education

Page 45: ZELOSKI MARSH PROJECT

What’s the next step ?A program director is hired ~

I’ve been on the job for a month!

A new project manager is hired ~She has been on the job for a week!

Project undergoes scrutiny ~

Page 46: ZELOSKI MARSH PROJECT

Asking all the right questions :• Who do I hire as the new project manager?• Are we meeting the grant requirements?• Are the surveys being done at the correct time?• Are the surveys even the right ones?• Are the survey protocols correct?• Is the data being stored correctly?• Is the data reaching the correct parties (utilization of data)?• How do we recruiter volunteer citizen scientists (monitors)• How do we train the volunteer monitors• How do we retain the volunteers• How do we find team leaders for each survey team?

Page 47: ZELOSKI MARSH PROJECT

• Where do we find the funding?• What equipment is needed?• Where do we find the equipment?• What about liability• How do I work with the many partners in the project?

~ NRCS~ Madison Audubon~ former land owner and current neighbor~ DNR~ Jefferson County Conservation Dept.

• How will the monitoring project be effected by usage change?

Page 48: ZELOSKI MARSH PROJECT

I have none of the answers !However, I hope I’m asking all the right questions. I also believe that at least one of you has an answer to at least one of my questions, and together all of my questions can be answered. After all isn’t that why we are hear: to net-work and ask questions?

I excited about the conference because at least four of the break-out sessions directly apply to the questions I am asking!

I challenge you not to be afraid to ask that question that is too embarrassing to ask … I believe I have all the questions so your not alone.

Let’s enjoy lunch and begin net-working and asking all the right questions!

thank you