Welcometo your New Home
8/6/2019 Mrr Ppt May2011
3/30
Experience the verve of living by the banks and drift throughthe historic and scenic beauty of Pasig River.
Project lot area composed of 14,000 square meters with 62
percent of the area allotted for roads, landscaped areas andamenities such as playground, swimming pool , and water-featured landscapes.
Comprised of 9 buildings ranging from 10 14 floors.
8/6/2019 Mrr Ppt May2011
4/30
Nile Building
8/6/2019 Mrr Ppt May2011
5/30
Location
Along the historic and scenic banks of PasigRiver in Sta. Ana, Manila
Surrounded by the nations busiest economiccenters of Makati, San Juan, Mandaluyong andManila
Close to school areas
Accessible to public transportation
8/6/2019 Mrr Ppt May2011
6/30
Location Map
8/6/2019 Mrr Ppt May2011
7/30
Site Development
8/6/2019 Mrr Ppt May2011
8/30
PROPOSED SITE DEVELOPMENT @
REARPORTION OF YANGTZE BUILDING
FRONTING PASIG RIVER
8/6/2019 Mrr Ppt May2011
9/30
Amenities
8/6/2019 Mrr Ppt May2011
10/30
Site Features
Proposed environment friendly features:
- Solar Panel
- Rain water catch basin
- Waste segregation
Elevated to safe levels Gated Community with 24-Hour Security
Swimming Pool
Landscaped Park
Pavillion
Childrens Playground Water featured landscaping
8/6/2019 Mrr Ppt May2011
11/30
Typical Building Floor Plan
8/6/2019 Mrr Ppt May2011
12/30
Building Features
Elevator
1.5 meter-wide corridors
Roof deck with landing area
Service stairs
Overhead tanks with water pump
Standby generator for common areas
8/6/2019 Mrr Ppt May2011
13/30
8/6/2019 Mrr Ppt May2011
14/30
Unit Finishes
RESIDENTIAL AREA
A. Floor Finishes
Living, Dining & Kitchen Vinyl Planks
Bedrooms Vinyl Planks
Toilet Unglazed ceramic tiles
Utility Area Plain cement finish
B. Wall Finishes No partition walls for bedroom/s
Interior walls 1-coat paint on concrete wallsToilet 1-coat plain cement finish above tile
8/6/2019 Mrr Ppt May2011
15/30
C. Ceiling Finishes
Living, Dining & Kitchen 1-coat paint on plain cement finishBedrooms 1-coat paint on plain cement finish
Toilet 1-coat paint on ficem board finish
D. Kitchen Kitchen counter top with sink & faucet. Undercounter cabinet door & overhead cabinet arenot included.
E. Door
Entrance & Bedroom door Solid finger jointed wood with sheet
laminated and solid wood core door
jambs plus casing
F. Windows Aluminum windows
8/6/2019 Mrr Ppt May2011
16/30
G. Finishing Hardware Cylindrical lockset for main
Privacy lockset for T & B door.
H. Toilet & Kitchen Fixtures
Water and Closet Lavatory Complete set of water closet and
lavatory with fittings & accessories.
Shower faucet Complete set of shower with faucet
and fittings.
I. Electricity Complete outlet and lighting devices
with circuit breaker.
8/6/2019 Mrr Ppt May2011
17/30
Typical Unit Floor Plan
Studio Unit
21.05 sq. m Provision for 1BR Unit
28.1 sq.m
8/6/2019 Mrr Ppt May2011
18/30
Typical Unit Floor Plan
Provision for 2BR Unit B
43.25 sq.m
Provision for 2BR Unit C
44.35 sq.m
8/6/2019 Mrr Ppt May2011
19/30
Construction Updates
Nile Building
100% Complete
8/6/2019 Mrr Ppt May2011
20/30
Blue Danube Building100% Complete
8/6/2019 Mrr Ppt May2011
21/30
Dnieper Building
100% complete
8/6/2019 Mrr Ppt May2011
22/30
Colorado Building
Structural works completed
As of May 2011
8/6/2019 Mrr Ppt May2011
23/30
Interior ofColorado Building
8/6/2019 Mrr Ppt May2011
24/30
8/6/2019 Mrr Ppt May2011
25/30
Euphrates Building
Structural works
8/6/2019 Mrr Ppt May2011
26/30
8/6/2019 Mrr Ppt May2011
27/30
Kumagawa
Structural works
8/6/2019 Mrr Ppt May2011
28/30
Development
Permit
8/6/2019 Mrr Ppt May2011
29/30
Certificate of
Registration
8/6/2019 Mrr Ppt May2011
30/30
Payments & Financing
As low as PHP 1.1M for a studio unit
As low as PHP6,000 per month
Flexible payment scheme (down payment payable up
to 24 months; balance payable up to 30 years throughPag-IBIG)
Available financing through in-house, bank or Pag-IBIG