×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [beam conditions]
Home >
beam conditions
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
216 views
Atelier PAF 27-29/03/06E. Kajfasz1 Du TeVatron au LHC: perspectivesphysiques du Run II.
104 views
Reach your goal with adonis design architectural services
38 views
S 2 DEL - Solid State and Diamond Electronics Lab SOLARIS PHOTONICS ROMA TRE 1/20 Radiation Hard Imaging Detectors based on Diamond Electronics Marco Girolami.
216 views
Readiness Review for Jlab Experiment E04 - 007 Hall A and BigBite Collaboration experiment Approved Jan 2004 for 16 days Precision Measurement of the Electroproduction.
220 views
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
217 views
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
216 views
H.J.Specht, Erice 2012 Future options for the CERN SPS Erice, 20 September 2012 Hans J. Specht Physikalisches Institut Universität Heidelberg 1.
218 views
June 28, 2004 BBBTF Steven H. Robertson McGill University, Institute of Particle Physics 1 Beam Background Simulation with B A B AR with B A B AR June.
214 views
MICE Ionization Cooling Channel and Phase II Construction Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley.
216 views
2012 H4IRRAD test campaigns Summary of results S. Uznanski CERN, Geneva, Switzerland Radiation Working Group meeting Oct 16, 2012.
213 views
Report to the Collaboration India-CMS Collaboration Meeting Delhi Univ, 27-28 March 2009 A. Gurtu Tata Institute of Fundamental Research, Mumbai.
213 views
Next >