GREEN MILL RUN GREENWAY/BIKEWAY - PHASE 2 EXTENSIONFROM EVANS PARK TO CHARLES BOULEVARD
CITIZEN’S INFORMATIONAL WORKSHOP MAY 30, 2012
PROPOSED 10’ HIGH-VISIBILITY CROSSWALK
WITH REFUGE ISLAND ON ARLINGTON BOULEVARD
REMOVE EXISTING CROSSWALK
REMOVE EXISTING CROSSWALK
500 YEAR FLOODPLAIN
500 YEAR FLOODPLAIN
100 YEAR FLOODPLAIN
100 YEAR FLOODPLAIN
FEMA FLOODPLAIN
FEMA FLOODPLAIN
CSX R
AILROAD
PROPOSED 10’ HIGH-VISIBILTY CROSSWALK ON EVANS STREET WITH
PEDESTRIAN AMENITIES
PROPOSED 8’ ASPHALT MULTI-USE PATH
PROPOSED 10’ WIDE BOARDWALK
PROPOSED TRAIL HEAD AT CANTERBURY
PROPOSED 8’ ASPHALT MULTI-USE PATH
CONNECTIONGREEN MILL RUN
END PROJECT
CSX RAILROAD
EVANS STREET
CLIFTON STREET
PIRATE’S PLACE APARTMENTS
EAST CAROLINA UNIVERSITY
EVANS PARK
ARLINGTON BOULEVARD
PROPOSED 10’ CROSSWALK ACROSS SCHOOL DRIVEWAY
REMOVE EXISTING 5’ CONCRETE SIDEWALK AND REPLACE WITH 2’ GRASS VERGE AND 10’ WIDE ASPHALT PATH
BEGIN PROJECT
J.H. ROSE HIGH SCHOOL
CONSTRUCT 10’ ASPHALT MULTI-USE PATH WITH 2’ GRASS VERGE AT EXISTING BACK OF CURB ALONG EVANS STREET
SULG
RAV
E RO
AD
CA
NTE
RBU
RY R
OA
D
CHA
RLES
BO
ULE
VARD
FICKLEN DRIVE
PROPOSED 10’ WIDE PEDESTRIAN BRIDGE
PROPOSED 10’ WIDE BOARDWALK
PROPOSED 10’ ASPHALT MULTI-USE PATH WITH 2’ GRAVEL SHOLDER
GREEN MILL RUN GREENWAY, PHASE 1
EAST CAROLINA UNIVERSITY CHALLENGE COURSE
TIE INTO EXISTING PATH
EAST CAROLINA UNIVERSITY ATHLETIC FIELDSMULTI-USE PATH TYPICAL SECTION
0 100 200 400
N