    EAST CHINA PROJECTS BY SCHOOL 

    Belle River Elementary School

    Exterior Work

    Partial roof replacement

    Interior Work

    Enclose kiln in separate room w/ exhaust system to meet code

    Replace folding partition between gym and cafeteria

    Replace folding partition between cafeteria and music room

    Abatement allowance for mechanical work

    Plumbing

    Replace Kitchen water heater

    Install building-wide point-of-use thermostatic mixing valves

    Mechanical

    Install dedicated exhaust system in kiln roomReplace exhaust system in main office toilet room

    Provide radiant perimeter heat in 22 classrooms

    Add split system A/C in IDF room

    Replace Kitchen make-up air unit and exhaust fan

    Replace packaged roof top unit over multi-purpose room

    Replace hot water heating control valves

    Upgrade temperature controls system

    Add variable frequency controls to hot water circulation pumps

    Electrical

    Electrical support for mechanical scope of workElectrical support for technology scope of work

    Install fire alarm system

    Install generator for emergency lights / technology

    Replace lighting in Media Center area w/LED type

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for10G

    Replace data/voice structured cabling

    Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication room

    Replace wireless infrastructure

    Replace phone system

    Security

    Video surveillance cameras

    Access control at main entrance

    Replace PA system

  • 8/19/2019 East China Projects by School

    2/21

    Technology Equipment

    Replace desktop computers

    Replace laptops

    Replace mobile devices

    Audiovisual

    Replace classroom Smart Suite - projector and cabling

    Refresh classroom Smart Suite - projector and cablingReplace classroom Smart Suite - sound field

    Replace classroom Smart Suite - document camera

    Replace classroom Smart Suite - interactivity

    Technology Equipment

    Replace printers and peripherals

    Replace copiers

    Site Work

    Reconstruct/Repave bus loop

    Replace concrete walks at bus loop entrance

    Repave southwest parking area

    Replace concrete walks at southwest parking area

    Replace paving at front parking lot

    Construct additional parking I create parent drop-off

    Site restoration for expanded parking area

    Construct concrete walks for parent drop-off

    Improve playgrounds

    Replace parking/walkway lighting with LED

    Install new light poles and heads

    Furnishings

    Install additional refrigerator and freezer

  • 8/19/2019 East China Projects by School

    3/21

     

    Eddy Elementary

    When the East China School District submitted its application for bonding approval to the Michigan

    Department of Treasury, Eddy Elementary was scheduled for closure and improvements for that

    facility were not included in the application. After the bond application was submitted to The

    Department of Treasury, the closure decision regarding Eddy Elementary was rescinded by the East

    China Board of Education. By law, only projects included in the application can be funded through

    the Bond.

    Given this, the Board of Education is committed to ensuring that Eddy students and staff will have

    the same instructional technology and opportunities as their peers in every district classroom will

    have. To achieve this, bond proceeds may be used to purchase laptops, tablets, and other

    instructional devices students use on a daily basis to access the curriculum.

    As building infrastructure needs arise, these repairs and improvements will be paid for through the

    current Sinking Fund.

  • 8/19/2019 East China Projects by School

    4/21

     

    Gearing Elementary School

    Exterior Work

    Partial roof replacement

    Replace doors at north corridor

    Replace skylights at Lobby area

    Replace hollow metal doors/frames with alum/FRP

    Interior Work

    Replace folding divider panel system in cafeteria

    Architectural work for new mechanical piping and equipment

    Abatement allowance for mechanical work

    Plumbing

    Add lavatories to classroom toilet rooms

    Replace kitchen hot water heater

    Install building-wide point-of-use thermostatic mixing valves

    Mechanical 

    Install new boilers w/ hot water distribution system

    Install vertical unit ventilators in classrooms

    Install new cafeteria rooftop units

    Install new library air-handling unit

    Install new gym air-handling unit

    Install new kitchen make-up air unit, exhaust fan, & rooftop unit

    Install new music room rooftop unit

    Install new office rooftop unit

    Upgrade temperature controls system

    Electrical

    Replace MDP, two distribution panels, and transformer

    Electrical support for technology scope of work

    Electrical support for mechanical scope of work

    Replace fire alarm system

    Install generator for emergency lights

    Install new LED lighting in corridor outside of Cafeteria

    Install occupancy sensors throughout building

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for 1OGReplace data/voice structured cabling

    Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication room

    Replace wireless infrastructure

    Replace phone system

  • 8/19/2019 East China Projects by School

    5/21

    Security

    Video surveillance cameras

    Access control at main entrance

    Add corridor PA speakers I modify existing PA system

    Technology Equipment

    Replace printers and peripherals

    Replace copiersReplace desktop computers

    Replace laptops

    Replace mobile devices

    Refresh devices

    Audio Visual

    Replace classroom Smart Suite – projector and cabling

    Refresh classroom Smart Suite – projector and cabling

    Replace classroom Smart Suite – sound field

    Replace classroom Smart Suite – document camera

    Replace classroom Smart Suite – interactivity

    Site Work

    Reconstruct/Repave bus loop

    Replace concrete walks at bus loop entrance

    Repave side drive and rear parking I site restoration

    Replace concrete walks at rear parking area

    Repave existing front parking area

    Construct additional parking and create parent drop-off

    Construct concrete walks at new parent drop-off

    Improve playgrounds

    Replace site lighting heads with LED type

    Install new light poles and heads

  • 8/19/2019 East China Projects by School

    6/21

     

    Palms Elementary School

    Exterior Work

    Partial roof replacement

    Replace curtainwall system at main entry

    Replace gym exterior door

    Interior Work

    Replace corridor borrowed-lite system w/ solid walls

    Replace toilet partitions 5

    Replace interior gym doors

    Abatement allowance for mechanical work

    Plumbing

    Replace Kitchen water heater

    Install Kitchen hood fire suppression system

    Install building-wide point-of-use thermostatic mixing valves

    Mechanical

    Replace hot water boilers and circulation pumps

    Install new kitchen make-up air unit, exhaust fan, & rooftop unit

    Upgrade temperature controls system

    Electrical

    Electrical support for mechanical scope of work

    Electrical support for technology scope of work

    Replace T12 light fixtures w/ T8's

    Install generator for emergency lights

    Replace electrical service / MDP for AIC loadReplace gym lights with fluorescent type and sensors

    Install occupancy sensors - 25% of building

    Install intercom / video camera at main entrance

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for 1OG

    Replace data/voice structured cabling

    Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication room

    Replace wireless infrastructure

    Replace phone system

    Security

    Video surveillance cameras

    Access control at main entrance

  • 8/19/2019 East China Projects by School

    7/21

    Technology Equipment

    Replace desktop computers

    Replace laptops

    Refresh devices

    Replace printers and peripherals

    Replace copiers

    AudiovisualReplace classroom Smart Suite - projector and cabling

    Refresh classroom Smart Suite - projector and cabling

    Replace classroom Smart Suite - sound field

    Replace classroom Smart Suite - document camera

    Replace classroom Smart Suite - interactivity

    Site Work

    Repave main parking area

    Replace concrete sidewalks

    Improve playgrounds

    Replace site lighting heads w/ LED type

  • 8/19/2019 East China Projects by School

    8/21

     

    Pine River Elementary Project Work List

    Exterior Work

    Partial roof replacement

    Interior WorkEnclose kiln in separate room w/exhaust system to meet code

    Replace folding partition between gym and cafeteria

    Replace toilet partitions in bathrooms

    Abatement allowance for mechanical work

    Plumbing

    Replace kitchen water heater

    Install building-wide point-of-use thermostatic mixing valves

    Mechanical

    Replace main office toilet room exhaust systemInstall radiant perimeter heat in classrooms

    Add A/C split system to IDF room

    Install new Kitchen make-up air unit, exhaust fan, & rooftop unit

    Replace rooftop unit over multi-purpose room

    Upgrade remainder of temperature controls system

    Add variable frequency controls to hot water circulation pumps

    Replace hot water heating control valves

    Replace hot water heating circulation pumps

    Electrical

    Electrical support for mechanical scope of work

    Electrical support for technology scope of work

    Install new fire alarm system

    Install new generator for emergency lights

    Install new LED lighting in media center area

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for 10G

    Replace data/voice structured cabling

    Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication roomReplace wireless infrastructure

    Replace phone system

    Security

    Video surveillance cameras

    Access control at main entrance

    Replace PA system

  • 8/19/2019 East China Projects by School

    9/21

    Technology Equipment

    Replace desktop computers

    Replace laptops

    Replace mobile devices

    Refresh devices

    Replace printers and peripherals

    Replace copiers

    Audiovisual

    Replace classroom Smart Suite - projector and cabling

    Refresh classroom Smart Suite - projector and cabling

    Replace classroom Smart Suite - sound field

    Replace classroom Smart Suite - document camera

    Replace classroom Smart Suite – interactivity 

    Site Work

    Reconstruct/Repave bus loop

    Replace concrete walks at bus loop area

    Repave south parking lot

    Replace concrete walks at south parking lot

    Repave rear parking lot

    Improve playgrounds

    Replace site lighting heads with LED type

    Add light poles and heads

    Construct additional parking I create parent drop-off

    Replace water line from street to building

  • 8/19/2019 East China Projects by School

    10/21

     

    Marine City Middle School

    Exterior Work

    Partial roof replacement

    Replace main entry curtainwall system

    Interior WorkInstall new toilet partitions

    Abatement allowance for mechanical work

    Architectural work at new mechanical work

    Plumbing

    Replace kitchen water heater

    Replace domestic hot water heater

    Replace Locker Room shower head assemblies

    Mechanical

    Install new cabinet unit heaters in corridorsReplace hot water boilers & circulation pumps

    Install new gymnasium rooftop units

    Install new locker room energy recovery unit and ductwork

    Install new kitchen make-up air unit, exhaust fan, & rooftop unit

    Install new horizontal HVAC unit vents - west classroom wing

    Upgrade temperature controls system for new equipment

    Electrical

    Electrical support for mechanical scope of work

    Electrical support for technology scope of work

    Replace fire alarm system

    Install generator for emergency lights

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for 1OG

    Replace data/voice structured cabling

    Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication room

    Replace wireless infrastructure

    Replace phone system

    Security

    Video surveillance cameras

    Access control at main entrances

    Modify PA system

    Technology Equipment

    Replace desktop computers

    Replace desktop computers (CAD, etc.)

    Replace laptops

    Replace mobile devices

  • 8/19/2019 East China Projects by School

    11/21

    Refresh devices

    Replace printers and peripherals

    Replace copiers

    Audiovisual 

    Replace classroom Smart Suite - projector and cabling

    Refresh classroom Smart Suite - projector and cabling

    Replace classroom Smart Suite - sound fieldReplace classroom Smart Suite - document camera

    Replace classroom Smart Suite - interactivity

    Gym or cafeteria presentation system

    Audiovisual for collaborative spaces

    Site Work

    Repave bus loop

    Replace concrete sidewalks at bus loop entrance

    Repave parking lot

    Replace concrete sidewalks at parking area

    Furnishings

    Provide new oven in cafeteria

  • 8/19/2019 East China Projects by School

    12/21

     

    St. Clair Middle School

    Interior Work

    Install expansion joint in classroom 2201

    Plumbing

    Replace kitchen water heaterReplace domestic hot water storage tank

    Mechanical 

    Improve locker room temperature controls

    Replace 20T air-cooled condensing units & cooling coils

    Upgrade remainder of temperature control system

    Electrical

    Replace main corridor metal halide pendant lights with LED

    Electrical support for technology scope of work

    Replace Cafeteria metal halide lights with LEDInstall new generator for emergency lights

    Replace hand dryers in Locker Room

    Replace Gym lights w/ fluorescent type and sensors

    Replace aux gym lights w/ fluorescent type and sensors

    Electrical support for mechanical work

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for 10G

    Replace data/voice structured cabling

    Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication room

    Replace wireless infrastructure

    Replace phone system

    Security

    Video surveillance cameras

    Access control at main entrance

    Technology Equipment

    Replace desktop computers

    Replace desktop computers (CAD, etc.)Replace laptops

    Replace mobile devices

    Refresh devices

    Replace printers and peripherals

    Replace copiers

    Audiovisual

    Replace classroom Smart Suite- projector and cabling

    Refresh classroom Smart Suite - projector and cabling

    Replace classroom Smart Suite - sound field

  • 8/19/2019 East China Projects by School

    13/21

    Replace classroom Smart Suite - document camera

    Replace classroom Smart Suite - interactivity

    Audiovisual for collaborative spaces

    Site Work

    Replace portion of bus loop

    Replace concrete sidewalks

    Replace concrete sidewalks at parking lotReplace site lighting heads with LED type

    Furnishings 

    Provide new oven in cafeteria

  • 8/19/2019 East China Projects by School

    14/21

     

    Marine City High School

    Exterior Work

    Partial roof replacement

    Replace main entry curtainwall system

    Replace skylights and rebuild light wellsReconstruct masonry walls around pool area

    Interior Work

    Install structural supports for gym backboards

    Replace Locker Room toilet partitions

    Replace Girl's Locker Room lockers

    Replace miscellaneous wood doors in Athletic area

    Install ADA hardware at wood classroom doors

    Abatement and architectural work at new mechanical work

    Replace starting blocks in pool

    Remodel Tech Lab area for STEM programRedefine / remodel stage area usage

    Plumbing

    Replace pool boiler and install monitoring gauges

    Replace kitchen water heater

    Replace PVC roof drain piping near Boiler Room

    Replace locker room shower assemblies

    Mechanical

    Upgrade temperature controls system

    Install new vertical unit ventilators in Classrooms

    Install new pool locker room energy recovery unit

    Install new pool dehumidification unit

    Replace hot water boilers & circulation pumps

    Install pool equipment room ventilation

    Install new media center rooftop unit

    Install new office rooftop units

    Install fume hoods in science rooms

    Electrical

    Electrical support for mechanical scope of work

    Electrical support for technology scope of work

    Install new generator for emergency lightsReplace MDP for increased NC load

    Replace pool lights/ceiling due to new RTU / ceiling removal

    Increase gym lighting / install occupancy sensors

    Install occupancy sensors throughout building

    Replace the pool PA system

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for 10G

    Replace data/voice structured cabling

  • 8/19/2019 East China Projects by School

    15/21

      Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication room

    Replace wireless infrastructure

    Replace phone system

    Security

    Video surveillance camerasBuilding-wide access control system

    Technology Equipment

    Replace desktop computers

    Replace desktop computers {CAD, etc.)

    Replace laptops

    Replace mobile devices

    Refresh devices

    Replace printers and peripherals

    Replace copiers

    Audiovisual

    Replace classroom Smart Suite - projector and cabling

    Refresh classroom Smart Suite - projector and cabling

    Replace classroom Smart Suite - sound field

    Replace classroom Smart Suite - document camera

    Replace classroom Smart Suite - Interactivity

    Site Work

    Replace paving at southwest parking lot, markings, site restoration

    Replace concrete sidewalks at southwest parking lot

    Replace paving at bus loop, markings, and site restoration

    Replace concrete sidewalks at bus loop areaReplace paving at main parking lot, markings, and site restoration

    Replace concrete sidewalks at main parking area

    Reconstruct tennis courts including fencing and lighting

    Improve site drainage I reconstruct structures

    Regrade athletic fields and add drain tile / improve fencing

    Replace site lighting heads with LED type

    Add light poles and heads

  • 8/19/2019 East China Projects by School

    16/21

     

    St. Clair High School

    Exterior Work

    Partial roof replacement

    Replace entry doors/framing with aluminum

    Interior WorkRemodel toilet rooms

    Replace lockers in pool locker rooms

    Replace starting blocks in pool

    Sand and refinish gym flooring

    Upgrade pool scoreboard and timing equipment

    Remodel tech lab area for STEM program

    Redefine / remodel stage area usage

    Abatement and architectural work at new mechanical work

    Plumbing

    Replace locker room shower valves / towersReplace kitchen water heater

    Install new pool pumps

    Install building isolation/sectionalizing valves

    Replace pool filtration system

    Mechanical

    Upgrade temperature controls system

    Install new vertical unit ventilators in classrooms

    Install new pool dehumidification unit

    Install new corridor cabinet unit heaters

    Correct Band Room heating issues

    Fire wrap grease duct in mezzanine

    Install new pool equipment ventilation system

    Install building isolation /sectionalizing valves

    Replace hot water boilers & circulation pumps

    Electrical

    Electrical support for mechanical work

    Electrical support for technology scope of work

    Increase gym lighting / install occupancy sensors

    Install new generator for emergency lights

    Replace cafeteria lights w/ LED type

    Replace MDP for increased A/C loadReplace pool lights/ceiling due to new RTU / ceiling removal

    Install occupancy sensors throughout building

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for 10G

    Replace data/voice structured cabling

    Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication room

  • 8/19/2019 East China Projects by School

    17/21

    Replace wireless infrastructure

    Replace phone system

    Security

    Video surveillance cameras

    Building-wide access control system

    PA system

    Technology Equipment

    Replace desktop computers

    Replace desktop computers (CAD, etc.)

    Replace laptops

    Replace mobile devices

    Refresh devices

    Replace printers and peripherals

    Replace copiers

    Audiovisual

    Replace Smart Suite – projector and cabling

    Refresh classroom Smart Suite – projector and cabling

    Replace classroom Smart Suite – sound field

    Replace classroom Smart Suite – document camera

    Replace classroom Smart Suite – interactivity

    Modify pool sound system

    Audiovisuals for collaborative spaces

    Site Work

    Replace paving at main entrance / bus loop

    Replace concrete sidewalks at main entrance / bus loop

    Replace paving at Clinton Rd. center parking lot

    Replace paving at Clinton Rd. west parking lotReplace paving at Cox Rd. south parking lot

    Replace paving at Cox Rd. north parking lot

    Remove and replace tennis courts and fencing

    Improve site drainage I reconstruct structures

    Replace site lighting poles and heads w/LED type

    Furnishings

    Provide new oven / mobile serving cart and cashier stand

  • 8/19/2019 East China Projects by School

    18/21

     

    Administration Building

    New Construction

    Renovate and/or Construct space for Pre-School programming

    Interior Work

    Remodel toilet roomsRemodel existing pre-school rooms

    Remodel headend room

    Remodel an area for pre-school office

    Plumbing

    Replace kitchen water heater

    Replace domestic water heater

    Replace plumbing fixtures

    Mechanical

    Install new business office rooftop unitInstall new superintendent office rooftop unit

    Install new board room rooftop unit

    Install vertical unit ventilators

    Upgrade temperature controls system

    Install new curriculum office rooftop unit

    Electrical 

    Replace fire alarm system

    Electrical support for technology scope of work

    Electrical support for mechanical work

    Install new generator for emergency lights

    Replace MDP for A/C load

    Replace distribution equipment

    Install occupancy sensors throughout building

    Technology Infrastructure

    Remove Category 5 and legacy cabling

    Fiber backbone to IDFs for 10G

    Replace data/voice structured cabling

    Replace network - core switch

    Replace network - edge switches

    Replace UPS in each telecommunication room

    Replace wireless infrastructureReplace phone system

    Security

    Video surveillance cameras

    Replace video surveillance servers

    Access control system at main pre-school entrance

    Technology Equipment 

    Replace desktop computers

    Replace laptops

  • 8/19/2019 East China Projects by School

    19/21

    Replace mobile devices

    Refresh devices

    Server room / back end system allowance

    Replace printers and peripherals

    Replace copiers

    Audiovisual

    Replace classroom Smart Suite - projector and cablingRefresh classroom Smart Suite - projector and cabling

    Replace classroom Smart Suite - sound field

    Replace classroom Smart Suite - document camera

    Replace classroom Smart Suite - interactivity

    Board room sound system

    Mediacast servers

    Site Work

    Repave front parking lot

    Replace concrete sidewalks

    Repave rear lot

    Relocate and expand playground area

    Site restoration at pre-school addition

    Furnishings

    New furnishings for pre-school addition

  • 8/19/2019 East China Projects by School

    20/21

     

    Performing Arts Center

    Interior Work

    Replace theatrical curtain and ceiling clouds rigging

    Plumbing

    Install electric heat trace for ice damning issue

    Mechanical

    Install dust collector in scene shop

    Install forced draft combustion air system in boiler room

    Install new variable frequency controls on Lobby AHU

    Replace Lobby AHU to meet cooling load

    Electrical

    Replace house lighting and controls w/LED type

    Electrical support for technology scope of work

    Replace lobby lighting w/ LED typeInstall stage lighting in Orchestra Shell

    Replace PA / stage monitor system, mixers, and wireless MIGs

    Replace lighting dimmer rack

    Electrical support for mechanical work

    Technology Infrastructure

    Data/voice structured cabling

    Replace network core switch

    Replace network edge switches

    Replace UPS in each telecommunication room

    Replace wireless infrastructure

    Replace phone system

    Security

    Video surveillance cameras

    Technology Equipment

    Replace desktop computers

    Replace laptops

    Refresh devices

  • 8/19/2019 East China Projects by School

    21/21

    ECSD Stadium

    New Construction

    Update locker room facilities

    Exterior Work

    Replace metal roofing over team/locker room building

    Interior WorkRemodel concessions and building restrooms

    Plumbing

    Install 3 compartment sink w/grease trap in concessions

    Electrical

    Replace sound system circuiting

    Site Work

    Repave lot east of athletic field

    Repave north area of parking lot

    Install pump station and piping at detention basin

    Replace site lighting heads w/ LED type

    Replace walkway lighting heads w/ LED type

    Replace fencing / upgrade main gate entrance area

    Resurface track

    Construct ADA access to visitor's bleacher area

    Transportation Building

    Electrical

    Electrical support for technology scope of work

    Technology Infrastructure

    Video surveillance-cameras

    Technology Equipment (FFE) Peripherals

    Replace copiers

    Site Work

    Replace asphalt paving

    Replace concrete paving 

    Maintenance Building

    Exterior Work

    Replace roofing