Production Planning and Control
Powered by
www.plantmanager.in Powered by
Why Production Planning ?
Better Resource Utilization
Reduced Manufacturing Cycle
Minimize Throughput Time
Low Production Costs
Faster Delivery
Reduced Inventory
Better Customer Service
What Plant Manager offers you ?
It offers you the Finite capacity planning and scheduling package, which
allows you to
Manage your resources optimally
Have greater visibility and control over manufacturing processes on day
to day basis.
Manage on time deliveries to the customer to his satisfaction
www.plantmanager.in Powered by
Features of Plant Manager
Multiple operation capability of a workstation can be defined into the
system
Daily production capacities for different operations or combination of
operations can be defined for a workstation
Multiple resources for single operation can be defined
Sequence of operations for a raw material to convert it into a finished
product can be defined
Vendors, their resources and respective production capacities can be
defined
Human resource can be defined as individual work station
www.plantmanager.in Powered by
The Plant Manager has three parts
Masters
Planning And Scheduling Part
Control Part
www.plantmanager.in Powered by
Features : Planning & Scheduling Part
The planning & scheduling part allows you to
Set the priorities of the orders in hand
Use Gantt chart for scheduling the orders for different scenarios.
Schedule the orders on the basis of sequence of insertion , due dates,
priorities, combination of insertion date and priorities, combination of
due dates and priorities.
Identify and manage impact of high priority orders
Generate schedule for available machines considering their capacities on
daily basis
Facility of capacity calculator for each work station
www.plantmanager.in Powered by
Features : Control Part
The Control part allows you to
Record shift wise production output at each workstation into the system
Manage the production at vendor site if any
Have quality control check if defined into the system on the production
quantity at both in-house and vendor site
It will not allow to override the sequence of manufacturing processes
already defined into the system for a particular product
Facility of Shift Management
www.plantmanager.in Powered by
Differentiators of Plant Manager
www.plantmanager.in Powered by
Resource Settings
The resource capacities can be defined for individual operation or
combination of multiple operations into the system. Hence if a machine
is doing multiple operations on a product in one setup, we can define the
combined capacity for all those operations and ultimately can record the
production against those combined operations.
The machine capacities can be set machine wise or product wise. i.e.
They can be set depending on the product to be manufactured on a
particular machine or irrespective of the product.
For a product to manufacture, the capacities can be set as combination of
machine wise or product wise settings for different processes in the
manufacturing cycle.
www.plantmanager.in Powered by
Planning Settings
The planning can be done individually or for set of orders.
The settings page has facility to sort the orders to be planned on the basis
of due date, order insertion sequence, priority, combination of due date
and priority and combination of insertion sequence and priority.
The priorities are created automatically while sorting and will be in the
multiple of 10.
The order having priority 10 will have highest priority and will be
planned first and as the number increases the order priority will decrease
and will be given preference sequentially during planning.
As mentioned earlier the orders can be sorted for planning purely on the
basis of due date, order insertion sequence and priority.
www.plantmanager.in Powered by
Planning Settings
The combination of due date and priority: The orders will be first sorted
on the basis of due date which will have some fixed priorities and these
can be altered specific to one or more orders to move them ahead or
behind while scheduling.
The combination of insertion sequence and priority: The orders will be
first sorted on the basis of insertion sequence which will have some fixed
priorities and these can be altered specific to one or more orders to move
them ahead or behind while scheduling.
To change the sort order of an order, in-between number of the priorities
can be chosen.
www.plantmanager.in Powered by
Planning Settings
As many iterations can be done for an order or set of an orders during
planning on the Gantt chart before finalizing the schedule.
The facility to un-plan an order or set of orders is provided on the
planning page itself so as to make it more user-friendly.
The orders can be scheduled on the basis of material availability or
tentative material availability date.
The types statuses of the orders in the system are Pending, Scheduled
and in process and complete.
The pending status indicates that the order is not taken for planning.
www.plantmanager.in Powered by
Settings Page
The option, not to schedule the orders for which material is not available
is also provided if required on the settings page.
The orders for which material is not available and are scheduled can be
swapped if the material does not come on the date already mentioned, by
number of days mentioned on the settings and the following order can be
preponed as and when required.
Powered bywww.plantmanager.in
Gantt chart
The Gantt chart displays the resource, the process and the quantities to
be processed in corresponding duration.
The quantities mentioned on the Gantt chart are being reflected directly
on the production page which will enable the production department to
act on it directly as mentioned therein.
All orders are displayed with separate colors for easy identification.
Powered bywww.plantmanager.in
Production Page
Since there are validations and compulsion to transfer the material from
one process to another process after its completion, there is complete
control over the production system and ultimately on the inventory.
The rescheduling of the orders scheduled can be done only if all the
production data inputs are given. Hence it is necessary to input all the
production data or mention the reasons if any to go for rescheduling.
The rework quantities will be rescheduled next day and new order will
be placed automatically for rejected quantities.
Powered bywww.plantmanager.in
Other Important Features
Comparison of actual production against scheduled quantity on daily
basis at individual work stations
Daily, Weekly, Monthly reports on machine utilization ,employee output,
rework and rejection
Alerts to the corresponding team members in case of material stuck-up
Roles definition and Login/passwords.
Drawing attachment facility to have better control over the processes
Powered bywww.plantmanager.in
Features
Powered bywww.plantmanager.in
Administration
Company Details
System Settings
Departments
Profile Settings.
• Roles
• Users
• Privileges
Vendor Master
Resource (Machine) Master
• Machine Capability
• Machine Details
Customer Master
Raw Material Master
– Add Unit
Product Master
– Product Categories
– Product Details
Shift Master
Holiday Master
Operator Master
Features
Powered bywww.plantmanager.in
Customer Section
• Order Inputs
• Completed Orders
Stores
• Material Availability
Planning
• Order Planning (Scheduling)
• Order Status
Production
• Daily Production Input
Quality Control
Reports
• Production Report
• Product wise order status
• Order wise status report
• Rejected Item Report
• Production Report (Raw
Material Wise)
• Material Status (Vendor)
Powered bywww.plantmanager.in Powered bywww.plantmanager.in
• The PO will be in the name of CNCTimes Pvt. Ltd., Building No. 3,
Shripal Industrial Estate, Behind Varun Industries, Dist. Vasai, Thane.
• 100% advance payment along with the Purchase Order.
• Prices valid till 15 Days from the date of proposal.
• All Support will be provided online.
Terms And Conditions
Screen-shot - www.plantmanager.in
Powered bywww.plantmanager.in
Screen-shot - Login Page
Powered bywww.plantmanager.in
Screen-shot - Plant Manager Menu
Powered bywww.plantmanager.in
Screen-shot - Company Details
Powered bywww.plantmanager.in
Screen-shot - System Settings
Powered bywww.plantmanager.in
Screen-shot - Department Master
Powered bywww.plantmanager.in
Screen-shot - Roles Master
Powered bywww.plantmanager.in
Screen-shot - Users
Powered bywww.plantmanager.in
Screen-shot - Privileges
Powered bywww.plantmanager.in
Screen-shot - Customers Master
Powered bywww.plantmanager.in
Screen-shot - Vendor Master
Powered bywww.plantmanager.in
Screen-shot - Machine Capabilities
Powered bywww.plantmanager.in
Screen-shot - Machine Details
Powered bywww.plantmanager.in
Screen-shot - Raw Material Master
Powered bywww.plantmanager.in
Screen-shot - Raw Material Unit Master
Powered bywww.plantmanager.in
Screen-shot - Product Categories Master
Powered bywww.plantmanager.in
Screen-shot - Product Details
Powered bywww.plantmanager.in
Screen-shot - Shift Master
Powered bywww.plantmanager.in
Screen-shot - Shift Assignment
Powered bywww.plantmanager.in
Screen-shot - Holiday Master
Powered bywww.plantmanager.in
Screen-shot - Order Input
Powered bywww.plantmanager.in
Screen-shot - Completed Orders
Powered bywww.plantmanager.in
Screen-shot - Material Availability
Powered bywww.plantmanager.in
Screen-shot - Order Planning
Powered bywww.plantmanager.in
Screen-shot - Capacity Setting Page
Powered bywww.plantmanager.in
Screen-shot - Order Status
Powered bywww.plantmanager.in
Screen-shot - Daily Production Input
Powered bywww.plantmanager.in
Screen-shot - Gantt Chart
Powered bywww.plantmanager.in
Screen-shot - Quality Control Input
Powered bywww.plantmanager.in
Screen-shot - Daily Production Schedule
Powered bywww.plantmanager.in
Screen-shot - Daily Production Report
Powered bywww.plantmanager.in
Screen-shot - Production Report
Powered bywww.plantmanager.in
Screen-shot - Process wise Schedule
Powered bywww.plantmanager.in
Virendra Rale
CNCTIMES.COMGokulam, First Floor, Plot No.: 59 + 60, Survey No. 150/7,
Lane No.:1, Prathamesh Park, Balewadi, Baner,
Pune – 411 045, Maharashtra, India. Cell : +91 77188 31474
Email : [email protected] | www.plantmanager.in