The “V”-IT Park by AscendasSite Visit
Made By-Naman Sukhija
Intern (27 May 2015– 10 July 2015)
Indian Green Building Council
About Ascendas
It is a Singapore based firm which deals in-
Real Estate Development & Investment
Real Estate Services
Funds Management
Phase II: AurigaTotal Area: 240,178 sft
Phase I: MarinerTotal Area: 234,323 sft
The V- Buildings Profile
Phase III: OrionTotal Area: 235,456 sft
Phase IV: CapellaTotal Area: 171,110 sft
Phase V: VegaTotal Area: 401,883 sft
The V ParkThe V Park
Rain Water
Harvesting
Energy Efficient
Lights
Solar Ltg. System
Energy Efficient
Chillers VFD
Energy
Efficient
Motors
Energy Monitoring
system
Building
Management
System
• Built on a 19 acre free-hold land, located at Software Units
Layout, HITEC City
• Total built-up area of 1.75 million Sft.
• Centrally Air-conditioned buildings
• 100% Power back-up
• Building Management Systems
• 24 x 7 operating hours
• Amenities available:
– Wellness Clinic
– ATM
– Bank
– Common Cafeteria & Food court
– Auditorium
– Training Rooms
– Gym with lounge
– Concierge Services
– Convenience store
The V
Key Features-
Hardscape is covered with existing tree canopy / open grid pavers.
Total 77% shaded area is there on site/
Daylight using tinted
high performance glass
Buildings are shaded
to reduce solar gain
inside building
Trees around building façade to
reduce solar gain inside building
from walls.
Adequate, separated and shaded
parking space to reduce heat island
effect
Storm-Water drains for rain water
harvesting
Rain Water harvesting pit filled with gravels so
that rainwater is easily percolated inside to
restore ground water level
Shaded lights to reduce outdoor light
pollution
High performance glass to
reduce solar heat gain
inside the building but still
providing adequate
daylight
Maximum
daylighting
wherever possible
to reduce
dependency on
artificial light
source
Designated smoking zone inside campus
No-Smoking sign boards inside the
campus except the area shown above.
Indoor PlantDoor Mat and Air
Curtain
Features to maintain better indoor air quality
CO2 sensors
58%
42%
Type of Transportation System
Eco-Friendly Transportation Other Transportation
High SRI (Solar Reflectance Index) Paint
to reflect solar heat transmitted inside
the building
Air-cooled air conditioning system
with fogging technology
Segregation of waste at site
Building Management System for efficient energy utilisation
Waste Water Treatment Plant
Sewage water
Mariner
Sewage water
Orion
Sewage water
Capella
Air
Secondary
Clarifier TankCollection
Tank
Air
Sand
Filter
Activated
Carbon
Filter
Raw Sewage
Collection
Sump
Sludge holding
Tank
Filter feed
Pumps
UV Treatment
Pumps
Treated water
Tank
Treated water
Tank
Treated water
Tank
Process Flow Chart
of
Sewage Treatment Plant
Aeration Aeration
Tank Tank
Blowers
Cl2 Auto doser
Back Washing
Sewage
Collection Tank
Screen
Bar
RS Pumps
Dual Plumbing system for water efficiency
Drip water irrigation to reduce water for irrigation
Eco-friendly refrigerants and fire-extinguishers
Around 450 energy meters are installed in whole campus
Energy efficient motors
Exhaust systems in Janitor rooms and housekeeping areas
Eco-friendly housekeeping chemicals
Many provisions for differently abled systems
Well-being facilities
Energy and water conservation teams and various green education programs
Maximum use of organic fertilizers
Automatic lighting system control
Water metering