MANAGEMEN PROYEK KONSTRUKSI PELABUHAN

TRAINING AHLI TEKNIK PELABUHAN

By : SUMARDI

E-mail: sumardi.port@gmail.com

HP: 0811805207

Update Oktober

2

1.  2000 – 2001 : Procurement of port equipment for Port

Semarang /TPKS (P.I. III) Port Surabaya/ TPS (P.I. III)

2.  2000 – 2001 : New wharf of Kumai, Bagendang (P.I.III)

3.  1998 – 2000 : Extention wharf & container yards of

TPS (P.I.III)

4.  1994 – 1998 : UP urgent rehabilitation project (incl.

port equipment) (OECF/JBIC,IDB,GOI)

5.  1989 – 1992 : The 7th & 9th port project

(ADB,NORDIC,GOI)

6.  1979 – 1987 : Belawan port phase I project

(ADB,KFW,GOI)

7.  1975 – 1978: Project F-27 Belawan port (OECF,GOI)

8.  1977 – 1980 : New port of Sibolga, Gunung Sitoli

(APBN)

9.  1974 – 1977 : New port of Malahayati (APBN)

SUMARDI PENGALAMAN

1.  2014 – sekarang : Komisaris PT. PPI . IPC

2.  2013 – Sekarang : Komisaris PT. OJA/ICTSI

3.  2008 – 2014 : Ketua Umum HAPI

4.  2002 - Sekarang : Konsultan PT. Diagram

5.  2001 - 2002: Komisaris PT. Pelindo III

6.  1999 – 2001 : Komisaris PT. TPS

7.  1998 – 2001 : Dirut PT. Pelindo III

8.  1988 – 1998 : Dirut PT. Pelindo IV

9.  1984 – 1988 : Dirtek PT. Pelindo I

Proyek : Manajemen :

3

MATERI PEMBAHASAN :

PENAJABARAN FUNGSI MANAJEMEN

LATAR BELAKANG KOMPETENSI

KOMPETENSI PIMPINAN / PPK

SUBSTANSI KEGIATAN

CONTOH PENJADWALAN PROYEK

HAL-HAL YANG HARUS DIPERHATIKAN

SARAN PERBAIKAN

PENGALAMAN KEBERHASILAN

SEKILAS PROYEK-PROYEK

PEMAHAMAN

4

TO MANAGE

•  Mengelola •  Mengurus •  menyelengg

arakan

MANAGEMEN

•  Pengelolaan •  Pengurusan •  penyelenggara

an

PROYEK

•  Suatu kegiatan (besar) yang terdiri dari sub-sub kegiatan yang mempunyai awal dan akhir, dengan target waktu, target kualitas/kwantitas, dengan biaya yang akuntabel untuk mencapai tujuan , keluaran dah hasil

1.  PEMAHAMAN

Dalam manajemen, dilakukan fungsi-fungsi : perencanaan, pengorganisasian,

pelaksanaan, pengawasan dan evaluasi.

5

Seorang pemimpin proyek dalam mengelola proyek harus melakukan fungsi-fungsi

manajemen untuk mewujudkan keluaran dan hasil akhir. Dia memproses input

(masukan) yang diperlukan menjadi keluaran dan hasil akhir sesuai ketentuan dan

target yang telah ditetapkan

Dalam proyek konstruksi fasilitas pelabuhan, keluaran/output berupa konstruksi

fasilitas sesuai dengan design dan spesifikasi dan ketentuan lain yang relevan.

Hasil akhir/out come adalah fasilitas yang memenuhi kriteria perencanaan dan design/

spesifikasi dan fungsi pemanfaatan, jasa dan operasionalnya sebagai ditentukan

dalam tujuan proyek.

Manajemen  Proyek  K.P  

•  Pemahaman  dok  pro  §  DIPA  §  Design  &  Spec  §  Gambar-­‐gambar  

•  Pengumpulan  informasi  terkait  §  Material  §  Perlaatan  §  Kordinasi  dengan  

KPA  dan  pihak  terkait  

•  Pembuatan  HPS  §  Info  Material  §  Info  Peralatan  

•  pembuatan  jadwal  pro  

 

•  Membuat  struktur  organisasi  

•  Job  desk  &  tanggung  jawab  

•  Mengisi  SDM  •  Prosedur  proyek  •  Prosedur  delegasian  •  Mee>ng  dan  

pelaporan  

 

•  Kick  off  Mee>ng  dengan  3  pihak  dan  KPA  §  Dok  kontrak  §  Jadwal  detail  §  Metode  kerja  §  Lain-­‐lain  

•  Mee>ng  teknis  •  Mee>ng  non  teknis  •  Ru>n  ke  lapangan    •  Supervisi,  

Melaksanakan  tugas  secara  profesional    

 

•  Laporan  ru>n  ke  KPA  &  Menteri  

•  Dengan  supervisi  •  Pantau  jadwal  •  Pantau  kualitas  •  Laporan  bulanan  •  Laporan  masalah  

 

PERENCANAAN  

PENGORGANISASIAN   PELAKSANAAN  

PENGAWASAN  

FUNGSI-­‐FUNGSI    P4E  /  P.O.E.C.E    

Guna    pembelajaran  proyek  proyek  berikutnya  

EVALUASI  

2. PENJABARAN FUNGSI MANAJEMEN KONSTRUKSI

7

3. LATAR BELAKANG KOMPETENSI

Kompetensi Port

Engineering

Kompetensi Pengalaman Management

Proyek Konstruksi

Port Operation & Maintenance

KNOWLEDGE APPLICATION BUSINESS

Port Development

8

•  Ocean •  Coastal •  River •  Bathy Metric •  Current •  Sedimentation, dredging & reclamation

- •  Chanel, Navigation aids •  Breakwater, slope protection, revetment. •  Basin, turning •  Wharf •  Terminal •  Wharf for floating EQ •  Utilities,installation environment

1. Ocean & Coastal

2. Design of Facilities

3. Planning & Development

Kompetensi mencakup :

9

4. KOMPETENSI PIMPINAN PROYEK

Suatu KEGIATAN yang terdiri dari sub

kegiatan-kegiatan, melibatkan

berbaga disiplin kompetensi, ada

sumber daya, jadwal waktu untuk

mencapai tujuan, kualitas, fungsi

tertentu dengan biaya akuntabel

Proyek - Sumber daya - kualitas/fungsi - Jadwal waktu - Kriteria - Biaya - Nilai tambah

- Pengalaman

- Pembelajaran - Logistik - Pengkaderan - Standarisasi

Proyek Konstruksi

10

Manajemen/ Mengelola Pelabuhan

INPUT

PROSES

OUTPUT

Sumber Daya: §  People §  Money §  Material §  Equipment §  Metode §  Location §  Time

MANAJEMEN Bangunan fasilitas yang

memenuhi kriteria dan

fungsi manfaat dalam

jangka waktu tertentu

dengan biaya yang

akuntable.

OUTCOME

11

MANAJEMEN PROYEK Kompetensi Pimpinan

Proses dan pengelolaan sumber daya menjadi keluaran (hasil) berupa bagunan fasilitas pelabuhan dengan target dan fungsi tertentu.

Target dan fungsi tertentu : kuantitas, kualitas, dan fungsi /manfaat tertentu dengan biaya waktu tertentu.

Fasilitas pelabuhan yang

berkualitas, memenuhi fungsi manfaat, dalam

jangka waktu yang ditentukan dengan biaya

yang akuntabel.

Controlable •  People •  Metode •  Regulasi •  Kontrak •  Konsultan •  kontraktor •  Dana •  Lokasi

Semi Controlable •  Material •  Peralatan

Uncontrolable •  Cuaca •  Logistik •  kondisi

lapangan/alam

•  Merencanakan •  Membagi tugas •  Komunikasi •  Koordinasi •  Memecahkan masalah •  Mengambil keputusan •  Memonitor pelaksanaan •  Pengawasan •  Evaluasi

INPUT PROSES/

KEPEMIMPINAN OUTPUT MANFAAT

12

SISTEM MANAJEMEN Menentukan Determine

Satisfy Memuaskan

Kebutuhan NEED

Stake Holder Kapal dan

Kargo

Proses Pekerjaan WORKS/

Management

Hasil

RESULT Why

How What

Menghasilkan Achieve

Dictate Mendikte

BANGFASPEL

13

Kompetensi PPK/Pengelola Proyek

n  Dedikasi, minat, semangat

n  Pembelajaran menuju profesional

n  Tekad praktek memimpin

n Minimal dibantu 3 staff : staf lapangan, kebendaharaan dan administrasi

n  Selayaknya tidak merangkap tugas

14

1.  Memahami deskripsi proyek DIPA

2.  Memahami skala, volume proyek

3.  Memahami karakteristik pekerjaan

4.  Memonitor jadwal kegiatan

5.  Memonitor progres pekerjaan

6.  Memonitor pembayarankepada konsultan maupun kontraktor

7.  Segera melapor kepada atasan manakala ada hambatan yang tidak bisa diatasi oleh KPA/PPK

Tugas KPA :

15

1.  Membaca laporan materi yang dibuat oleh PPK

2.  Menanyakan hal-hal penting dalam laporan misalnya kalau ada masalah apakah sudah diatasi oleh PPK, konsultan ataupun kontraktor

3.  Ikut rapat bulanan proyek

4.  Sekali-kali melihat ke lapangan dan memberikan masukan yang diperlukan

5.  Membantu kelancaran pelaksanaan proyek

Pengawasan KPA :

16

1.  Memahami dan menghayati seluk beluk proyek yang tercantum dalam semua dokumen proyek DIPA yang menjadi wilayah tanggung jawabnya.

2.  Mempelajari semua dokumen yang inti maupun yang relevan

3.  Menghayati inti manajemen, perencanaan, pengorganisasian, pelaksanaan, pengawasan/evaluasi

Tugas PPK :

4. Membuat perencanaan proyeknya, termasuk penjadwalan proyek

5. Melakukan pembayaran termin

Planning Organizing executing controlling

EVALUATION

17

1.  Aktif mengawasi jalannya proyek, memantau jadwal

2.  Ikut memastikan bahwa posisi dan arah dermaga sudah benar

3.  Aktif bersama konsultan mengawasi kualitas beton sesuai standar melalui test laboratorium dan lain lain, pemancangan tiang apakah setting sesuai dengan beban design

4.  Mengatasi masalah teknis pekerjaan

5.  Membaca laporan bulanan oleh konsultan

6.  Memimpin rapat teknis, mingguan, bulanan

7.  Membahas hal diluar pekerjaan, yang mempengaruhi jalannya proyek

8.  Bersama konsultan membuat laporan akhir

Pengawasan PPK :

18

1.S

2.S I

3.D

4.T

5.C

6.S

EXCELLENT/ COMPLETED

PROJECT Quality, time,

cost

OWNER CONSULTANT

OWNER

5. SUBSTANSI KEGIATAN

Siklus Rangkaian Kegiatan :

PROJECT MANAGEMENT (lanjutan)

1.   S (STUDY)

2.   SI (SURVEY INVESTIGATION)

3.   D (DESIGN)

4.   T (TENDERING)

5.   C (CONSTRUCTION)

6.   S (SUPERVISION)

20

DESKRIPSI : 1. STUDY (Pengembangan Pelabuhan)

Suatu IDE, KONSEP yang tersusun dengan sistematis atas pelabuhan terminal dan fasilitas, jasa yang akan dibangun, disediakan dengan tujuan melayani, menyesuaikan dengan demand pasar, perdagangan, logistik dan transportasi.

Kesimpulan dan rekomendasi akan diperoleh dengan melakukan pengumpulan data, informasi prospek ekonomi dan financial, kondisi geografi dan alam , data informasi engineering awal yang dibutuhkan.

Memenuhi ketentuan UU dan perijinan (Kem Hub) dilakukan studi yang berkaitan dengan AMDAL antara lain ; analisis dampak, RKL, RPL, UPL dan lain-lain.

20

21

1. S (STUDY ) OWNER & CONSULTANT

n  TUJUAN DAN LINGKUP

n  PROSPEK

n  KONSEP DASAR

n  LAY OUT TENTATIF, MASTERPLAN

n  KONDISI MATERIAL

n  KUARY, SUMBER PASIR URUGAN

n  TOPOGRAFI

n  PENGAMATAN GELOMBANG

n  BATIMETRI, PASANG SURUT

n  KARAKTER ARUS DAN SEDIMENTASI

n  PERKIRAAN BIAYA

n  KELAYAKAN TAHAP I

n  LAPORAN AKHIR

n  STUDI YANG BERKAITAN DENGAN AMDAL ANTARA LAIN : •  ANALIS DAMPAK, RKL, RPL, UKL DAN

LAIN-LAIN

22

DESKRIPSI : 2. SURVEY INVESTIGATION

22

Kegiatan pengumpulan data informasi baik literatur maupun lapangan geografis, kondisi alam, rupa bumi, teknik pantai, hidografi, bathimetri, oceaonografi, sifat dan daya dukung tanah guna membuat design bangunan fasilitas pelabuhan merujuk pada hasil rekomendasi studi.

23

2. S I (SURVEY INVESTIGATION) OWNER + CONSULTANT

n  GELOMBANG

n  ARUS

n  PASANG SURUT

n  SEDIMENTASI

n  BATHIMETRI

n  TOPOGRAFI

n  SURVEY YANG BERKAITAN DENGAN STUDI AMDAL

23

24

2. S I (SURVEY INVESTIGATION) OWNER + CONSULTANT

n  TANAH/SOIL o BORING o SONDIR SPT o KONSOLIDASI TEST o LABORATORIUM o TEST PANCANG

n  LAPORAN/SOIL REPORT

n  LAHAN o KEPEMILIKAN, PENGUASAAN o JAMINAN HUKUM o KUALITAS, JUMLAH PASIR o LAPORAN

n  AMDAL, LANJUTAN

25

DESKRIPSI: 3. DESIGN

Suatu rancang bangun fasilitas/struktur pelabuhan yang disusun berdasarkan Kriteria, yang lazim, perhitungan , gambar-gambar dan spesifikasi teknis. Dengan tujuan, fungsi sesuai dengan rekomendasi studi, mengacu pada informasi dan data yang relevan yang diperoleh sebelumnya.

Sebagian dokumen rancang bangun merupakan bagian dari dokumen tender yang akan di lelangkan.

Penyelesaian proses studi AMDAL dan perijinan.

26

3. D (DESIGN) SWAKELOLA/KONSULTAN

n  LAY OUT RINCI

n  KRITERIA DESIGN

n  KRITERIA OPERASI

n  DESIGN STRUCTURE – MENGACU HASIL STUDI DAN SURVEY

n  ALUR, DIMENSI DAN ARAH ENTRANCE

n  PEMECAH GELOMBANG

n  KOLAM , PUTARAN

n  DESIGN PEKERJAAN DREDGING

n  ALIGNMENT DAN ARAH DERMAGA DAN TINGGI APRON/ELEVASI

n  DESIGN STRUKTUR DERMAGA LENGKAP DAN RINCI

n  METODE KERJA DAN PERALATAN YANG DIANJURKAN

n  JADWAL PEKERJAAN

n  PERHITUNGAN DESIGN

n  RENCANA ANGGARAN

n  LAPORAN DESIGN

n  DOKUMEN LELANG (DRAFT KONTRAK, DRAWING, SPESIFIKASI, MATERIAL YANG DIANJURKAN)

n  DOKUMEN AMDAL YANG TELAH DI SAHKAN

27

Gambar Design Dermaga Minimal memuat:

n  Peta lokasi yang jelas, dilengkapi dengan koordinat geografis

n  Masterplan dengan alur dan akses diatas peta laut

n  Peta detail layout diatas peta laut / kontur

n  Lokasi alur

n  Potongan melintang antara lain :

• Konstruksi yang jelas

• Dimensi bagian konstruksi yang jelas

• Gambar / dimensi kedudukan pasang surut air laut

•  Jenis material atas konstruksi

•  Skala ukuran yang jelas

• Gambar-gambar detail yang penting

•  Jumlah gambar potongan melintang cukup untuk memahami gambar design

n  Lain-lain keterangan yang relevan dan merupakan penjelas

28

DESKRIPSI : 4. TENDER

Kegiatan yang bertujuan memilih, menyeleksi kontraktor yang akan ditugaskan untuk melaksanakan konstruksi berdasarkan tender document yang di sah kan, melalui sebuah pelelangan yang transparan dan profesional.

29

4. T (TENDERING) OWNER

n  KESIAPAN KOMITE/PANITIA

n  KESIAPAN KONSULTAN (BILA DIPERLUKAN

n  KRITERIA PQ

n  DAFTAR SINGKAT/SHORT LIST

n  KRITERIA LELANG DAN ATURAN

n  RAPAT LELANG (AANWYZING)

n  EVALUASI

n  RAPAT KLARIFIKASI (JIKA DIPERLUKAN)

n  MENENTUKAN PEMENANG

n  LAPORAN AKHIR

30

DESKRIPSI : 5. CONSTRUCTION

Kegiatan melaksanakan konstruksi berdasarkan dokumen tender, kontrak dan standar acuan yang lazim.

30

31

5. C (CONSTRUCTION) KONTRAKTOR

n  ORGANISASI LAPANGAN

n  PERSONIL YANG BERTANGGUNG JAWAB

n  LAY OUT PROYEK

n  KICK OFF MEETING

n  RE SURVEY & LAY OUT, ALIGNMENT

n  METODE PEKERJAAN

n  JADWAL PEKERJAAN

n  PERLATAN YANG AKAN DIPAKAI, ALAT PANCANG DAN KELENGKAPANNYA DAN PENGOLAH BETON

n  LABORATORIUM

n  MELAKSANAKAN PEKERJAAN

n  PENERAPAN K3 DILAPANGAN

n  BEKERJA SAMA DENGAN KONSULTAN SUPERVISI

n  PENERAPAN STANDAR – STANDAR

n  DOKUMENTASI

n  MEETING TEKNIS DAN BULANAN

n  PEMBUATAN AS BUILT DRAWING

n  BEKERJA SAMA DENGAN KONSULTAN SUPERVISI

32

DESKRIPSI : 6. SUPERVISION

Kegiatan profesional untuk mengawasi, mensupervisi pekerjaan konstruksi berdasarkan kontrak antara kontraktor dengan pemilik proyek.

32

33

6. Sp (SUPERVISION) KONSULTAN

n  ORGANISASI LAPANGAN

n  PERSONIL YANG BERTANGGUNG JAWAB

n  KICK OFF MEETING

n  PEMAHAMAN KONTRAK, SPESIFIKASI

n  METODE PEKERJAAN

n  RAPAT BULANAN, LAPORAN

n  LAPORAN TEKNIS

n  PROGRESS PEKERJAAN

n  LAPORAN TENAGA KERJA

n  LAPORAN CUACA

n  LAPORAN SUPPLY MATERIAL

n  MENGAWASI PEKERJAAN KONTRAKTOR

n  MEMPROSES PEMBAYARAN KEPADA KONTRAKTOR BERDASARKAN ATAS KEMAJUAN PEKERJAAN

n  BEKERJASAMA DENGAN KONTRAKTOR

n  LAPORAN AKHIR KONSULTAN

34

1.  Study  

2.  Survey  InvesRgaRon  

3.  Design  

4.Tender    

5.b.  Supervision   PORT  FACILITIES  

PORT  INDUSTRY  &  BUSINESS  

PORT  OPERATION  

RANGKAIAN  KEGIATAN  HULU-­‐HILIR  PROYEK  KONSTRUKSI  PELABUHAN  

5.a.  ConstrucRon  

35

36

6. CONTOH PENJADWALAN PROYEK

•  Persiapan

•  Survey ulang lokasi

•  Suply material komponen

•  Mobilisasi peralatan

•  Survey

•  Pelaksanaan konstruksi

•  pemeliharaan

KOMPONEN KEGIATAN : 1. Proses Tender 2.  Kontrak Konstruksi

37

Contoh Merencanakan Jadwal Proyek : 1. Deskripsi proyek 2. Lokasi 3. Dimensi / volume : (1) Pancang –M (2) M2 Dek (3) Asesoris (4) Talud dan lain-lain 4. Waktu : 12 bulan 5. Komponen : tiang pancang, material talud, beton dek, fender 6. Peralatan kunci 7. Rencana jadwal Tahun 3 : Pemeliharaan Tahun 1: Studi & Design Tahun 2 : Tender & Konstruksi

12 Bulan 12 Bulan 6 Bulan Design disahkan

Tender

2 Bulan

Persiapan, mobilisasi

Survey

2 Bulan

Konstruksi

7 Bulan 1 Bulan

Supervisi PERHATIKAN LINTASAN KRITIS PROYEK

Persiapan

Supply

Survey Lay out

pemancangan

Cor balok & dek

asesoris

Pek lapangan & jalan

Pek talud

A.

B.

C. Dirinci oleh kontraktor

PEMAHALAN HARGA

KEKURANGAN VOLUME

TIDAK SESUAI SPESIFIKASI

PEKERJAAN BELUM SELESAI SUDAH DINYATAKAN SELESAI -> HARUSNYA ADA DENDA KETERLAMBATAN

§  Harga satuan pekerjaan pemancangan

§  Pengadaan tiang pancang §  Pengangkatan tiang pancang §  Material : batu, timbunan

§  Mob/Demob §  Direksi Keet §  Pembetonan §  Pengadaan balok girder

Selisih antara volume pekerjaan yg seharusnya dilaksanakan dg kondisi di lapangan

§  Kualitas beton -> Diukur dg Schmidt Hammer TST (Spec : K300 : 30 N/mm2)

§  Test Ultrasonic Pulse Velocity -> Beton encer §  Beton tidak rata karena karena penahan bekisting kurang kuat §  Tiang pancang baja tidak menggunakan Splash Guard

KUTIPAN ATAS ARAHAN DIREKTUR PELABUHAN DAN PENGERUKAN DJPL, PADA ANGKATAN I-IV

38

KRITIS PEMBANGUNAN : -  KUALITAS PEKERJAAN (SPEK TEKNIS) -  VOLUME/RUANG LINGKUP -  MATERIAL ON SITE

WAKTU PELAKSANAAN

PERENCANAAN – STUDI KELAYAKAN/DESAIN/GAMBAR/OWNER ESTIMATE

PELELANGAN

39

DOK. YG DISAHKAN

GAMBAR DESAIN

RKS

-­‐  KRITERIA  PERENCANAAN  -­‐  DATA  PENYELIDIKAN  TANAH  -­‐  DATA  PASANG  SURUT  -­‐  LAYOUT  FASILITAS  -­‐  TAMPAK  DAN  POTONGAN  -­‐  DETAIL  DAN  PERHITUNGAN  

KONSTRUKSI  

40

MENYUSUN  HPS  BERDASARKAN  :  

HARGA  PASAR  SETEMPAT  YAITU  HARGA  BARANG/JASA  DI  LOKASI  BARANG/JASA  DIPRODUKSI/DISERAHKAN/DILAKSANAKAN  

INFORMASI  BIAYA  SATUAN  YANG  DIPUBLIKASIKAN  SECARA  RESMI  OLEH  BPS  

INFORMASI  BIAYA  SATUAN  YANG  DIPUBLIKASIKAN  SECARA  RESMI  OLEH  ASOSIASI  TERKAIT  DAN  SUMBER  LAIN  YG  DAPAT  DIPERTANGGUNGJAWABKAN  

DAFTAR  BIAYA/TARIF  BARANG/JASA  YANG  DIKELUARKAN  OLEH  PABRIKAN/DISTRIBUTOR  TUNGGAL  

INFLASI  TAHUN  SEBELUMNYA,  SUKU  BUNGA  BERJALAN  DAN/ATAU  KURS  TENGAH  BANK  INDONESIA  

PERKIRAAN  PERHITUNGAN  BIAYA  YANG  DILAKUKAN  OLEH  KONSULTAN  PERENCANA  (ENGINEER’S  ESTIMATE)  

NORMA  INDEKS  

INFORMASI  LAIN  YANG  DAPAT  DIPERTANGGUNGJAWABKAN   41

PERSIAPAN  

PEMANCANGAN  

PENGECORAN/BETON  BERTULANG  

TALUD  &  URUGAN  AREAL  DARAT  

PERLENGKAPAN  DERMAGA   42

JENIS  TIANG  PANCANG  

ALAT  PANCANG  

PEMANCANGAN  

PENCATATAN  (KALENDERING)  

CONCRETE SPUN PILE & STEEL PIPE PILE

-  SPESIFIKASI TONGKANG & ALAT -  KAPASITAS -  BERAT HAMMER -  TINGGI JATUH

-  AKURASI TITIK PANCANG -  KEMIRINGAN -  PENYAMBUNGAN -  KONDISI PERAIRAN

-  PENGHENTIAN PEMANCANGAN SAAT FINAL SET TERCAPAI

-  PENGHITUNGAN DAYA DUKUNG TIANG PANCANG

43

44

Tiada resep yang instan, segera terwujud hasilnya. Diperlukan

konsep, keputusan strategis dan aksi manajerial.

8. SARAN PERBAIKAN

1.   Organisasi /institusi OP diperkuat dibidang konstruksi

2.   Dukungan SDM yang sesuai dan kompeten untuk pekerjaan design dan

manajemen konstruksi

3.   Perlu sistem informasi konstruksi

4.   Program yang berkelanjutan

Masukan kepada :

Pemerintah :

Konsep : -  Penguatan organisasi -  Penguatan SDM -  Pembangunan sistem informasi konstruksi -  Peningkatan manajerial dan manajemen

45

5. Ditempat-tempat tertentu, diluar OP perlu semacam SATKER konstruksi untuk

pengawasan

6. Pengambilan keputusan berjenjang dengan cepat, bila ada masalah

7. Peninjauan kembali harga satuan terutama atas pekerjaan yang dipersoalkan

oleh auditor/BPK . Misalnya : pekerjaan pemancangan dilaut, urukan dilaut, dan

lain-lain

8. Perlunya sertifikasi tenaga ahli konstruksi

9. Perlunya standar kontrak jasa konsultan dan kontraktor pekerjaan laut/dermaga

dan lain-lain

10.Perlunya standar engineering procedures

•  Pekerjaan studi, masterplan

•  Pekerjaan design

•  Pekerjaan supervisi

•  Pekerjaan konstruksi

LANJUTAN:

46

1.   Memupuk pengalaman & Kompetensi

2.   Pembelajaran berkelanjutan

3.   Pengkaderan, perekrutan dan peminatan SDM bersertifikat

4.   Sub kontrak bertanggung jawab

5.   Pembuatan construction completion report

1.   Bertanggung jawab

2.   Fokus pekerjaan Konstruksi Pelabuhan

3.   Investasi peralatan Pancang dan beton

4.   Kualitas beton

5.   Pemeliharaan tenaga terampil, kompeten dan bersertifikat

6.   Penyebaran pool/workshop ke daerah

7.   Pembelajaran dari pengalaman menuju profesionalisme

Himbauan Kepada Konsultan :

Himbauan kepada Kontraktor :

47

•  Tersedianya SDM ahli yang bersertifikat di pusat dan penyebarannya di OP dan Satker

•  Terjaminnya kepastian program proyek konstruksi 5 tahun kedepan •  Tersedianya standar-standar

•  Desain

•  Kualitas •  Prosedur kerja •  Pedoman harga satuan pekerjaan •  Profesional konsultan •  Profesional kontraktor

•  Pembelajaran dan pelatihan berkelanjutan

•  Terjaminnya pasar konstruksi bagi konsultan dan kontraktor •  Kepastian berinvestasi dibidang

•  Soil, concrete, equipment & lab •  Peralatan Hydrographic survey

•  Floating EQ. pile driving, barges

TUJUAN AKHIR

•  Kualitas, fungsi fasilitas sesuai jadwal, dan biaya yang akuntabel

48

Komp. Substansi

Komp. Pemimpinan

Komp. Managerial

3 KOMPETENSI MENGELOLA PROYEK

49

1.  Lokasi proyek : Jailolo, Tepa, Kisar, Wonreli, Daruba, Kao, Elat, Kobisonta, Namlea, Seram

2.  Jumlah dermaga : 11 buah

3.  Sumber dana : bantuan Belanda (BI), APBN (KBN/KPN)

4.  Executing Agency : Ditpelpeng

5.  Pembuat design : Ditpelpeng, Tim Design

6.  Pimpinan proyek : Kadiv Teknik Pelabuhan Ambon, Ir. Samsul Ashar Sargo

7.  Kantor proyek : Pelabuhan Ambon

8.  Konsultan Induk supervisi : NEDECO (2 Orang bergantian)

9.  Konsultan partners supervisi : Parama (2 Orang per lokasi)

10.  Kontraktor : PT. Tobiran, PT. Daya Bangun Raya, PT. Teguh Karya Pratama, PT. Modern

Proyek Dermaga Provinsi Maluku Tahun 1985 - 1995

9. PENGALAMAN KEBERHASILAN

50

11. Catatan Penting

a.  Material beton kebanyakan dari pulau lain bahkan dari Palu

b.  Kontraktor memobilisasi alat pancang dan peralatan kerja, laboratorium beton

c.  Struktur dermaga, dek diatas tiang pancang beton persegi, trestel disambung dengan couseway urukan badan jalan.

d.  Konsultan supervisi menugaskan 2 orang dilapangan

e.  Pemantauan /audit rutin oleh Irjen, BPKP, BPK

f.  Kualitas hasil proyek : dermaga, trestle jalan penghubung talud dinilai baik.

g.  Biaya per proyek kurang lebih sama dengan biaya proyek DIP murni

h.  Inspeksi dari Ditpelpeng oleh : -  Ir. Tanjung Indrawan -  Ir. Suwandi Saputro -  Ir. Bambang Ristianto -  Ir Ajiph

-  2 Kali inspeksi oleh Kadit Ir. Sadhu Adisasmita

Lanjutan

51

10. SEKILAS PROYEK-PROYEK :

Proyek-proyek pelabuhan 1974 - 2014

52

1. UPRP Makassar (OECF, GOI, IDB) 1994 - 1998

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

2. Belawan Phase I Project (ADB, KFW, GOI) 1980 - 1987

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

3. Pelabuhan Baru Sibolga (APBN/DIP) 1977-1980

134

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

154

4. Proyek Terminal Kariangau, Balikpapan 2010 - 2012

(APBN, PELINDO IV, PEMDA KALTIM)

155

156

157

158

159

5. Proyek Teluk Lamong Surabaya (PELINDO III)

2010 - 2014

160

5. Proyek Teluk Lamong Surabaya (PELINDO III) 2010 - 2014

161

162

163

164

165

166

167

168

169

170

6. Progress Proyek North Kalibaru Tanjung Priok 2013 - 2017

171  

DEVELOPMENT  OF  NORTH  KALIBARU    CONTAINER  TERMINAL  PHASE  I  

PORT  OF  TANJUNG  PRIOK  

PILING  :  

   JETTY  1A  =    1,276  points    

 CY  1A  =    5,102  points  

   

JETTY AND CY1A PROGRESS

173  

UPPER  STRUCTURE  -­‐  Precast:  

 JETTY  1A  =    674  unit  of  8.401  unit  

 CY  1A  =    3,930  unit  of  41.454  unit  

 

JETTY AND CY1A PROGRESS

174  

VOLUME  :  

 PILING  =    510  points  

       

 

ACCES ROAD PROGRESS

175  

PROCUREMENT OF CSP 800 mm & 1000 mm

176  

CONTAINER TERMINAL 1

177  

TOWER CRANE POSITION

178  

CONTAINER TERMINAL 1

179  

CONTAINER TERMINAL 1

180  

CONTAINER TERMINAL 1

181  

CONTAINER TERMINAL 1

182  

CONTAINER TERMINAL 1

183  

CONTAINER TERMINAL 1

184  

DEVELOPMENT  OF  NORTH  KALIBARU    CONTAINER  TERMINAL  PHASE  I  

PORT  OF  TANJUNG  PRIOK  

DEVELOPMENT  OF  NORTH  KALIBARU    CONTAINER  TERMINAL  PHASE  I  

PORT  OF  TANJUNG  PRIOK  

VIDEO 1

DEVELOPMENT  OF  NORTH  KALIBARU    CONTAINER  TERMINAL  PHASE  I  

PORT  OF  TANJUNG  PRIOK  

VIDEO 2

DEVELOPMENT  OF  NORTH  KALIBARU    CONTAINER  TERMINAL  PHASE  I  

PORT  OF  TANJUNG  PRIOK  

VIDEO 3

VOLUME  :  

   BAMBOO  CLUSTER  =    32,359.00  unit  

   

BREAKWATER

189  

VOLUME  :  

   BAMBOO  MATRESS  =    98,065.00  m2  

   

BREAKWATER

190  

VOLUME  :  

 CORE  OF  ROCK  =    350,263.74  m3  

   

BREAKWATER

191  

CLUSTER BAMBOO FABRICATION

192  

Unloading  CSP  dia.  800  mm  from  Sunway  China  

MATTRESS & CLUSTER BAMBOO

193  

ROCK  PRODUCTION  –  BOJONEGARA  TANJUNG  AWURAN  

ROCK PRODUCTION – TANJUNG AWURAN

194  

ROCK PRODUCTION – CICANDI

195  

ROCK PRODUCTION – GANDASARI

196  

ROCK & A-JACK BOJONEGARA

197  

Unloading  CSP  dia.  800  mm  from  Sunway  China  

BREAKWATER WORKS

198  

BREAKWATER WORKS

199  

Unloading  CSP  dia.  800  mm  from  Sunway  China  

BREAKWATER WORKS

200  

Unloading  CSP  dia.  800  mm  from  Sunway  China  

BREAKWATER WORKS

201  

DEVELOPMENT  OF  NORTH  KALIBARU    CONTAINER  TERMINAL  PHASE  I  

PORT  OF  TANJUNG  PRIOK  

Dredging  Je8y  

Dredging  Basin  

Remarks  :  

Dredging  Channel  

DREDGING WORKS

203  

DREDGING WORKS

VOLUME  :  

 JETTY  1A  =  1,230,800  m3    

 JETTY  1B  =  1,053,417  m3  

 BASIN  =        167,766  m3  

-­‐16  mLWS  

-­‐20  mLW

S  

-­‐16  mLWS  

-­‐15  mLWS  

204  

No  Mafress  Bamboo  

Produc>on  Sat   Volume  

1   Plan     m2   9,107  

2   Up  to  now   m2   10.560  

3   Remain   m2   8,660  

4   Labour   Group   10  

DREDGING WORKS

205  

No  Mafress  Bamboo  

Produc>on  Sat   Volume  

1   Plan     m2   9,107  

2   Up  to  now   m2   10.560  

3   Remain   m2   8,660  

4   Labour   Group   10  

DREDGING WORKS

206  

No  Mafress  Bamboo  

Produc>on  Sat   Volume  

1   Plan     m2   9,107  

2   Up  to  now   m2   10.560  

3   Remain   m2   8,660  

4   Labour   Group   10  

DREDGING WORKS

207  

DREDGING WORKS

208  

DREDGING WORKS

209  

210  210  