Post on 31-May-2020
transcript
www.s tark-egypt .com
Index..About us
Board of directors
Our projects
BanksArab Investment Bank
ResidentialDr.Hisham Mansour Villa
Dr.Ashraf EL- Feky Villa
SchoolsInternational QMM shcools
Safety Policy
Quality PolicyExperience Certificates
Contact us
AdministrativeMIST Headquarters
EGY-GATE HeadquartersDr- Mohamed Sleim AL-AWA Headquarters
FactoriesLESAFFRE- EGYPT yeast Factory
VINAVIL- EGYPT Acrylic Emulsion factory
HospitalsAbo Al-Rish Children’s Hosiptal renovation
Dr.Hatem Badran Villa
www.s tark-egypt .com
Who are we ?We are group of engineers with an average of 20 to 25 years experience. We decided to Make our own construction company on March 2009, named it STARK construction which means “Construction by all its true meanings”” hoping to eliminate and avoid any mistakes that we faced during our work life time in other companies .
STARK Strength points
- We target to finish our projects in its dedicated time schedule with high quality, and stakeholders satisfaction “Client, Engineer, subcontractors and Employees”.
- we believe that High coordination gives Zero re-work, High precautions gives zero injuries.
www.s tark-egypt .com
About us
Board of directors
Mohamed Abdel Ghany , MBA,PMP
C.E.O
Abdel Aziz Haroun Electro - Mech.
manager Ayman Zaky
Projects Director
Khaled Tolba Mechanical manager
Ashraf Sherif C.F.O
www.s tark-egypt .com
Mohamed Abdel Ghany , MBA,PMPC.E.O
1- Develop a strategic plan to advance the company’s mission and objectives
and to promote revenue, profitability, and growth as an organization.
2- Oversee company operations and construction progress to insure work
efficiency, quality, Time,and cost-effective management of resources.
3- Plan, develop, and implement strategies for generating resources and/or
revenues for the company.
4-”Approve company operational procedures, policies, and standards.
5- Review activity reports and financial statements to determine progress and
status in attaining objectives and revise objectives and plans in accordance with
current conditions.
6- Evaluate performance of executives for compliance with established policies
and objectives of the company and contributions in attaining objectives.
7- Present company report at Annual Stockholder and Board of Director meetings.
8- Direct company planning and policy-making committees.
Responsibilities :
www.s tark-egypt .com
No. Project name Job Title Owner Consultant Value
1MB1 & MB2 & MB4 Admin.
BuildingsTechnical Sector
HeadMinistry of
CommunicationECG 210 M
2 NOVOTEL Airport HotelTechnical Sector
HeadNovotel EHAF 55 M
3 LYCEE-SchoolTechnical Sector
HeadLYCEE WASF 75 M
4 VIP Lounge -AirportTechnical Sector
HeadCairo -Airport ECG 20 M
5 Cairo American CollegeTechnical Sector
HeadCAC R.M.C 75 M
6 Domiatec H.OTechnical Sector
HeadDomiaty Group ECG 52 M
7 ASWAR CompoundTechnical Sector
HeadUnited Group AL-AMAR 60 M
8 Intercontinental City Stars HotelTechnical Sector
HeadIntercontinental Dr/ Shakr 35 M
9NPC Admin . Building -Smart
VillageTechnical Sector
HeadNPC Company ECG 100 M
10ECG Admin . Building –Smart
VillageTechnical Sector
HeadECG ECG 60 M
11B-2215 Admin . Building – Smart
VillageTechnical Sector
HeadSmart Village ECG 91M
12 Smart villages Co. H.OTechnical Sector
HeadS.V.C ECG 35 M
13Elnour Admin . Building – Smart
VillageTechnical Sector
HeadElnour Company Dr/ Shakr 35M
14 AMARANTI El-Nile Hotel Tendering Manager Alex Group A & P 120 M
15 Mena House Hotel Tendering Manager EGOTTH ECG 60 M
16 Pyramisa Hurghada Hotel Tendering Manager Misr For Hotels DECOR 45 M
17 Millennium Tiran Hotel Tendering Manager El-Montazah Dar El Omara 26 M
Mohamed Abdel Ghany , MBA,PMPC.E.O
Past Experience
www.s tark-egypt .com
Abdel Aziz HarounElectro-Mechanical manager
Managing both site and office electromechanical issues , coordinate with construction
division in order to finish the project according to planned time schedule and budget .
No. Project name Job Title Owner Consultant Value
1MB1 & MB2 & MB4 Admin.
BuildingsElectrical Section Head
Ministry of Communication
ECG 210 M
2 NOVOTEL Airport Hotel Electrical Section Head Novotel EHAF 55 M
3 LYCEE-School Electrical Section Head LYCEE WASF 75 M
4 VIP Lounge -Airport Electrical Section Head Cairo -Airport ECG 20 M
5 Cairo American College Electrical Section Head CAC R.M.C 75 M
6 Domiatec H.O Electrical Section Head Domiaty Group ECG 52 M
7 ASWAR Compound Electrical Section Head United Group AL-AMAR 60 M
8Intercontinental City Stars
HotelElectrical Section Head Intercontinental Dr/ Shakr Office 35 M
9NPC Admin . Building -Smart
VillageElectrical Section Head NPC Company ECG 100 M
10ECG Admin . Building –Smart
VillageElectrical Section Head ECG ECG 60 M
11B-2215 Admin . Building –
Smart VillageElectrical Section Head Smart Village ECG 91M
12 El Napela Resort Hurghada Project Manager El Napela GroupDr/ Hasa El
Bakry110 M
13Elnour Admin . Building –
Smart VillageProject Manager Elnour Company Dr/ Shakr Office 35M
14EMCO Medical Factory 10th of
RamadanSite Engineer Dr/ Samy Elhampoly
Magdi Kamal Office
5M
15 El Khamael City Site Engineer Ministry of InteriorDr/ Ahmed Abd
El Wareth9M
Responsibilities :
Past Experience
www.s tark-egypt .com
Ayman ZakyProjects Director
Responsibilities :1. Developing projects plan.2. Managing projects stakeholders, Time schedule, Budget and conflicts.3. Agreeing projects objectives.4. Representing the client’s interest.5. Organizing the various professional people working on a project.6. Risk assessment.7. Making sure that all the aims of the project are met.8. Making sure the quality standards are met.9. Using the latest IT to keep track of people and progress10. Recruiting specialists and sub-contractors11. Monitoring sub-contractors to ensure guidelines are maintained12. Accounting, costing and billing.
No. Project name Job Title Owner Consultant Value
1Lesaffre Egypt Factory at
Al Nubaria city Projects director Lesaffre Egypt ECG 35 M
2Abo el-Rish children’s Hospital Renovations
Projects directorAbo el Rish Hospitals
Qasr el-Ainy Engineering Department
7 M
3Arab Bank for Economic
Development in Africa - El- Khartom - Sudan
Project ManagerArab Bank
for Economic Development
Moharam-Bakhoom Consultant
22 M USD
4The Grove Residential
CompoundProject Manager
Kuwait Egyptian company
Al-Amar Consulting co 56 M
5Cairo American College
(CAC) - Maadi, CairoConstruction
ManagerCairo American
CollegeRaafat Milar (RMC)
Consultant102 M
6ALnahda Univeristy IN Beni
Seuf cityProject Manager ALnahda Univeristy (T.H.E) Consultant 39 M
7Beverly hills Housing
projectSenior site engineer
/ CoordinatorSodic
Moharam-Bakhoom Consultant co
72 M
8 Helwan university projects Site Engineer Helwan universityEngineering department of
Helwan University60 M
91500 Housing building in
AlgeriaConstruction
ManagerQatar Development
BankMoharam-Bakhoom
Consultant co30 M USD
10Waste water pipes network for AL Motamaddia village
and Bolak Dakror area
Senior site engineer / Quality Control /
Material Control
Water and Sewage Company
Sabbour Associates 8 M
Past Experience
www.s tark-egypt .com
Khaled TolbaMechanical manager
Managing both site and office mechanical issues , coordinate with Electromechanical
section head and construction division in order to finish the project according to
planned time schedule and budget .
No. Project name Job Title Owner Consultant Value
1MB4 Administration
BuildingMechanical Section Head
Ministry of Communication
ECG 135 M
2 NOVOTEL Airport Hotel Mechanical Section Head Novotel EHAF 55 M
3 LYCEE-School Mechanical Section Head LYCEE WASF 75 M
4 VIP Lounge -Airport Mechanical Section Head Cairo -Airport ECG 20 M
6 Domiatec H.O Mechanical Section Head Domiaty Group ECG 52 M
7 ASWAR Compound Mechanical Section Head United Group AL-AMAR 60 M
8 El-Naeem H.O – Smart Village
Mechanical Section Head Elnaeem Company Crown Home 97M
9 EMAC Building Mechanical Section Head Elkhorafy Hatem Hasan 60M
10Abo Ghazala H.O- Smart
VillageMechanical Section Head
Talal Abo Ghazala Group
Mast Group 91M
11 Vodafone Building Bani Suief Project Manager Vodafone Company Crown Home 20M
12 Elfuttaim Villas Project Manager Elfotaem Company E.C.H 27M
13East Foreign Production
FactoryProject Manager
Elsharkia LlDokhan Company
Dr/ Mohamed Rabea
250M
14West Foreign Production
FactoryProject Manager
Elsharkia LlDokhan Company
INFRA Group 250M
15 Grand Hotel Sharm El-Sheikh Project Manager Red Sea Hotels groupEngineering
Office for group120M
16 Zeina For Paper products WProject Manager Ziena Infra Group 75
17Misr Lltamen Company
BuildingProject Manager
Misr Lltamen Company
Dr/ Samer Rabea
28M
Responsibilities :
Past Experience
www.s tark-egypt .com
Ashraf SherifC.F.O
1- Providing and interpreting financial information.
2- Monitoring and interpreting cash flows and predicting future trends.
3- Analyzing change and advising accordingly.
4- Researching and reporting on factors influencing business performance.
5- Conducting reviews and evaluations for cost-reduction opportunities.
6- Managing a company’s financial accounting, monitoring and reporting systems.
7- Liaising with auditors to ensure annual monitoring is carried out.
8- Developing external relationships with appropriate contacts, e.g. auditors, solicitors,
bankers and statutory organizations such as the Inland Revenue.
9- Producing accurate financial reports to specific deadlines.
10- Managing budgets.
11- Arranging new sources of finance for a company’s debt facilities.
12- Keeping abreast of changes in financial regulations and legislation.
22 years Experience in all financial management reports in multinational
construction companies by providing and monitoring cash flows ,analyzing
all financial changes in costing and accounts receivables/payables to specific
deadlines. Preparing budgets by coordination with all departments heads
and study the differences by the accurate.
Responsibilities :
Past Experience
www.s tark-egypt .com
Assignment:
Project DescriptionProject Type Factory
Location Nubaria Cairo /Alex road
Owner LESAFFRE - Egypt
Consultant ECG
Duration 12 Month
Completion Date Oct , 2016
LESAFFRE- EGYPT yeast Factory
Fac
tori
es
| New water treatment 4000 m2 plant including concrete, insulation, finishes and mechanical fixations.
| Loading platform including Steel structure, metal cladding, dock leveler and all relevant civil works.
| All concrete works for chemical and yeast tanks foundations and production area slab on grade including surface chemical flooring finishes.
| All flooring types including (Heavy duty ceramic, epoxy , U-Crete ,paving, interlock and etc).
| Cooling units for cold stores.
| Fence and landscaping.
| Drainage stainless steel piping and trenches network for all the factory areas.
www.s tark-egypt .com
Assignment:
Project DescriptionProject Type Factory
Location Suez - Egypt
Owner VINAVIL Egypt for chemicals
Consultant ECG
Duration 5 Month
Completion Date August , 2016
VINAVIL- EGYPT Acrylic Emulsion factory
Fac
tori
es
| Demolishing the administration building, underground water tank, electrical room, security room and fences
| Site grading of the new purchased land including cut and fill.
| all above packages includes all type of works Architectural, Structural, Electrical ,Light current ,Plumbing & Fire-fighting ,Grading, Infrastructure and piping
| Construction of 300 M.l concrete fence, steel gate and guard room.
| Construction of an underground tunnel between Vinavil East side part of factory and Vinavil west side part of factory crossing the external main road. Work includes excavation in the road between the two parts of vinavil factory, laying of external protecting carbon steel pipes fully assembled with the internal stainless steel AISI 316 process pipes.
www.s tark-egypt .com
Assignment: | Replacing all the sewage and water supply networks for all risers with about 3000 meter length.
| Renovation of existing floors for the next works :
All types of finishing works including (gypsum , wood, glass, porcelain and ceramic tiles, epoxy, vinyl and marble)
All electromechanical works including Electrical, fire alarm, CCTV, Plumbing, Fire-fighting and HVAC works.
Project DescriptionProject Type Hospital
Location Cairo - Egypt
Owner Abo Al-Rish Hospital
Consultant Qasr Al-Ainy Engineering Department
Duration 6 Month
Completion Date Sep , 2016
Abo Al-Rish Children’s Hosiptal renovations
Hosp
ital
www.s tark-egypt .com
Assignment:Our assignment was all finishing works of the first floor of 250 m2, gypsum partitions , glass partitions , carpet tiles, ceilings (wood, gypsum, etc.), doors, , also all electro-mechanical works (HVAC, electric, fire alarm, fire fighting, plumbing, telephone and data) the specs of the work are according to the standard specs of the Smart village company.
Project Description
Project Type Administrative
Location Smart Village - Cairo / Alex Road
Owner MIST
Consultant ECG - Engineering Consultants Group
Completion Date June 2013
MIST Headquarters
Adm
inis
trAt
ive
www.s tark-egypt .com
Assignment:Our assignment was as the following : all finishing works of 400 m2, gypsum partitions , glass partitions , Porcelain tiles, ceilings (wood, gypsum, etc.), doors, , also all electro-mechanical works (HVAC, electric, Access control, CCTV, plumbing, telephone and data) the specs of the work are according to the standard specs of the IATA [ International Air Transport Association ] regulations.
Project Description
Project Type Administrative
Location Mustafa AL- Nahas - Nasr City - Cairo
Owner EGY-Gate Tourism Company
Consultant Dr. Asharf El-Ezaby
Completion Date Sep 2013
EGY-GATE Headquarters
Adm
inis
trAt
ive
www.s tark-egypt .comwww.s tark-egypt .com
Assignment:Our assignment was as the following : all finishing works of 600 m2, masonry works , gypsum partitions , glass partitions , Marble tiles, ceilings (wood, gypsum, Plexi glass , etc.), doors, wall cladding ( Stone , Wood, wall paper , Decorative painting , etc.) ,fixed and loose furniture , also all electro-mechanical works (HAVC, electric, fire fighting, plumbing,CCTV , telephone and data).
Project Description
Project Type Administrative Building
Location New Cairo - Cairo
Owner Dr . Mohamed Sleim Al-AWA
Duration 9 Month
Completion Date Nov 2014
Dr- Mohamed Sleim AL-AWA Headquarters
Adm
inis
trAt
ive
www.s tark-egypt .com
Assignment:Our assignment is renovate the data center floor for Arab investment bank as the following : finishes and all MEP works of one floor of 1200 m2 raised flooring, ceilings (wood, gypsum, etc.), doors, also all electro-mechanical works (HVAC, electric, fire alarm, fire fighting, plumbing, telephone and data).
Project Description
Project Type Banks
Location Down town – CAIRO – EGYPT
Owner Arab Investment bank
Consultant ECG - Engineering Consultants Group
Completion Date Apr 2013
Arab Investment Bank
Ban
ks
www.s tark-egypt .comwww.s tark-egypt .com
Assignment:Our assignment is all finishing works of five typical floors of area 6500 m2 including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings , doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumbing).
Project Description
Project Type Schools
Location Al-Meraaj - New Maadi
Owner QMM
Consultant Dr. Bhaa Mahmoud
Completion Date March 2013
International QMM schools
Scho
olS
www.s tark-egypt .com
Assignment:Our assignment was the all finishing works of the basement of 600 m2 and three typical floors of area 490 m2 / Floor including facades finishes (stone,painting,glass block), marble pattern flooring, ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumbing, telephone and data) .
Project Description
Project Type Residential
Location Elyasmeen compound – Shikh Zayed
Owner Elyasmeen compound – Shikh Zayed
Consultant Albonian Consultant Engineers
Completion Date July 2013
Dr.Hisham Mansour Villa
Resi
den
tia
l
www.s tark-egypt .com
Assignment:Our assignment was the concrete Skeleton and all finishing works of one basement of 450 m2 and five typical floors of area 450 m2/floor including facades finishes (stone, painting,glass block), marble pattern flooring, ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumbing, telephone and data) .
Project Description
Project Type Residential
Location AUC Compound - New cairo
Owner Dr.Ashraf El -Feky
Consultant Dr.Magdy Shaban
Completion Date July 2012
Dr.Ashraf EL- Feky Villa
Resi
den
tia
l
www.s tark-egypt .com
Assignment:Our assignment was the all concrete , finishing, landscape and interior works of the ground , 2 typical floors and penthouse of total area 600 m2 including facades finishes (stone,painting,slate), flooring (Marble, ceramic , HDF, etc.) , ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumbing, CCTV ,telephone and data) .
Project Description
Project Type Residential
Location Ro’ya Compound – 6th of october
Owner Dr.Hatem Badran
Design & build STARK
Duration 8 Month
Completion Date Jan 2015
Dr.Hatem Badran Villa
Resi
den
tia
l
www.s tark-egypt .com
Accidents don’t just happen, they are caused and it usually crop up due to one’s negligence. When accident happen, it entails considerable damages to the company more so on the part of the worker who was hurt and to his family. Hence, the best way to remedy the cause is through strict observance of the precautionary measures and continuous consciousness of Safety.
PURPOSE :
It is the Policy of STARK to provide and maintain a safe and healthy working environment in accordance with best industry practice.
SCOPE :
All permanent and temporary employees as well as others who may be affected by activities in the company project worksite and facilities, including; clients, visitors, contractors and members of the public .
Duties and Responsibilities :
Each employee will be made aware of the company Environment, Health and Safety Policy towards the control of accidents, damage to property and fire and, as an individual, must perform to achieve this end. This section specifies the duties and responsibilities of Management, supervisors, and employees. It is expected that everyone must satisfactorily discharge the duties and responsibilities allocated to him.
Safety Policy
www.s tark-egypt .com
Quality Policy
STARK Quality Statement is to ensure “Customer driven” approach that meets Customer expectations through effective management and performance, excellent co-ordination, increased productivity and greater focus on business objectives .The Project aims to continuously improve its performance by effective involvement of all levels of staff, providing staff with the training, techniques and authority needed to identify and resolve problems and by the establishment, monitoring and periodic review of objectives in relevant areas for the Project team members during the next activities :
* Documents and Data Control.* Purchasing.* Handling, Storage, Packaging and Delivery.* Process Control.* Corrective and Preventive actions.* Inspection and Testing.* Control of inspection, measuring and test equipment.* Training.* Quality Records and Inspection Reports.
www.s tark-egypt .com
Documents and Data Control :
This is to establish the rules and outline the methods to be adopted for ensuring that incoming and outgoing documents, which require traceability, are adequately controlled, so that documents can be appropriately identified, registered, distributed and filed to ensure that the nominated parties receive the current revisions, or information in a known status. Records shall be maintained to demonstrate the traceability of documents.
* Project controlled documents* Method of Implementation* Incoming controlled documents* Stamping of Incoming documents* Receipt Distribution* Identification* Registration* Master copy* Outgoing Documents* Project Controlled Forms* Archiving.
purchasing :
The Project Manager shall issue Material Requisitions on behalf of the Project. The Material Requisition shall be filled in and signed by the Project team member who requests the material specified in the Material Requisition and then signed approved by the Project Manager. The Material Requisition will have full information specifying the required material, quantities required, specifications requirement and the nominated supplier (if nominated in the contract documents) and shall attach all the technical data (if needed) , Consultant Approval to enable the Purchasing Department to make the purchase procedures easily and as mentioned in their purchasing procedures in STARK Quality Plan.
Handling, Storage, Packaging and Delivery
The Project Manager shall make sure that a suitable site store has been constructed within the site office facilities to keep material in a safe condition. Its area shall be enough for storage of material in a safe and correct way to prevent damage or deterioration. Air conditioning shall be provided to the store, if needed, to keep the material at the required temperature as recommended by the manufacturer.
Quality Policy
www.s tark-egypt .com
Process Control:
The Site Engineers shall make sure that site work processes are carried out in a manner that will demonstrate the achievement of Project quality requirements. The following procedures outline the methods to be adopted for the control of site work processes.
* Planning* Workshop drawings* Material Submittal* Working under controlled conditions* Variations/Changes to the work* Verification of completed works
Corrective and Preventive actions
Corrective action shall be carried out for customer’s complaint, reported non-conformance and audit findings.
Preventive actions
Use of appropriate sources of information i.e. process and work operation which affect product quality, internal audit report, rejection analysis, non-conformance report (N.C.R) and customer’s complaint, to detect, analyze and eliminate potential causes of non conformities.
Inspection and Testing.
Inspection and testing shall be carried out to ensure that purchased material conforms to specified requirements in accordance with the Project technical specifications and the International standard specifications.
Control of inspection, measuring and test equipment :
Control of the calibration of the equipment, devices and tools will be done and recorded by the QC – Personnel and a Calibration record shall be maintained as per the quality plan manual.Calibration of measuring and test equipment shall be done internally at the Project site wherever possible following the relevant standard. Unless externally at approved third partyCalibration result & certificates shall be submitted to the consultant for acknowledgement.
www.s tark-egypt .com
Quality Policy
Training
Initial training in the implementation of the quality plan shall be performed by QC-Department to the Project personnel having co-ordination responsibilities. QC department shall ensure that all assigned personnel are qualified by training them to perform the tasks assigned.
Quality Records and Inspection Reports
Records and inspection reports shall be compiled and collated as the works is performed throughout the duration of contract in order to provide objective evidence of the quality verification of work performed.
Records and inspection reports shall be indexed, filed and protected to prevent damage and deterioration or loss.
Experience Certificates
www.s tark-egypt .com
Contact us
Address : 31 th Ebad El-Rahman Towers , Behind shooting club - maadi.
Telephone : +202 27252137 / 38
Fax : +202 27252138
Email : info@stark-egypt.com
Website : www.stark-egypt.com