EAST CHINA PROJECTS BY SCHOOL
Belle River Elementary School
Exterior Work
Partial roof replacement
Interior Work
Enclose kiln in separate room w/ exhaust system to meet code
Replace folding partition between gym and cafeteria
Replace folding partition between cafeteria and music room
Abatement allowance for mechanical work
Plumbing
Replace Kitchen water heater
Install building-wide point-of-use thermostatic mixing valves
Mechanical
Install dedicated exhaust system in kiln roomReplace exhaust system in main office toilet room
Provide radiant perimeter heat in 22 classrooms
Add split system A/C in IDF room
Replace Kitchen make-up air unit and exhaust fan
Replace packaged roof top unit over multi-purpose room
Replace hot water heating control valves
Upgrade temperature controls system
Add variable frequency controls to hot water circulation pumps
Electrical
Electrical support for mechanical scope of workElectrical support for technology scope of work
Install fire alarm system
Install generator for emergency lights / technology
Replace lighting in Media Center area w/LED type
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for10G
Replace data/voice structured cabling
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication room
Replace wireless infrastructure
Replace phone system
Security
Video surveillance cameras
Access control at main entrance
Replace PA system
8/19/2019 East China Projects by School
2/21
Technology Equipment
Replace desktop computers
Replace laptops
Replace mobile devices
Audiovisual
Replace classroom Smart Suite - projector and cabling
Refresh classroom Smart Suite - projector and cablingReplace classroom Smart Suite - sound field
Replace classroom Smart Suite - document camera
Replace classroom Smart Suite - interactivity
Technology Equipment
Replace printers and peripherals
Replace copiers
Site Work
Reconstruct/Repave bus loop
Replace concrete walks at bus loop entrance
Repave southwest parking area
Replace concrete walks at southwest parking area
Replace paving at front parking lot
Construct additional parking I create parent drop-off
Site restoration for expanded parking area
Construct concrete walks for parent drop-off
Improve playgrounds
Replace parking/walkway lighting with LED
Install new light poles and heads
Furnishings
Install additional refrigerator and freezer
8/19/2019 East China Projects by School
3/21
Eddy Elementary
When the East China School District submitted its application for bonding approval to the Michigan
Department of Treasury, Eddy Elementary was scheduled for closure and improvements for that
facility were not included in the application. After the bond application was submitted to The
Department of Treasury, the closure decision regarding Eddy Elementary was rescinded by the East
China Board of Education. By law, only projects included in the application can be funded through
the Bond.
Given this, the Board of Education is committed to ensuring that Eddy students and staff will have
the same instructional technology and opportunities as their peers in every district classroom will
have. To achieve this, bond proceeds may be used to purchase laptops, tablets, and other
instructional devices students use on a daily basis to access the curriculum.
As building infrastructure needs arise, these repairs and improvements will be paid for through the
current Sinking Fund.
8/19/2019 East China Projects by School
4/21
Gearing Elementary School
Exterior Work
Partial roof replacement
Replace doors at north corridor
Replace skylights at Lobby area
Replace hollow metal doors/frames with alum/FRP
Interior Work
Replace folding divider panel system in cafeteria
Architectural work for new mechanical piping and equipment
Abatement allowance for mechanical work
Plumbing
Add lavatories to classroom toilet rooms
Replace kitchen hot water heater
Install building-wide point-of-use thermostatic mixing valves
Mechanical
Install new boilers w/ hot water distribution system
Install vertical unit ventilators in classrooms
Install new cafeteria rooftop units
Install new library air-handling unit
Install new gym air-handling unit
Install new kitchen make-up air unit, exhaust fan, & rooftop unit
Install new music room rooftop unit
Install new office rooftop unit
Upgrade temperature controls system
Electrical
Replace MDP, two distribution panels, and transformer
Electrical support for technology scope of work
Electrical support for mechanical scope of work
Replace fire alarm system
Install generator for emergency lights
Install new LED lighting in corridor outside of Cafeteria
Install occupancy sensors throughout building
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for 1OGReplace data/voice structured cabling
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication room
Replace wireless infrastructure
Replace phone system
8/19/2019 East China Projects by School
5/21
Security
Video surveillance cameras
Access control at main entrance
Add corridor PA speakers I modify existing PA system
Technology Equipment
Replace printers and peripherals
Replace copiersReplace desktop computers
Replace laptops
Replace mobile devices
Refresh devices
Audio Visual
Replace classroom Smart Suite – projector and cabling
Refresh classroom Smart Suite – projector and cabling
Replace classroom Smart Suite – sound field
Replace classroom Smart Suite – document camera
Replace classroom Smart Suite – interactivity
Site Work
Reconstruct/Repave bus loop
Replace concrete walks at bus loop entrance
Repave side drive and rear parking I site restoration
Replace concrete walks at rear parking area
Repave existing front parking area
Construct additional parking and create parent drop-off
Construct concrete walks at new parent drop-off
Improve playgrounds
Replace site lighting heads with LED type
Install new light poles and heads
8/19/2019 East China Projects by School
6/21
Palms Elementary School
Exterior Work
Partial roof replacement
Replace curtainwall system at main entry
Replace gym exterior door
Interior Work
Replace corridor borrowed-lite system w/ solid walls
Replace toilet partitions 5
Replace interior gym doors
Abatement allowance for mechanical work
Plumbing
Replace Kitchen water heater
Install Kitchen hood fire suppression system
Install building-wide point-of-use thermostatic mixing valves
Mechanical
Replace hot water boilers and circulation pumps
Install new kitchen make-up air unit, exhaust fan, & rooftop unit
Upgrade temperature controls system
Electrical
Electrical support for mechanical scope of work
Electrical support for technology scope of work
Replace T12 light fixtures w/ T8's
Install generator for emergency lights
Replace electrical service / MDP for AIC loadReplace gym lights with fluorescent type and sensors
Install occupancy sensors - 25% of building
Install intercom / video camera at main entrance
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for 1OG
Replace data/voice structured cabling
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication room
Replace wireless infrastructure
Replace phone system
Security
Video surveillance cameras
Access control at main entrance
8/19/2019 East China Projects by School
7/21
Technology Equipment
Replace desktop computers
Replace laptops
Refresh devices
Replace printers and peripherals
Replace copiers
AudiovisualReplace classroom Smart Suite - projector and cabling
Refresh classroom Smart Suite - projector and cabling
Replace classroom Smart Suite - sound field
Replace classroom Smart Suite - document camera
Replace classroom Smart Suite - interactivity
Site Work
Repave main parking area
Replace concrete sidewalks
Improve playgrounds
Replace site lighting heads w/ LED type
8/19/2019 East China Projects by School
8/21
Pine River Elementary Project Work List
Exterior Work
Partial roof replacement
Interior WorkEnclose kiln in separate room w/exhaust system to meet code
Replace folding partition between gym and cafeteria
Replace toilet partitions in bathrooms
Abatement allowance for mechanical work
Plumbing
Replace kitchen water heater
Install building-wide point-of-use thermostatic mixing valves
Mechanical
Replace main office toilet room exhaust systemInstall radiant perimeter heat in classrooms
Add A/C split system to IDF room
Install new Kitchen make-up air unit, exhaust fan, & rooftop unit
Replace rooftop unit over multi-purpose room
Upgrade remainder of temperature controls system
Add variable frequency controls to hot water circulation pumps
Replace hot water heating control valves
Replace hot water heating circulation pumps
Electrical
Electrical support for mechanical scope of work
Electrical support for technology scope of work
Install new fire alarm system
Install new generator for emergency lights
Install new LED lighting in media center area
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for 10G
Replace data/voice structured cabling
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication roomReplace wireless infrastructure
Replace phone system
Security
Video surveillance cameras
Access control at main entrance
Replace PA system
8/19/2019 East China Projects by School
9/21
Technology Equipment
Replace desktop computers
Replace laptops
Replace mobile devices
Refresh devices
Replace printers and peripherals
Replace copiers
Audiovisual
Replace classroom Smart Suite - projector and cabling
Refresh classroom Smart Suite - projector and cabling
Replace classroom Smart Suite - sound field
Replace classroom Smart Suite - document camera
Replace classroom Smart Suite – interactivity
Site Work
Reconstruct/Repave bus loop
Replace concrete walks at bus loop area
Repave south parking lot
Replace concrete walks at south parking lot
Repave rear parking lot
Improve playgrounds
Replace site lighting heads with LED type
Add light poles and heads
Construct additional parking I create parent drop-off
Replace water line from street to building
8/19/2019 East China Projects by School
10/21
Marine City Middle School
Exterior Work
Partial roof replacement
Replace main entry curtainwall system
Interior WorkInstall new toilet partitions
Abatement allowance for mechanical work
Architectural work at new mechanical work
Plumbing
Replace kitchen water heater
Replace domestic hot water heater
Replace Locker Room shower head assemblies
Mechanical
Install new cabinet unit heaters in corridorsReplace hot water boilers & circulation pumps
Install new gymnasium rooftop units
Install new locker room energy recovery unit and ductwork
Install new kitchen make-up air unit, exhaust fan, & rooftop unit
Install new horizontal HVAC unit vents - west classroom wing
Upgrade temperature controls system for new equipment
Electrical
Electrical support for mechanical scope of work
Electrical support for technology scope of work
Replace fire alarm system
Install generator for emergency lights
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for 1OG
Replace data/voice structured cabling
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication room
Replace wireless infrastructure
Replace phone system
Security
Video surveillance cameras
Access control at main entrances
Modify PA system
Technology Equipment
Replace desktop computers
Replace desktop computers (CAD, etc.)
Replace laptops
Replace mobile devices
8/19/2019 East China Projects by School
11/21
Refresh devices
Replace printers and peripherals
Replace copiers
Audiovisual
Replace classroom Smart Suite - projector and cabling
Refresh classroom Smart Suite - projector and cabling
Replace classroom Smart Suite - sound fieldReplace classroom Smart Suite - document camera
Replace classroom Smart Suite - interactivity
Gym or cafeteria presentation system
Audiovisual for collaborative spaces
Site Work
Repave bus loop
Replace concrete sidewalks at bus loop entrance
Repave parking lot
Replace concrete sidewalks at parking area
Furnishings
Provide new oven in cafeteria
8/19/2019 East China Projects by School
12/21
St. Clair Middle School
Interior Work
Install expansion joint in classroom 2201
Plumbing
Replace kitchen water heaterReplace domestic hot water storage tank
Mechanical
Improve locker room temperature controls
Replace 20T air-cooled condensing units & cooling coils
Upgrade remainder of temperature control system
Electrical
Replace main corridor metal halide pendant lights with LED
Electrical support for technology scope of work
Replace Cafeteria metal halide lights with LEDInstall new generator for emergency lights
Replace hand dryers in Locker Room
Replace Gym lights w/ fluorescent type and sensors
Replace aux gym lights w/ fluorescent type and sensors
Electrical support for mechanical work
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for 10G
Replace data/voice structured cabling
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication room
Replace wireless infrastructure
Replace phone system
Security
Video surveillance cameras
Access control at main entrance
Technology Equipment
Replace desktop computers
Replace desktop computers (CAD, etc.)Replace laptops
Replace mobile devices
Refresh devices
Replace printers and peripherals
Replace copiers
Audiovisual
Replace classroom Smart Suite- projector and cabling
Refresh classroom Smart Suite - projector and cabling
Replace classroom Smart Suite - sound field
8/19/2019 East China Projects by School
13/21
Replace classroom Smart Suite - document camera
Replace classroom Smart Suite - interactivity
Audiovisual for collaborative spaces
Site Work
Replace portion of bus loop
Replace concrete sidewalks
Replace concrete sidewalks at parking lotReplace site lighting heads with LED type
Furnishings
Provide new oven in cafeteria
8/19/2019 East China Projects by School
14/21
Marine City High School
Exterior Work
Partial roof replacement
Replace main entry curtainwall system
Replace skylights and rebuild light wellsReconstruct masonry walls around pool area
Interior Work
Install structural supports for gym backboards
Replace Locker Room toilet partitions
Replace Girl's Locker Room lockers
Replace miscellaneous wood doors in Athletic area
Install ADA hardware at wood classroom doors
Abatement and architectural work at new mechanical work
Replace starting blocks in pool
Remodel Tech Lab area for STEM programRedefine / remodel stage area usage
Plumbing
Replace pool boiler and install monitoring gauges
Replace kitchen water heater
Replace PVC roof drain piping near Boiler Room
Replace locker room shower assemblies
Mechanical
Upgrade temperature controls system
Install new vertical unit ventilators in Classrooms
Install new pool locker room energy recovery unit
Install new pool dehumidification unit
Replace hot water boilers & circulation pumps
Install pool equipment room ventilation
Install new media center rooftop unit
Install new office rooftop units
Install fume hoods in science rooms
Electrical
Electrical support for mechanical scope of work
Electrical support for technology scope of work
Install new generator for emergency lightsReplace MDP for increased NC load
Replace pool lights/ceiling due to new RTU / ceiling removal
Increase gym lighting / install occupancy sensors
Install occupancy sensors throughout building
Replace the pool PA system
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for 10G
Replace data/voice structured cabling
8/19/2019 East China Projects by School
15/21
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication room
Replace wireless infrastructure
Replace phone system
Security
Video surveillance camerasBuilding-wide access control system
Technology Equipment
Replace desktop computers
Replace desktop computers {CAD, etc.)
Replace laptops
Replace mobile devices
Refresh devices
Replace printers and peripherals
Replace copiers
Audiovisual
Replace classroom Smart Suite - projector and cabling
Refresh classroom Smart Suite - projector and cabling
Replace classroom Smart Suite - sound field
Replace classroom Smart Suite - document camera
Replace classroom Smart Suite - Interactivity
Site Work
Replace paving at southwest parking lot, markings, site restoration
Replace concrete sidewalks at southwest parking lot
Replace paving at bus loop, markings, and site restoration
Replace concrete sidewalks at bus loop areaReplace paving at main parking lot, markings, and site restoration
Replace concrete sidewalks at main parking area
Reconstruct tennis courts including fencing and lighting
Improve site drainage I reconstruct structures
Regrade athletic fields and add drain tile / improve fencing
Replace site lighting heads with LED type
Add light poles and heads
8/19/2019 East China Projects by School
16/21
St. Clair High School
Exterior Work
Partial roof replacement
Replace entry doors/framing with aluminum
Interior WorkRemodel toilet rooms
Replace lockers in pool locker rooms
Replace starting blocks in pool
Sand and refinish gym flooring
Upgrade pool scoreboard and timing equipment
Remodel tech lab area for STEM program
Redefine / remodel stage area usage
Abatement and architectural work at new mechanical work
Plumbing
Replace locker room shower valves / towersReplace kitchen water heater
Install new pool pumps
Install building isolation/sectionalizing valves
Replace pool filtration system
Mechanical
Upgrade temperature controls system
Install new vertical unit ventilators in classrooms
Install new pool dehumidification unit
Install new corridor cabinet unit heaters
Correct Band Room heating issues
Fire wrap grease duct in mezzanine
Install new pool equipment ventilation system
Install building isolation /sectionalizing valves
Replace hot water boilers & circulation pumps
Electrical
Electrical support for mechanical work
Electrical support for technology scope of work
Increase gym lighting / install occupancy sensors
Install new generator for emergency lights
Replace cafeteria lights w/ LED type
Replace MDP for increased A/C loadReplace pool lights/ceiling due to new RTU / ceiling removal
Install occupancy sensors throughout building
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for 10G
Replace data/voice structured cabling
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication room
8/19/2019 East China Projects by School
17/21
Replace wireless infrastructure
Replace phone system
Security
Video surveillance cameras
Building-wide access control system
PA system
Technology Equipment
Replace desktop computers
Replace desktop computers (CAD, etc.)
Replace laptops
Replace mobile devices
Refresh devices
Replace printers and peripherals
Replace copiers
Audiovisual
Replace Smart Suite – projector and cabling
Refresh classroom Smart Suite – projector and cabling
Replace classroom Smart Suite – sound field
Replace classroom Smart Suite – document camera
Replace classroom Smart Suite – interactivity
Modify pool sound system
Audiovisuals for collaborative spaces
Site Work
Replace paving at main entrance / bus loop
Replace concrete sidewalks at main entrance / bus loop
Replace paving at Clinton Rd. center parking lot
Replace paving at Clinton Rd. west parking lotReplace paving at Cox Rd. south parking lot
Replace paving at Cox Rd. north parking lot
Remove and replace tennis courts and fencing
Improve site drainage I reconstruct structures
Replace site lighting poles and heads w/LED type
Furnishings
Provide new oven / mobile serving cart and cashier stand
8/19/2019 East China Projects by School
18/21
Administration Building
New Construction
Renovate and/or Construct space for Pre-School programming
Interior Work
Remodel toilet roomsRemodel existing pre-school rooms
Remodel headend room
Remodel an area for pre-school office
Plumbing
Replace kitchen water heater
Replace domestic water heater
Replace plumbing fixtures
Mechanical
Install new business office rooftop unitInstall new superintendent office rooftop unit
Install new board room rooftop unit
Install vertical unit ventilators
Upgrade temperature controls system
Install new curriculum office rooftop unit
Electrical
Replace fire alarm system
Electrical support for technology scope of work
Electrical support for mechanical work
Install new generator for emergency lights
Replace MDP for A/C load
Replace distribution equipment
Install occupancy sensors throughout building
Technology Infrastructure
Remove Category 5 and legacy cabling
Fiber backbone to IDFs for 10G
Replace data/voice structured cabling
Replace network - core switch
Replace network - edge switches
Replace UPS in each telecommunication room
Replace wireless infrastructureReplace phone system
Security
Video surveillance cameras
Replace video surveillance servers
Access control system at main pre-school entrance
Technology Equipment
Replace desktop computers
Replace laptops
8/19/2019 East China Projects by School
19/21
Replace mobile devices
Refresh devices
Server room / back end system allowance
Replace printers and peripherals
Replace copiers
Audiovisual
Replace classroom Smart Suite - projector and cablingRefresh classroom Smart Suite - projector and cabling
Replace classroom Smart Suite - sound field
Replace classroom Smart Suite - document camera
Replace classroom Smart Suite - interactivity
Board room sound system
Mediacast servers
Site Work
Repave front parking lot
Replace concrete sidewalks
Repave rear lot
Relocate and expand playground area
Site restoration at pre-school addition
Furnishings
New furnishings for pre-school addition
8/19/2019 East China Projects by School
20/21
Performing Arts Center
Interior Work
Replace theatrical curtain and ceiling clouds rigging
Plumbing
Install electric heat trace for ice damning issue
Mechanical
Install dust collector in scene shop
Install forced draft combustion air system in boiler room
Install new variable frequency controls on Lobby AHU
Replace Lobby AHU to meet cooling load
Electrical
Replace house lighting and controls w/LED type
Electrical support for technology scope of work
Replace lobby lighting w/ LED typeInstall stage lighting in Orchestra Shell
Replace PA / stage monitor system, mixers, and wireless MIGs
Replace lighting dimmer rack
Electrical support for mechanical work
Technology Infrastructure
Data/voice structured cabling
Replace network core switch
Replace network edge switches
Replace UPS in each telecommunication room
Replace wireless infrastructure
Replace phone system
Security
Video surveillance cameras
Technology Equipment
Replace desktop computers
Replace laptops
Refresh devices
8/19/2019 East China Projects by School
21/21
ECSD Stadium
New Construction
Update locker room facilities
Exterior Work
Replace metal roofing over team/locker room building
Interior WorkRemodel concessions and building restrooms
Plumbing
Install 3 compartment sink w/grease trap in concessions
Electrical
Replace sound system circuiting
Site Work
Repave lot east of athletic field
Repave north area of parking lot
Install pump station and piping at detention basin
Replace site lighting heads w/ LED type
Replace walkway lighting heads w/ LED type
Replace fencing / upgrade main gate entrance area
Resurface track
Construct ADA access to visitor's bleacher area
Transportation Building
Electrical
Electrical support for technology scope of work
Technology Infrastructure
Video surveillance-cameras
Technology Equipment (FFE) Peripherals
Replace copiers
Site Work
Replace asphalt paving
Replace concrete paving
Maintenance Building
Exterior Work
Replace roofing