Crenshaw/LAX Transit Project Construction Update Meeting
March 24, 2015
1
2
Project Overview
• Design-Build Contract - Walsh Shea Corridor Constructors
• 8.5 miles of light rail
• 8 new stations
• Southwestern Yard Maintenance Facility – Separate Contract
• $2.058 billion-Life-of-Project Budget
• Planned opening: 2019
• 24,400 daily project trips (2035)
2
Traffic Closures Map
3
Southern Segment Update
(105 Fwy to West Bl)
Crenshaw/LAX Transit Project
4
5
Crenshaw/LAX Transit Project Underground #1
• Piles that have been installed as a support to the underground tunnel that will run along a portion of Aviation Bl
5
6
Crenshaw/LAX Transit Project Century/Aviation Bridge Progress
• All CIDH columns are complete, 10 columns poured to date
6
7
Crenshaw/LAX Transit Project The Century/Aviation Bridge
A conceptual rendering of the Century/Aviation Station
8
>Tree removal
>Along Metro right-of-way
>Closure of Redondo Bl parking lot
>Construction lay down area
>Closure of Redondo Bl exit at Florence Av
>Construction of La Brea Bridge
Grading work along Metro ROW
8
Construction in Inglewood
9 9
Construction in Inglewood: Redondo Blvd.
New Parking
Road Closure
Parking lot closure
10
Activity Projected Start
Date
Estimated Length of
Activity
Concrete Crushing (La Brea Yard) Redondo Blvd Parking Lot closure (Construction lay down area) Drive H-Piles (Start of Foundation Work on La Brea Bridge)
February, 2015* February, 2015* April, 2015
Complete Duration of project April, 2015
La Brea Bridge Construction Redondo Blvd at Florence Ave. Closure * Work has begun
May, 2015 April, 2015
July, 2016 Duration of project
Projected Construction Schedule: Inglewood
10
11
Activity Projected Start
Date*
Estimated Length of
Activity Clear and Grub along Metro ROW Rough subgrade/initial excavation for trailer Guideway storm drain installation Rail welding ROW at Redondo Bl I-405 Bridge I-405 Bridge MSE Walls
March, 2015* March, 2015* April, 2015 April, 2015 May, 2015 July, 2015
May, 2015 May, 2015 December, 2015 May, 2015 March, 2017 December, 2015
* Work has begun
Projected Construction Schedule: Inglewood
11
12
Activity Projected Start
Date*
Estimated Length of
Activity
Manchester Bridge H-Pile Manchester Bridge Construction Manchester Bridge MSE Walls
May, 2015 May, 2015 June, 2015
May, 2015 November, 2016 December, 2015
Guideway storm drain installation
April, 2015
December, 2015
Projected Construction Schedule: Westchester
12
Activity Projected Start
Date
Estimated Length of
Activity Erect Century Bridge Falsework Remove Century Bridge Falsework 111th St Bridge Foundation Construction Rail welding ROW at Arbor Vitae St Erect 111th St Bridge Falsework Remove 111th St Bridge Falsework
April, 2015 December, 2015 April, 2015 May, 2015 June, 2015 December, 2015
April, 2015 December, 2015 May, 2015 June, 2015 June, 2015 December, 2015
Projected Construction Schedule: Westchester
13
Activity Projected Start
Date
Estimated Length of
Activity
Demo 18” Sanitary sewer March, 2015 April, 2015
CIDH Pile Installation (Foundation) Erect Green Line Bridge Falsework Remove Green Line Bridge Falsework
March, 2015 May, 2015 May, 2016
April, 2015 July, 2015 May, 2016
Projected Construction Schedule: Green Line
14
15 15 15 15 15
15
15 15
Crenshaw/LAX Transit Project
Northern Segment Construction Update
(Crenshaw Bl between Exposition Bl and 67th St/West Bl)
16 16 16 16 16
16
16 16
17 17 17 17 17
17
17 17
Exposition/Crenshaw Station Construction
• Street excavation and decking operation complete
• Utility work requires nightly and weekend closures
• HOBAS Sewer – Crenshaw Bl closure (Expo to Coliseum)
mid-late April 2015
• Crenshaw Bl traffic reconfiguration throughout project
Exposition Bl/Crenshaw Station Construction
18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18 18 18 18 18 18
18
18 18
MLK Station Area Construction
19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19 19 19 19 19 19
19
19 19
• Street excavation and decking on-going • Business and pedestrian access • Crenshaw Bl re-opens on March 28 • Crenshaw Bl traffic reconfiguration throughout project
20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20
20 20 20 20 20 20 20
20 20 20 20
20
20
21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21
21 21 21 21 21 21 21
21 21 21 21
21
21
Leimert Park Station Construction (43rd St to 48th St)
22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22
22 22 22 22 22 22 22
22 22 22 22
22
22
• Crenshaw closure on-going (Vernon Av to 43rd St/Homeland)
• Third party utility relocations with nightly lane closures
• Crenshaw scheduled to re-open on March 28 • March 28 Stage B Traffic Reconfiguration
Leimert Park Station Area Construction From 43rd St to 48th St (cont.)
23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23
23 23 23 23 23 23 23
23 23 23 23
23
23
• Stage B Traffic Reconfiguration – March 28 • Approximately 4 months • East side pile installation and street widening • Two traffic lanes in each direction on Crenshaw Bl • Left turns prohibited from Crenshaw Bl to Vernon Ave • Removal of parking on Crenshaw Bl • Limited and re-routed pedestrian access
• Excavation and decking - Full closure in Spring 2015
Leimert Park Station Area Traffic Reconfiguration Stage B
24 24 24 24 24
24
24 24 24 24 24 24 24
24
24 24 24 24 24 24 24
24
24 24 24 24 24 24 24
24
24 24 24 24 24 24 24
24
24 24 24 24 24 24 24
24
24 24
N
Crenshaw Blvd.
No left turns
Left turns
restored
Leimert Park Station Area Traffic Reconfiguration Stage C
25
Crenshaw Blvd.
N
26
Park Mesa Heights Area Construction (48th St. to 67th St/Brynhurst Av)
• Tree removal and replacement on-going • ‘Cut n Cover’/Tunnel Construction in Spring 2015
• At-Grade construction and street widening (48th St to 59th St) in Summer 2015 • Utility relocation work activities through May
27
Park Mesa Heights (Vernon Av to 67th St) Tree Removal and Replacement
• 107 trees removed to date
• An additional 124 trees slated for removal (sidewalk trees)
• Replacement of trees to occur during later stage of project
• Crenshaw Bl Streetscape Plan by City of LA Planning
28
Park Mesa Heights (59thSt to 67thSt/Brynhurst) Cut And Cover/ Tunnel Construction
• Traffic reconfiguration scheduled for Spring 2015 • Crenshaw Bl - Two lanes in each direction • Crenshaw Bl (59th St to 60th St) – mid-street work zone
• Multiple construction activities:
• Pile installation – 1x1 - one side and one block at a time • Excavation and decking at center of the street • Tunnel construction at center of street • Utility relocations at various locations
• Traffic reconfiguration through duration of construction
29
Park Mesa Heights (59thSt to 67thSt/Brynhurst) Cut And Cover/ Tunnel Construction (cont.)
• Removal of street parking • Temporary parking lots provided
• Left-turn restrictions on Crenshaw Bl
• 63rd St (both directions) • 67 St (southbound) • 59th Pl (permanently to and from 59th Pl)
• Occasional weekend lane closures of Crenshaw Bl • Pedestrian and driveway access maintained • Daytime heavy construction
33
Park Mesa Heights (59thSt to 67thSt/Brynhurst) Cut N Cover/ Tunnel Construction (cont.)
Insert Table
N
Crenshaw Bl
60
th S
t
63
th S
t
Stage C
Tunnel
construction
36
Park Mesa Heights (59thSt to 67thSt/Brynhurst) Cut N Cover/ Tunnel Construction
Activity Anticipated Start Date
Anticipated Duration
Anticipated Impacts
Implementation of Traffic Control Spring 2015 3 1/2 Years Long –Term Lane Reductions
East-side Pile Installation Spring 2015 3-4 Months Some occasional full street closures
West-side Pile Installation Late Summer 2015 3-4 Months Some occasional full street closures
Street Excavation and Decking
Late 2015
8 months Some occasional full street closures
Cut N Cover/Tunnel Construction Mid 2016 2 years Long –Term Lane Reductions
Utility Relocations Ongoing 2015 TBD Lane closures
Final Backfilling and Decking 2018 TBD Some occasional full street closures
Eat, Shop, Play Local Campaign
Support for Community Businesses
37
Crenshaw/LAX Transit Project
Eat, Shop, Play Local Support for Community Businesses
Metro’s Eat, Shop, Play Local campaign brings
focused attention to project-area businesses
impacted by construction of Metro Projects.
Short overview video:
https://www.youtube.com/watch?v=wU4bfka4QYk
38
39
Eat, Shop, Play Bus Shelters, Signs & More
Eat, Shop, Play Local Business Participation is free
Website listing www.metro.net/eatshopplay
40
41
Eat, Shop, Play Crenshaw Promotional Opportunities
Vendor Days at Metro’s Gateway building
42
Eat, Shop, Play Community Fest Leimert Park Village
3.21.15
Eat, Shop, Play Crenshaw to win cash prizes
#1 Metro.net/Crenshaw
#2 Click Eat, Shop, Play
banner
#2 Click Submit Drawing
Entry
Online Form
43
Eat, Shop, Play Local What’s Next…
Quarterly Drawing will be held on April 2nd, 2015!
Cash prizes… $1,000, $500 & $250
44
DEOD-Diversity Economic Opportunity Department
Construction Careers
45
Crenshaw/LAX Transit Project
Crenshaw/LAX Transit Project
Project Labor Agreement (PLA) / Construction Careers Policy (CCP) Update
46
47
48
Crenshaw/LAX Transit Project
49
Connect with us: Telephone: 213-922-2736 Email: [email protected] Web site: metro.net/crenshaw Facebook.com/crenshawrail Twitter.com/crenshawrail
http://www.walsh-shea-corridorconstructors.com/