Phase I:• Currentlyinconstruction• Includesgrading,fencing,drainage(including
basins)anddemolitionofexistingstructuresonthesite
• CompletedbyPennDOT
Phase II:• Constructionanticipatedtobeginsummer2017• Includestrackwork,electrificationtraction,
platformsandpedestrianaccesstowersforingress/egresstothenewstation
• CompletedbyAMTRAK,NorfolkSouthernorotherdesignatedcontractors
New Middletown Station
About the keystone corridor
Amtrak station improvement Projectkeystone corridor - Middletown station
TheKeystoneCorridorisa105-milerailroadlinebetweenHarrisburgandPhiladelphia,Pa.AMTRAKruns11eastboundand12westboundtrainsthatstopatMiddletownStation.ThesetrainsprovideservicebetweenHarrisburgandPhiladelphiawithconnectionsonwardtoNewYorkCity.MiddletownStationridershipwas68,484in2015. Parkesburg
Keystone Corridor Middletown Station
Harrisburg
PhiladelphiaElizabethtown
Mount JoyLancaster
Coatesville
Downingtown
ExtonPaoli
Ardmore
Rendering of New Middletown Station Pedestrian Bridge
Site Specifications• Location:IntersectionofAnnStreetand
StateRoute(SR)230(WestMainStreet)• Development Space Available:8.38acres• Zoning:C-1Commercial• Utilities:
8”waterlinewithinEmausStreetcartwayfromSR230toWoodStreetwitha375’-long8”waterlineservicetosite
2”electricalconduitinparkinglotsandroadwayforlighting
P3 Developement Opportunity:ThepotentialforanewcommercialdevelopmentthatcomplementstheparkingfacilityandnewlyrelocatedAMTRAKMiddletownStation.
For More Information:Public-PrivateTransportationPartnershipsOfficeEmail:[email protected]
RFP Selection Standards• Lowestsubsidizationby
PennDOTandfundingpartners• Mostusefulandmeaningful
developmentofland• OperationsandMaintenance
Plan• Maximizerevenuefrom
parkingandcommercializationactivities
P3 Project Schedule: December16,2016-RFQResponseDueDate
New Middletown Station Construction Phases
Rendering of Pedestrian Bridge and Potential Commercial Development
The P3 Project• DBFOMparkingfacilitiesthatprovidea
minimumof400parkingspaces• Fixed-priceparkingfeestructure• Potentialcommercial/retaildevelopment
(commercializationactivities)
• FinalizetheEmausStreetextensionandconstructapedestrianbridgeoverSR230
• OperationsandMaintenanceTerm:30years(min)• LandLease:Approximately50years