×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [lhc commissioning]
Home >
lhc commissioning
1 Letter of Rossi to Peggs (agred with Schmickler and Devred) April 2005 We strongly believe that the major steps in the near term are: 1)Construction.
214 views
J. Patrick - Major Challenges/MOPA021 LHC@FNAL – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
222 views
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
213 views
Haroon Rafique 11/06/2015HR IIAA Group Meeting1. Richmond Virginia 11/06/2015HR IIAA Group Meeting2.
216 views
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
220 views
The AC Dipole system for LHC Technology and operational parameters Javier Serrano AB-CO-HT LHCCWG 10 April 2007.
219 views
450 GeV Optics: IR aperture and IR Bumps
31 views
LHC Remote Operations Center
36 views
The LHC Machine
41 views
Transverse Mass Kink
31 views
The AC Dipole system for LHC Technology and operational parameters
45 views
LHCf: very forward measurement of neutral particles at LHC
41 views
Next >