×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [beam tests]
Home >
beam tests
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
219 views
March 22, 2011Mike Hildreth – ALCPG 2011, Beam Instrumentation Energy Spectrometer R&D; Plans for End Station A Test Beams Mike Hildreth University of.
218 views
Clock module for TB spring 2012 Uli Schäfer 1 R.Degele, P.Kiese, U.Schäfer, A.Welker Mainz.
219 views
Radiowave shower detection Basic parameters: 1)Radio transparency ~ L atten ~2 km vs. 40 m ice/water for optical 2)Radio ‘coherence’ quadratic growth.
213 views
Radiowave shower detection (GV, also) – cf optical/acoustic Basic parameters: 1)Transparency ~ 2 km vs. 40 m ice/water 2)Radio ‘coherence’ quadratic.
214 views
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
220 views
August 26, 2003P. Nilsson, SPD Group Meeting1 Paul Nilsson, SPD Group Meeting, August 26, 2003 Test Beam 2002 Analysis Techniques for Estimating Intrinsic.
217 views
M. Letheren, EAB 3 July 2001; MIC group activities1 EP-Microelectronics group Overview of activities & Project Summaries (more info at: .
215 views
1 Summary of Session E: Electron Cloud an Ion Desorption A. Kraemer and S.Y. Zhang Three Workshops in one year: Beam Induced Pressure Rise in Rings, BNL,
216 views
Extended LTC 3-3-2008 CERNMassimiliano Ferro-Luzzi 1 Experiments during HWC, beam tests and initial commissioning What are the experiments going to do.
214 views
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
225 views
RPC Trigger Software ESR, July 2003. 2 Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
215 views
< Previous
Next >