10 juni 2011
Impulse Dynamic Vessel Traffic Management
Vessel Traffic Management Centres of the future
Cas Willems
Rijkswaterstaat
Content presentation
• IDVV • Track 1: Basic VTM services• Track 2: Single window for inland navigation• Track 3: Research – logistic challenges• Vessel Traffic Management Centres of the future (VCM)
Rijkswaterstaat
Impuls Dynamisch Verkeersmanagement VaarwegenIDVV
Impulse to the development of Dynamic Traffic Management on the waterway network
in the Netherland
Part of a policy vision on Vessel Traffic ManagementVTM2015
… 100 Meuro…..
2010-2013
Rijkswaterstaat4
The problem
• Increased traffic jams and environmental pressure • Shift from water to road• Reliability of inland navigation decreases
– Congestion and increased waiting times at locks and ports Verdeling wachttijden (in uren) in de haven voor de containerbinnenvaart
0%
5%
10%
15%
20%
25%
30%
0-4 u 4-8 u 8-12 u 12-16 u 16-20 u 20-24 u 24-36 u 36-48 u 48-60 u
Rijkswaterstaat5
Policy objectives Sustainable transport Inprove position of inland navigation in the transport chain; Shift from road to water; Benefits for the environment by shifting to rail and water.
Program objectives• Reliable voyage times• Maintain safety level• Fast and reliable incident management• Improve the use of infrastructure• Reduce administrative burden• Improve quality of the basic information
5
Rijkswaterstaat6
Measures IDVV program
Rijkswaterstaat
Governmental domain
OTP PCS
Private sector
1
4
5
A
B
D
NSW
transportmanagement
European NSW European PCS
OTP PCS
11
44
55
A
B
D
NSW
Trafficmanagement transportmanagement
National Single Window (NSW)
Maritime SW
Track 2: Single window for inland navigation
Rijkswaterstaat
Track 3 Research - Logistic challenges
ChallengeKnowledge creation on how to optimise traffic management on Dutch waterways:– How transport operators can be
stimulated and persuaded to make the choice for IWT instead of road?
– What new logistical concepts can strengthen this goal and accommodate the increase IWT between Rotterdam and the hinterland?
– How economically feasible are they?– And what kind of (economic) policy
should be considered to implement them?
The current logistical system
A new logistical system
Actions to be taken
Rijkswaterstaat
Track 1: Basic governmental services
• Implementation of a Vessel Traffic Management Supporting System VOS (RIS system)
• Vessel Traffic Management Centres of the future• ICT on governmental vessels supporting Vessel Traffic Management
Rijkswaterstaat
VerkeersmanagementCentrale van Morgen
Vessel Traffic Management Centres of the future
VCM(Track 1)
Rijkswaterstaat
Objectives and results VCM
Development of concept for “Vessel Traffic Management Centres of the future” and implement a VTM centre as proof of the concept
Integral Vessel Traffic Management: VTS, control of locks and bridges , traffic planning services as a support to the logistic chain
Improve efficiency for private and public parties by • Interaction and integration of VTS and control of locks and bridges.• Uniformity and optimal use of the systems for traffic management like
AIS, inland ECDIS, VOS.
Projectresults:• Blueprint of the concept for Vessel Traffic Management Centres• Transitionplan with CBA
Rijkswaterstaat
Phases of the project Vessel Traffic Management Centre of Tomorrow (VCM)
Planningphase
BlueprintVTM centres
Implementation Evaluation
Proof of
Concept
Formalisation
Blueprint VTMTransitionplan
1-9-2012 31-12-2013 2014
Rijkswaterstaat
Planning phase
Blueprint VTM
Operation&
evaluation
Implementationphase
Blueprint VTMTransitionplan
Communication networks
Organisation model
Visionstatement implementation of VTM
in the Netherlands
implementationVTM
Centre of the future
Phases and projectstructure
Operational Testing phase
VTM
Evaluation
Domainarchitecture Vessel Traffic Management
Scenarios for traffic measures and
traffic planning
UniformFunctionional equipment
Servicemodel
Control room, MMI
Rijkswaterstaat
Future Vessel Traffic Management Centres
Verkeersplanning
VTS / Begeleiding
Bediening
Centrale
Verzorgingsgebied bediening
Verzorgingsgebied verkeersplanning
Verkeersplanning
VTS / Begeleiding
Bediening
Centrale
Verzorgingsgebied bediening
Verzorgingsgebied verkeersplanning
2014-2025
Integrated corridorcentres + remote control centres 2050
Intgegrated corridor centres