Rev 01 09.01.2020
Company Profile
We are the leading global supplier of solutions
protecting people and equipment from fire, blast and
radiant heat hazards for the offshore and onshore oil
and gas, nuclear, renewable energy, chemical and
petrochemical industries.
And we have been doing it since 1969.
2
Contents
Brief Overview Page 3
Mission & Values Page 4
Company Facilities Page 5 MTE Organisation Chart Page 6 Quality Certification Page 7
Health & Safety & Environmental Certification Page 8
CE Certification Page 9 FPAL Approved Page 10
Achilles JQS Approved Page 11
DSME Certificate Page 12
Management Policy Statement Page 13
HSE Policy Statement Page 14 Safety Awards Page 15
MTE Products & Key Service Areas Page 16
Project Experience Page 17 - 24
3
Brief Overview
Mech-Tool Engineering Ltd [MTE] is a technology company with a global reputation for the protection of people
and equipment from fire, blast and radiant heat hazards in on-shore and off-shore oil & gas, nuclear,
renewable energy and petrochemical industries.
We devote a unique wealth of specialist skills and 50 years’ experience to design, build and deliver individual
and dependable solutions.
• Location Darlington, North East of England
• Established 1969
• Quality Approval ISO 9001:2015, EN1090 EXC 4, ISO3834
• Health & Safety Approval ISO 45001:2018
• Environmental Approval ISO 14001:2015
• Number of Employees 220
• Registered with FPAL Supplier No. 10040137
• Registered with Achilles JQS Supplier No. 20917
• Safety Awards RoSPA Order of Distinction
4
Mission & Values
MTE strives to use its expertise and experience to provide reliable solutions to protect people and equipment
from explosion, heat, and fire hazards.
The company provides design and engineering consultancy services for hydrocarbon fire and blast rated
structures. It also supplies bespoke turnkey solutions for ranges of Modular, Firewall and Blast wall
products.
The company seeks to conduct its business activities with a highly professional and ethical approach at
all times. MTE aims to foster for all its staff, safe and agreeable working conditions, a supportive and friendly
culture and a stimulating and rewarding working environment.
5
Company Facilities
MTE provide one of the UK's foremost facilities for the preparation, fabrication and surface preparation of
Modular and Fire & Blast Protection Equipment enabling us to serve our clients on a worldwide basis.
Our internationally recognised fire and blast testing has enabled us to develop innovative engineering
solutions with techniques and software fully validated by third party authorities.
Darlington
The 7200m2 production facility and outside storage area
at our Darlington site ensure that we are equipped to
cater for the widest variety of work possible.
Supporting the production facilities are our
administrative, sales, estimating, in-house design and
state-of-the-art engineering functions, housed within
1700m2 of dedicated office space at our Darlington
facility.
Riverside facility (Middlesbrough)
The 11000m2, 35m high covered riverside facility with
three 20 tonne overhead cranes located by the River
Tees, in Nearby Middlesbrough, has the flexibility to
assemble modules up to 33m long x 20m wide x 480
tonnes. These are loaded out on to barges for shipping
to their final destination.
Mech-Tool Korea, Busan
MTK’s design, engineering, sales, estimating and
administration functions are independent to the 6200m2
production facility in the Busan region.
The facility provides a large flexible unit to cater for a
wide variety of work with easy access to all main routes
and nearby construction yards.
13
MANAGEMENT POLICY/OBJECTIVES AND VALUES SHEQ Policy Statement based on the requirements of the business, ISO9001 & the MTE QMS
We will realise our company mission by active pursuance of the following:
1. Top Management have identified and documented
• Risks and Opportunities to the business
• Interested parties internal and external
• Issues internal and external
• Objectives including documented evidence to aid generation
• Customer feedback
• High level process maps
2. Conduct regular reviews of QMS via the Executive Team monthly Reports and Annual Management Review.
3. Sustained financial growth in accordance with the business plan (budget) to achieve our corporate goals. 4. Guide our course with financial discipline, accountable/responsible management and personal
accountability. 5. Awareness of the company’s reputational risks. 6. Listening and understanding our customer’s requirements, responding promptly to their needs and
keeping our promises. 7. Remaining at the forefront of those industries we supply to through superior quality products and
outstanding service. 8. Creating and maintaining a personal and professional environment for ourselves and our families,
enhance safety, diversity, fulfilment and success on the foundations of our business. 9. The company will maintain and continually improve its processes, procedures and the QMS (Quality
Management Systems) in accordance with the requirements of ISO9001. 10. The integrity of the products produced by MTE will be in line with the requirements of the
Construction Products Regulations (EU) No. 305/2011.
14
Safety, Health & Environmental Statement
The Health, Safety & Environmental Manual and all associated procedures detail the lines of responsibility and communications for Health, Safety & Environmental matters and the company’s requirements for revisions to be brought to the notice of all company employees, other interested parties and the General Public. It is the responsibility of the CEO (Managing Director) and the Executive Team to ensure enough financial resources are made available to meet the requirements of the Health, Safety and Environmental management systems and their associated procedures and to also ensure the efficient implementation as required by the Health and Safety at Work etc. Act 1974 (HSWA), the Environmental Protection Act 1990, the Management Health and Safety at Work regulations and any other legislation and regulations applicable to our company’s activities. This legislation provides the minimum standard required to ensure compliance with Health; Safety & Environmental law, the aim throughout the company is to exceed these minimum standards. It is the duty and responsibility, or where appropriately delegated by the CEO (Managing Director) of the company to ensure that this Health, Safety, Environmental Policy and its associated Procedures, along with any relevant revisions, are implemented and maintained (by annual monitoring and auditing). To ensure that any deviations, or consistent refusal to follow this Health, Safety & Environmental Policy and associated processes/procedures, are brought to the attention of the Managing Director for the decision as to the appropriate action to be taken.
MTE Ltd is committed to objectives list below (not an exhaustive list) to establish an incident free operation –
• Achieve an injury free workplace and Prevent Injury and ill health.
• SHEQ Risks and Opportunities to the business.
• Interested parties internal and external.
• Awareness of the company’s reputational risks.
• Allocate both physical and financial resources to aid SHEQ.
• Conduct regular reviews of HS&E management systems via the Project Governance Steering Committee and Management Review.
• Promote a healthy work place and mitigate significant health risks.
• Creating and maintaining a personal and professional environment for ourselves and our families, enhance safety, diversity, fulfilment and success on the foundations of our business.
• Eliminate spills, environmental incidents, identify and mitigate key environmental risks.
• To exercise all due care in the disposal of waste produced by the company’s activities.
• Develop plans/actions to reduce waste, energy consumption, encourage recycling and good housekeeping.
• To implement & maintain an effective Environmental Management system to eliminate the potential risk of polluting the environment.
• Continuously strive to reduce its environmental impact to as low as is reasonably practicable.
• The company will maintain and continually improve its HS&E processes, procedures in accordance with the requirements of ISO45001 & ISO14001.
16
MTE Products & Key Service Areas
Highly accurate designs, engineering and cost projections at FEED stage using bespoke and fully validated MTE design tools and systems. MTE’s early involvement on projects has proved particularly effective in optimum weight and cost savings for operators and EPC’s.
50 years of knowledge and experience; all MTE fully certified fire and blast walls are designed, engineered, manufactured and supplied to provide the most cost-effective and weight optimised solution to the specific requirements of each individual project however challenging. MTE ventilated heat shield, solar shield and wind wall cladding designs are proven and provide protection for people and equipment against the effects of radiant heat and extreme weather.
For five decades MTE has pioneered the design of modules providing fire and blast protection. Using MTE
latest technology and modelling techniques modules can be cost effectively purpose designed to meet the
clients’ specified explosion, seismic, thermal, fire and acoustic performance criteria.
17
Project Experience Fire & Blast Walls
Client Operator Project Year Scope of Work
KBR BP Azeri Central East 2019 Internal Partitions & Ceilings
Bomesc Novotek Arctic LNG 2 2019 Fire & Blast Walls
GSP Offshore Black Sea Oil & Gas
Midio Gas Development 2019 Blast Walls
Kaefer Energy Equinor (Statoil) Johan Sverdrup–Phase 11 2019 Under Deck Cladding
KBR BP Azeri Central East 2019 Doors & Windows
Drydocks World-
Dubai
TenneT HKZ Alpha 2019 Firewalls
KBR BP Azeri Central East 2019 Blast & Internal Walls, Cladding & Doors (Topsides & Drilling)
BP BP Clair Ridge 2019 Replacement Duct Unit
Sejin Technical
Industries Co
Malaysian Royal Navy
Carrier Ships 2019 Corrugated Fire Walls
ASK JV Equinor (Statoil) Johan Sverdrup 2019 External Pre-Fabricated Walls
Shell UK Shell UK Leman Delta 2019 Blast Wall
PD&MS Energy Chrysaor
Aberdeen
Lomond Platform 2019 Blast Wall
Aker Solutions Conoco Phillips
M&M
Eldfisk
2019 Replacement Wall
Cladding Panels
Kaefer Energy Nexen Buzzard Phase 2 2019 Fire Rated Blast Wall
Fluor Shell Penguins Field
Development
2019 External Cladding
Petrofac Spirit Energy &
Neptune Energy
Cygnus Gas Field 2018 Fire Wall Cladding & Weather Shields
Aibel AS Equinor
Snorre Expansion (SEP) 2018 Fire & Blast Wall Panels
AAF Ltd Storengy Stublach Gas Storage 2018 Stainless Steel Blast Relief System
Aker Solutions Statoil Mariner HUC 2017 Offshore installation of HUC panels and door commissioning
Petrofac Galloper Wind
Farm Ltd
Galloper 2 2017 Offshore Door Commissioning
JKC Inpex LNG Ichthys 2017 Onshore door repairs and commissioning
SHI Statoil Johan Sverdrup 2017 Site Services (SHI Yard So. Korea)
Worley Parsons Exxon Mobil Hebron 2017 Offshore Door Commissioning
Statoil Frame Agreement, Johan Sverdrup Project - 2016
Client Operator Scope of Work
Aibel Statoil Drilling Platform
Fire and blast walls, heat shields, wind walls, blast relief panels and windows
Aker/SHI Statoil Process Platform
Fire and blast walls, heat shields, wind walls, blast relief panels and windows
Aker/SHI Statoil Riser Platform
Fire and blast walls, heat shields, wind walls, blast relief panels and windows
18
Client Operator Project Year Scope of Work
BiFab BP BP Kinneil 2016 Fire and Blast relief walls and specialist fire louvres
Heerema Fabrication Group
Petrofac Galloper II 2016 Firewalls and Louvres.
Internal and External Doors and windows
SHI Petronas Petronas FLNG 2015 Blast walls
NPCC/Technip ADMA-OPCO Umm Lulu 2015 Blast walls
Sembmarine
SLP
Dudgeon Offshore
Dudgeon Offshore
Wind Farm
2015 Fire and blast walls
DSME Statoil Mariner 2014 Fire and blast walls
SHI Total Martin Linge 2014 Fire and blast walls
HHI BP Clair Ridge 2013 External blast resistant ducting
AG&P Inpex Ichthys 2013 Fire and blast rated cladding
Worley Parsons Exxon Mobil Hebron 2013 Blastwalls, doors & windows
AMEC Gaz de France Cygnus 2012 External walls, doors & windows
EnQuest EnQuest Knightsbridge 2012 Fire & blast walls
AMEC BG Armada 2012 Blast walls
Burntisland Chrysoar Solan 2012 Fire walls
SLP Nexen Golden Eagle 2012 LQ Blast walls
HHI BP Clair Ridge 2012 Fire & Blast walls
Wood Group
PSN
Hibernia Hibernia 2012 Blast relief panels
Harland &Wolff RWE Gwynt y Mor 2011 Blast relief panels
Scottish Power Scottish Power Longannet 2011 Blastwalls
PTSC M&C Petro Vietnam Su Tu Trang 2011 Blastwalls
MMHE Exxon Mobil Telok A & B 2011 Firewalls
Sime Darby Petronas Kebabangan 2011 Fire & blastwalls
Conoco
Phillips
Conoco
Phillips
Britannia LTC 2011 Firewalls & windwalls
OGN Apache Forties 2011 Fire & blastwalls and doors
Dragados Hess South Arne 2011 Fire & Blastwalls and doors
Worley
Parsons
Exxon Mobil Sakhalin I
Arkutun-Dagi
2010 22300m2
Cladding, blast relief, doors
and windows
McNulty Centrica Lincs Offshore Wind 2010 Fire & blastwalls and Louvre walls
MT Corp PTSVP Tortoise 2010 120m2
Fire & blastwalls
PFC Eng Petronas Cili Padi F23R-A 2010 920m2
Fire & blastwalls
Kencana HL
Sdn
Newfield
Exploration
East Piatu 2010 300m2 Blastwalls
Centrica
Energy
Centrica
Energy
Ensign 2010 Fire & Blastwalls
McNulty
SSE/RWE Galloper Offshore
Windfarm
2009 1058m2 Fire & blastwalls, louvre walls & doors
Wood Group Statoil Hydro Sheringham Shoal 2009 1220m2 Fire & blastwalls
PSN
(Melbourne)
Esso Australia Marlin ‘A’ 2009 440m2
Fire & blastwalls and doors
SLP Eng Vattenfall Thanet 2009 Cladding, louvres & doors
SBM Asia Encana Deep Panuke 2009 2300m2 Blastwalls
Sime Darby Petronas Kumang 2009 1893m2 Blastwalls
SLP Eng BP Valhall 2008 5000m2 Fire & blastwalls and doors
SLP Eng Conoco
Phillips
Ensign 2008 230m2
Fire & blastwalls and doors
NPCC Maersk Al Shaheen 2008 1640m2
Fire & blastwalls
Gusto Eng Talisman YME Mopustor 2008 1500m2 Blastwalls
19
SLP Eng Maersk Qatar A
Al Shaheen 2007 Cladding, windows & doors for living
quarters BF1700m2
GC1400m2
EF1100m2
CF1100m2
AJS Shell Bacton Safety Upgrade
2007 Control room explosion protection. Design, supply and installation of the CREP structure, blastwall and doors
Lyondell Lyondell Fos-sur-mer 2006 Control room blast protection. Design, supply and supervision of installation of blastwalls at site
Aker BP Ula 2006 560m2
Fire & blastwalls SLP Eng ATP Venture 2006 Fire & blastwalls and doors
SLP Eng CH4 Energy Chiswick 2006 Fire & blastwalls and doors
SLP Eng ConocoPhillips Kelvin 2006 Fire & blastwalls and doors
Heerema ConocoPhillips Britsats 2005 MEG Module 230m2
& 150m2
blastwalls
PT Technip
ConocoPhillips Kerisi 2005 670m2
Fire & blastwalls
KBR Petro Canada
Terra Nova FPSO 2005 143m2
Lifeboat enclosure blastwalls
Heerema Conoco Phillips Britsats 2005 710m2
blastwalls & 1030m2
heatshields
SLP Eng ATP Kilmar 2005 270m2
Fire, blastwalls & doors MMHE Shell E11PB 2005 400m
2 Blastwalls
Enterprise Eng BP Forties Alpha 2005 570m2 Blastwalls, 570m
2 cladding & doors
SLP Eng Conoco Munro 2005 170m2 Blastwalls, windwalls & doors
IHI Chevron Sanha LNG FPSO 2004 148m2 Blast relief panels
Heat Shields and Wind Shields
Client Operator Project Year Scope of Work
North Sea Energy Services
Dana Petroleum Triton 2020 Heat Shields
Global Energy Group
BP Clair Ridge 2020 Windwall Cladding
Archer Equinor (Statoil) Snorre 2020 Heat Shield Panels
Samsung Heavy Industries
Total S.A Martin Linge 2019 Heat Shield Panels
Kiewit Offshore Services
Husky Energy Inc White Rose 2019 Stair Tower Wind Walls
Wood plc BP BP ETAP 2019 Stairwell Heat Shield
Worley Parsons
Rosenberg
Total S.A Martin Linge 2019 Wind Walls
Aibel Equinor (Statoil) Johan Sverdrup 11 2019 Wind Shields
Jurunature Petronas Carigali Sabah Oil & Gas
Terminal Integrated
2019 Radiation Heat Shield
Kiewit Offshore
Services
Husky Energy
Inc
White Rose WHP –
Living Quarters
2019 Wind Shields
Hanmaek TCO TCO Future Growth
Project
2019 Cladding Colour Coat
Egger UK Ltd 2018 Stainless Steel Heat shield
R&M Oil & Gas
Services
Montrose Production
Deck
2018 Stainless Steel Windwall Cladding
Petrofac Spirit & Neptune
Energy
Cygnus Gas Field 2018 Stainless Steel Weather Shields & Fire Wall Cladding
Fluor Shell Penguins Field 2018 Weather Protection
20
Development
Aibel AS Equinor
Snorre Expansion (SEP) 2018 Wind & Heat Shields
Suncor Energy Suncor Terra Nova FPSO 2018 Stainless Steel Flare Tower Heatshields
Wood PLC BP Clair Ridge 2018 Stainless Steel Heatshields
Total E&P Congo
Total N’Kossa Offshore Oil Field
2018 Flare Platform Heat Shield
Jurunature SDN BHD
Petronas Carigali Sdn Bhd
East Belumut 2018 Heatshields
Hanmaek TCO TCO Future Growth Project
2018 Profiled Steel Walls
Hanmaek TCO TCO Future Growth Project
2018 Heatshield Panels & Profiled Steel Walls
R & M Engineering Ltd
Conoco Phillips Judy Riser Platform 2018 Stanless Steel Heatshields
Jurunature SDN BHD
Petronas Carigali Sdn Bhd
Duyong Gas Comples 2018 Stainless Steel Heatshields
HHI Adma Opco Abu Dhabi
NASR Offshore Field Development – Phase 2
2017 Heatshield for Life Buoy-Bridge
RIG Services S.A
OMV Petrom S.A
OMV Petroma Heatshields
2017 Double Skin Thermal Heatshields
Daewoo Shipbuilding Marine Engineering
TCO TCO 2017 Design, engineering and manufacture of heatshields
Jurunature SDN BHD
Murphy Sapa Water 2017 Design, engineering and manufacture of roof and wall heatshields
Greig Engineering Ltd
ConocoPhillips Jade & Judy Operations & Maintenance (J-Block)
2017 Windwalls 1 of 2
Greig Engineering Ltd
ConocoPhillips Jade & Judy Operations & Maintenance (J-Block)
2017 Windwalls 2 of 2
HHI Statoil Aasta Hansteen 2017 Design, engineering and manufacture of windshields
HHI Adma Ocpo Al Nasr 2017 Design, engineering and manufacture of stair tower heatshields
SHI Total Martin Linge 2016 Louvered walls, flare tower heatshields and an embarkation area
Saipem Kaombo 2016 Heatsheilds with a 23% open area on a span of up to 7.8m long
SHI Total Egina FPSO 2016 Heatshields
PCMC SAMAC MMA PMMA 2015 Solar radiation heat shields
HHI Total Moho Nord 2015 Heatshields
SHI Total Egina FPSO 2015 Heatshields
SHI Total Martin Linge 2015 Windshields
Kaefer Statoil Snorre A 2014 Heatshields
Dragados Total Vega Pleyade 2014 Windwalls
Aker Solutions ZPMC 2014 Windwalls
Aker Solutions CIMC JU2000E 2014 Windwalls
Rosetti Marino Total West Franklin 2014 Heatshields
Ranhill Worley Parsons
Exxon Mobil Telok Gas 2013 Heatshields
Jurunature Petronas Kinalabu 2013 Heatshields
Aker Solutions Statoil Songa CAT D 2013 5000m2
Windwalls
Aker Solutions CIMC Jack Up Rig 2013 320m2 Windwalls
21
Worley Parsons Exxon Mobil Hebron 2013 Windwalls
AMEC Gaz de France Cygnus 2012 Stairtowers Heatshields and windwalls
Jacobs Shell Bacton 2012 Heatshields
AMEC Conoco Phillips
Britannia 2012 Heatshields
OGN Group Apache Forties Alpha 2011 Heatshielding to bridge
Dragados Hess South Arne 2011 Heatshields
Suncor Energy Suncor Terra Nova 2011 Flare stack heatshield modification
WD Close Apache Forties Alpha 2011 Heatshields
KBR BP Chirag 2011 Heatshielding
PD&MS Energy Transocean 2011 Heat shields
KCA Deutag BP East Azeri 2011 Heatshielding
PFC Eng Petronas Cili Padi F23R-A 2010 Flare stack heatshields
Wood Group Statoil Sheringham Shoal 2009 Windwalls
Wood Group Total Elgin 2009 Heatshields
Ramunia Fab Woodside Pluto 2009 200m2
Heatshields
Heerema Zwijndrecht
BP Valhall 2009 1950m2
Windwalls
Hoogvliet BP Valhall 2009 1450m2 Heatshields
Ramunia Newfield Belumut 2008 770m2
Heatshields & blastwalls
Maersk Maersk HE jack up Derrick 2008 800m2 Derrick heatshields
SHI SeaDrill West Eminence & West E-drill
2007 6700m2 Heatshields / weather walls
PT Technip Conoco Phillips North Belut 2007 330m2 Heatshields
MMHE Woodside Angel 2007 430m2 Stairtower heatshields
MMHE Clough Maari 2007 270m2 Heatshields
AMEC Shell E&P Corrib 2007 350m2 Heatshields – pipe rack
Marine Accomm Conoco Phillips Bohai Bay 2006 876m2 Heatshields
Heerema ConocoPhillips Britsats 2005 1030m2 Heatshields
Chemit ELF Amenam 2005 550 m2 Heatshields
Transocean Offshore
Deepwater Drilling
T9 2004 100m2 Heatshields
DSME Exxon Mobil Sable Tier II 2004 1330m2 Heatshields
Malaysia Shipyard
Shell Sarawak F13W & E11KA 2004 340m2 Heatshields
Maritime Hydraulics
Sakhalin Energy
Lunskoye & Piltun 2004 3900m2 Derrick Heatshields
SBM Husky/ Petro Canada
White Rose FPSO 2003 1844m2 Turret heatshields
KCA Drilling AIOC/BP Azeri East & West 2003 1200m2 Heatshields
22
Modular Solutions
Client Operator Project Year Scope of Work
Barrier Architectural Siemens Moray East 2018 Stainless Steel Module
Woodgroup Mustang
TCO Future Growth Project/Wellhead Pressure Management
2017 Phase 2 - Multi-well pad enclosures, metering station & large standalone enclosures
Amec Foster Wheeler
Sellafield Sellafield Modular Switchrooms
2017 Design, engineering and manufacture of 2 EPD101 Containerised Switchrooms
Mustang TCO Crude Shipment capacity 2016 Multi-well pad enclosures, metering station & large standalone enclosures and a field operating office.
Atlas Copco Tengizchevroil CSC (Crude Shipment Capacity)
2015 Substation module
ABB Tengizchevroil CSC 2015 LER/E-House
Mustang Tengizchevroil CSC 2015 Remote Instrument Enclosures (RIE)
Sulzer Pumps Statoil Ivar Aasen 2014 Acoustic enclosure
Wood Group ETAP Mungo 2014 Additional Living Quarters (ALQ)
Siemens Total Optara 2014 500te Substation/E-House
ABB Sakhalin I Odoptu Field 2013 LER (Local Equipment Room)
Arcadion BP Clair Ridge 2012 Blast rated module
Turner EPS Chrysoar Solan 2012 Blast and fire rated generator modules
Hertel Stena Drilling Stena Spey 2012 Additional Living Quarters (ALQ)
Allseas Eng Total Laggan & Tormore 2012 Beach valve control cabin
Hertel Talisman Montrose 2012 16 No. Accommodation modules
Nexen Nexen Golden Eagle 2012 Laboratory module
HSM Steel EOG Conwy 2011 LER module
Hertel Nexen Buzzard 2011 16 No. Accommodation modules
Scheneider INEOS Grangemouth 2011 Substation module
Hertel ConocoPhillips Britannia 2011 LER module
Cameron Maersk Perigrino FPSO 2011 Equipment room module
Heerema BP Andrew 2011 LER module
Atlas Copco Tengizchevroil TCO Plant 2011 4 No compressor modules
McNulty Centrica Lincs Offshore
Wind Farm
2010 Substation modules consisting of control
room, 33KV room, fire fighting room & day refuge room
McNulty
Offshore
SSE/RWE Galloper Offshore
Wind Farm
2009 Electrical control room & day rooms
(temporary accommodation modules)
AMEC BG Armada 2009 Laboratory module including HVAC &
electrical fit-out
Shell E&P
Ireland
Shell E&P
Ireland
Corrib 2009 Instrument cabin designed to fit HVAC &
electrical components in a tight space internally
23
Wood Group Total Dunbar 2009 VSD module
AMEC Black &
McDonald
ExxonMobil
Canada
Thebaud 2009 4 No. Additional living quarters designed to fit in with existing living quarters and rig layout
Heerema SSE Greater Gabbard 2009 LER & accommodation modules
BBESL Sellafield Sellafield 2009 Design, manufacture & supply of a multi services processing module. Both seismic and fire rated to protect personnel/equipment for up to 30 min
Foster Wheeler ExxonMobil Fawley Refinery 2009 Blast resistant building
IV Oil & Gas NAM NAM L02 2008 Acoustic enclosure
MAN Turbo BP Valhall 2008 Acoustic enclosures
McGill
Sea Dragon Oban B 2008 41 No Fire rated accommodation modules combined into 3 sections for transport. Overall dimension 75m x 11m x 4m
McGill
ConocoPhillips Britannia 2008 Fire rated modules & structures, comprising 10 modules and supporting steelwork, unique design of carbon steel frame with stainless steel insulated walls
Whessoe Volker Stevin
Dragon LNG Dragon LNG 2007 Jetty monitoring building
McGill
BP Valhall 2006 11 No. 4-man temporary accommodation modules
ABB BP Saqqara 2006 Fire and blast rated LER module complete with Electrics & HVAC
Shell UK E&P Shell UK E&P Shearwater 2006 Flat pack LER module for offshore assembly
SLP Engineering
ATP Wenlock Inde 2006 Blast rated workshop and sampling module including electrics & HVAC
Aiken Group BG Armada 2006 4 No H60 fire rated accommodation modules c/w 2 No H60 fire and blast rated covered stairtower modules and module support frame (MSF)
KBR Chevron Captain 2006 3 No A60 Fire rated accommodation modules complete with all electrics, HVAC and internal fit-out of furniture
Sulzer Pumps BP Ula 2006 Acoustic enclosure (3 stage compressor chain)
Enterprise Apache Alpha 2005 Transformer room
Design Consultancy
Client Operator Project Year Scope of Work
Shell Ineos Grangemouth
Clipper Platform 2020 Design of Blast Walls
Mustang TCO RIE (Remote Instrument Enclosures)
2014 Design and engineering study
AG&P INPEX Ichthys 2014 Thermal insulation study
Hertel British Gas Lomond ALQ 2012 Feasibility study
Hertel Stena Drilling Stena Spey 2012 FEED study accommodation upgrade
Hertel Talisman Montrose ALQ 2011 Design consultancy services
Hertel British Gas Lomond FEED 2011 Engineering services
24
General Fabrication
Client Operator Project Year Scope of Work
DMC Mining Services
Sirius Mines Polyhalite North Yorkshire 2019 General Fabrication
EEW Offshore Structures (Britain) Ltd
Dong Energy Offshore Wind Farm Hornsea Project Two
2018 Suspended Internal Platforms
Able UK Orsted Offshore Wind Farm Hornsea One
2018 General Fabrication of transportation cradles