Container sewagetreatment plants
Containerkläranlagen
www.clearfox.com
Highest Quality, and it is affordable?Yes, with Clearfox containerized systems!
You will be surprised! Made in Germany
Höchste Qualität bezahlbar gemacht?Ja, mit Clearfox Container Lösungen!
Lassen Sie sich überraschen!Produziert in Deutschland
industrial, commercial& municipalities
Industrie undKommunen
plant construction& technologies
Anlagenbau &Technologie
domestic waste-water systems
Kleinkläranlagen -private Hauskläranlagen
mobile sewage treatment(container plants)
Container-kläranlagen
GARANTIE
ClearFox®
10 JAHRE
waste water treatment containerized turnkeyAbwasserbehandlung in Iso Seecontainern schlüsselfertig
10 year warranty* on system components10 Jahre Garantie* auf die Systemkomponenten
Full service out of one source
• waste water treatment• sludge treatment• odour control system• potable water treatment• pre-engeneering, budgeting• detail engineering• pilot systems (industrial applications)• laboraty work• monitoring & after sales• wordwide with partners
Alles aus einer Hand
• Abwasserbehandlung• Schlammbehandlung• Abluftbehandlung• Brauchwasseraufbereitung• Vorplanung, Kostenberechnung,
Ausführungsplanung• Pilotsysteme (Industrieabwasser)• Laboruntersuchungen• Betreuung & Kundendienst• weltweit mit Partnern
Einsatzgebiete/Anwendungen
Applications
waste water treatment containerized turnkeyAbwasserbehandlung in Iso Seecontainern schlüsselfertig
Developed and produced in GermanyEntwickelt und produziert in Deutschland
• commercial (foodindustry)• municipal• leasing• upgrading of existing
wwt systems• worker camps
• touristic & seasonal sites• port sewage system• communities• oildrilling camps• offshore application
• Industrie (Lebensmittelproduktion)
• Gemeinden• Leasing• Entlastung bestehender
Kläranlagen• Asylheime
• Tourismus und Kampagnenbetrieb• Hafen-Abwassersysteme• Kommunen• Ölbohrcamps• Offshore-Anwendungen
MADEIN
GERMANY
high quality technology turnkeyHochwertige Technologie betriebsfertig montiert
Zulassungen VorteileApprovals
InvestitionssicherheitNo risk financially
KosteneinsparungCost saving
Hohe QualitätHigh Quality Standard
Flexibler EinsatzAll purpose system
Einfacher, robuster BetriebEasy and stable in operation
Your benefit
• Ohne Risiko - alles aus einer Hand• Ohne Kompromisse - 20 Jahre Garantie• Schnell gebaut - plug and play
high quality technology turnkeyHochwertige Technologie betriebsfertig montiert
Vorteile
• System is approved officially• You pay what you see before• For multiple reusage• Plug & play
• Anlage ist offiziell geprüft• Man sieht vorher was man kauft• Mehrfache Wiederbenutzung• Anschlussfertig
• Energy saving strategy• No installation cost• Short project terms• Low engineering cost• Fully automatic operation
• Energiesparkonzept• Keine Installationskosten• Kurze Projektlaufzeit• Niedrige Planungskosten• Voll automatisiert
• High value components• Quality ensurance system
• Markenbauteile bewährt• Qualitätssicherungssystem
• Mobile use & rental systems• As used one it is sellable• Adapted on clients requirements
• Mobiler Einsatz & Mietanlagen• Gebraucht verkäuflich• Projektbezogen zusammengestellt
• Control unit simply to handle• Stable processtechnology• Self regulated controlling• No black-out possible
• Steuerung einfache Bedienung• Stabile Verfahrensführung• Selbstregelungsverhalten• Kein Totalausfall möglich
Your benefit
• No risk (out of one source)• No compromise• Fast installed
treatment modulesBehandlungsmodule
1 Pretreatment Vorklärung
1 Pretreatment Vorklärung
Removal of solids, reduction of COD and BODFeststoffreduzierung/-entfernung, Reduzierung von CSB und BSB5
Use for or discharge to:Benutzung für oder Ableitung in:
municipal sewer systemÖffentliches Kanalnetz
Class C: biodegradation of BOD, COD
soakaway systemsrivers with low nutrient load
Class N (Nitrification):total biodegradation of BOD, CODbiodegradation of NH4N
sensitive rivers
Class D (Nitrificationand denitrification):total biodegradation ofBOD, COD, Nges
sensitive rivers
Use or discharge of water after treatment stepsWasserbenutzung nach den jeweiligen Behandlungsschritten
Compact treatmentKompakteinheit M
ach
ine
hous
eTe
chni
kcon
tain
er
Biological containerBiologiecontainer
GreasetrapFettabscheider
Screw screenSiebschnecke
BufferPuffer
Fixed bed reactorFestbett getaucht
Buffer aeratedcarbon reduction
Puffer belüftet
Buffer anox/denitrification
Puffer Denitrifikation
Imhoff tankEmscherbecken
DAF + equilizing tank prebuffer
Flotation mit Vorpuffer
Lamella separatorSchrägklärer
Settling tankAbsetzbecken
Waste basketSiebguttonne
SandtrapSandfang
2 Biological treatment Biologische Reinigung
2 Biological treatment and 3 Clarifying Biologische Reinigung und 3 Nachklärung
treatment modulesBehandlungsmodule
P-elimination: removal of PhosphorousP-Elimination: Phosphor-Entfernung
sensitive rivers and lakesempfindliche Vorfluter und Seen
Disinfection: removal of bacteria,viruses and pathogensHygenisierung: Entfernung von(pathogenen) Keimen
irrigation, areas for drinking water supply, toilet water, cooling towers (depending on the material)Bewässerung, Trinkwasserschutz-gebiete, Toilettenwasser, Kühltürme (in Abhängigkeit des Materials)
Sludge thickening/storage: separation of solidsSchlammeindickung/-speicher: Feststoffabtrennung
recycling of nutrientsNährstoffrecycling
Klasse C: Bioabbau von CSB und BSB5
Versickerung, Vorfluter mitniedriger Nährstofffracht
Klasse N (Nitrifikation):vollständiger Bioabbau von CSB und BSB5, Bioabbau von NH4
empfindliche Vorfluter
Klasse D (Nitrifikationund Denitrifikation):vollständiger Bioabbauvon N-Verbindungen
empfindliche Vorfluter
P-EliminationP-Elimination
Desinfection UVHygienisierung
Interstage clarifyingZwischenklärung
Lamella separatorSchrägklärer
Drum filterTrommelfilter
Sludge thickening /storage
Schlammspeicher
Machine houseTechnikcontainer
3 Clarifying Nachklärung
2 Biological treatment and 3 Clarifying Biologische Reinigung und 3 Nachklärung
4 Extended treatment Weitergehende Reinigung
4 Extended treatment Weitergehende Reinigung
screw screen Siebschnecke
buffer areated Puffer belüftet
machine house Technikcontainer
sludge thickening Schlammentwässerung
fixed bed reactor Festbettreaktor
DAF & equalizing tank Flotation & Vorpuffer
control unit SPS Steuerungdrum sieve
Trommelfilter
combination of modules (examples)Modulkombinationen (Beispiele)
200 p.e.200 EW
municipalkommunal
municipalkommunal
municipalkommunal
municipalkommunal
municipalkommunal
municipalkommunal
NitrificationNitrifikation
qh = 10 h/dqh = 10 h/d
hardly degradable substancesschwer abbaubare Stoffe
qspez = 200 l/(p.e.xd)qspez = 200 l/(Exd)
floating substancesSchwebstoffe
Bd,BSB5 = 120 g/(p.e.xd)Bd,BSB5 = 120 g/(Exd)
higher requirementserhöhte Anforderungen
temperature > 15°C, nitrification Temperatur > 15°C, Nitrifikation
DenitrificationDenitrifikation
P-EliminationP-Elimination
municipalkommunal
municipalkommunal
municipalkommunal
municipalkommunal
municipalkommunal
industryIndustrie
industryIndustrie
industryIndustrie
industryIndustrie
400 p.e.400 EW
800 p.e.800 EW
1600 p.e.1600 EW
3000 p.e.3000 EW
300 p.e.300 EW
300 p.e.300 EW
300 p.e.300 EW
800 p.e.800 EW
800 p.e.800 EW
800 p.e.800 EW
400 p.e.400 EW
800 p.e.800 EW
800 p.e.800 EW
800 p.e.800 EW
100
100
100
100
100
100
100
100
100
100
75
75
0,25 Container 0,5 Container 1 Container
75
75
75
25
25
25
25
25
25
15
15
15
15
15
10
10 25 2
10
10
25
25
25
25
CODCSB
BOD5BSB5
NH4NNH4N
NtotNges
PtotPges
Effluent requirements [mg/l]Ablaufwerte [mg/l]
Municipal: 150 l/(p.e.xd); 60 g BOD5/(p.e.xd); inflow 24 h/d; pH 6,5 - 9,0Industry: basic values according to municipalContainer: 20‘ High Cube ISO-ContainerCompact treatment: grease trap, sand trap, screen
Kommunal: 150 l/(Exd); 60 g BSB5/(Exd); Zulauf 24 h/d; pH 6,5 bis 9,0Industrie: Basisparameter wie kommunalContainer: 20‘ High Cube ISO-ContainerKompaktanlage: Fettfang, Sandfang, Siebschnecke
combination of modules (examples)Modulkombinationen (Beispiele)
PretreatmentVorklärung
Biological treatmentBiologische Reinigung
ClarifyingNachklärung
ExtraExtra
SC
SC
SC
CT
CT
IT BD
BD
BT
BA
BA FB
FB
FB
FB
FB
FB
FB
FB PE
NK
NK
NK
NK
NK
NK
NK
NK
NK
NK
NK
NK
NK
NK
NK SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS SS SS SS
SS
SS
SS
SS
SS
FB
FB
FB
FB
FB
FB
FB
FB
FB FB FB
FB
FB
FB
BT
IT
IT
SC
SC
SC
SC
SC
SC
FL
SC Screen SiebschneckeCT Compact treatment KompaktanlageIT Imhoff tank EmscherbeckenFL Flotation FlotationST Settling tank AbsetzbeckenBT Buffer tank PufferbeckenBA Buffer aerated Puffer belüftetBD Buffer denitrification Puffer Denitrifikation
FB Fixed bed FestbettLS Lamella separator/clarifier SchrägklärerDF Drum filter TrommelfilterSS Sludge storage SchlammspeicherPE P-elimination P-EliminationHY Disinfection HygiensierungNK Clarifying Nachklärung
technology in detail system comparisonTechnologie im Detail Systemvergleich
lettering / documentation multilanguageeasy to operate
mulitilingualeDokumentation,einfache Bedienung
plug&playspareparts easy to replace by client
anschlußfertigsteckerfertiger Austausch von Ersatzteilen
one piece monolith-inlets(no weldings)
fugenlose Wasserinlets(keine Schweissnähte)
reinforcementsallweather conditions
verstärkte Ausführungalle Klimazonen
Technology
Screening - grease requirement
Process of treatment
Pressure
Grease leak
Overall cost
Electrical shut down
Energy
Quality of treated sewageEffluent TSE
Spare parts
Sludge return
Trained service
Sludge production
Sludge settlement
Aeration
Backwash
Developed and producedin GermanyEntwickelt und produziertin Deutschland
MADEIN
GERMANY
technology in detail system comparisonTechnologie im Detail Systemvergleich
MBR requires excellent screening Grit grease removal and automaticSizes 2-3 mm.Important Factor
Normal Screening.Can be ManualCan be Above 3 mm
Normal Screening.Can be ManualCan be Above 3 mm
MBR higher costs for screening system
Mechanical - Physical separation for the impurities by ultra filtration. Remove up to the separation of germs. The fresh sewage go first to screening, than aeration for sludge activation
The Bio impurities attached to the suspended Materials and form biofilm. The Biomass degrade the Biomass to an acceptable level
The Bio impurities attached to the Fixed Bed Materials and form biofilm. The Biomass degrade the Biomass to an acceptable level
MBR is physical process and Bio-film is 100% biological
Requires negative pressure for the filtration
Not needed Not needed MBR higher energy
MBR MBBR
FBBRClearFox®
fixed bed reactor Cost relation
Big problemMembrane need to be cleaned well and can be replaced
Big problemMaterials to change and 10 days start up
The Oil leaked will stay on the top, easy to remove
Service, energy, parts and cost of plant
Less Best FBBR best cost over 5 years
Can hold 24 hours Form bio cakes if electricity is down more than 10 hours. This will re-quire change materials, Clean take and 10 days start up
No cakes formed the biomass stationary
Advantage FBBR
Highest Middle Lowest FBBR the materials not need to move, it is fixed
Superior Acceptable for irrigation Acceptable for irrigation MBR best TSE quality
Costly - periodic Cheaper and long lasting Cheaper and long lasting Small scratch MBR element than no fix need to changeBIOFIL is sturdy and replaceable at cheap cost
The activated young sludge return to the aeration tank, to contribute to the active biomass
Higher energy, pumping sludge require maintenance too
Constant and trained service Higher cost
More Less Less The Biofilm depends on feeding on the biomass
Not required Lamella Lamella Advantage MBRLamella technology reuqires much less space
Buffer mixing activated sludge than filtration
Buffer - Bioreactor Buffer - Bioreactor
Requires backwash for cleaning Not needed Not needed MBR higher energy
design criteria - questionaireAuslegungskriterien - Fragenkatalog
PEEW
Screening primary sludgeSiebung
Deposit of sludgeSchlammlagerung
Way of disposal or treatment on-site Art der Entsorgung oder Behandlung vorort
Requirements regarding effluentAblaufanforderung
Advanced effluent treatmentWeitergehende Aufbereitung
Maximum effluent concentrationMaximale Ablaufkonzentrationen
Inflow concentration / parameters of affluxCOD, BOD, Carbon, NH-4n, P, pHZulaufkonzentrationen bzw. Zulaufparame-ter CSB, BSB, TOC, NH4-N, P, pH
Specific contingent of BOD5 (Biological Oxygen Demand) calculated for a PEMenge BSB5 pro Tag in kg
Specific contingent of waste water by PESpezifischer Anfall von BSB5 pro EW
Waste water quantity Q/daySpezifischer Anfall von Abwasser pro EW
Average waste water quantity per hourStündlicher durchschnittlicherAbwasseranfall
Maximum waste water quantity per hourStündlicher maximaler Abwasseranfall
Seasonal operation continousSaisonbetrieb
Commercial operated kitchen: oils & greasesGewerbliche Küchen: Fette und Öle
Detergents and purifiers fromindustrial operationReinigungsmittel - gewerblich
Any other organic contaminated wastewaters from foodindustryDiverses organisch verschmutztes Abwasser
Sewerage systemKanalsystem
External watersFremdwasseranteil
Any backflush water from dairy Milchkammernzufluß - Landwirtschaft
Stage of extension Ausbaustufe
Bekannter Einwohner(gleich)wert
Entfernung von anorganischem Material notwendig über Siebschnecke oder Trom-melsieb (bei Stabilisierung notwendig)
Wie groß ist das Schlammentsorgungsinter-vall, kann der Primär- mit dem Sekundär-schlamm gemeinsam gelagert werden
Kommt der Schlamm in eine Schlammbehand-lungsanlage, muss er entwässert (Schwer-krafteindickung genug, oder weitergehend), stabilisiert, geruchsfrei gemacht werden
Versickerung, Kohlenstoffbau, (Grund-reinigung), Stickstoffabbau, Nitrifikation, Denitrifikation
Gießwasser, Löschwasser, Brauchwasser ohne menschlichen Kontakt, Kreislaufführung, Bade-wasser, Trinkwasser, Phosphatentfernung
CSB, BSB,TOC,NH4-N, NO3-N, Pges, AS
überwiegend häuslich oder auch Gastrono-mie, bzw. andere Gewerbeanteile, existie-ren Messungen der Zulaufparameter oder Konzentrationen
Anzahl EW mit spezifischer BSB5-Fracht pro Tag multipliziert
in kg/EWxTag (Standard 60 gr/EWxd)
in Liter pro Tag und EW (Standard 150 Liter/EWxd)
Standard (Qd/10 Stunden)
Spitzenlast wegen Betrieb, Mischwasser
Anlage jahreszeitbedingt nur teilweise ausgelastet
Ist das Fett, bzw. Öl aus dem Abwasser ent-fernt mit Fettabscheidern, oder muss dies berücksichtigt werden
Sind größere Mengen an Reinigungsmitteln,-Desinfektionsmittel bzw. Entschwefler zu erwarten
Ist Abwasser aus Tierverwertung, Schlach-tereien etc. wie z.B. Blut zu erwarten
Trennsystem ohne Regenwasser (oder Mischsystem = Schmutzwasser mit Regen-wasser) vorhanden
Läuft ständig ein definierter Anteil aufgrund undichter Kanäle bzw. Deckel zu, Schätzung oder Angabe in % von Tagesabwasser Qd
Werden Spülwässer aus der Milchwirtschaft in die Anlage eingeleitet, falls ja wieviel, wird das Wasser neutralisiert
von Anfang an voll belastet oder mehrere Ausbaustufen geplant
known number of inhabitants and population equivalent (PE), considered also commercial parts
removal of anorganic matter required; in case of stabilisation systems requirements, spiral or drum
time interval of sludge removal required
succeeding sludge treatment in a separate plant or dehydration required, together with exemption from odours, adequate densifica-tion and gravity assumed
infiltration, degradation of carbon (purifica-tion) and nitrate, nitrification anddenitrification
watering (garden), fire-water, washwater (without human contact), circular flow, bath water, drinking water, phosphate removal)
COD, BOD5, Carbon, NH4-N, NO3-N, P, ...or normative link
mainly domestic ww or ww from catering or trade; based on analysis of the influx or ww concentration
kg / PE x day (standard: 60 g per PE x day)
litres per day and PE (standard 150 lit /day)depending on national standard orapplication
specific quantity per PE x inhabitants
standard = Q per day / 10 hours
peak load (mixed water due to full operation)
partial utilisation subject to seasonalinfluences
grease separator required for separating oils and greases from waste water
considerable quantities of detergents, disin-fection, desulfurization
waste water from slaughtering / bloodmilk industrie / wheyfish / oil etc.
separation of rain water available or waste water as a mixture of foul water andrain water
permanent inflow of external water due to leaky sewers or damaged caps – how much approximately? (percentage of daily ww qty)
is water coming from milking parlors, if yes, is it equalized in pH?
full operation right from the start or phasing in gradually, seasonal differences by tourist activities
1 Capacity and Quantities Größe und Mengen
3 Outlet (effluent requirement) Ablauf
4 Sludge Schlamm
2 Waste water inlet Abwasserzusammensetzung
design criteria - questionaireAuslegungskriterien - Fragenkatalog
Upwelling securityAuftriebssicherung
Alarm managementStörmeldung
Machine failureMaschinenausfall
Control modeSteuerung
AerationBelüftung
Two compressors, pumps. screens2 Verdichter
Worm gearSiebschnecke
Spare/ware addtionalErsatzteile
Outside control cabinetAußenschrank
For any budget offer clients minimum information needed aboutFür Budgetangebot notwendig
For a detail offer clients minimum information needed aboutFür eine detailliertes Angebot notwendig
In case of contracting a pre decided arrangement necessaryFür Auftragsannahme erforderlich
Odour controlGeruchsbehandlung
Personal availabilityPersonal
Power supplyStromnetz
DistancesEntfernungen
Buildings, premisesGebäude
Air conditions specialsLuftverhältnisse
Sealevel onsiteSeehöhe über NN
Maximum – minimum temperature °C onsiteMaximale/Minimale Temperaturen
Yearly average temperature in °CDurchschnittstemperatur in °C
Pre-fabricated parts, site-mixed concretFertigteile, Ortbeton
Existing containersBehälterbestand
Material - Cheaper/no concreteMaterial
Sludge treatment requirement Entsorgung
Maximaler auftretender Grundwasserstand unter Geländeoberkante in Metern
Fehlermeldungen oder Sammelstörung, Weiterleitung über Modem, optische oder akkustische Anzeige (Hupe, Lampe)
Notprogramm
Mechanisch, vollautomatisch
Aufteilung auf mehrere Belüftungssysteme
Wechselbetrieb
Siebung bei Schlammnutzung
Mitlieferung von Verschleißteilsätzen
Maschinentechnik in Außenschrank
Aktivkohlefilteractivated carbon filter
Klärwärter, ungelerntes Personal, wie oft Kontrollen, Reaktionszeit bei Ausfällen
Angabe Spannung, Frequenz
Wie weit ist die geplante Entfernung von der Umhausung zur Mitte der Kläranlage
Existiert ein Gebäude o.ä. zum Aufstellen der Steuerung, Luftverteiler etc. wenn ja wie groß, bei kleineren Räumen existiert Zwangsentlüftung, Frostwächter
Staub oder Feinsand in der Luft
Angabe falls höhere Lage
Angaben
Angaben
Behälter als Fertigteile angeliefert oder vorort geschalt, sind bestimmte Geometrien einzuhal-ten (maximale Wasserstände, Schalbreiten)
Bei genauen Angaben über bestehende Behäl-ter (Oberflächen, Wasserstände) können diese mit einbezogen werden
Beton, Edelstahl, Kunststoff, Befestigung-möglichkeiten für Einbauteile
Schlammbeete, Kompostierung, Deponie, Verbrennung
maximum ground water level (meters) below top ground surface
alarm message or collective alarm, modem data transmission, optic or acoustic alert (signal light, horn)
emergency programme, priority list for signalizing
mechanical, fully automated
one or distributed aeration systems(auxiliaries)
alternating operation or stand bydevices available
sieving on sludge deduction/dewatering
supply of consumables (sets)
outdoor control cabinet operation equipment
In case of lack or incomplete informations, PPU takes assumptions for any budgeting or offering. Rights are reserved for a higher price level in case of detail informations, which are given subsequently.
Bei unvollständigen Angaben werden von PPU Annahmen getroffen.Vorbehaltlich sind Preiserhöhungen möglich auf Grund mangelhafter Kundenangaben.
waste water specialised staff, unskilled staff, control frequency, breakdown response time
voltage, frequency & network; generators
distance between housing and waste water treatment plant
kind and size of existing buildings for moun-ting of switch board, supercharger); exhaust device, frost damage guard device
dust, drifting sand, offshore(salty)
please specify
please specify country region
please specify
technical requirements: pre-fabricated cont-ainers, locally formed, geometric specificati-on (maximum water levels, boarding size...)
existing containers may be considered - please specify surface, water levels
concrete, stainless steel, plastics, aluminium; fixing of mounting parts
thickening, dewatering, sludge bedding, composting, dumping ground, burning etc.
Site environment Umgebung bauseitig 6
Optional equipment Optionen & Ausrüstung 7
Tank (container) construction type Behälterbau 5
KontaktContact
Ihr HändlerYour dealer
PPU Umwelttechnik GmbH
Bernecker Straße 7395448 BayreuthGermany
Tel.: +49 [0] 921 - 150 639 90Fax: +49 [0] 921 - 150 639 99
[email protected] ARTA
IUS-DESIGN.DE
* Please pay attention to our general terms of business (clearfox.com/agb).Beachten Sie unsere AGBs unter clearfox.com/agb.
construction processBauablauf
Aufladen im Werk
Abladen und Positionieren
Transport zur Baustelle
Inbetriebnahme - fertig
Loading for transport
Unload and position
Transport to site
Startup - ready