List of Annexure - Agenda Notes for 27th TCC & 28th SRPC Meetings
ANNEXURES
ANNEXURE-I SRLDC vide letter dated 18th
September 2015
ANNEXURE-II The updated status of upcoming Inter Regional Scheme
ANNEXURE-III Upcoming schemes for Renewable in Southern Region
ANNEXRE-IV Congestion Charges related issues- SRPC Secretariat letter dated
26.06.2015
ANNEXURE-V Congestion Charges related issues- NLDC reply dated 31.07.2015
ANNEXURE-VI Congestion Charges related issues - SRPC Secretariat letter dated
09.07.2015
ANNEXURE-VII RGMO analysis for the incident 28.07.2015 11:52 Hrs -
Presentation
ANNEXURE-VIII Format for furnishing the data/information in respect of PSS
Tuning
ANNEXURE-IX A Scheduling of Simhadri STPS Stage-I - APTRANSCO letter dated
19.08.2015
ANNEXURE-IX B Scheduling of Simhadri STPS Stage-I - TSTRANSCO letter dated
18.09.2015
ANNEXURE-X SRPC Secretariat letter dated 15.09.2015 regarding the
modifications of Raichur –Sholapur SPS
ANNEXURE-XI SRPC Secretariat letter dated 28.07.2015- status update on
instantaneous scheme for sudden withdrawal of wind and on
ADMS
ANNEXURE-XII Task-2, 15 Stations identified from Southern Region.
ANNEXURE-XIII KPCL letter dated 06th
August 2015- Issues Relating To PSDF
Funding
ANNEXURE-XIV Chairperson, SRPC letter dated 21st
May 2015 to Secretary (Power)
- Issues Relating To PSDF Funding
ANNEXURE-XV Statement showing net amount payable by Member Utilities of
SRPC for the year 2015 -16
ANNEXURE-XVI Caution / violation messages issued to the constituents by SRLDC
ANNEXURE-XVII NLDC letter dated 24.08.2015 regarding coordinated outage
planning
ANNEXURE-XVIII SRPC Secretariat letter date 10.08.2015 regarding amendment in
Regulation 6.5.19 of CERC (IEGC) Regulations.
ANNEXURE-XIX Record Notes of the discussion in the Workshop on Weather
Forecast Matters
ANNEXURE IIANNEXURE II
Transmission elements Schedule Revised Constraints/ Remarks
System Strengthening –XVII in SR Grid ( PGCIL SR II portion of Narendra‐KolhapurTransmission elements Schedule
d CODRevised
Target dateConstraints/ Remarks
765 kV D/C Narendra (New Kudgi)- Kolhapur line (initially
Mar’15 Sep’15 Completion matching withreadiness of Kudgi S/S (Landudg ) o apu e ( t a y
charged at 400 kV)ead ess o udg S/S ( a dAcquisition in Feb 2014). Effortsbeing made to complete earlier.
400 kV D/C Narendra (New Kudgi) Sep’15 Completion matching with ( g )– Narendra (existing) line (Quad) S/stn
LILO of both ckt at 400 kV D/C Kolhapur‐Mapusa line at Kolhapur
Sep’15 Completion matching with S/stn
765/400 kV Narendra (New Kudgi) SS (GIS) (charged at 400 kV)
Apr’15 Sep’15 Award placed in Mar’14. Land acquired in Feb’14. Supply, civil works & errection under works & errection under progress
765/400 kV Kolhapur SS(GIS) (charged at 400 kV)
Sep’15 Award placed in Mar’14. Supply,civil works & errection under progress
Extn. At 400/220 kV Narendra S/stn Sep’15 Award placed in Mar’14. Supply,civil works & errection under progress
Implement-ing CKM Sch. COD Ant COD/ Act COD
Constraints/ Remarks
Wardha - Nizamabad 765 kV D/C line
Wardha-Nizamabad-Hyderabad (Maheswaram)765kV D/C
PGCIL 1094 May’18Award placed in Mar’15. Towererrection commenced from Jul’15
Wardha – Raipur PS 765 kV D/C PGCIL 713 Dec’15 Commissioned on 15-11-2014
Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed
Extn. of Wardha 765 kV S/S PGCIL May’18 May’18 Award under progress.
Wardha Aurangabad 765 kV Line 1 commissioned in July 14 Line IIWardha – Aurangabad 765 kVD/C
PGCIL 701 Dec’15 Fe b’15Line 1 commissioned in July 14. Line IIby Feb’15
Extn. of Aurangabad 765 kV S/S PGCIL Mar’16 Mar’16Award placed in May’ 2014 and underprogress
Nizamabad-Dichipalli 400 kVD/C
PGCIL May’18Award placed in Mar’15. Towererrection commenced from Jul’15.
Nizamabad-YeddumailaramThis along with “Maheshwaram PG -Mahboobnagar 400 kV D/C line” was
(Shankarapalli) 400 kV D/C through based (TBCB) route. wasrecommended GoI for
Maheshwaram PG 765/400 kV,2x1500 MVA S/S
PGCIL Mar’18 Mar’18 Award placed in Ma’152x1500 MVA S/S
Nizamabad 765/400 kV, 2x1500MVA S/S
PGCIL May’18Award placed in Mar’15. Engg. Inprogress
Transmission ElementImple-
mentingLine
length COD Constraints/
WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System
Transmission Element mentingAgency
length (ckm)/ MVA
Capacity
COD Constraints/ Remarks
Sch. Ant / Act
Scheme # 1: Raigarh‐Pugalur 6000 MW HVDC System . This system Scheme # 1: Raigarh Pugalur 6000 MW HVDC System . This system would be designed with normal 20% overload for 30 minutes and 10% overload for 2 hours The scheme
had beenawarded to
1. Establishment of Raigarh HVDC Station 8 kV ith 6 MW HVDC t i l awarded to
PGCIL(GoIcircular dated10.12.2014)as informed
h
+800kV with 6000 MW HVDC terminals. This Raigarh Station would be implemented with extended bus of Raigarh(Kotra) existing 400kV S/S. The
in 26th SRPCmeeting.
Regulatedtariff
g ( ) g 4HVDC Station would have GIS for 400kV part and AIS for HVDC part.
2 Establishment of Pugalur HVDC Stn mechanismvide MoPletter dated03-03-2015.
2. Establishment of Pugalur HVDC Stn+800kV with 6000 MW HVDC terminals. The HVDC Station would have GIS for 400kV part and AIS for HVDC part.3. ± 800 kV Raigarh (HVDC Stn) – Pugalur(HVDC Stn) HVDC Bipole link with 6000 MW capacity.
Transmission ElementImple-
mentingLine
length COD Constraints/
WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System
Transmission Element mentingAgency
length (ckm)/ MVA
Capacity
COD Constraints/ Remarks
Sch. Ant / Act
Scheme # 2: AC System strengthening at Pugalur endScheme # 2: AC System strengthening at Pugalur end
The schemehad beenawarded to
1. Pugalur HVDC Station – Pugalur (Existing) 400kV (quad) D/c line2. Pugalur HVDC Station – Arasur 400kV (quad) D/c line awarded to
PGCIL(GoIcircular dated10.12.2014)as informed
(quad) D/c line.3. Pugalur HVDC Station – Thiruvalam 400kV(quad) D/c line with 2x80 MVAR line reactor atPugalur HVDC Station end and 2x63 MVAR line
h l k das informedin 26th SRPCmeeting.
Regulatedtariff
reactor at Thiruvalam 400kV end.3. Pugalur HVDC Station – Edayarpalayam400kV (quad) D/c line with 63 MVAR switchable line reactor at Edayarpalayam end.
d l d l k ( d) tariffmechanismvide MoPletter dated03-03-2015.
4.Edayarpalayam – Udumulpeta 400kV (quad) D/c line.(Establishment of 400/220kV substation at Edayarpalayamwith 2x500 MVA transformers
d MVAR b ld b d and 2x125 MVAR bus reactors would be under the scope of TANTRANSCO. The bay for ISTS transmission lines at Edayarpalayamwould be implemented as ISTS.)
Transmission ElementImple-
mentingLine
length COD Constraints/
WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System
Transmission Element mentingAgency
length (ckm)/ MVA
Capacity
COD Constraints/ Remarks
Sch. Ant / Act
Scheme # 3: Pugalur‐ Trichur 2000 MW VSC Based HVDC SystemScheme # 3: Pugalur Trichur 2000 MW VSC Based HVDC System
The schemehad been
1.+320kV, 2000 MW VSC based HVDC terminal at Pugalur. The HVDC Station would have GIS for 400kV part and AIS for HVDC awarded to
PGCIL(GoIcircular dated10.12.2014)
i f d
HVDC part.2. +320kV, 2000 MW VSC based HVDC terminal at North Trichur. The HVDC Station would have GIS for 400kV part and as informed
in 26th SRPCmeeting.
Regulatedt iff
4 pAIS for HVDC part.3. Establishment of VSC based 2000 MW HVDC link between Pugalur and North T i h * (K l ) (* t/ t f thi li k tariff
mechanismvide MoPletter dated03-03-2015
Trichur* (Kerala). (*part/parts of this link, in the Kerala portion, may be implemented as underground cable where implementation as overhead transmission 03-03-2015.pline is difficult because of RoW issues).4. LILO of North‐Trichur – Cochin 400 kV (Quad) D/c line at North Trichur HVDC Stn
Transmission Element ImplementingLine length (ckm)/ MVA COD Constraints / Remarks
Angul - Srikakulam PS 765 kV D/C line
Transmission Element Implementing Agency
(ckm)/ MVA Capacity
COD Constraints / Remarks
Sch.Ant / Act
Angul - Srikakulam PS 765 PGCIL 552 Jun'15 Aug’16
St-1 forest clearance awaited(99Ha). )1 package re tendered& awarded in June ‘15.Completion matching with
kV D/C line 552 Srikakulam-Vemagiri beingexecuted under TBCB(Sch:Aug’16)
Extn. 765/400 kV Angul Sub PGCIL 1 1500 J ’15 J '16Award placed in Aug’13. Engg.S l i il k & tig
station PGCIL 1x1500 Jun’15 Jun'16 Supply, civil works & erectionunder progress
765 kV D/C Angul-Jharsuguda line PGCIL 570 Dec'15 Jun’16
RoW being faced. Huge forestinvolvement clearance awiated.Huge forest involvement765 kV D/C Jharshuguda-
Dharamjayagarh line PGCIL 230 Dec'15 Jun’16Huge forest involvement.Critical
Extn. of 765/ 400 kV Angul PGCIL D '15 A ’16
Completion matching withSrikakulam-Vemagiri beingg
SS PGCIL Dec'15 Aug’16 g gexecuted under TBCB(Sch:Aug’16)
Extn. of 765/ 400 kVJharshuguda SS PGCIL Dec'15 Jun’16
Engineering & Civil worksunder progress
Srikakulam P P- Vemagiri- IIP li t ti 765 kV D/C
M/s Vizag Transmission
Li it d 30.08.201 A ’16 U d P
Angul - Srikakulam PS 765 kV D/C line
Pooling station 765 kV D/Cline
Limited(A subsidiary of
PGCIL)
6 Aug’16 Under Progress
Srikakulam Pooling Station 765/ Completion matching withSrikakulam Pooling Station 765/400 kV, 2x1500 MVA PS (400kV - AIS & 765 kV – GIS)
PGCIL 2x1500 Aug’16Completion matching with
Srikakulam-Vemagiri TBCB line(sch: Aug’16)
Srikakulam Pooling StationSrikakulam Pooling Station –Garividi 400 kV (Quad) D/Cline with 80 MVAR switchableline reactor at Garividi end.
PGCIL RFQ has been issued on12.04.2017 by RECTPCL
400/220 KV S/S at Maradam(Garividi) along with 2 Nos. 400KV Quad Bays at the existing400/220 KV Kalpaka S/S
APTRANSCO Feb’16Purchase order issued on15.11.2014Levelling work under progress
Behrampur- Gazuwaka 400kV D/C line M/s Talcher
TransmissionCompany Limited(Subsidiary of M/s
290 CERC ROP (for 18.11.2014)enclosedCEA letter 17.11.2014 : Nophysical progress visible on
Talcher II – Behrampur 400 kVD/C line 220
T l h II R k l 400 kV (Subsidiary of M/sReliance PowerTransmissionCompany Limited)
ground.The scheme needed to beimplemented without any furtherdelay
Talcher II- Rourkela 400 kVD/C Quad line 161
Behrampur 400/220 kV, 2x315MVA S/S 2x315
Additional inter‐Regional AC link for import into Southern Region, i.e., Warora‐Warangal ‐Hyderabad‐ Kurnool 765 kV link
CEA Notification dated 06.02.2015, CEA appointed PFC CL as BPCTransmission Elements Line Length
(ckm)/ MVA Capacity
Implementing
Agency
Sch COD
Constraints/ Remarks
Establishment of 765/400 kV substations at Bidding yet to a Warangal (New) with 2x1500 MVA transformer and
2x240 MVAR bus reactors.
g ycommence.RfQ inputs communicated by CTU
bWarora Pool -Warangal (New) 765 kV D/C line with240 MVAR switchable line reactor at both ends.
CTU.
The transmission element at(g) was identified for
cWarangal (New) –Hyderabad 765 kV D/C line with330 MVAR switchable line reactor at Warangal end.
dWarangal (New) – Warangal (existing) 400 kV
(quad) D/C line.Hyderabad– Kurnool 765 kV D/C line with 240 (g)
implementation undercompressed time schedulethrough regulated tariffmecha nism by PGCIL.
eHyderabad Kurnool 765 kV D/C line with 240MVAR switchable line reactor at Kurnool end.
fWarangal (New) – Chilakaluripeta 765 kV D/C line
with 240 MVAR switchable line reactor at bothends.
g LILO of Kurnool-Thiruvalam 765 kV D/C atCuddapah
PGCIL
h Cuddapah- Hoody 400 kV (quad) D/C line with 63MVAR switchable line reactor at both ends.
T i i El t Li L th I l S h C t i t / R k
System strengthening within SR for transmitting power beyond Vemagiri
CEA Notification dated 06.02.2015, CEA appointed RECTPCL as BPCTransmission Elements Line Length
(ckm)/ MVA Capacity
Implementing
Agency
Sch COD
Constraints/ Remarks
a Vemagiri II – Chilakaluripeta 765 kV D/C line with(i) SPV has been incorporatedVemagiri II Chilakaluripeta 765 kV D/C line with
240 MVAR switchable line reactor at both ends.incorporatedon 06.04.2015.(ii) RFQ has been issued on
b Chilakaluripeta – Cuddapah 765 kV D/C line with 240 MVAR switchable line reactor at both ends.
12.04.2015.
The transmission elements at(e) and (h) were identified forimplementation under
c Chilakaluripeta – Narsaraopeta 400 kV (quad) D/C line
dCuddapah – Madhugiri 400 kV (quad) D/C line with 80 MVAR switchable line reactor at both implementation under
compressed time schedulethrough regulated tariffmechanism by PGCIL.
d with 80 MVAR switchable line reactor at both ends.
e Cuddapah-Hindupur 400 kV (quad) D/C line with 80 MVAR switchable line reactor at Hindupur end.
PGCIL
fSrikaukulam Pooling Station – Garividi 400 kV (Quad) D/C line with 80 MVAR switchable line reactor at Garividi end.
gEstablishment of 2x1500 MVA, 765/400 kV substation at Chilakaluripeta with 2x240 MVARg substation at Chilakaluripeta with 2x240 MVAR bus reactors.
hEstablishment of 2x1500 MVA, 765/400 kV substation at Cuddapah with 2x240 MVAR bus reactors.
PGCIL
Annexure - III
Upcoming schemes for Renewable in Southern Region
Uravakonda Wind - AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
Uravakonda 400kV S/s 4x315 MVA
+
80 MVAR BR
Jun-15 Aug-15 Work awarded to M/s.
TEEECL in 20.08.2013
& work under progress
400 kV (Q)
Uravakonda -
Jammalmadugu
Jul-15 Oct-15 Work awarded on
23.01.2014 & under
progress
400 kV (Q)
Uravakonda -
Mahaboobnagar
190 kM Oct 15 35 SCPSPSR : Wind
project in Uravakonda
(1361 MW)
KfW funding 36th
SCPSPSR
400 kV (Q)
Uravakonda–
Hindupur
130 kM Tenders will be floated
shortly.
KfW funding 36th
SCPSPSR
400 kV Kondapur -
Kurnool
35 SCPSPSR : Wind
project in Kondapur
(1109 MW)
400 kV Uravakonda -
Kondapur
35 SCPSPSR : Wind
project in Kondapur
(1109 MW)
&vUravakonda (1361
MW)
Solar Power Park at Ghani/Panyam (1000 MW ) - AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implementing
Agency
Sch
CoD
Ant CoD/
Act CoD
Constraints/ Remarks
Phase-I ( 500 MW)
400/220kV Substation
at Gani/Panyam
3x500 MVA APTRANSCO Tenders opened on
20.04.2015 and under
analysis
2X125 MVAR
BR
APTRANSCO
400 kV Kurnool -
Gani/Panyam (Q) D/C
35 kM APTRANSCO Tenders opened on
20.04.2015 and under
analysis
220 kV sub-pooling APTRANSCO 38th SCPSPSR – Details
to be furnished
Phase-II (500 MW)
Jammalamadugu/
Kondapuram -
Gani/Panyam (Q) D/C
90 kM APTRANSCO
Annexure - III 1000 MW Wind Power at Aspiri- AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implementing
Agency
Sch
CoD
Ant CoD/
Act CoD
Constraints/ Remarks
400/220kV Substation
Aspiri
3x315 MVA APTRANSCO
2X125 MVAR
BR
APTRANSCO
400kV Aspiri -
Uravakonda(Q) D/C
APTRANSCO
220 kV sub-pooling APTRANSCO 38th SCPSPSR – Details
to be furnished
1500 MW NP Kunta Solar Project- AP
Transmission
Elements
Line Length
(ckm)/ MVA
Capacity
Impleme
nting
Agency
Sch COD Ant
COD/
Act
COD
Constraints/ Remarks
Phase-I 250 MW (NP Kunta) Dec 15
400/220 kV Substation
NP Kunta
3x500 MVA, May 2016
1x125 MVAR
BR
±100 MVAR
STATCOM
LILO of 400kV
Kadapa(Cuddapah) -
Kolar S/c line at NP
Kunta
May 2016
2 nos. 220kV line bays
at NP Kunta Pooling
Station
May 2016
Phase-II 750 MW (NP Kunta) Sep 16
LILO of
Kadapa(Cuddapah) –
Hindupur 400kV D/c
(Q) line at NPKunta
Aug 16
6 nos. 220kV line bays
at NP Kunta Pooling
Station
Aug 16
Phase-III 500 MW (Galiveedu) Dec 16
Augmentation of
transformation
capacity at NP Kunta
station
1x500 MVA Aug 16
4 nos. 220kV line bays
at NP Kunta Pooling
Station
Aug 16
Annexure - III
Kamuthi Solar(Max 100 MW injection)-TN
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
400/230 – 110 kV
Substation Kamuthi
3x315 MVA,
400/230 kV
TANTR
ANSCO
Sep 2016
2 x 200 MVA,
400/110 kV
400 kV Kamuthi –
Karaikudi (PG) (Q)
D/C
230 kV Kamuthi –
Muthuramalingapuram
230 kV Kamuthi-
Kavanoor
Samugarengapuram Wind (1800 MW existing + 300 MW) - TN
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
400/230 – 110 kV
Substation
Samugarengapuram
3x315 MVA,
400/230 kV
Land to be identified
2 x 200 MVA,
400/110 kV
400 kV
Samugarengapuram –
Udangudi D/C
LILO of 230 kV
Kudankulam – SR
Pudur S/C at
Samugarengapuram
LILO of 230 kV
Udayathur – Sankaneri
at Samugarengapuram
230 kV
Samugarengapuram –
Muppandal D/C
GREEN ENERGY CORRIDORS:- Inter State Transmission Scheme (ISTS) - Part – A
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
ISTS Part-A
400kV D/C Tirunelveli
PS-Tuticorin PS line-1
(Q)
11 kM PGCIL April 17
400kV D/C Tirunelveli
PS-Tuticorin PS line-2 (Q)
11 kM PGCIL April 17
400/220kV Tiruneveli PS.
(GIS)
2 x 500
MVA
PGCIL April 17
Annexure - III 400 kV Tirunelveli
Pooling Station
3x125
MVAR, BR
PGCIL Agreed in 37th SCPSPSR
LTA to Wind Generators in Tirunelveli Area - Tamil Nadu
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
400/230 kV
Tirunelveli Pooling
Station (GIS)
2x500 MVA PGCIL Work to
be
impleme
nted
after
LTA
Agreed in 37th SCPSPSR
2x125 MVAR,
BR
PGCIL Agreed in 37th SCPSPSR
400 kV Tirunelveli PS
– Tuticorin PS 2 x D/C
(Q)
PGCIL Agreed in 37th SCPSPSR
Charging of Tuticorin
– Salem & Salem –
Madhugiri 765kV
lines &substationsat its
rated voltage 765 kV
level
As discussed in 36th
SCPSPSR
230 kV Mytrah wind
farms 300 MW –
Tirunelveli PS D/C
It was also decided
that after the Wind
Developers apply for
LTA as per the
CERCRegulations,
2009, for at least 25%
quantum of their
installed
capacity,connectivity
and LTA shall be
granted and
transmission system
shall be taken upfor
implementation.
For connectivity as
discussed in 36th
SCPSPSR
230 kV Samimeru
wind farms (4 x 48.5
MW) –
Tirunelveli PS D/C
For connectivity as
discussed in 36th
SCPSPSR
230 kV RS India wind
farms (270 MW) –
Tirunelveli PS D/C
For connectivity as
discussed in 36th
SCPSPSR
400 kV Suzlon wind
farms –
Tirunelveli PS D/C
For connectivity as
discussed in 36th
SCPSPSR
Connectivity to Wind Generators in Coimbatore Area -Tamil Nadu
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
230 kV Suzlon (200
MW) switchyard –
Pugalur D/C
It was also decided
that after the Wind
Developers apply for
LTA as per the
CERCRegulations,
2009, for at least 25%
quantum of their
installed
capacity,connectivity
and LTA shall be
granted and
transmission system
shall be taken upfor
For connectivity as
discussed in 36th
SCPSPSR
230kV Vestas wind
farms (150 MW) –
Udumalpet D/C
For connectivity as
discussed in 36th
SCPSPSR
Annexure - III
implementation.
Connectivity to Wind Generators in Anantpur Area – AP
Transmission Elements Line Length
(ckm)/ MVA Capacity
Implementing
Agency
Sch CoD Ant CoD/ Act CoD
Constraints/ Remarks
220 kV Suzlon wind
farms – Gooty D/C
It was also decided
that after the Wind
Developers apply for
LTA as per the
CERCRegulations,
2009, for at least 25%
quantum of their
installed
capacity,connectivity
and LTA shall be
granted and
transmission system
shall be taken upfor
implementation.
For connectivity as
discussed in 36th
SCPSPSR
Renewables (KfW) Hindupur – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
400/220kV Substation
at Hindupur
3x315 MVA As agreed in 36th
SCPSPSR
80 MVAR As agreed in 36th
SCPSPSR
400kV DC Hindupur -
Uravakonda
130 kM As agreed in 36th
SCPSPSR
220kV Hindupur-
PenukondaD/C
50 kM As agreed in 36th
SCPSPSR
220/132 kV
Substations at
Penukonda
2x100 MVA As agreed in 36th
SCPSPSR
220kV Hindupur to
PampanurTanda ( TM
) D/C
90 kM As agreed in 36th
SCPSPSR
220/132 kV Substation
at PampanurTanda
2x100 MVA As agreed in 36th
SCPSPSR
Renewables (KfW) Jammalamadugu – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
400/220/132kV
Substation at
Jammalamadugu
4x315 MVA As agreed in 36th
SCPSPSR
2X160 MVA As agreed in 36th
SCPSPSR
80 MVAR BR As agreed in 36th
Annexure - III
SCPSPSR
400kV
Jammalamadugu -
Kurnool (Q) D/C
125 kM As agreed in 36th
SCPSPSR
400kV DC
Jammalamadugu -
Uravakonda
(Q) D/C
110 kM As agreed in 36th
SCPSPSR
220kV
Jammalamadugu-
TirumalaipallyD/C
17kM As agreed in 36th
SCPSPSR
220/132 kV Substation
at Tirumalaipally
2x160 MVA As agreed in 36th
SCPSPSR
220kV
Jammalamadugu-
Betamcherla D/C
68 kM As agreed in 36th
SCPSPSR
220/132/33 kV
Substation at
Betamcherla
2x100 MVA As agreed in 36th
SCPSPSR
2x31.5 MVA As agreed in 36th
SCPSPSR
220kV
Jammalamadugu-
Chakrayapet SS D/C
70 kM As agreed in 36th
SCPSPSR
220/132/33 kV
Substation at
Chakrayapet
2x100 MVA As agreed in 36th
SCPSPSR
2x31.5 MVA As agreed in 36th
SCPSPSR
220kV
Jammalamadugu-
Porumamilla SS D/C
75 kM As agreed in 36th
SCPSPSR
220/132 kV Substation
at Porumamilla
2x100 MVA As agreed in 36th
SCPSPSR
Renewables (KfW) Uravakonda – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
400/220kV Substation
at Uravakonda
4x315 MVA As agreed in 36th
SCPSPSR
80 MVAR BR As agreed in 36th
SCPSPSR
400kV
Uravakonda -
Mahaboobnagar D/C
190 Km As agreed in 36th
SCPSPSR
220kV Uravakonda -
Vajrakarur SS ( TM )
D/C
13 kM As agreed in 36th
SCPSPSR
220/132 kV Substation
at Vajrakarur
1x100 MVA As agreed in 36th
SCPSPSR
220kV Uravakonda-
Borampalli( TM ) D/C
68kM As agreed in 36th
SCPSPSR
220/132 kV Substation
at Borrampalli
1x100 MVA As agreed in 36th
SCPSPSR
Annexure - III
Renewables (KfW) 220 kV Interconnectivities – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
220kV Hindupur
400kV -
Hindupur220kV D/C
20kM As agreed in 36th
SCPSPSR
220kV Uravakonda SS
-KalyanDurgD/C
50kM As agreed in 36th
SCPSPSR
LILO of both the
circuits of
220kVUravakonda–
KalyanDurgat 220kV
Borampalli SS
10 kM As agreed in 36th
SCPSPSR
220kV
Jammalamadugu-
TadipatriD/C
40 kM As agreed in 36th
SCPSPSR
Renewables (KfW) 132 kV Interconnectivities – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
Penukonda- 132/33 kV
Penukonda SS
10kM As agreed in 36th
SCPSPSR
Jammalamadugu -
132/33
kVJammalamadugu
SS
12kM As agreed in 36th
SCPSPSR
Porumamilla to 132/33
kV
Porumamilla SS
10 kM As agreed in 36th
SCPSPSR
220kV
Jammalamadugu-
TadipatriD/C
40 kM As agreed in 36th
SCPSPSR
Renewables (KfW) Intra-state – Karnataka
Transmission Elements Line Length (ckm)/ MVA
Capacity
Implementing
Agency
Sch CoD Ant CoD/ Act CoD
Constraints/ Remarks
400/220 kV Dhoni S/S 2x500 MVA 36 SCPSPSR: Line
survey is underprogress
Earlier agreed in 3
SCPSP SR (16.04.2012)
LILO of S/C400 kV
line Davanagere-
Guddadahally at
Dhoni
52kM As agreed in 36th
SCPSPSR
Earlier agreed in 3
SCPSP SR (16.04.2012)
LILO of 220kV D/C
Gadag-Lingapur at
6 kM As agreed in 36th
SCPSPSR
Annexure - III Dhoni
220/66 kV
Shivanasamudram S/S
2x100 MVA As agreed in 36th
SCPSPSR
LILO of 220kV D/C
T.K.Hally
and Madhuvinahallyat
Shivanasamudram S/S
4 kM 36 SCPSPSR: Line
survey to betaken up
Conversion of existing
220
kV Hootagally –
Vajamangala – T.K.
Halli S/Cline to D/C
line with
Drakeconductor
130 kM As agreed in 36th
SCPSPSR
220/66 kV Hosadurga
S/S
2x100 MVA As agreed in 36th
SCPSPSR
By extending 220 KV
D/C
line from the existing
400/220kV station at
Hiriyur to Hosadurga
84 kM 36 SCPSPSR: Line
survey to betaken up
220kV D/C Gadag-
Bagalkote& LILO of
one of the220kV D/C
line Bidnal -
Lingapur.
191.4 kM 36 SCPSPSR: DPR
ready
Conversion of 220kV
SC to DC Guttur-
Chitradurga.
170 kM 36 SCPSPSR: DPR
ready
Conversion of 220kV
SC to
DC Chitradurga-
Hiriyurand 2nd 220
kV S/C line
between 400/220 kV
& 220/66 kVstations at
Hiriyur.
120 kM 36 SCPSPSR: DPR
ready
LILO of one of the
circuit 220kV D/C
Narendra - Haveri
atBidnal.
24 kM 36 SCPSPSR: Line
survey to be taken up
Conversion 66kV DC
line‘Coyote ACSR’ to
‘Drake ACSR’
Sakalespura-Hassan.
72 kM 36 SCPSPSR: DPR
under progress
Renewables (KfW) Phase I – Tamil Nadu
Transmission Elements Line
Length
(ckm)/
MVA
Capacity
Implementing
Agency
Sch CoD Ant CoD/
Act CoD
Constraints/ Remarks
Thappugundu400/110
kV SS in Theni area
5 x 200
MVA
M/s BHEL,
New Delhi
04.12.14
/
30.09.15
March
2016
Works under progress.
Annexure - III
63
MVAR
Reactor
As agreed in 36th SCPSPSR
Anaikadavu400/230-
110
kV SS in Udumalpet
area
400/230
kV
2 x 315
MVA
M/s BHEL,
New Delhi
04.12.14
/30.09.1
5
March
2016
Works under progress.
400/110
kV
2 x 200
MVA
Rasipalayam400/230-
110 kV SS in
Udumalpet area
400/230
kV
2 x 315
MVA
M/s Alstom
T & D India
Limited,
Chennai
15.11.15
March
2016
Works under progress.
400/110
kV
2 x 200
MVA
63 MVAR
Reactor
As agreed in 36th SCPSPSR
Kanarpatty400/230-
110
kV SS in
Tirunelveliarea
400/230
kV
2 x 315
MVA
March
2016
As agreed in 36th SCPSPSR
400/110
kV
2 x 200
MVA
March
2016
As agreed in 36th SCPSPSR
LILO of one circuit of
Thappagundu -
Anikadavu 400kV D
/C Line at
Udumalpet(PGCIL)
25 kM As agreed in 36th SCPSPSR
Tendering activities
underway.
Agreement signed for bay
provision with PGCIL .
Thappagundu-
Anaikadavu
400 kV Twin DC
358 ckm M/s. KEC
International
Ltd, Gurgaon
31.05.15 March
2016
Works are under progress.
Anaikadavu-
Rasipalayam
400 kV Twin DC
86 ckm M/s. KEC
International
Ltd, Gurgaon
13.08.14
/31.05.1
5
March
2016
Works are under progress.
Rasipalayam -
Palvadi (SS) 400 kV
Quad DC
386 ckm M/s Larsen
and Toubro
Ltd, Chennai
31.05.15 March
2016
Work under progress
Kanarpatti –
Tirunelveli(PGCIL)
400
kV Quad S/C
15 kM March
2016
Work under progress
As agreed in 36th SCPSPSR
Kanarpatty – Kayathar
400
kV D/C Twin line
12 kM March
2016
Work under progress
As agreed in 36th SCPSPSR
Annexure - III
Renewables (KfW) Phase II – Tamil Nadu
Transmission
Elements
Line Length
(ckm)/ MVA
Capacity
Impleme
nting
Agency
Sch
COD
Ant
COD/ Act
COD
Constraints/ Remarks
Thenampatty400/230
kV SS inTirunelveli
area
400/230 kV
4 x 315 MVA
18
months
from date
of award
Price bid opened on
20.08.2015
As agreed in 36th
SCPSPSR
Earlier agreed in 3
SCPSP SR (16.04.2012)
Vagarai400/230-110
kV SS in
Udumalpetarea
400/230 kV
4 x 315 MVA
Not
considere
d at
present
As agreed in 36th
SCPSPSR
Earlier agreed in 3
SCPSP SR (16.04.2012)
400/110 kV
2 x 200 MVA
As agreed in 36th
SCPSPSR
Earlier agreed in 3
SCPSP SR (16.04.2012)
Thenampatty-Kayathar
400 kV Quad D/C
112 ckm Techno
Commer
cial
tender
analysis
under
progress
As agreed in 36th
SCPSPSR
Earlier agreed in 3
SCPSP SR (16.04.2012)
Thenampatty-
Koilpatty
400 KV Quad D/C
110 ckm As agreed in 36th
SCPSPSR
Vagarai - Rasipalayam
400 kV Twin D/C
100 kM Not
considere
d at
present
As agreed in 36th
SCPSPSR
Vagarai – Udumalpet
(PGCIL) 400 kV Twin
D/C
40 kM Not
considere
d at
present
As agreed in 36th
SCPSPSR
Salem – Palvadi
(Singarapet) 400
kV D/C Quad Line
90 kM Subject
to
availabili
ty of
bays at
Salem PS
PGCIL
As agreed in 36th
SCPSPSR
Rasipalayam- Palvadi
(Singarapet) 400 kV
D/C Quad line
390 ckm Board
note for
placing
order
submitte
d
As agreed in 36th
SCPSPSR
Earlier agreed in 3
SCPSP SR (16.04.2012)
Kayathar – Tuticorin
Auto
230 kV D/C Line
110 ckm Work
awarded
on
30.06.15
Sep 2016 As agreed in 36th
SCPSPSR
Veeranam-Tirunelveli 30 km As agreed in 36th
Annexure - III 230 kVDC Line Fifteen
months
from date
of award
SCPSPSR
Veeranam-
Kodikurichi 230
kV D/C Line
25 km As agreed in 36th
SCPSPSR
Ingur-Thiruppur 230
kV D/C
Line
60 km As agreed in 36th
SCPSPSR
Arasur- Thiruppur 230
kV D/C line
As agreed in 36th
SCPSPSR
Arasur- Gobi (MC
patty) 230 KV DCline
95 km As agreed in 36th
SCPSPSR
Cuddalore- Neyveli
230 kV
DC line
360 ckm As agreed in 36th
SCPSPSR
Neyveli- SP Koil 230
kV DCline
As agreed in 36th
SCPSPSR
OK Mandapam-
Thudiyalur
230 kV DC Line
28 kM As agreed in 36th
SCPSPSR
Sembatti-Madurai 230
KV DCline
40 kM As agreed in 36th
SCPSPSR
Villupuram - Neyveli
230 kVDC line
40 kM As agreed in 36th
SCPSPSR
Sembatty SS 2X100 MVA Contract
awarded
on
25.08.20
15
Eighteen
months
from date
of award
Feb 2017 As agreed in 36th
SCPSPSR
Anupankulam SS 2X100 MVA As agreed in 36th
SCPSPSR
Cuddalore SS 2X100 MVA As agreed in 36th
SCPSPSR
Pudhukottai SS 2X150 MVA As agreed in 36th
SCPSPSR
Tiruvanamalai SS 2X150MVA As agreed in 36th
SCPSPSR
Villupuram SS 2X100MVA As agreed in 36th
SCPSPSR
Annexure –VII (RGMO Analysis for the Incident 28-07-2015)
<07 Pages>
RGMO ANALYSIS FOR 28.07.15
49.2
49.3
49.4
49.5
49.6
49.7
49.8
49.9
50
50.1
50.2
261
266
271
276
281
286
Load Frequency
RGMO ANALYSIS FOR 28.07.15
49.2
49.3
49.4
49.5
49.6
49.7
49.8
49.9
50
50.1
50.2
261
266
271
276
281
286
Load Frequency
RGMO ANALYSIS FOR 28.07.15 NTECL, Vallur
INCIDENT
• AT 11:52:22 Hrs. on 28.07.2015 Raichur-Solapur circuit 2 got tripped which
was carrying more than 1000MW, SR Grid separated from NEW grid
• Frequency dipped to 49.56 HZ from 49.95HZ
TOTAL RESPONSE
I/C No Of
Units No of R Possible
(MW) Actual(MW) %
AP 3015 13 2 125.68 13.06 10.39
TG 1500 4 0 61.2 12.46 20.36
KAR 6399.5 33 10 247.86 69.47 28.03
KER 529 8 0 12.1 0 0
TN 4201 31 2 156.56 41.78 26.69
CGS 5180 15 1 222.77 37.93 17.03
SR 20824.5 104 15 826.17 174.7 21.15
THERMAL MACHINES RESPONSE
I/C No Of
Units No of R Possible
(MW) Actual
(MW) %
AP 2550 8 1 108.84 11.72 10.77
TG 1500 4 0 61.2 12.46 20.36
KAR 4400 13 1 188.5 18.01 9.55
KER 0 0 0 0 0
TN 3340 12 1 133.03 38.33 28.81
CGS 5180 15 1 222.77 37.93 17.03
SR 16970 52 4 714.34 118.45 16.58
HYDRO MACHINES RESPONSE
I/C No Of Units No of R Possible
(MW) Actual
(MW) %
AP 2550 8 1 108.84 11.72 10.77
TG 1500 4 0 61.2 12.46 20.36
KAR 4400 13 1 188.5 18.01 9.55
KER 0 0 0 0 0
TN 3340 12 1 133.03 38.33 28.81
CGS 5180 15 1 222.77 37.93 17.03
SR 16970 52 4 714.34 118.45 16.58
I/C No Of
Units No of R Possible Actual %
AP 465 5 1 16.84 1.34 7.96
TG 0 0 0 0 0
KAR 1999.5 20 9 59.36 51.46 86.69
KER 529 8 0 12.1 0 0
TN 861 19 1 23.53 3.45 14.66
CGS 0 0 0 0 0
SR 3854.5 52 11 111.83 56.25 50.3
RESPONDED UNITS
STATE STATION RESPONDED UNITS
AP RAYALASEEMA 4,5
CGS NLC2STII 5
CGS RAMAGUNDAM 4,5
CGS VALLUR 1
KAR SHARAVATHI ALL
KAR RTPS 1,5,7
TS KTPS 1,2,11
TN METTUR 1,2,4
TN TTPS 2,4,5
Data received from Vallur, APTRANSCO
&METTUR TPS.
Name of the Utility:
Status as on:
Name of
the
Station
Unit
No.
Type(Hydro/
Coal/Gas/Die
sel/Nuclear
IC in
MW
Date of
Commer
cial
Operatio
n(CoD)
AVR or
DVR
PSS
Availabili
ty
(Yes/No)
PSS in
service
or not
Whether
exempted
by ERC
Date of
last Step
Response
Test
Date of Step
Response Test
report furnished to
CTU/SRLDC/SRPC
Date of next
Step Response
Test as per
Generator
Date of next
Step response
Test (in case
insufficient
damping)
Name of
AMC/OEM
for PSS
Status of PSS Tuning of generators of capapcity above 50 MWAnnexure- VIII
Annexure –X (Modification of Raichur-Sholapur SPS)
<10 Pages>
ANNEXURE -XV
As on 21.09.2015 29 Members 30 Members (Figures in Rupees)
1,044,676.28 1,184,333
per Member per Member
Amount for
2014-15
(on Actual
Expenditure)
Amount for
2015-16
(on Budget
Estimates)
1 2 3 4 5 6 7 8 9 10 11 12 13
1 APTRANSCO, Hyderabad 2 -584,931 2,089,353 1,504,422 0 1,504,422 2,368,667 3,873,088 0 3,873,088
2 APGENCO, Hyderabad 1 -292,466 1,044,676 752,211 0 752,211 1,184,333 1,936,544 0 1,936,544
3 APSPDCL,Tirupati * 1 0 0 0 0 0 1,184,333 1,184,333 0 1,184,333 2015-16
4 APEPDCL,Vishakapatnam * -603,202 0 -603,202 0 -603,202 0 -603,202 0 -603,202 2012-13
5 KPTCL, Bengaluru 3 -877,397 3,134,029 2,256,632 3,043,373 -786,741 3,553,000 2,766,259 2,766,259 0
6 KPCL, Bengaluru 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 922,086 0
7 PCKL, Bengaluru 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 922,086 0
8 KSEB, Thiruvananthapuram 4 -1,169,862 4,178,705 3,008,843 4,057,830 -1,048,987 4,737,333 3,688,346 0 3,688,346
9 TNEB, Chennai 4 -1,169,864 4,178,705 3,008,841 4,057,828 -1,048,987 4,737,333 3,688,346 0 3,688,346
10 TSTRANSCO, Hyderabad 2 0 2,089,353 2,089,353 0 2,089,353 2,368,667 4,458,019 0 4,458,019
11 TSGENCO, Hyderabad 1 0 1,044,676 1,044,676 0 1,044,676 1,184,333 2,229,010 0 2,229,010
12 TSSPDCL, Hyderabad * 1 9,594 1,044,676 1,054,270 1,316,517 -262,247 0 -262,247 0 -262,247 Balance for 2010-11 &
2014-15
13 TSNPDCL, Warangal * 1 -292,466 0 -292,466 0 -292,466 1,184,333 891,867 891,867 0 2015-16
14 Elecy.Dept.Puducherry 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 922,086 0
15 NLC Ltd.,Neyveli 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 922,086 0
16 NPC of India Ltd., Mumbai 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 0 922,086
17 NTPC Ltd, Secunderabad 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 0 922,086
18 PGCIL, Bengaluru 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 922,086 0
19 JSWEL, New Delhi 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 0 922,086
20 UPCL, Bengaluru 1 -292,466 1,044,676 752,211 1,014,458 -262,247 1,184,333 922,086 922,086 0
21 NTECL, Vallur 1 0 1,044,676 1,044,676 1,306,923 -262,247 1,184,333 922,087 922,086 1
22 PTC India Ltd., New Delhi 0 0 0 0 0 0 0 0 0 2011-12
23 RETL, New Delhi -461,143 0 -461,143 0 -461,143 0 -461,143 0 -461,143 2012-13
24 TPTCL, Noida -292,466 0 -292,466 0 -292,466 0 -292,466 0 -292,466 2013-14
25 GMRETL, Bengaluru 1 0 1,044,676 1,044,676 0 1,044,676 0 1,044,676 0 1,044,676 2014-15
26 Instinct Infra & Power Ltd., New Delhi 1 1,184,333 1,184,333 0 1,184,333 2015-16
Total 30 -8,366,391 30,295,612 21,929,221 22,912,593 -983,372 35,530,000 34,546,628 10,112,728 24,433,900
* By rotation
Amount
Received
During
2015-16
Balance
Amount
Payable
(11 - 12)
Remarks
SOUTHERN REGIONAL POWER COMMITTEE, BENGALURU
Statement showing Net Amount Payable for 2015 - 16
Sl No. OrganisationNo. of
Members
Balance amount
payable for
Previous Years
Total amount
payable for
2014-15
(4 +5)
Amount
Received in
2014-15
Difference
(8+4 -7)
Net Amount
Payable
during
2015-16
(9 + 10)
May-15 June-15 July-15 August-15
Alert 7 2 4 2
EMERGENCY 6 8 11 7
NC 0 0 2 5
Alert 5 1 3 2
EMERGENCY 4 6 3 3
NC 0 1 1 0
Alert 0 0 2 0
EMERGENCY 0 3 4 12
NC 0 0 0 8
Alert 12 1 2 0
EMERGENCY 10 2 2 7
NC 1 0 0 8
Alert 4 2 1 0
EMERGENCY 1 7 5 9
NC 0 0 0 6
Alert 0 0 1 0
EMERGENCY 0 0 0 2
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 1
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 1 0 0 0
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 1 0 0 0
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 1
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
KSEB
TANTRANSCO
PUDUCHERY
APTRANSCO
COASTAL
ZERO CROSSING VIOLATION
NLY -TS2-2
SIMHADRI -ST2
TAL st2
VALLUR
NLC 1 Exp
RSTPS-1&2
RSTPS-3
MEPL
SEPL
NLY -TS2-1
TELENGANA
KPTCL
Month May-15 June-15 July-15 August-15Alert 2 9 1 7
EMERGENCY 1 3 0 1
NC 0 0 0 0
Alert 3 9 1 5
EMERGENCY 1 3 0 1
NC 0 0 0 0
Alert 4 9 0 1
EMERGENCY 1 2 0 3
NC 0 0 0 0
Alert 1 0 0 0
EMERGENCY 0 0 0 1
NC 0 0 0 0
Alert 4 8 0 0
EMERGENCY 0 3 0 5
NC 0 0 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
Month May-15 June-15 July-15 August-15Alert 3 0 0 1
EMERGENCY 0 3 5 3
NC 0 0 0 0
Alert 1 0 0 0
EMERGENCY 1 1 2 2
NC 0 0 0 0
Alert 1 0 0 2
EMERGENCY 0 1 2 3
NC 0 0 0 0
Alert 1 0 0 1
EMERGENCY 20 1 1 0
NC 1 0 0 0
Alert 2 0 0 2
EMERGENCY 22 5 3 2
NC 1 1 0 0
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0
Month May-15 June-15 July-15 August-15Alert 1 0 1 1
EMERGENCY 2 2 5 6
NC 0 1 0 2
Alert 1 0 0 1
EMERGENCY 1 1 2 4
NC 0 0 0 0
Alert 1 0 0 2
EMERGENCY 0 0 1 3
NC 0 0 0 2
Alert 1 0 0 1
EMERGENCY 2 0 0 5
NC 0 0 0 3
Alert 1 0 0 2
EMERGENCY 3 1 1 5
NC 1 0 0 2
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 0 0 0 0PUDUCHERY
APTRANSCO
TELENGANA
KPTCL
KSEB
TANTRANSCO
KPTCL
KSEB
TANTRANSCO
PUDUCHERY
FREQUENCY VIOLATION
PUDUCHERY
VOLTAGE VIOLATION
LOADING VIOLATION
APTRANSCO
TELENGANA
APTRANSCO
TELENGANA
KPTCL
KSEB
TANTRANSCO
Month May-15 June-15 July-15 August-15
Alert 19 5 13 9
EMERGENCY 3 35 40 36
NC 2 5 4 9
Alert 7 12 6 2
EMERGENCY 0 28 11 18
NC 1 0 0 3
Alert 4 4 8 9
EMERGENCY 0 15 12 31
NC 4 0 2 17
Alert 7 2 5 4
EMERGENCY 0 7 4 15
NC 7 0 0 13
Alert 14 8 8 11
EMERGENCY 2 43 17 23
NC 0 4 2 10
Alert 0 0 0 0
EMERGENCY 0 0 0 0
NC 1 0 0 0
0
1
0
2
0
0
1 0
0 0
0 0
0 0
0 0
0 0
Alert 8 0 0 0
EMERGENCY 1 0 1 0
NC 0 0 1 1
Coastal
TPCIL
TANTRANSCO
PUDUCHERY
LANCO
SEPL
MEPL
DEVIATION VIOLATION
APTRANSCO
TELENGANA
KPTCL
KSEB