GREEN MILL RUN GREENWAY/BIKEWAY - PHASE 2 EXTENSION

Post on 27-Dec-2021

3 views 0 download

transcript

GREEN MILL RUN GREENWAY/BIKEWAY - PHASE 2 EXTENSIONFROM EVANS PARK TO CHARLES BOULEVARD

CITIZEN’S INFORMATIONAL WORKSHOP MAY 30, 2012

PROPOSED 10’ HIGH-VISIBILITY CROSSWALK

WITH REFUGE ISLAND ON ARLINGTON BOULEVARD

REMOVE EXISTING CROSSWALK

REMOVE EXISTING CROSSWALK

500 YEAR FLOODPLAIN

500 YEAR FLOODPLAIN

100 YEAR FLOODPLAIN

100 YEAR FLOODPLAIN

FEMA FLOODPLAIN

FEMA FLOODPLAIN

CSX R

AILROAD

PROPOSED 10’ HIGH-VISIBILTY CROSSWALK ON EVANS STREET WITH

PEDESTRIAN AMENITIES

PROPOSED 8’ ASPHALT MULTI-USE PATH

PROPOSED 10’ WIDE BOARDWALK

PROPOSED TRAIL HEAD AT CANTERBURY

PROPOSED 8’ ASPHALT MULTI-USE PATH

CONNECTIONGREEN MILL RUN

END PROJECT

CSX RAILROAD

EVANS STREET

CLIFTON STREET

PIRATE’S PLACE APARTMENTS

EAST CAROLINA UNIVERSITY

EVANS PARK

ARLINGTON BOULEVARD

PROPOSED 10’ CROSSWALK ACROSS SCHOOL DRIVEWAY

REMOVE EXISTING 5’ CONCRETE SIDEWALK AND REPLACE WITH 2’ GRASS VERGE AND 10’ WIDE ASPHALT PATH

BEGIN PROJECT

J.H. ROSE HIGH SCHOOL

CONSTRUCT 10’ ASPHALT MULTI-USE PATH WITH 2’ GRASS VERGE AT EXISTING BACK OF CURB ALONG EVANS STREET

SULG

RAV

E RO

AD

CA

NTE

RBU

RY R

OA

D

CHA

RLES

BO

ULE

VARD

FICKLEN DRIVE

PROPOSED 10’ WIDE PEDESTRIAN BRIDGE

PROPOSED 10’ WIDE BOARDWALK

PROPOSED 10’ ASPHALT MULTI-USE PATH WITH 2’ GRAVEL SHOLDER

GREEN MILL RUN GREENWAY, PHASE 1

EAST CAROLINA UNIVERSITY CHALLENGE COURSE

TIE INTO EXISTING PATH

EAST CAROLINA UNIVERSITY ATHLETIC FIELDSMULTI-USE PATH TYPICAL SECTION

0 100 200 400

N