ST. DISMAS ASSISTED LIVING FACILITY

Project DeliverablesType Occupancy No. of Rooms

Heavy Assisted Single 30

Light Assisted Single 20

Light Assisted Double 50

Project DeliverablesoBuilding Construction

o Living Room- TV, entertainment

o Bed Rooms

o Furniture Setup

oMedical Facility Setup

oGarden

oWalking Track

o Sheltered Connection

ConstraintsoTime Constraint: 7 months

(project duration)

oUnits Constraint: 100 units oLight Assisted: Most of single

occupancy rooms oConnectivity Constraint: New site has to be closer to appropriate location of the building

AssumptionsoHeavy Assisted: Given ->15-30 units Assumed -> 30 units oPopulation: Given -> 110 to 150 Assumed -> 150

Preliminary Level 1 Action PlanoPurchase land

oFinish initial paper works: oland registrationobuilding construction permission,o submit proposal to accreditation board

oDesign heavy & light assisted apartment plan

oConstruct BuildingoFurnish interiorsoSetup Medical FacilityoRecruit Staff

Dr.Fred -Project Manager?• Pros:

oMore control over the project

oDirect supervision

oQuick decision making in critical times

• Cons:

oNot able to completely focus on ALF project

oWill have other organization tasks to perform

oTrade off b/n ALF and other tasks: overloaded

RecommendationAppoint a Project Manager

• Reporting Frequency:

• 2 times/week

• Total: 56+ scheduled reporting

• Give decision making power for items,

which doesn’t require Fred’s direct

involvement