Advanced Work Packaging WorkFace Planninggroupasi.net/conferencelibrary/2014/AWPC 2014... ·...

Post on 10-Mar-2021

28 views 0 download

transcript

Advanced Work Packaging & WorkFace Planning

Solutions for Project DeliveryA Global EPC Perspective

Hadi MasriVice President - CoSyn Technology (WorleyParsons)

CURRENT STATE

VALUEAWP

SOLUTIONCHALLENGES

WHY ARE WE HERE?

WHY ARE WE HERE?

RESULTS

GLOBALIZATIONCURRENT STATE

CURRENT STATE

CHANGE

CURRENT STATE

PREDICTABILITY

SAFETY

QUALITYOPERABILITY

VALUE

ENVIRONMENTALPREDICTABILITY

VALUE

MAINTAINABILITYCONSTRUCTABILITY

ADVANCED WORK PACKAGING

Advanced WorkPackaging

(AWP)?

THINKING WITH THE END IN MINDAT THE START

ADVANCED WORK PACKAGING

ADVANCED WORK PACKAGINGOWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

PROCUREMENT

MAINTENANCEOPERATIONS

OWNER

ENGINEERING CONSTRUCTION

ADVANCED WORKPACKAGING

ADVANCED WORK PACKAGING

SUPPLYNETWORK

AssetDefinition Operate Decommission

/mothballCompletions

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

DetailedEngineeringFEEDConceptual

Development Construct

ADVANCED WORK PACKAGING

CII – IR 272, Advanced Work Packaging:Implementation Resource 272-2 version 3.0, Volume 2, Sect 1.1, Figure 1

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

WHY WE DO IT?

INFLUENCE CURVE

Project Cum

ulative

Opp

ortu

nitie

s fo

r Sav

ings

Max

Min

100%

Concept Completion0%

AssetDefinition Operate Decommission

/mothballCompletionsDetailedEngineeringFEEDConceptual

Development Construct

Ability to influence

Cost

INTEGRATED TOOLSAND USE OFTECHNOLOGY

ADVANCED WORK PACKAGING

3D (Space)4D (time)5D (IMM)

6D (Ops/mtce)

Data IntegrationData Transfer

ADVANCED WORK PACKAGING

BUY‐IN

GLOBALIZATIONCULTURE

CONTRACTS

TECHNOLOGY

CHALLENGES

GLOBALIZATIONRESULT

RESULT

CHANGE

RESULT

PREDICTABILITY

RESULT

SYSTEMS

PEOPLESAFETY

TECHNOLOGY

OWNER

RESULT

Thank-you